Federal Register / Vol. 72, No.

32 / Friday, February 16, 2007 / Notices 7647

become a party to the proceeding must service please go to http://www.ferc.gov/ a number of typically asked questions,
file a motion to intervene pursuant to esubscribenow.htm. including the use of eminent domain
Rule 214 of the Commission’s Rules of and how to participate in the
Magalie R. Salas,
Practice and Procedures (18 CFR Commission’s proceedings.
Secretary.
385.214). Anyone may intervene in this Summary of the Proposed Project
proceeding based on this Draft EIS. You [FR Doc. E7–2695 Filed 2–15–07; 8:45 am]
must file your request to intervene as BILLING CODE 6717–01–P DTI seeks authority to install and
specified above.1 You do not need operate two new wells, EW–210 and
intervenor status to have your EW–326, located in its Ellisburg Storage
DEPARTMENT OF ENERGY Field. The new wells would replace two
comments considered.
The Draft EIS has been placed in the previously abandoned wells, EW–203
Federal Energy Regulatory and EW–313. The previous well
public files of the FERC and is available Commission
for public inspection at: Federal Energy abandonments were completed under
Regulatory Commission, Public [Docket No. CP07–067–000] DTI’s blanket certificate authorization in
Reference Room, 888 First Street N.E., Docket No. CP06–419–000.
Room 2A, Washington, DC 20426, (202) Dominion Transmission, Inc.; Notice of The new well EW–210 would be
502–8371. Intent To Prepare an Environmental installed approximately 32 feet
A limited number of copies of the Assessment for the Proposed northwest of EW–203, and the new EW–
Draft EIS are available from the Public Ellisburg Replacement Well Project 326 well would be located
Reference Room identified above. In and Request for Comments on approximately 49 feet northeast of EW–
addition, CD copies of the Draft EIS Environmental Issues 313. In addition, DTI would connect the
have been mailed to affected new wells to the existing storage
February 9, 2007.
landowners; various Federal, State, and pipeline network by installing
The staff of the Federal Energy approximately 230 feet of new well
local government agencies; elected Regulatory Commission (FERC or
officials; environmental and public pipeline. The construction and
Commission) will prepare an
interest groups; Native American tribes; operation of the new pipeline would be
environmental assessment (EA) that will
local libraries and newspapers; performed under DTI’s existing blanket
discuss the environmental impacts of
intervenors; and other individuals that certificate authorization in Docket No.
the Ellisburg Replacement Well Project
expressed an interest in the proposed CP82–537–000. The new wells are
involving the installation and operation
Project. Hard-copies of the Draft EIS required to maintain the overall
of two new injection/withdrawal wells
have also been mailed to those who deliverability of the Ellisburg Storage
by Dominion Transmission, Inc. (DTI)
requested that format during the scoping Field.
within its Ellisburg Storage Field
and comment periods for the proposed The general locations of the new wells
located in Potter County, Pennsylvania.1
Project. are shown in Appendix 1.2
This EA will be used by the
Additional information about the Commission in its decision-making Land Requirements
proposed Project is available from the process to determine whether the Construction of the new wells would
Commission’s Office of External Affairs, project is in the public convenience and require about 3.31 acres of land and
at 1–866–208–FERC or on the FERC necessity. includes access roads, staging areas and
Internet Web site (http://www.ferc.gov). This notice announces the opening of extra work areas. Each well site would
To access information via the FERC the public comment period that will be require approximately 1.62 acres.
Web site click on the ‘‘eLibrary’’ link used to gather environmental input from Following construction, about 1.26 acres
then click on ‘‘General Search’’ and the public and interested agencies on would be permanently maintained. The
enter the docket number excluding the the project. Comments are requested by remaining 2.05 acres of land would be
last three digits in the Docket Number March 9, 2007. restored and allowed to revert to its
field. Be sure you have selected an If you are a landowner receiving this
former use.
appropriate date range. The ‘‘eLibrary’’ notice, you may be contacted by a
link provides access to the texts of company representative about the The EA Process
formal documents issued by the acquisition of an easement to construct, The National Environmental Policy
Commission, such as orders, notices, operate, and maintain the proposed Act (NEPA) requires the Commission to
and rulemakings. For assistance with facilities. The company would seek to take into account the environmental
‘‘eLibrary’’, please contact FERC Online negotiate a mutually acceptable impacts that could result from an action
Support at FercOnlineSupport@ferc.gov agreement. However, if the project is whenever it considers the issuance of a
or toll free at 1–866–208–3676, or for approved by the Commission, that Certificate of Public Convenience and
TTY, contact (202) 502–8659. approval conveys with it the right of Necessity. NEPA also requires us to
In addition, the Commission now eminent domain. Therefore, if easement discover and address concerns the
offers a free service called eSubscription negotiations fail to produce an public may have about proposals. This
which allows you to keep track of all agreement, the company could initiate process is referred to as ‘‘scoping’’. The
formal issuances and submittals in condemnation proceedings in main goal of the scoping process is to
specific dockets. This can reduce the accordance with state law. focus the analysis in the EA on the
amount of time you spend researching A brochure prepared by the FERC
proceedings by automatically providing entitled ‘‘An Interstate Natural Gas 2 The appendices referenced in this notice are not
you with notification of these filings, Facility On My Land? What Do I Need being printed in the Federal Register. Copies of all
document summaries and direct links to To Know?’’ is available for viewing on appendices, other than Appendix 2 (map), are
sroberts on PROD1PC70 with NOTICES

these documents. To learn more about the FERC Web site at http:// available on the Commission’s website at the
‘‘eLibrary’’ link or from the Commission’s Public
eSubscription and to sign-up for this www.ferc.gov. This fact sheet addresses Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
1 Interventions may also be filed electronically via 1 DTI’s application was filed with the on connecting to eLibrary refer to the last page of
the Internet in lieu of paper. See the previous Commission under section 7 of the Natural Gas Act this notice. Copies of the appendices were sent to
discussion on filing comments electronically. and Part 157 of the Commission’s regulations. all those receiving this notice in the mail.

VerDate Aug<31>2005 19:03 Feb 15, 2007 Jkt 211001 PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 E:\FR\FM\16FEN1.SGM 16FEN1
7648 Federal Register / Vol. 72, No. 32 / Friday, February 16, 2007 / Notices

important environmental issues. By this paper and save it to a file on your hard included in Appendix 3. If you do not
Notice of Intent, the Commission staff drive. Before you can file comments, return this form, you will be removed
requests public comments on the scope you will need to create an account by from our mailing list.
of the issues to address in the EA. All clicking on ‘‘Login to File’’ and then
Additional Information
comments received are considered ‘‘New User Account.’’ You will be asked
during the preparation of the EA. State to select the type of filing you are Additional information about the
and local government representatives making. This filing is considered a project is available from the
are encouraged to notify their ‘‘Comment on Filing.’’ Commission’s Office of External Affairs,
constituents of this proposed action and The determination of whether to at 1–866–208–FERC or on the FERC
encourage them to comment on their distribute the EA for public comment Internet Web site (http://www.ferc.gov)
areas of concern. will be based on the response to this using the eLibrary link. Click on the
Our 3 independent analysis of the notice. If you are interested in receiving eLibrary link, click on ‘‘General Search’’
issues will be in the EA. Depending on a copy of the EA, please return the and enter the docket number excluding
the comments received during the Information Request form (Appendix 2). the last three digits in the Docket
scoping process, the EA may be An effort is being made to send this Number field. Be sure you have selected
published and mailed to federal, state notice to all individuals affected by the an appropriate date range. For
and local agencies, public interest proposed project. This includes all assistance, please contact FERC Online
groups, interested individuals, affected landowners who are potential right-of- Support at FercOnlineSupport@ferc.gov
landowners, newspapers, libraries and way grantors, whose property may be or toll free at 1–866–208–3676, or for
the Commission’s official service list for used temporarily for project purposes, TTY, contact (202)502–8659. The
this proceeding. A comment period will or who own homes within distances eLibrary link also provides access to the
be allotted for review if the EA is defined in the Commission’s regulations texts of formal documents issued by the
published. We will consider all of certain aboveground facilities. Commission, such as orders, notices,
comments on the EA before we make Becoming an Intervenor and rulemakings.
our recommendations to the In addition, the Commission now
In addition to involvement in the EA offers a free service called eSubscription
Commission.
scoping process, you may want to which allows you to keep track of all
Public Participation become an official party to the formal issuances and submittals in
You can make a difference by proceeding, or ‘‘intervenor’’. To become specific dockets. This can reduce the
providing us with your specific an intervenor, you must file a motion to amount of time you spend researching
comments or concerns about the project. intervene according to Rule 214 of the proceedings by automatically providing
By becoming a commentor, your Commission’s Rules of Practice and you with notification of these filings,
concerns will be addressed in the EA Procedure (18 CFR 385.214). Intervenors document summaries and direct links to
and considered by the Commission. You have the right to seek rehearing of the the documents. Go to http://
should focus on the potential Commission’s decision. Motions to www.ferc.gov/esubscribenow.htm.
environmental effects of the proposal, Intervene should be electronically Finally, public meetings or site visits
alternatives to the proposal (including submitted using the Commission’s will be posted on the Commission’s
alternative locations), and measures to eFiling system at http://www.ferc.gov. calendar located at http://www.ferc.gov/
avoid or lessen environmental impact. Persons without Internet access should EventCalendar/EventsList.aspx along
The more specific your comments, the send an original and 14 copies of their with other related information.
more useful they will be. Please motion to the Secretary of the
Commission at the address indicated Magalie R. Salas,
carefully follow the instructions below
to ensure that your comments are previously. Persons filing Motions to Secretary.
received in time and properly recorded: Intervene on or before the comment [FR Doc. E7–2698 Filed 2–15–07; 8:45 am]
• Send an original and two copies of deadline indicated above must send a BILLING CODE 6717–01–P
your letter to: Magalie R. Salas, copy of the motion to the Applicant. All
Secretary, Federal Energy Regulatory filings, including late interventions,
Commission, 888 First St., NE., Room submitted after the comment deadline DEPARTMENT OF ENERGY
1A, Washington, DC 20426. must be served on the Applicant and all
• Label one copy of the comments for other intervenors identified on the Federal Energy Regulatory
the attention of Gas Branch 3. Commission’s service list for this Commission
• Reference Docket No. CP07–067– proceeding. Persons on the service list [Project No. 12769–000]
000. with email addresses may be served
• Mail your comments so that they electronically; others must be served a Ice House Partners, Inc.; Notice of
will be received in Washington, DC on hard copy of the filing. Application Tendered for Filing With
or before March 9, 2007. Affected landowners and parties with the Commission, Soliciting Additional
The Commission strongly encourages environmental concerns may be granted Study Requests, and Establishing
electronic filing of comments. Please intervenor status upon showing good Procedual Schedule for Licensing and
refer to 18 Code of Federal Regulations cause by stating that they have a clear Deadline for Submission of Final
(CFR) 385.2001(a)(1)(iii) and the and direct interest in this proceeding Amendments
instructions on the Commission’s Web which would not be adequately
represented by any other parties. You do February 9, 2007.
site at http://www.ferc.gov under the ‘‘e-
Filing’’ link and the link to the User’s not need intervenor status to have your Take notice that the following
hydroelectric application has been filed
sroberts on PROD1PC70 with NOTICES

Guide. Prepare your submission in the environmental comments considered.


same manner as you would if filing on with the Commission and is available
Environmental Mailing List for public inspection.
3 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the If you wish to remain on our a. Type of Application: Exemption
environmental staff of the Office of Energy Projects environmental mailing list, please From Licensing
(OEP). return the Information Request form b. Project No.: P–12769–000