BILL OF QUANTITIES

Contract Name :

Fit-Outs to complete the Operation and Management (Civil


Works) to Iloilo Convention Center

Location

Mandurriao District, Iloilo City

Contract Duration: 60 C.D.


ITEM
OF
WORKS

ABC: P62,947,025.32

DESCRIPTION
UNIT

QTY

1.00

Ls

1.00

Ls

1.00

Each

1.00

Ls

397.00

Sq.m.

580.50

lm

(Unit price in words)

A.

GENERAL REQUIREMENTS

a.1

Mobilization and Demobilization


(Pesos________________________
_______________________)
Progress Photograph/Submittals

a.2

(Pesos________________________
_______________________)
Provide Project Sign Board

a.3

(Pesos________________________
_______________________)
Construction Safety and Health

a.4

(Pesos________________________
_______________________ )

B.

BUILDING FINISHES
b.1 Floor Finishes

1019

Plain Cement Wood Trowelled Finish


with 25mm x 25mm dia. Grooves (
For Ramp Finish)
(Pesos________________________
_______________________ )

SPL-1

6mm thick Stainless Steel Insert to Floor


Termination
(Pesos________________________
_______________________ )

77

UNIT
COST

TOTAL
COST

1021(3)

Plain Cement Finish over membrane


type waterproofing
(Pesos________________________

1,033.00

Sq.m.

5,230.31

Sq.m.

27.00

pc.

47.25

Sq.m.

13.60

l.m.

1,080.21

Sq.m.

_______________________ )

b.2 Ceiling Finishes

1032

CF2: Exposed RC Beams and Slabs


(Rubbed Concrete)
(Pesos________________________
_______________________ )

SPL-2

Access Manhole
(Pesos________________________
_______________________ )
b.3 Toilet Finishes

SPL-3

Facial-Mirror-6mm thk glass from


Belgium
(Pesos________________________
_______________________

SPL-4

Grab Bar for Disabled Toilets


b.4 Water Proofing

1016(1)

4.5kg. Torch-on Membrane Type


Waterproofing
(Pesos________________________
_______________________ )

C.

SPECIALTY WORKS

Folding Wall Partitions


78

1. Ground Floor

SPL-5

Wall A1: 17.0 x 11.50 opening


(Pesos________________________

1.00

Set

1.00

Set

1.00

Set

1.00

Set

1.00

Set

1.00

Set

1.00

Set

1.00

Set

1.00

Set

_______________________ )

SPL-6

Wall A2: 17.0 x 11.50 opening


(Pesos________________________
_______________________ )

SPL-7

Wall A3: 17.0 x 11.50 opening


(Pesos________________________
_______________________ )

SPL-8

Wall A4: 17.0 x 11.50 opening


(Pesos________________________
_______________________ )

SPL-9

Wall B.1: 17.0 x 4.0 opening


(Pesos________________________
_______________________ )

SPL-10

Wall B.2: 17.0 x 4.0 opening


(Pesos________________________
_______________________ )
2. Second Floor

SPL-11

Wall B.1: 13.421 x 5.0 opening


(Pesos________________________
_______________________ )

SPL-12

Wall B.2: 13.4 x 5.0 opening


(Pesos________________________
_______________________ )

SPL-13

Wall B.3: 13.421 x 4.0 opening


(Pesos________________________
_______________________ )

79

SPL-14

Wall C.1: 6.57 x 4.00 m opening


(Pesos________________________

1.00

Set

1.00

Set

2.00

Units

2.00

Units

2.00

Units

2.00

Units

1.00

ls

2,280.00

lm

_______________________ )

SPL-15

Wall C.2:7.196 x 4.50m opening


(Pesos________________________
_______________________ )

D.

SANITARY/PLUMBING WORKS

SPL-16

Hydro Pneumatic Pumps 7.50 Hp.


230 V/3 dia./60 Hz
(Pesos________________________
_______________________ )

SPL-17

Bladder Tank 349 gals. (396 gals)


(Pesos________________________
_______________________ )

SPL-18

Holding Tank
(Pesos________________________
_______________________ )

SPL-19

Kitchen Sink including accessories


(Pesos________________________
_______________________ )

E.

SPL-20

ELECTRICAL WORKS
Main Feeder (Primary)
(Pesos________________________
_______________________ )

SPL-21

Generator Wire Connection


(LSVG/ATS to Genset)
(Pesos________________________
_______________________ )

F.

MECHANICAL WORKS
A/C Equipments
80

SPL-22

Packaged Air Cooled Conditioning


Unit, 40 TR capacity
(Pesos________________________

1.00

Each

1.00

Each

1.00

l.s.

7.00

Set

46.00

Set

5.00

Set

1,587.00

Sq.m.

_______________________

SPL-23

Packaged Air Cooled Conditioning


Unit,15 TR capacity
(Pesos________________________
_______________________

G.

Spl-24

FIRE PROTECTION
Pumps, Motors and accessories
(Pesos________________________
_______________________ )

H.

Spl-25

BATTERY PACKS
Battery Pack for T5 32W LF
(Pesos________________________
_______________________)

Spl-26

Battery Pack for Pinlight, 26W


(Pesos________________________
_______________________)

Spl-27

Battery Pack for Flourescent Lamp,


Surfaced MTD 28W
(Pesos________________________
_______________________)

I.

SITE DEVELOPMENT WORKS


1. Parking Area and Exterior Floor
Finishes
1.1 Parking Area

311

Portland Cement Concrete Pavement(


0.23m thk)
(Pesos________________________
_______________________)