SOUTH PARS FIELD DEVELOPMENT

(PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
Job No. : 99012
Doc No. : INSP 99012 999

INSPECTION & TEST PLAN FOR


ELECTRICAL

Page : 1/23

8700 0004

Rev. 4

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

INSPECTION & TEST PLAN


FOR
ELECTRICAL

07/01/01

ISSUE OF APPROVED FINAL DOCUMENT

M. G. KIM

S. Y. KIM

S. K. AN

21/12/00

ISSUE OF APPROVED FINAL DOCUMENT

M. G. KIM

S. Y. KIM

S. K. AN

20/12/99

APPROVED FOR CONSTRUCTION

M. G. KIM

S. Y. KIM

Y. H. KIM

17/11/99

APPROVED FOR CONSTRUCTION

M. G. KIM

S. Y. KIM

Y. H. KIM

30/09/99

ISSUED FOR APPROVAL

M. G. KIM

S. Y. KIM

Y. H. KIM

REV.

DATE

DESCRIPTION

BY

REVIEWED

APPROVED

TOTAL SOUTH PARS


SOUTH PARS FIELD DEVELOPMENT (PHASE TWO & THREE)

INSPECTION & TEST PLAN FOR


ELECTRICAL

DOCUMENT TITLE

INSP 99012 999 8700 0004

IAFD

NONE

DOCUMENT No.

REV

STATUS

SCALE

2
CLASS

1/23
PAGE

SOUTH PARS FIELD DEVELOPMENT


(PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
Job No. : 99012
Doc No. : INSP 99012 999

INSPECTION & TEST PLAN FOR


ELECTRICAL

Page : 2/23

8700 0004

Rev. 4

TABULATION OF REVISED PAGES


PAGE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Rev.1

Rev.2

Rev.3

X
X
X

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

X
X

X
X

X
X
X
X
X
X
X

X
X

Rev.4

Rev.1
45
46
47
X
48
X
49
X
50
X
51
X
52
X
53
X
54
X
55
X
56
X
57
X
58
X
59
X
60
X
61
X
62
X
63
X
64
X
65
X
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
SOUTH PARS FIELD DEVELOPMENT
(PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES
PAGE

Rev.2
X
X
X
X
X

Rev.3

Rev.4

INSPECTION & TEST PLAN FOR


ELECTRICAL

Job No. : 99012


Doc No. : INSP 99012 999

Page : 3/23

8700 0004

Rev. 4

CONTENTS
A. EARTHING AND LIGHTNING INSTALLATION ----------------------------------------

PAGE 4

B. CABLE LADDER INSTALLATION ---------------------------------------------------------

PAGE 6

C. CABLE INSTALLATION ----------------------------------------------------------------------

PAGE 8

D. EQUIPMENT INSTALLATION --------------------------------------------------------------

PAGE 11

E. LIGHTING AND SMALL POWER INSTALLATION -----------------------------------

PAGE 18

F. HEAT TRACING INSTALLATION ---------------------------------------------------------

PAGE 20

G. CATHODIC PROTECTION INSTALLATION -------------------------------------------

PAGE 22

H. TELECOMMUNICATION INSTALLATION ---------------------------------------------

PAGE 23

NOTE :
COMPANY reserves the right to increase surveillance from SW to W and from W to H
depending on results of site surveillance activities.
COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance
of the Activity

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :
Earthing and Lightning Installation

NO.

DESCRIPTION OF INSPECTION / TEST

EARTHING AND LIGHTNING INSTALLATION

Material Verification(Receiving Inspection)

1.1

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

RP 5561V 999
1630 029

QP 550 002

Verify the Material Type/Size/Quantity

1.2

Check the Damage

1.3

Review the Test Report

PP 99012 999
0001 550

INSP 99012 999 8700 0004

PAGE

4 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

SW

SW

SW

SW

Earthing Installation

RP 5561V 999
1620 001

2.1

Cable Type/Size

Related DWG

SW

SW

2.2

Location & Routing

SP-COM-511

SW

SW

2.3

Bolts and Nuts Tighting

Related STD
: IEC 364

SW

SW

SW

SW

2.4 Compression Type Connection


LEGEND :
R : Review
SW : Spot Witness

CPX26

W : Witness
H : Hold
FORM NO. QP 545 002 2

REMARK

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :
Earthing and Lightning Installation

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

INSP 99012 999 8700 0004

PAGE

5 OF 23

PARTICIPATION BY

REPORTING
FORMAT

SUBCON

HDEC/
TPA

COMPANY

TPX26

SW

SW

REMARK

Test

3.1

Continuity Test

3.2

Earthing Resistance Test

LEGEND :

R : Review

RP 5561V 999
1620 001

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

NO.

DESCRIPTION OF INSPECTION / TEST

REPORTING
FORMAT

QP 550 002

PAGE

Cable Ladder Installation


APPLICABLE SPEC.
OR PROCEDURE

INSP 99012 999 8700 0004

6 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

SW

Check the Damage & Sharp Edge

SW

Review the Related Document

SW

SW

SW

SW

SW

CABLE LADDER INSTALLATION

Material Verification(Receiving Inspection)

PP 99012 999
0001 550

Verify the Material Type/Size/Quantity

Related DWG

Cable Ladder Installation

CPX30
Related DWG

Proper Type / Size


Cable Ladder Location / Routing
Cable Ladder Damage, Sharp Edge, Burr
1.1
1.2

RP 5561V 999
1630 007
RP 5561V 999
1620 001

REMARK

1.3
2
2.1
2.1
2.3

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Cable Ladder Installation


NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
7 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

Support(Type/Size/Welding/Anchoring )

SW

Coating(touch up paint) on cut end & damage


Portions

SW

Earthing / Bonding

SW

SW

Final Inspection

2.4
2.5
2.6
2.7
LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Cable Installation

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
8 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

CABLE INSTALLATION

Material Verification(Receiving Inspection)

1.1

Verify the Material Type/Size/Quantity

1.2

Check the Cable Damage

1.3

Review the Related Test Record

RP 5561V 999
1630 029

QP 550 002
-

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

PP 99012 999
0001 550

Cable Installation

2.1

Cable Type / Size / Routing

Related DWG

CPX08
(HV cable)

2.2

Cable Arrangement

RP 5561V 999
1630 007

CPX09(LV
power/control)

2.3

Cable Damage

2.4 Cable Pulling Tension


LEGEND : R : Review

SW : Spot Witness

RP 5561V 999
1630 008
W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Cable Installation

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
9 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

2.5

Cable Installation(In Cable Trenches)

RP 5561V 999
1630 029

- Cable Trenches Preparation

- Cable Segregation

SW

- Sand Bedding and Depth

SW

SW

SW

SW

SW

SW

Cable Termination
CPX08
(HV cable)

3.1

Crimping Lug or Plug Size / Bolting

3.2

Cable Bending Radius

3.3

Gland , Fitting

SW

SW

3.4

ID Marker & Wire ID Marker

SW

SW

3.5

Cable Splicing( If required )

LEGEND :

R : Review

CPX09(LV
power/control)

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Cable Installation

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
10 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

Cable Test
SP-COM-511

4.1

Above 1000V Cable

TPX08
RP 5561V 999
1630 029

- Continuity Test

4.2

- Insulation Resistance Test

- High-Voltage Test

- Continuity Test

- Insulation Resistance Test

Up to 1000 V Cable

LEGEND :

R : Review

TPX09

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Equipment Installation
NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
11 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

EQUIPMENT INSTALLATION

Equipment Verification(Receiving Inspection)

RP 5561V 999
1630 007

QP 550 002

Verify the Equipment Type/Size/Quantity


Check the Physical Damage

PP 99012 999
0001 550

Review the Related Document


Generator Installation

Related DWG

Foundation/Level/Alignment

RP 5561V 999
1630 033

SW

SW

SW

CPX01

Anchor Bolt Setting


Vendor Spec
Physical Damage/Loose Parts
1.1
1.2
1.3
2
2.1
2.2
2.3
LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold

FORM NO. QP 545 002 2


SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

NO.

DESCRIPTION OF INSPECTION / TEST

REPORTING
FORMAT

PAGE

Equipment Installation
APPLICABLE SPEC.
OR PROCEDURE

INSP 99012 999 8700 0004

12 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

2.4

Earthing / Bonding

2.5

Cleaning

SW

SW

2.6

Electrical Test

SW

SW

SP-COM-511

TPX01

RP 5561V 999
1630 007

CPX02

Power Transformer Installation

3.1

Location/Foundation/Level/Alignment

3.2

Anchor Bolt Setting

3.3

Physical Damage/Loose Parts

RP 5561V 999
1630 021
Vendor Spec

3.4

Bushing joint / Seal

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold

REMARK

FORM NO. QP 545 002 2


SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)
EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Equipment Installation

NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
13 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

3.5

Oil Level / No Leak

3.6

Tap change mechanism

SW

3.7

Earthing / Bonding

SW

3.8

Electrical Test

SP-COM-511

- HV Transformer

Vendor Spec

TPX02

TPX03

- LV Transformer

LEGEND :

R : Review

SW : Spot Witness

W : Witness

REMARK

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

NO.

4.

DESCRIPTION OF INSPECTION / TEST

Bus Duct Installation

REPORTING
FORMAT

PAGE

Equipment Installation
APPLICABLE SPEC.
OR PROCEDURE

INSP 99012 999 8700 0004

14 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

SW

SW

SW

REMARK

Related DWG
CPX07

4.1

Bus Duct Location / Routing

RP 5561V 999
1630 007

4.2

Support Type/Foundation/Welding/Anchoring

4.3

Bus Duct Level / Alignment

SW

SW

4.4

Bus Bar Connection(Bolt tighting)

4.5

Earthing / Bonding

SW

4.6

Cleaning

SW

SW

4.7

Electrical Test

Vendor Spec

LEGEND :

R : Review

SP-COM-511

SW : Spot Witness

W : Witness

TPX07

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

REPORTING
FORMAT

HV/LV SWITCHGEAR/MCC Installation

Related DWG

CPX04(HV)

5.1

Location / Level / Foundation

RP 5561V 999
1630 007

CPX05(LV)

5.2

Support /Welding/Anchoring/Bolting

5.3

Alignment of Total Board

5.4

Bus Bar Connection

5.5

Physical Damage

5.6

NO.

DESCRIPTION OF INSPECTION / TEST

PAGE

Equipment Installation
APPLICABLE SPEC.
OR PROCEDURE

INSP 99012 999 8700 0004

15 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

SW

SW

SW

SW

SW

SW

SW

SW

Earthing / Bonding

SW

5.7

Mechanical operation & CTs data

5.8

Cleaning

TPX04(HV)

SW

SW

TPX05(LV)
H : Hold

RP 5561V 999
1630 022
RP 5561V 999
1630 023

REMARK

Vendor Spec

5.9 Electrical Test


LEGEND : R : Review

SW : Spot Witness

SP-COM-511
W : Witness

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

NO.

DESCRIPTION OF INSPECTION / TEST

Battery/Charger/Inverter Installation

Related DWG

6.1

Location / Level / Foundation

RP 5561V 999
1630 007

6.2

Support /Welding/Anchoring/Bolting

6.3

Number of Cells Inter-connected

6.4

Polarity of Interconnections between Cells

6.5

Bolts, Nuts Washer Assembly Tighting

6.6

Physical Damage

REPORTING
FORMAT

PAGE

Equipment Installation
APPLICABLE SPEC.
OR PROCEDURE

INSP 99012 999 8700 0004

16 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

SW

SW

SW

SW

SW

SW

SW

REMARK

CPX16/17

RP 5561V 999
1630 025
RP 5561V 999
1630 026
Vendor Spec
SP-COM-511

6.7

Earthing / Bonding

SW

6.8

Cleaning

SW

SW

6.9 Electrical Test


LEGEND : R : Review

SW : Spot Witness

W : Witness

TPX16/17
H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

NO.

DESCRIPTION OF INSPECTION / TEST

Miscellaneous Equipment Installation


(LV DB, Control Station, NER, Control Panel,
etc)

Related DWG

REPORTING
FORMAT

PAGE

Equipment Installation
APPLICABLE SPEC.
OR PROCEDURE

INSP 99012 999 8700 0004

17 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

SW

SW

SW

SW

SW

SW

REMARK

CPX06/15/21/
23/24/32

RP 5561V 999
1630 007

7.1

Name Plate

7.2

Location / Level / Foundation

7.3

Support /Welding/Anchoring/Bolting

7.4

Bolts, Nuts Washer Assembly Tighting

SW

SW

7.5

MCBs rating

SW

SW

7.6

Physical Damage

SW

SW

7.7

Electrical Test

RP 5561V 999
1630 008
Vendor Spec

LEGEND :

R : Review

SP-COM-511
SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :
Lighting and Small Power Installation

NO.

DESCRIPTION OF INSPECTION / TEST

LIGHTING AND SMALL POWER INSTALLATION

Material Verification(Receiving Inspection)

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

RP 5561V 999
1640 001

QP 550 002

INSP 99012 999 8700 0004

PAGE

18 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

1.1

Verify the Material Type/Size/Quantity

SW

SW

1.2

Check the Physical Damage

SW

SW

1.3

Review the Related Document

SW

SW

Lighting and Small Power Installation

Related DWG

2.1

Lighting Distribution Board Installation

RP 5561V 999
1640 001

CPX 15

2.2

Lighting Fixture / Power Socket / Welding


Socket Installation
- Raceway installation

RP 5561V 999
1630 029

CPX18/19/25

LEGEND :

R : Review

SW : Spot Witness

W : Witness

REMARK

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :
Lighting and Small Power Installation

NO.

DESCRIPTION OF INSPECTION / TEST

- Cable / Wire installation

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

RP 5561V 999
1640 001

- Lighting Fixture / Power Socket / Welding


Socket Installation
- Final inspection

INSP 99012 999 8700 0004

PAGE

19 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

SW

SW

SW

SW

Test
SP-COM-511
Continuity Test
Insulation Resistance Test

TPX18/19/25
RP 5561V 999
1630 029
RP 5561V 999
1640 001

REMARK

3.1
3.2

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Heat Tracing Installation


NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
20 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

HEAT TRACING INSTALLATION

Material Verification(Receiving Inspection)

1.1

Verify the Material Type/Size/Quantity

1.2
1.3

RP 5561V 999
1630 007

QP 550 002
-

SW

Check the Physical Damage

SW

SW

Review the Related Document

SW

SW

Vendor spec

2
2.1

Heat Tracing Installation

RP 5561V 999
1630 007

Heating Cable Installation


- Cable Type / Size / Route
- Cable Tie or Tape Binding

CPX22

Related DWG
Vendor spec

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Heat Tracing Installation


NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
21 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

Accessory(Junction Box, Thermostats, Sensor) Related DWG

SW

SW

Vendor spec
Test
SP-COM-511
Insulation Resistance Test
( Before insulation )

TPX22
RP 5561V 999
1630 007

Insulation Resistance Test


( After insulation)
3.1
3.2

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Cathodic Protection Installation


NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
22 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

CATHODIC PROTECTION INSTALLATION

Material Verification(Receiving Inspection)

1.1

Verify the Material Type/Size/Quantity

1.2

Check the Physical Damage

1.3

Review the Related Document

Cathodic Protection Installation

RP 5561V 999
1630 017, 1300 082

QP 550 002
-

SW

SW

SW

SW

SW

SW

Vendor spec

CPX33
2.1

Anode / Anode Cable Installation

RP 5561V 999
1630 007,1300 082

2.2

Cable connection/bonding

2.3

Test Box, Reference Electrode, etc

Related DWG
Vendor spec
3

Electrical test
- Loop resistance for anode cable
- Potential test for reference cell
LEGEND : R : Review
SW : Spot Witness

SP-COM-511

TPX33

W : Witness

H : Hold
FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)


EPSCC3-CONTRACT NO. TSP/PJ/013
ONSHORE FACILITIES

DISCIPLINE :

INSPECTION & TEST PLAN FOR SITE

SUBCON

ELECTRICAL

ITP No.

Rev. No.

DESCRIPTION OF WORK :

PAGE

Telecommunication Installation
NO.

DESCRIPTION OF INSPECTION / TEST

APPLICABLE SPEC.
OR PROCEDURE

REPORTING
FORMAT

INSP 99012 999 8700 0004

4
23 OF 23

PARTICIPATION BY
SUBCON

HDEC/
TPA

COMPANY

REMARK

TELECOMMUNICATION INSTALLATION
Above item is separated from ITP for electrical.
ITP for telecommunication will be issued later.

LEGEND :

R : Review

SW : Spot Witness

W : Witness

H : Hold
FORM NO. QP 545 002 2