Footing
F1
No.
Excavation
conc.work
F2
Excavation
Conc. Work
8
8
Footing reinforcement
F1
10 tor 150 c/c
Bars parallel to length
1.1/0.15= 7+ 1 BAR= 8
Length=1.1-0.15-0.15= 0.8
Bars parallel to breadth
1.1/0.15= 7+ 1 BAR= 8
Length=1.1-0.15-0.15= 0.8
F2
10 tor 150 c/c
Bars parallel to length
1.3/0.15= 8 + 1 Bar = 9
Length= 1.3-0.15-0.15 = 1
Bars parallel to breadth
1.3/0.15= 8 + 1 Bar = 9
Length= 1.3-0.15-0.15 = 1
Surface dressing
Lean Conc
In footing
F1
F2
For plinth beam
H
V
No. of column in
footing
4
8
12
Reinforcement detail
C1
of Height 2.4 m
Length of Lateral Ties
2*(0.41)+4*(0.19)
Spacing 16 Dia 75c/c
Height of column/75
2.4/0.075 = 32 Bar + 1= 33
22
HOOKS= 8*Dia
8*0.016
Total rmft in stirup of 16 Dia
Longitudinal bar length
2.4+.045+1.5+48*0.012(DIA)
7
33
Plinth beams
PB 1
Excavation
H PB 1
VPB 1
2
2
HPB 1
VPB 1
2
2
Conc. Work
Reinf. Of 16 Dia
PB 2
Excavation
VPB 2
VPB 2
Conc Work
Reinf. Of 12 Dia
Roof Beam
RB 1
HRB 1
Reinf. Of 12 Dia
2
6
RB 2
VRB 2
Reinf. Of 16 Dia
9
6
6
Shuttering
Ar of roof
Column
C1
of Height 2.4m
12
Plinth Beam
PB 1
HPB 1
VPB 1
PB 2
VPB 2
Column in footing
F1
F2
10
4
8
Wall
Drawf wall
11
13
Roof Slab
RS 1
14
Flooring
car parking
15
102
29
no walls , no
plaster
L
Quantity
Unit
1.2
1.2
1.6
9.216
cum
1.1
1.1
1.5
7.26
1.4
1.3
1.4
1.3
1.6
1.5
25.088
20.28
Total Excavation
Total Conc. Work
34.304
27.54
cum
cum
No. of Bars
0.8
25.6
0.8
25.6
72
72
16.46
7.26
119.4996
sqm
1.1
1.3
1.1
1.3
0.15
0.15
0.726
2.028
cum
cum
30.46
25.44
0.23
0.23
0.15
0.15
1.05087
0.87768
cum
cum
0.23
0.45
2.4
2.9808
cum
1.708
1240.008
4.521
795.696
1.58
0.128
18.66
6.26
0.23
0.23
0.6
0.6
2.57508
0.86388
cum
cum
30.46
8.52
0.23
0.23
0.6
0.6
4.20348
1.17576
cum
cum
233.88
12.12
0.23
0.45
1.25442
cum
16.92
0.23
0.45
1.75122
cum
101.52
30.46
0.23
0.45
25.38
0.23
0.45
3.15261
cum
182.76
2.62683
cum
152.28
64.4229
sqm
0.23
0.45
2.4
39.168
2*(lh+bh)
30.46
8.52
0.23
0.23
0.6
0.6
36.828
10.5
sqm
sqm
16.92
0.23
0.45
15.435
sqm
1.1
1.3
1.1
1.3
1.5
1.5
Total
26.4
62.4
88.8
sqm
25.38
0.23
0.6
3.50244
cum
15.23
4.23
0.13
8.374977
cum
4.23
431.46
15.23
441.67
15.23
4.23
15.23
0.9
0.6
1746.26
64.4229
sqm
8.2242
cum
.1m added
extra
10
195.2
12
1079.976
16
1626.168
8
1746.26
2* becoz of
bottom and top
Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5 m in depth for
foundation n.exc. 10 sqm on plan and n. exc. 1.5 m depth and getting out in
soft/loose soil.
M/L Treating the bottom and sides of excavation at the rate of 5 litres per sqm of
surface area
Treating the back fill in contact with foundation at the rate of 7.5 litre of emulsion
per sqm of vertical surface
Treating the top surface of filled earth at the rate of 5 litres of emulsion per sqm of
surface.
7
8
Treating the soil along with external perimeter of building at the rate of 2.25 litre
of emulsion per meter of perimeter of wall.
Cement concrete in foundation filling and mass concrete type D2 1:4:8
TMT bars 10 mm dia and over cut to length bent to shape required including
cranking bending spirally for hooping for cloumns hooking ends and binding with
mild steel wire not less than 0.9-0 mm dia
10
11
12
Formwork to soffits of suspended slabs such as roof slabs floor slabs landings and
similar works
13
14
Modular bricks in cement mortar 1:6 with fly ash bricks straight or curved on plan
not exc 6 m mean radius
15
16
Rendering 10mm thick in CM 1:6 finished even and smooth internal plaster
17
Rendering 5mm thick in CM 1:3 to RCC soffits bottom of beams lintal RCC chajjas
slabs etc
18
20-25 mm thick kota stone flooring 600x600 over 20 mm screed in CM1:6 over
100 mm thick PCC Type D2 over 150 mm thick hard core
19
20
21
22
7-8 mm thick non skid ceramic tiles 300x300 mm laid over cement screed in CM
1:4 over 100 mm thick PCC 1:2:4
Roof treatment
Dry distemper
Three coats of white wash on ceiling
23
no plaster ?
Qty
119.4996
Unit
Sqm
Rate
7.9
Amount
944.04684
SSR
3011
38.99738
Cum
115.2
4492.4982
3006
4.32692
Cum
41.7
180.43256
3009
234.78
Sqm
80.6
18923.268
3047
83.85
Sqm
126.8
10632.18
3048
64.4229
Sqm
80.6
5192.4857
3049
119.4996
Sqm
38.6
4612.6846
3051
4.68255
Cum
2303.3
10785.317
4025
4314.376
kg
48.6
209678.67
10034
190.731
Sqm
134.2
25596.1
7004
51.6549
Cum
3482.2
179872.69
4053
64.4229
Sqm
211.5
13625.443
7006
8.374977
Cum
3770
31573.663
4055
3.50244
Cum
255.3
894.17293
5019
Sqm
134.8
Sqm
77.3
14001
Sqm
76.3
Sqm
805.69
Sqm
520.4
13074
Sqm
Sqm
Sqm
300
31.1
11.8
0
0
0
Assessed
15010
15006
64.4229
4915.4673
14001 & 14004
Sqm
Total
11.8
0
521919.13
Add 3% for
unforeseen
items
15657.574
Grand total
537576.7
Plinth area of
building
Plinth area
rate per Sqm
Sqm
#DIV/0!
15006
10
12
16
20
25
0.39
0.61
0.89
1.57
2.46
3.85
1746.26
195.2
1079.976
1626.168
1746.26
195.2
1079.976
1626.168
681.0414
119.072
961.17864 2553.0838
4314.3758