Sie sind auf Seite 1von 1

7964 Federal Register / Vol. 72, No.

35 / Thursday, February 22, 2007 / Notices

request to the program contact person evaluate the January 18, 2007 This ROD has been prepared in
listed in this section. recommendations EAC received from accordance with the regulations of the
NIST to federally accredit two voting Council on Environmental Quality (40
VIII. Other Information
system test laboratories and (2) to serve CFR Parts 1500–1508) for implementing
Electronic Access to This Document: the public interest by having the two NEPA and DOE’s NEPA Implementing
You may view this document, as well as federally accredited labs in place Procedures (10 CFR Part 1021). The
all other documents of this Department immediately in order to begin testing accompanying Floodplain Statement of
published in the Federal Register, in voting systems against federal voting Findings has been prepared in
text or Adobe Portable Document system standards and guidelines. With accordance with DOE’s regulations
Format (PDF) on the Internet at the the 2008 elections schedule fast ‘‘Compliance with Floodplain and
following site: http://www.ed.gov/news/ approaching, it is most critical that the Wetland Environmental Review
fedregister. federal voting system testing process Requirements’’ (10 CFR Part 1022).
To use PDF you must have Adobe begin at the earliest possible date. Because the decision differs somewhat
Acrobat Reader, which is available free PERSON TO CONTACT FOR INFORMATION: from the alternatives evaluated in the
at this site. If you have questions about Bryan Whitener, Telephone: (202) 566– EIS, DOE has prepared a Supplement
using PDF, call the U.S. Government 3100. Analysis (SA) (DOE/EIS–0385–SA–1) to
Printing Office (GPO), toll free, at 1– determine whether a supplement to the
* * * * *
888–293–6498; or in the Washington, final EIS is required. DOE has
DC, area at (202) 512–1530. Gracia M. Hillman, determined that the minor modification
Note: The official version of this document Commissioner, U.S. Election Assistance to the Bayou Choctaw expansion site,
is the document published in the Federal Commission. i.e., an increase in capacity of 33 MMB
Register. Free Internet access to the official [FR Doc. 07–809 Filed 2–16–07; 4:21 pm] compared to 20 MMB as described in
edition of the Federal Register and the Code BILLING CODE 6820–KF–M the final EIS, is not a substantial change
of Federal Regulations is available on GPO to the proposed action that is relevant
Access at: http://www.gpoaccess.gov/nara/ to environmental concerns, and there
index.html. are no significant new circumstances or
DEPARTMENT OF ENERGY
information relevant to environmental
Dated: February 16, 2007.
Record of Decision and Floodplain concerns and bearing on the proposed
Deborah A. Price,
Statement of Findings: Site Selection action or its impacts, within the
Assistant Deputy Secretary for Safe and Drug- meaning of 40 CFR 1502.9(c)(1) and 10
Free Schools.
for the Expansion of the Strategic
Petroleum Reserve CFR 1021.314(c). Therefore, a
[FR Doc. E7–3036 Filed 2–21–07; 8:45 am] supplement to the SPR final EIS is not
BILLING CODE 4000–01–P AGENCY: Office of Fossil Energy, U.S. needed.
Department of Energy (DOE). ADDRESSES: The final EIS is available on
ACTION: Record of Decision (ROD). the DOE NEPA Web site at http://
ELECTION ASSISTANCE COMMISSION www.eh.doe.gov/nepa/
SUMMARY: DOE has prepared an
environmental impact statement (EIS) documentspub.html and on the project’s
Sunshine Act Notice
(DOE/EIS–0385), pursuant to the Web site at http://
AGENCY: United States Election National Environmental Policy Act of www.fossil.energy.gov/programs/
Assistance Commission. 1969 (NEPA), to assess the reserves/spr/expansion-eis.html, and the
environmental impacts associated with ROD and SA will be available on both
* * * * *
a proposal to expand the crude oil Web sites in the near future. Copies of
ACTION: Notice of Public Meeting. the final EIS and this ROD and SA may
storage capacity of the Strategic
DATE & TIME: Wednesday, February 21, be requested by contacting Donald
Petroleum Reserve (SPR) from 727
2007, 8 a.m.–8:30 a.m. Silawsky at the Office of Petroleum
million barrels (MMB) to 1 billion
PLACE: Ritz-Carlton Atlanta, 191 barrels, and to fill the Reserve to the full Reserves (FE–47), U.S. Department of
Peachtree Street, NE., Ballroom Pre- authorized volume of 1 billion barrels. Energy, 1000 Independence Avenue,
Function III/IV, Atlanta, Georgia 30303, The proposal was to develop one new SW., Washington, DC 20585, by
(404) 659–0400. storage facility and expand the capacity telephone at 202–586–1892, by
AGENDA: The Commission will consider of two or three existing SPR storage facsimile at 202–586–4446, or by
accrediting iBeta Quality Assurance and facilities. electronic mail at
SysTest Labs LLC. to receive federal After careful consideration of the donald.silawsky@hq.doe.gov.
approval to test voting systems against environmental impacts of the FOR FURTHER INFORMATION CONTACT: For
federal voting system standards and alternatives, along with an evaluation of further information on the site selection
guidelines based upon the SPR distribution capabilities, geological for the expansion of the Strategic
recommendations of the National technical assessments, projected costs, Petroleum Reserve, contact David
Institute of Standards and Technology and operational impacts associated with Johnson at the Office of Petroleum
(NIST) as required by the Help America existing commercial operations, DOE Reserves (FE–42), U.S. Department of
Vote Act (HAVA). has decided to develop a new 160 MMB Energy, 1000 Independence Avenue,
This meeting will be open to the SPR storage facility at Richton SW., Washington, DC 20585, by
public. (Mississippi), expand the storage telephone at 202–586–4733, by
STATEMENT OF EXCEPTION capacity at the existing Bayou Choctaw facsimile at 202–586–7919, or by
CIRCUMSTANCES: This notice of a meeting (Louisiana) SPR facility by 33 MMB, electronic mail at
rwilkins on PROD1PC63 with NOTICES

will not be published in the Federal expand the storage capacity at the david.johnson@hq.doe.gov. For general
Register 7 days prior to the meeting existing Big Hill (Texas) SPR facility by information on the DOE NEPA process,
date. Late notice was unavoidable due 80 MMB, and fill the Reserve to 1 contact Carol Borgstrom, Director, Office
to the combination of two factors: (1) billion barrels of oil as authorized by of NEPA Policy and Compliance (GC–
The time required for EAC to properly Congress. 20), U.S. Department of Energy, 1000

VerDate Aug<31>2005 14:11 Feb 21, 2007 Jkt 211001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\22FEN1.SGM 22FEN1

Das könnte Ihnen auch gefallen