Sie sind auf Seite 1von 1

Federal Register / Vol. 72, No.

29 / Tuesday, February 13, 2007 / Notices 6805

Estimated Total Annual Burden control of access (access only at existing surrounding the project study area, to
Hours: Total estimated average annual secondary roads [SRs]) is proposed for discuss concerns regarding the proposed
burden is 14,700 hours. the remainder of the project. The relocation of NC 119. Several project
Public Comments Invited: You are purpose of this project is to relieve newsletters were mailed to the area
asked to comment on any aspect of this traffic congestion in the downtown area, residents and project stake holders
information collection, including: (1) provide access to the local area, and providing updated information about
Whether the proposed collection is provide Alamance County with a the project and showing the location of
necessary for the FHWA’s performance; primary north/south route. The the NC 119 Relocation alternatives being
(2) the accuracy of the estimated proposed action is consistent with the considered. In July 2003, another
burdens; (3) ways for the FHWA to 2030 Long Range Transportation Plan Citizens Informational Workshop was
enhance the quality, usefulness, and for Burlington-Graham Metropolitan held by NCDOT, showing the detailed
clarity of the collected information; and Planning Organization last updated in study alternatives to the public and
(4) ways that the burden could be May 2005. The proposed action is also seeking public input. Afterwards, the
minimized, including the use of consistent with the Burlington-Graham NCDOT decided that an Environmental
electronic technology, without reducing Urbanized Area Transportation Plan Impact Statement would be prepared for
the quality of the collected information. (which the Thoroughfare Plan map is a this project instead of the EA.
The agency will summarize and/or part of) last updated in January 2004.
include your comments in the request In 2004, the NCDOT hired the Wills
Alternatives under consideration
for OMB’s clearance of this information Duncan Group to manage a community
include: (1) The ‘‘no-build’’, (2)
collection. facilitation program for the NC 119
improving existing facility, and (3) three
Relocation project. The intent of this
Authority: The Paperwork Reduction Act limited controlled access highways on
program was to increase citizen
of 1995; 44 U.S.C. Chapter 35, as amended; new location. Letters describing the
involvement and identify the most
and 49 CFR 1.48. proposed action and soliciting
important issues regarding the proposed
Issued On: February 7, 2007. comments were sent to appropriate
Federal, State, and local agencies. A project from the perspective of the
James R. Kabel, various communities within the study
public meeting and meetings with local
Chief, Management Programs and Analysis area. A series of community charettes
Division.
officials and neighborhood groups were
and will continue to be held in the were conducted by the Wills Duncan
[FR Doc. E7–2458 Filed 2–12–07; 8:45 am] Group as part of this program and the
project study area. A public hearing will
BILLING CODE 4910–22–P
also be held. Information on the time result was the formation of the NC 119
and place of the public hearing will be Relocation Steering Committee; a
provided in the local news media. The diverse group of citizens representing
DEPARTMENT OF TRANSPORTATION the neighborhoods and the business
draft EIS will be available for public and
agency review and comment at the time community of the Greater Mebane area.
Federal Highway Administration The primary responsibility of this
of the hearing. A formal scoping
Environmental Impact Statement: meeting was held on February 15, 1994. Steering Committee was to assist in
Alamance County, NC A result of the scoping meeting, as increasing citizen participation in the
well as a meeting held with local transportation decision making process
AGENCY: Federal Highway officials, was an environmental study and to identify the most important
Administration (FHWA), DOT. area comprised of several potential issues regarding the project from the
ACTION: None of Intent. alignment corridors for the relocation of perspective of the local communities.
NC 119. The project study area Due to extensive coordination with the
SUMMARY: The FHWA is issuing this resource agencies, local officials, and
developed from the initial project
notice to advise the public that an the public during the EA and EIS
scoping process was presented to the
environmental impact statement will be process for the NC 119 Relocation
public at two Citizens Informational
prepared for the relocation of highway project, no additional scoping meetings
Workshops, at which time public input
NC 119 in Mebane, Alamance County, will be conducted for the DEIS.
on this study area was received. In
North Carolina (TIP Project U–3109).
addition, NCDOT held several small To ensure that the full range of issues
FOR FURTHER INFORMATION CONTACT: Mr. group meetings with representatives
Clarence Coleman, PE, Operations related to the proposed action is
from the various communities in the addressed and all significant issues are
Engineer, Federal Highway project study area as a way to gain
Administration, 310 New Bern Avenue, identified, comments and suggestions
additional input from residents and are invited from all interested parties.
Suite 410, Raleigh, North Carolina identify ways to minimize community
27601, Telephone: (919) 856–4350, Comments and questions concerning the
impacts. In early 1997, the majority of proposed action should be directed to
Extension 133. the supporting documentation for the the FHWA at the address provided
SUPPLEMENTARY INFORMATION: The Environmental Assessment (EA) was above.
FHWA, in cooperation with the North completed and at that time, the EA was
Caroline Department of Transportation anticipated to be completed in mid (Catalog of Federal Domestic Assistance
(NCDOT), will prepare an environment Program Number 20.205, Highway Research
1997.
impact statement (EIS) on the relocation Planning and Construction. The regulations
In March 1997, NCDOT held a
implementing Executive Order 12372
of NC 119 in Mebane, Alamance meeting where local residents suggested
regarding intergovernmental consultation on
County. The proposed action would be an eastern route for the relocation of NC Federal programs and activities apply to this
the construction of a multi-lane divided 119. Over the course of the next year, program.)
facility on new location from the I–85 NCDOT studied various alternatives that
jlentini on PROD1PC65 with NOTICES

Issued on: February 6, 2007.


interchange southwest of Mebane to would relocate NC 119 to the east side
existing NC 119 near SR 1918 (Mrs. of Mebane. During this process, NCDOT Clarence W. Coleman,
White Lane) north of Mebane. Full conducted several meetings with agency Operations Engineer, Raleigh, North Carolina.
control of access is proposed at the representatives, as well as residents [FR Doc. 07–615 Filed 2–12–07: 8:45 am]
I–85 interchange and limited or partial from the various communities BILLING CODE 4910–22–M

VerDate Aug<31>2005 16:55 Feb 12, 2007 Jkt 211001 PO 00000 Frm 00098 Fmt 4703 Sfmt 4703 E:\FR\FM\13FEN1.SGM 13FEN1

Das könnte Ihnen auch gefallen