Auxiliary/Distribution Transformers
Epoxy-Resin Dry Type
1
After the transformer has been installed, the following tests shall be executed as a minimum
requirement. The transformer shall be OUT of SERVICE:
2.1
Measurement of Winding Ratio on all tap positions (for OFF-LOAD and LOAD
tap changing transformer) by voltmeter method.
The test must be carried out by applying voltage (low voltage 380 Vac or 220 Vac) to
H.V. winding at rated frequency.
The test must be carried out by using two voltmeters, one to read voltage of H.V. winding
and the other to read L.V. winding.
The test must be carried out on all phases and for each position of the tap changer.
Example:
283724012.doc
OLTC
Position
Theoretical
Ratio K
Voltmeter
H.V., V1
Voltmeter L.V.,
V2
9.68
VAB= 376
VBC= 376
VCA= 376
Vab= 39.2
Vbc= 39.2
Vca= 39.2
Measured
Ratio
KM=V1/V2
9.592
(diff - 0.9%)
Page 4 of 7
2.2
The test will be carried out by applying low voltage (415V or 240V) A.C.) three phases
clock wise on the primary side. H.V. side phase (A) must be connected with the L.V. side
phase (a). Check that the relation of the vector groups are satisfied by using one
voltmeter.
Example:
Bb = Cc
Bb < AB
Bb < Bc
for an Star / Delta connected transformer, the vector group must by YND1.
2.3
In all resistance measurements, all the precautions shall be taken in order to minimise the
effect of the self induction.
Record the resistance value, when the measuring current value become steady.
Use D.C. source and resistor to limit the current, within the range of 10 A. Use one
Voltmeter class +/- 0.1 %, shunt 15 A, 75 mV.
283724012.doc
Page 5 of 7
Tf = Test temperature (0 C)
Example:
Phase
1
2
3
2.4
Amb.Temp.
350 C
350 C
350 C
AMP
13
12.5
12.5
VOLT
1.883
1.909
1.869
REF ()
0.0724
0.0764
0.0748
REQ ()
0.0831
0.0877
0.0859
5000 or 10000 VDC between primary H.V. winding and ground (secondary grounded)
1000 or 5000 VDC between secondary L:V: winding and ground with other secondary
L.V. and primary H.V. windings grounded..
2.5
2.6
2.7
Apply about 0.4 kV or higher ACV to the transformer high-voltage (primary) bushing
Measurements:
283724012.doc
U1
U-V
U2
W-V
U3
U-W
Um
(U1+U2+U3) / 3
I1
Current of phase U
I2
Current of phase V
I3
Current of phase W
Page 6 of 7
Im
(I1+2+I3) / 3
IT
UT
Impedance:
2.8
2.9