14796 Federal Register / Vol. 72, No.

60 / Thursday, March 29, 2007 / Notices

facilities. The proposed project would application. Submission of a timely filing refers. Any of the above-named
consist of: (1) Two developments, notice of intent to file a development documents must be filed by providing
Development 1, containing (1) a application allows an interested person the original and the number of copies
powerhouse with two turbines and to file the competing application no provided by the Commission’s
generators with a total capacity of 2,962 later than 120 days after the specified regulations to: The Secretary, Federal
kW, and (2) a new 72-inch-diameter, comment date for the particular Energy Regulatory Commission, 888
1,000 to 2,000-foot-long, penstock, and application. A competing license First Street, NE., Washington, DC 20426.
(3) Development 2, containing multiple application must conform with 18 CFR A copy of any motion to intervene must
hydrokinetic turbines located in the 4.30(b) and 4.36. also be served upon each representative
outlet channel of Arkbutla Dam p. Notice of Intent—A notice of intent of the Applicant specified in the
immediately below the discharge point must specify the exact name, business particular application.
of Development 1, and (4) a 69 Kv address, and telephone number of the t. Agency Comments—Federal, state,
transmission line, 500 to 1500-foot-long, prospective applicant, and must include and local agencies are invited to file
connecting the development to the an unequivocal statement of intent to comments on the described application.
switch yard; (5) a switch yard; and (6) submit, if such an application may be A copy of the application may be
a new 69 Kv transmission line, one-to- filed, either a preliminary permit obtained by agencies directly from the
five miles-long, routed to the local application or a development Applicant. If an agency does not file
utility. The project would have an application (specify which type of comments within the time specified for
estimated average annual generation of application). A notice of intent must be filing comments, it will be presumed to
13 gigawatt-hours. served on the applicant(s) named in this have no comments. One copy of an
l. Locations of Applications: A copy public notice. agency’s comments must also be sent to
of the application is available for q. Proposed Scope of Studies under the Applicant’s representatives.
inspection and reproduction at the Permit—A preliminary permit, if issued,
Commission in the Public Reference does not authorize construction. The Philis J. Posey,
Room, located at 888 First Street NE., term of the proposed preliminary permit Acting Secretary.
Room 2A, Washington DC 20426, or by would be 36 months. The work [FR Doc. E7–5763 Filed 3–28–07; 8:45 am]
calling (202) 502–8371. This filing may proposed under the preliminary permit BILLING CODE 6717–01–P
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental DEPARTMENT OF ENERGY
number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the studies, the Applicant would decide Federal Energy Regulatory
document. For assistance, call toll-free whether to proceed with the preparation Commission
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Notice of Application Accepted for
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Filing and Soliciting Motions To
available for inspection and Intervene—Anyone may submit Intervene, Protests, and Comments
reproduction at the address in item h comments, a protest, or a motion to March 23, 2007.
above. intervene in accordance with the Take notice that the following
m. Individuals desiring to be included requirements of Rules of Practice and hydroelectric application has been filed
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211, with the Commission and is available
so indicate by writing to the Secretary 385.214. In determining the appropriate for public inspection:
of the Commission. action to take, the Commission will a. Type of Application: Preliminary
n. Competing Preliminary Permit— consider all protests or other comments Permit.
Anyone desiring to file a competing filed, but only those who file a motion b. Project No.: 12761–000.
application for preliminary permit for a to intervene in accordance with the c. Date filed: December 28, 2006 and
proposed project must submit the Commission’s Rules may become a amended on February 22, 2007.
competing application itself, or a notice party to the proceeding. Any comments, d. Applicant: Hydro Green Energy,
of intent to file such an application, to protests, or motions to intervene must LLC.
the Commission on or before the be received on or before the specified e. Name of Project: Mississippi 3
specified comment date for the comment date for the particular Project.
particular application (see 18 CFR 4.36). application. f. Location: The project would be
Submission of a timely notice of intent Comments, protests and interventions located at the U.S. Army Corps of
allows an interested person to file the may be filed electronically via the Engineers’ existing Grenada Reservoir
competing preliminary permit Internet in lieu of paper; See 18 CFR Dam, on the Yalobusha River, in
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions Grenada, Yalobusha, and Calhoun
the specified comment date for the on the Commission’s web site under ‘‘e- Counties, Mississippi.
particular application. A competing filing’’ link. The Commission strongly g. Filed Pursuant to: Federal Power
preliminary permit application must encourages electronic filing. Act, 16 U.S.C. §§ 791(a)–825(r).
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive h. Applicant Contacts: Mr. James H.
o. Competing Development Documents—Any filings must bear in Hancock, Jr., Batch & Bingham LLP,
Application—Any qualified all capital letters the title 1710 Sixth Avenue North, Birmingham,
development applicant desiring to file a ‘‘COMMENTS’’, AL 35203–2014, (205) 226–3418. Mr.
competing development application ‘‘RECOMMENDATIONS FOR TERMS James R. Kunkel, PhD, P.E., Knight
jlentini on PROD1PC65 with NOTICES

must submit to the Commission, on or AND CONDITIONS’’, ‘‘PROTEST’’, Piesold and Co., 1050 Seventeenth
before a specified comment date for the ‘‘COMPETING APPLICATION’’ OR Street, Suite 450, Denver, CO 80265,
particular application, either a ‘‘MOTION TO INTERVENE’’, as (303) 629–8788.
competing development application or a applicable, and the Project Number of i. FERC Contact: Etta Foster, (202)
notice of intent to file such an the particular application to which the 502–8769.

VerDate Aug<31>2005 17:20 Mar 28, 2007 Jkt 211001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\29MRN1.SGM 29MRN1
Federal Register / Vol. 72, No. 60 / Thursday, March 29, 2007 / Notices 14797

j. Deadline for filing comments, the Commission on or before the motions to intervene must be received
protests, and motions to intervene: 60 specified comment date for the on or before the specified comment date
days from the issuance date of this particular application (see 18 CFR 4.36). for the particular application.
notice. Submission of a timely notice of intent Comments, protests and interventions
The Commission’s Rules of Practice allows an interested person to file the may be filed electronically via the
and Procedure require all intervenors competing preliminary permit Internet in lieu of paper; See 18 CFR
filing documents with the Commission application no later than 30 days after 385.2001 (a) (1) (iii) and the instructions
to serve a copy of that document on the specified comment date for the on the Commission’s Web site under ‘‘e-
each person in the official service list particular application. A competing filing’’ link. The Commission strongly
for the project. Further, if an intervenor preliminary permit application must encourages electronic filing.
files comments or documents with the conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive
Commission relating to the merits of an o. Competing Development Documents—Any filings must bear in
issue that may affect the responsibilities Application—Any qualified all capital letters the title
of a particular resource agency, they development applicant desiring to file a ‘‘COMMENTS’’,
must also serve a copy of the document competing development application ‘‘RECOMMENDATIONS FOR TERMS
on that resource agency. must submit to the Commission, on or AND CONDITIONS’’, ‘‘PROTEST’’,
k. Description of Project: The before a specified comment date for the ‘‘COMPETING APPLICATION’’ OR
proposed project would utilize the U.S. particular application, either a ‘‘MOTION TO INTERVENE’’, as
Army Corps of Engineers’ Grenada Dam, competing development application or a applicable, and the Project Number of
reservoir, and all appurtenant facilities. notice of intent to file such an the particular application to which the
The proposed project would consist of: application. Submission of a timely filing refers. Any of the above-named
(1) Two developments: Development 1, notice of intent to file a development documents must be filed by providing
consisting of (1) a powerhouse application allows an interested person the original and the number of copies
containing two turbines and generators to file the competing application no provided by the Commission’s
with a total capacity of 23,038 kW, and later than 120 days after the specified regulations to: The Secretary, Federal
(2) a new 72-inch-diameter, 1,000 to comment date for the particular Energy Regulatory Commission, 888
2,000-foot-long, penstock; and (3) application. A competing license First Street, NE., Washington, DC 20426.
Development 2, containing multiple application must conform with 18 CFR A copy of any motion to intervene must
hydrokinetic turbines located in the 4.30(b) and 4.36. also be served upon each representative
outlet channel of Grenada Dam p. Notice of Intent—A notice of intent of the Applicant specified in the
immediately below the discharge point must specify the exact name, business particular application.
of Development 1, and (4) a 69 Kv address, and telephone number of the t. Agency Comments—Federal, state,
transmission line, 500 to 1500-foot-long, prospective applicant, and must include and local agencies are invited to file
connecting the development to the an unequivocal statement of intent to comments on the described application.
switch yard; (5) a switch yard; and (6) submit, if such an application may be A copy of the application may be
a new 69 Kv transmission line, one to filed, either a preliminary permit obtained by agencies directly from the
five miles-long, routed to the local application or a development Applicant. If an agency does not file
utility. The project would have an application (specify which type of comments within the time specified for
estimated average annual generation of application). A notice of intent must be filing comments, it will be presumed to
101 gigawatt-hours. served on the applicant(s) named in this have no comments. One copy of an
l. Locations of Applications: A copy public notice. agency’s comments must also be sent to
of the application is available for q. Proposed Scope of Studies under the Applicant’s representatives.
inspection and reproduction at the Permit—A preliminary permit, if issued,
Commission in the Public Reference does not authorize construction. The Philis J. Posey,
Room, located at 888 First Street NE., term of the proposed preliminary permit Acting Secretary.
Room 2A, Washington DC 20426, or by would be 36 months. The work [FR Doc. E7–5764 Filed 3–28–07; 8:45 am]
calling (202) 502–8371. This filing may proposed under the preliminary permit BILLING CODE 6717–01–P
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental DEPARTMENT OF ENERGY
number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the studies, the Applicant would decide Federal Energy Regulatory
document. For assistance, call toll-free whether to proceed with the preparation Commission
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Notice of Application Accepted for
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Filing and Soliciting Motions To
available for inspection and Intervene—Anyone may submit Intervene, Protests, and Comments
reproduction at the address in item h comments, a protest, or a motion to March 23, 2007.
above. intervene in accordance with the Take notice that the following
m. Individuals desiring to be included requirements of Rules of Practice and hydroelectric application has been filed
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211, with the Commission and is available
so indicate by writing to the Secretary and 385.214. In determining the for public inspection:
of the Commission. appropriate action to take, the a. Type of Application: Preliminary
n. Competing Preliminary Permit— Commission will consider all protests or Permit.
jlentini on PROD1PC65 with NOTICES

Anyone desiring to file a competing other comments filed, but only those b. Project No.: 12762–000.
application for preliminary permit for a who file a motion to intervene in c. Date filed: December 28, 2006 and
proposed project must submit the accordance with the Commission’s amended on February 22, 2007.
competing application itself, or a notice Rules may become a party to the d. Applicant: Hydro Green Energy,
of intent to file such an application, to proceeding. Any comments, protests, or LLC.

VerDate Aug<31>2005 17:20 Mar 28, 2007 Jkt 211001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\29MRN1.SGM 29MRN1