DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY 157.205 of the Commission’s
Regulations under the Natural Gas Act Federal Energy Regulatory Federal Energy Regulatory (NGA) (18 CFR 157.205) a protest to the Commission Commission request. If no protest is filed within the [Docket No. EL07–34–000] [Docket No. CP07–82–000] time allowed therefore, the proposed activity shall be deemed to be Entergy Gulf States, Inc.; Notice of Florida Gas Transmission Company, authorized effective the day after the Petition for Declaratory Order LLC; Notice of Request Under Blanket time allowed for protest. If a protest is Authorization filed and not withdrawn within 30 days February 15, 2007. after the time allowed for filing a February 16, 2007. protest, the instant request shall be Take notice that on January 24, 2007, Entergy Gulf States, Inc. (EGSI) Take notice that on February 6, 2007, treated as an application for submitted a petition requesting that the Florida Gas Transmission Company, authorization pursuant to section 7 of Commission issue a declaratory order LLC (FGT), 5444 Westheimer Road, the NGA. finding that the payment of one or more Houston, Texas 77056, filed in Docket The Commission strongly encourages dividends out of paid-in capital by EGSI No. CP07–82–000, a prior notice request electronic filings of comments, protests, to its parent, Entergy Corporation, under pursuant to sections 157.205 and and interventions via the Internet in lieu the facts and circumstances described in 157.210 of the Federal Energy of paper. See 18 CFR 385.2001(a) (1) (iii) the petition, will not violate Section Regulatory Commission’s regulations and the instructions on the 305(a) of the Federal Power Act. under the Natural Gas Act to construct, Commission’s Web site (http:// Any person desiring to intervene or to own, and operate a 6.64 mile loop of www.ferc.gov) under the ‘‘e-Filing’’ link. protest this filing must file in FGT’s existing 30-inch mainline, located in Clay County, Florida, all as more Magalie R. Salas, accordance with Rules 211 and 214 of Secretary. the Commission’s Rules of Practice and fully set forth in the application, which is on file with the Commission and open [FR Doc. E7–3215 Filed 2–23–07; 8:45 am] Procedure (18 CFR 385.211, 385.214). Protests will be considered by the to public inspection. The filing may also BILLING CODE 6717–01–P
Commission in determining the be viewed on the Web at http://
appropriate action to be taken, but will www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the DEPARTMENT OF ENERGY not serve to make protestants parties to the proceeding. Any person wishing to last three digits in the docket number field to access the document. For Federal Energy Regulatory become a party must file a notice of Commission intervention or motion to intervene, as assistance, contact FERC at appropriate. Such notices, motions, or FERCOnlineSupport@ferc.gov or call [Docket No. ER07–546–000] protests must be filed on or before the toll-free, (886) 208–3676 or TYY, (202) 502–8659. ISO New England, Inc.; Notice of Filing comment date. Anyone filing a motion to intervene or protest must serve a copy Specifically, FGT proposes to February 20, 2007. of that document on the Applicant and construct approximately 6.64 miles of Take notice that on February 15, 2007, all the parties in this proceeding. 30-inch pipeline loop (East Leg ISO New England, Inc. (ISO–NE) filed a The Commission encourages Expansion), and in accordance with the package of revisions to its Market Rules electronic submission of protests and U.S. Department of Transportation to implement the Forward Capacity interventions in lieu of paper using the safety requirements, FGT will install Market (FCM) Settlement Agreement ‘‘eFiling’’ link at http://www.ferc.gov. one new mainline valve, in Clay approved by the Commission in Devon Persons unable to file electronically County, Florida. FGT states that the Power LLC, 115 FERC ¶ 61,340, order should submit an original and 14 copies proposed pipeline is an extension of on reh’g, 117 FERC ¶ 61,133 (2006). of the protest or intervention to the their existing 30-inch mainline. FGT In the portion of this filing docketed Federal Energy Regulatory Commission, estimates the cost of construction to be as Docket No. ER07–546–000, ISO–NE is 888 First Street, NE., Washington, DC $16,000,000. FGT asserts that the East filing the following tariff provisions 20426. Leg Expansion project will provide relating to the FCM: This filing is accessible on-line at incremental firm transportation service • Definitions, and those tariff sheets http://www.ferc.gov, using the capacity of 10,000 MMBtu/d to help related to qualification, Section III.13.1 ‘‘eLibrary’’ link and is available for meet gas requirements for a new electric (effective date requested: February 16, review in the Commission’s Public generation plant that Florida Municipal 2007). Reference Room in Washington, DC. Power Agency is constructing in St. • Changes to the Installed Capacity There is an ‘‘eSubscription’’ link on the Lucie County, Florida. Requirements (ICR) Market Rules Web site that enables subscribers to Any questions regarding the (effective date requested: March 1, receive e-mail notification when a application should be directed to 2007). document is added to a subscribed Stephen T. Veatch, Sr. Director, • Market Rules governing the docket(s). For assistance with any FERC Certificates and Tariffs, Florida Gas Forward Capacity Auction (FCA), Online service, please e-mail Transmission Company, LLC, 5444 Section III.13.2 (effective date requested: FERCOnlineSupport@ferc.gov, or call Westheimer Road, P.O. Box 4967, April 16, 2007) (866) 208–3676 (toll free). For TTY, call Houston, Texas 77210–4967 at (713) The remainder of the proposed tariff (202) 502–8659. 989–2024. provisions filed by ISO–NE have been Comment Date: 5 p.m. Eastern Time Any person or the Commission’s Staff docketed as Docket No. ER07–547–000. on March 2, 2007. may, within 60 days after the issuance Comments, protests and motions to ycherry on PROD1PC64 with NOTICES
of the instant notice by the Commission, intervene or notices of intervention in
Magalie R. Salas, file pursuant to Rule 214 of the Docket No. ER07–546–000 will be due Secretary. Commission’s Procedural Rules (18 CFR on or before March 8, 2007. [FR Doc. E7–3190 Filed 2–23–07; 8:45 am] 385.214) a motion to intervene or notice Parties interested only in the matters BILLING CODE 6717–01–P of intervention and, pursuant to section to be considered in Docket No. ER07–
VerDate Aug<31>2005 16:03 Feb 23, 2007 Jkt 211001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1