Beruflich Dokumente
Kultur Dokumente
DIVISION OF MINERALS
400 W. King Street, Suite 106
Fax
(7()'},)4~6 ..n4S
.Ili\l GlfHmr-.:S
http://mjllefal~.s
GOI':'rl/nr
tatG.Jlv.lIs/
,\L\r~
R. COY/I,ER
Administrator
Venessa Langmacher
Plains Exploration & Production Company
14421 County Road 10
Fort Lupton, CO 80621
Re:
(j{
(L.
(~....../
./
')
"""
4L~-::/:C~ L:/Jtt:2l't.:J-
'
Linda Wells
Administrative Assistant IV
Enclosures
Cc:
Hi,~'hM,l
(,'('mlwrll/ot /(cso/lU
('.~
La~ v(,gll~
STATE OF N EV ADA
CO:\'livIlSSION ON MINERAL RESOURCES
DfV~SION
SUlle fI I 20-1\
OF MINERALS
(71l?) 4U,-43.+)
(775) 6R4-7040
.111\1 GIHHfH\S
(,"/l'('rnbr
Hrandl:
AL\N R COYNER
Administrator
An Application for Permit to Drill and Oil or Gas Well has been issued by the
Commission on Mineral Resources, Division of Minerals to Plains Exploration & Production
Company. 14421 County Road 10, Fort Lupton, CO 80621, 303-857-9999, for the following
well:
Permit Number 888, API Number 27-033-05318, has been assigned to the Pluto 27-1
well. The wel1 is located in the SWl,4 NEl,4 SE of Section 27, T18N, R61E, in White Pine
County. The location of the well is 1865' from the south line and 905' from the east line of the
section. The elevation is 7357' and the proposed depth of the well is 12,000'. The proposed
well is located 15.5 miles northwest of Ely, Nevada
The permit was issued January 30, 2007 and will expire on January 30, 2009 in the event
that the well is not drilled.
l":\i.~;Il\:
I.ar:c!,t'-,Vco/.
(;,',.J1/, TlIud
/I./jj{iJl~
Rt'Mtltrt!s
f;ih,,,,,tn .Jf,~
ChHirlHan~
(:\.'ncn,1 j)uhJic
non P,lfntU.
V.
STATE OF NEVADA
DIVISION OF MINERALS
RECEIVED
]U.: 0 l 2006
.)\vision of Minerals
State -..::!C~O:.....-_ _ _ _ __
Field Wildcat
, County_Wl..I..Uhit!.lleot..JPwicu.nell<-_ _ _ __
T---r-T
line of the section. (Give location from section line, cross out wrong direction
.L
I
I-+
Section
27
12,000
feet using a rotary rig. The elevation is
It is proposed to drill the well to a depth of
7357
feet above sea level. The KB will be
7,356 '
The status of a bond for this well is conformance with NRS 522.230 of the Nevada Revised Statues
Signed
Name
Venessa Langrnacher
Position
Date
27-033-05318
Approval date
By
Form 2
. 20-.OL.
888
Permit No.
API No.
November 28
4!Q.; ;2/k~
(REV 5/1012001 LV)
Operator:
Plains Exploration and Production Company
Well:
Pluto 27-1
Location: ~y.. SE
y.., Sec. 27
, T.
18
Lease: N-80835
N, R.
E.
Ag;ency Contacts
BUREAU OF LAND MANAGEMENT
Petroleum Technician:
Michael Tyler
24 Hr. Telephones:
(775) 289-1964
michael_tyler@nv.blm.gov
Petroleum Engineer:
John Menghini
Office Telephone:
(775) 861-6573
(775) 223-1359
Cell:
jmenghin@nv.blm.gov
I. Approval ofthis APD does not warrant or certifY that the applicant holds legal or equitable title to those rights in
the subject lease which would entitle the applicant to conduct operations thereon. In addition, approval ofthis APD
does not imply that the operator has legal access to the drilling location. When crossing private surface 43 CFR
3814 regulations must be complied with and when crossing public surface off-lease the operator must have an
approved right-of-way.
2. All operations shall conform to the Code of Federal Regulations, 43 CFR 3160, Bureau of Land Management
Onshore Orders and the Nevada Division of Minerals Oil and Gas chapter 522 Oil and Gas General Provisions.
3. A complete copy of the approved APD must be at the drill site during the construction of the roads and drill pad,
the drilling of the well, and the completion of the well.
4. The spud date will be reported orally to the Authorized Officer 24 HOURS PRIOR TO SPUDDING, unless
otherwise required in site specific conditions of approval.
5. Verbal notification shall be given to the Authorized Officer at least 24 hours in advance offormation tests, BOP
tests, running and cementing casing (other than conductor casing), and drilling over lease expiration dates.
6. A progress report needs to be filed a minimum of once a week starting with the week the well was spud and
continuing until the well is completed. This report may be by mail, fax or email. A complete set of daily drilling
reports must be submitted upon completion of the well. The report will include the spud date, casing information
such as size, grade, weight, hole size, and setting depth, amount and type of cement used, top of cement, depth of
cementing tools, casing test method, intervals tested, perforated, acidized, fractured and results obtained and the
dates all work done.
7. Deviation from the approved APD must receive prior approval. If you want to change your operations in any
way, you must first receive approval from the BLM and from the NDOM.
8. Any information you desire to be held confidential must be clearly marked "CONFIDENTIAL "on each page.
9. All survey monuments found within the area of operations shall be protected. Survey monuments include, but are
not limited to: General Land Office and Bureau of Land Management Cadastral Survey Comers, reference comers,
witness points, U. S. Coast and Geodetic benchmarks and triangulation stations, military control monuments, and
recognizable civil (both public and private) survey monuments. In the event of obliteration or disturbance of any
Pluto 27-1
survey monuments, the incident shall be reported in writing to the Authorized Officer.
10. If at any time the facilities located on public lands authorize <.I by the terms ofthe lease are no longer included in
the lease (due to a contraction in the unit or other lease or unit boundary change) the BLM will process a change in
authorization to the appropriate statue. The authorization will be subject to appropriate rental or other financial
obligation determined by the authorized officer.
11. A copy of the completion report and all test information obtained from this well shall be submitted within 30
days after the well is completed.
12. No later than the fifth business day after any well begins pr<>duction on which royalty is due anywhere on a lease site or
allocated to a lease site, the operator must notify the BLM by letter or sundry notice ofthe date on which such production
commenced. The date is defined as follows: the date on which liquid hydrocarbons are first sold or shipped from a
temporary storage facility, such as a test tank, and for which a run ticket is required to be generated, or the date on which
liquid hydrocarbons are first produced into a permanent storage facility, whichever occurs first. Ifyou intend to sell from a
test tank, it must be calibrated as specified in Onshore Order Number 4, Part C, and sealed in accordance with Onshore Order
Number 3. You can initially notify orally, but you must follow-up with a letter or sundry notice. Reference is made to 43
CFR 3162.4-1(c). As a minimum, such notice must provide the following information:
a. Operator's name, address and telephone number.
b. Well name and number.
c. Well location (1/4 Y4 Section, Twp., Rge., MDBM).
d. Date well placed in a producing status.
e. The nature of the well's production, i.e., crude oil, natural gas, or both.
f. The lease communitization, or unit number applicable.
13. An Hydrogen Sulfide (H2S) Contingency Plan as outlined in Onshore Order No.6 will be submitted when required by
this office. However, minimum safety precautions must be taken at all times. Personal safety equipment, including a portable
hydrogen sulfide detector situated in a position to detect gas from the well, and two or more OSHA-approved protective
breathing apparatus must be on location. If company policy requires more than this, please supply this office with a copy of
the company plan or requirement, if not already submitted.
14. Abandonment program approval must be obtained prior to plugging the well. Following an oral approval, a sundry notice
titled "Notice of Intent to Abandon" will be submitted within five business days. Failure to obtain approval prior to
commencement of abandonment operations shall result in immediate assessment under 43 CFR 3163 .1 (b) (3). Notice: if no
logs are run (mud or electric), all open sections of hole will be filled with cement in a manner which precludes interzonal
migration of fluids.
15. Directional surveys (inclination and azimuth) shall be run on the well wherever the inclination exceeds 10 degrees or the
projected bottom hole location is within 200 feet of the spacing unit or lease or unit boundary.
] 6. Pursuant to 43 CFR 3162.7-1 (b), production testing wiJ] be permitted into test tanks only. No oil will be permitted into
the reserve pit except in emergency situations.
] 7. The State of Nevada (NAC 522A.215) requires that samples of cuttings shall be collected at a minimum of30 foot
intervals from surface to the surface casing point, and on 10 foot intervals from surface casing shoe to total depth. A
minimum of two 15 milliliter sets of cuttings per sampling interval must be cleaned, dried, and placed in 3" x 5" sample
envelopes, properly identified and sent prepaid to the Nevada Bureau of Mines and Geology (NBMG) University of Nevada,
Reno, Mail Stop 178, Reno, Nevada 89557-0088. You may contact David Davis at (775) 784-6694 x 133.
Note: the cuttings are not to be sent to the Division of Minerals. The cuttings are due within 15 days of completion
of the well. The operator will be responsible for the cost of any further handling ofthe samples by the NBMG
required to meet standards set out in this permit condition.
18. Two copies of all logs run on the well and where possible, one copy of the computed logs in electronic format such as
LAS or PDF are to be submitted to the NDOM within 30 days of the date of being run.
19. All BOPE tests of 5000 psi or greater shall be conducted by an independent contractor. Test charts and test results are to
be submitted to the Bureau of Land Management within 48 hrs. of completion of the test.
..
NE SE Sec. 27 T1 8N - R61 E
Prepared For:
PLAINS EXPLORATION AND PRODUCTION COMPANY
By:
PERMITCO INC.
14421 County Road 10
:'\: \A()~
Ft. Lupton, Colorado 80621
\ :\\U~ .
303/857-9999
'to"'\\\~\.'
"'
"
.
.
\U~\~
,~.. \\\~y,~
\1..,)
:t
-sU;ce i;M-
.f,
435-789-1017
LOCATION PHOTOS
TAKEN BY: J.F.
PHOTO
..
PLAINS EXPLORATION & PRODUCTION COMPANY
5268.12' (G.L.O.)
BASIS OF ELEVATION
SPOT ELEVATION AT THE SOUTHEAST CORNER OF SECTION 27.
T18N. R61E. M.D.M. TAKEN FROM THE ROBINSON SUMMIT.
QUADRANGLE, NEVADA. WHITE PINE COUNTY. 7.5 MINUTE QUAD.
(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATES
DEPARTMENT OF THE INTERIOR. GEOLOGICAL SURVEY. SAID
ELEVATION IS MARKED AS BEING 7305 FEET.
""'
o
-i
'-'"
s?
BASIS OF BEARINGS
CD
N
........
.-J
55o
<.:l
'-'
'0
o
co
27
l.f)
3:
'N
o
o
'"iii"
~
'.::.
8o
t)
90S'
810
"o
o
'0
"~
t'\j
I
'1.0
CD
co
.-
I'-..
,!I)
.....
s::>
_J
N89'S1'w -
2633.40' (G.L.O.)
r-
REG
A
*OR
19778ra88 Cap,
1.0' High, Pih/
______________________________________________________
ofSton/l8~,~S~t~/I~~
Post
UINTAH ENGINEERING
85 SOUTH
LEGEND:
L ::
90' SYMBOL
...
(NAD 83)
LATITUDE = 39'23'49.25" (39.397014)
. LONGITUDE = 115'05'19.85" (115.088847)
(NAD 27)
LATITUDE
39'23'49.48" (39.397078)
LONGITUDE = 115'05'16.76" (115.087989)
SCALE1"
1000'
\ DATE DRAWN:
10-01-06
PARTY
84078
10-02-06
REFERENCES
J.f.
S.P.
WEATHER
C.G.
G.L.O. PLAT
FILE
WARM
24. Attachments
The following, completed in accordance with the requirements of Onshore Oil and Gas Order No.1, shall be attached to this form:
Attached
2. A Drilling Plan
Plains Exploration & Production Co. proposes to dril r a well to 12,000' to test the Guilmette Limestone
formation. If productive, an open hole completion will be done from 7200' 12,000'. If dry, the well will be
plugged and abandoned as per BlM and State of Nevada requirements. See Onshore Order No.1 attached.
3. A Surface Use Plan (if the location is on National Forest System Lands, the SUPO shall be filed with the Appropriate
Forest Service Office.
Attached
4. Bond to cover the operations unless covered by an existing bond on file (see Item 20).
5. Operator cenification.
Plains Exploration & Production Co. has been designated by proper lease interest owners to conduct
operations on the subject lands. Plains Exploration & Production Co. agrees to be responsible under the
terms and conditions of the lease for the operations conducted on the leased lands.
6. Such other site specific information and/or plans as may be required by the authorized officer.
1.
Formation
Deeth
7,356'
Rib Hill SS
1,600'
5,756'
ElyLS
3,100'
4,256'
5,600'
1,756'
7,200'
156'
Pilot Shale
7,700'
-344'
Guilmette Limestone
8,200'
-844'
T.D.
12,000'
-4,644'
I Joana Limestone
2.
Subsea
0'
Arcturus LSW
I,
Substance
Formation
Dee.th
Oil
5,600'
Oil
Joana Limestone
7,200'
Oil
Guilmette Limestone
8,200'
All shows of fresh water and minerals will be reported and protected.
3.
open.
When testing the kill line valve(s) the check valve shall be held open or the ball removed.
Pipe and blind rams shall be activated each trip. however, this function need not be perforrned more
A BOPE pit level drill shall be conducted weekly for each drilling crew.
All of the above described tests and/or drills shall be recorded in the drilling log.
* Revised 1-12-07
The choke manifold, BOP extension rods and hand wheels will be located outside the substructure.
The hydraulic BOP closing unit will be located at least 100 feet from the well head, with the remote
control unit on the rig floor. The casing head and BOP will be flanged 5,000 psi w.p. Kill line will be
2M Ld. with burst pressure rating of 5,000 psi. These items will be pressure tested concurrently with
BOP's. The BOP will be tested when the stack is first installed on the well. It will also be tested at
each casing shoe and at least every 30 days. BOP and choke manifold sizes will be in accordance
with API-RP-53 as per the attached. See attached schematic of choke manifold.
4.
a.
The size and rating of the BOP stack is shown on the attached diagram.
b.
A choke line and a kill line are to be properly installed. The kill line is not to be used as a
fill-up line.
c.
The accumulator system shall have a pressure capacity to provide for repeated operation of
hydraulic preventers.
d.
Drill string safety valve(s), to fit all drill string connections in use, are to be maintained on the
rig floor while drilling operations are in progress.
The proposed casing and cementing program shall be conducted as approved to protect
and/or isolate all usable water zones, potentially productive zones, lost circulation zones,
abnormally pressured zones, and any prospectively valuable deposits of minerals. Any
isolating medium other than cement shall receive approval prior to use. The casing setting
depth shall be calculated to position the casing seat opposite a competent formation which
will contain the maximum pressure to which it will be exposed during normal drilling
operations. Determination of casing setting depth shall be based on all relevant factors,
including; presence/absence of hydrocarbons; fracture gradients; usable water zones;
formation pressures; lost circulation zones; other minerals; or other unusual characteristics.
All indications of usable water shall be reported.
b.
Casing design shall assume formation pressure gradients of 0.44 to 0.5 psi per foot for
exploratory wells (lacking better data).
c.
Casing design shall assume fracture gradients from 0.70 to 1.00 psi per foot for exploratory
wells (lacking better data).
Revised 1-12-07
d.
Casing collars shall have aminimum clearance of 0.422 inches of all sides in the hole/casing
annulus, with recognition that variances can be granted for justified exceptions.
e.
All waiting on cement times shall be adequate to achieve aminimum of 500 psi compressive
strength at the casing shoe prior to drilling out.
f.
All casing except the conductor casing, shall be new casing that meets or exceeds API
standards for new casing.
g.
The surface casing shall be cemented back to surface either during the primary cement job
or by remedial cementing.
h.
All indications of usable water shall be reported to the authorized officer prior to running the
next string of casing or before plugging orders are requested, whichever occurs first.
i.
Surface casing shall have centralizers run as follows: 1on the shoe joint, 1on the first collar
from the bottom and 1 on the second collar.
j.
Top plugs shall be used to reduce contamination of cement by displacement fluid. Abottom
plug or other acceptable technique, such as a suitable preflush fluid, inner string cement
method, etc. shall be utilized to help isolate the cement from contamination by the mud fluid
being displaced ahead of the cement slu rry.
k.
All caSing strings below the conductor shall be pressure tested to 0.22 psi per foot of casing
string length or 1500 psi, whichever is greater, but not to exceed 70 percent of the minimum
internal yield. If pressure declines more than 10 percent in 30 minutes, corrective action shall
betaken.
I.
On all exploratory wells, and on that portion of any well approved for a 5M BOPE system or
greater, apressure integrity test of each casing shoe shall be performed. Formation at the
shoe shall be tested to a minimum of trle mud weight equivalent anticipated to control the
formation pressure to the next casing depth or at total depth of the well. This test shall be
performed before drilling more than 20 feet of new hole.
Hole Size
D.D.
Weight
Grade
Type
New/Used
60'
17-1/2" RHM
20"
1/4" Wall
P.E.
New
Surface
1,200'
17-1/2"
13-3/8"
54.5
J--55
STC
New
Intermediate
7,250'
12-1/4"
9-5/8"
40#
HCN-80
LTC
New
Production
12,000'
8-3/4"
Purpose
Conductor
n.
o.
Surface
TOC @ Surface
Lead: 652 sx 35:65 Poz/G, 6% Gel, 1 gps defoamer, 13.6 ppg, 1.53 cu ftlsk.
Tail: 321 sx Class G, 1 gps defoamer, 0.3% dispersant,15.8 ppg, 1.15 cu ftlsk.
Production
p.
After cementing but before commencing any test, the casing string shall stand cemented until
the cement has reached a compressive strength of at least 500 psi at the shoe, except that
in no case shall test be initiated until the cement has been in place at least 12 hours. WOC ./
time shall be recorded in the drillers log.
q.
The following reports shall be filed with the District Manager within 30 days after the work is
completed.
1.
Progress reports, Form 3160-5 (formerly 9-331) "Sundry Notices and Reports on
Wells", must include complete information concerning:?;~
'/
b.
r.
5.
Setting of each string of casing, showing the size, grade, weight of casing
set, hole size, setting depth, amounts and type of cement used, whether
cement circulated or the top of the cement behind the casing, depth of
cementing tools used, casing test method and results, and the date work
was done. Spud date wi II be shown on the first reports submitted.
ij
... ,
2.
3.
Full opening safety valve - rated to the Ram Preventer working pressure.
MUD PROGRAM:
a.
Interval
Mud Type
Mud
wt.
Visco
FIL
PH I
0-1,200'
Spud (GellLime)
8.6-9.0
38-50
N/C
8.0-9.5
1,200'-7,250'
LSND/Polymer
8.8-9.0
38-50
25-12
8.0-8.5
7,250'-12,000'
LSND/Polymer
8.8-9.0
38-50
12-8
8.0-8.5
There will be sufficient mud material on location to maintain hydrostatic control of the formations
encountered at all times.
A mud test shall be performed every 24 hours after mudding up to determine, as applicable: density,
viscosity, gel strength, filtration, and pH.
6.
Periodic checks will be made each tour of the mud system. The mud level will be
checked visually.
c.
The concentration of hazardous substances in the reserve pit at the time of pit backfilling
must not exceed the standards set forth in the Comprehensive Environmental Response,
Compensation, and liability Act of 1980 (CERCLA).
d.
All oil and gas drilling related CERCLA hazardous wastes/substances removed from a
location and not reused at another drilling location must be disposed of at an EPA approved
hazardous waste facility.
EVALUATION PROGRAM:
The antiCipated type and amount of testing, logging and coring are as follows:
a.
Drtll stem tests will be run as needed. If drill stem tests are run, following will be adhered to:
Initial opening of drill stem test tools shall be restricted to daylight hours unless specific
approval to start during other hours is obtained from the authorized officer. However, DST's
may be allowed to continue at night if the test was initiated during daylight hours and the rate
of flow is stabilized and if adequate lighting is available (Le. lighting which is adequate for
visibility and vapor-proof for safe operations). Packers can be released, buttripping shall not
begin before daylight, unless prior approval is obtained from the authorized officer. Closed
chamber DSTs may be accomplished day or night.
A DST that flows to the surface with evidence of hydrocarbons shall be either reversed out
of the testing strtng under controlled surface conditions, or displaced into the formation prior
to pulling the test tool. This would involve provided some means for reverse circulation.
Separation equipment required forthe anticipated recovery shall be properly installed before
a test starts.
All engines within 100 feet of the wellbore that are required to "run" during the test shalf have
spark arresters or water cooled exhausts.
b.
The logging program will consist of a Tri pie Combo to be run from 1,200' SCP to TO.
c.
Cores are anticipated between 8,200' to TO in the Guilmette Limestone formation, (possible 5 ~
50 rotary sidewall cores).
d.
(I
I'' -'
Open hole completion with packer, tubin 9 and seating nipple(s}. Possible acid stimulation.
In the event that water is encountered in the open hole interval, PXP may elect to run and
cement a 4-1/2" production liner that will require perforating.
7.
8.
The maximum anticipated bottom hole pressure is estimated at approximately 6,000 psi
(calculated at 0.5 psVfoot for 12,000' planned TO) resulting in a calculated maximum
anticipated surface pressure {MASP} of approximately 3400 psi based upon a partially
evacuated hole at TO with an average fluid gradient of 0.22 psilfoot. (4.23 ppg EMW)
b.
No hydrogen sulfide gas is anticipated during drilling, however the logging unit will have an
H2S detector for monitoring purposes.
b.
It is anticipated that the drilling of this well will take approximately 30 days.
c.
2.
3.
4.
i ;
w,j
5.
OBJLLJNG PROGRAM
Page 9
How the pipe was cemented, inciliding amount of cement, type, whether cement
circulated, location of the cementing tools, etc.
d.
6.
7.
Casing pressure tests after cementing, including test pressures and results.
Section 102 (b) (3) of the Federal Oil and Gas Royalty Management Act of 1982, as
implemented by the applicable provision of the operating regulations at Title 43 CFR
3162.41 @), requires that -not later than the 5th business day after any well begins
production on which royalty is due anywhere on the lease site or allocated to a \ease site, or
resumes production in the case of a well which has been off production for more than 90
days. the operator shall notify the authorized officer by letter or sundry notice, Forms 316(}S
or orally to be followed by a letter or sundry notice, of the date on which such production has
begun or resumed."
The date on which production is commenced or resumed will be construed for oil wells as the
date on which liquid hydrocarbons are first sold or shipped from a temporary storage facility,
such as a test tank, and for which a run ticket IS required to be generated or, the date on
which liquid hydrocarbons are first produced into apermanent storage facility. whichever first
occurs; and, for gas sales as the date on which associated liquid hydrocarbons are first sold
or shipped from a temporary storage facility, such as a test tank, and for which a run ticket
is required to be generated or, the date on which gas is first measured through permanent
metering facilties, whichever first occurs.
" the operator fails to comply with this requirements in the manner and lime allowed, the
operator shall be liable for a civil penalty of up to $10,000 per violation for each day such
violation continues. not to exceed a maximum of 20 days. See Section 109 @) (3) of the
Federal on and Gas Royalty Management Act of 1982 and the implementing regulations at
Trtle 43 CFR 3163.4-1 (b) (5) (ii).
e.
.. Revised 19-07
Notifications Requirements:
"1.
The BlM in Ely, Nevada (775-289-1964 Michael Tyter - Inspector) will be notified
verbally not more than 48 hours before the well is spudded, or on the next regular
workday..
2.
3.
For verbal plugging orders on drilling locations, the BLM will be notHied 24 hours
prior to plugging.
The following standards apply to the abandonment of newly drilled dry or
non-productive wells in accordance with 43 CFR 3162.3-4. Approval shall be
obtained prior to the commencement of abandonment. All formations bearing
usable-quality water, oil, gas, or geothermal resources, and/or a prospectively
valuable deposit of minerals shall be protected. Approval may be given orally by
the authorized officer before abandonment operations are initiated. This oral
request and approval shall be followed by awritten notice of intent to abandon filed
not later than the fifth busine 5S day following oral approval. Failure to obtain
approval prior to commencement of abandonment operations shall result in
immediate assessment under 43 CFR 3153.1 (b)(3). The hole shall be in static
condition at the time any plugs are placed (this does not pertain to plugging lost
circulation zones). Within 30 days of completion of abandonment, a subsequent
report of abandonment shall be filed.
i'l
BOPE 0 iagram
Minimum Requirements
()ti cl..,-f-'Y'1 / /
fr::)
,/D ?
Fillup Line
Flowline
13-5/8" 3M
Annular
".
To mud tanks
2"
.1---n......
"iii
:g
Possible Upgrade to
Flare line
2"
BOPE Diagram
Minimum Requirements
Fillup Line
Flowline
13-S/8" 3M
Annular
rorm'
c
To mud tanks
2"
~0
. . .F'
. . . nO
3-1/16"
"'iii
c:
0
I=M1
~,
Flare line
2"
BOPE Diagram
Minimum Req uirements
Fillup Line
Flowline
13-5/8" 3M
Annular
:::nxtJ
I To mud tanks
2"
o
I ==ao;
.,l.--n..A
3-1/16"
(ij
l::
;;
Flare line
2"
~ON
)plemental Information
hite Pine
Total Depth:
Elevation:
12,000'
Well Type:
Exploratory
7,460' GL
Lease Number:
NVN-S0835
BOP
Size
Inch
BOP Rated
Working Pressure
Ramsl Annular
BOP Test
Pressures
Ramsl Annular
Casing
Conn.
Casing
Burst
Rating
psi
Wellhead
Flange
Rating
psi
Casing
Test
psi
PE
NA
NA
N/A
STC
2730
3,000
1500
133/8
5,000/3,000
3,000/1,500
LTC
5750
5,000
1600
133/8
5,000/3,000
3,000/1,500
TBD
TBD
TBD
TBD
133/8
5,000/3,000
3,000/1,500
lUMBER
713579-6036
"
'",
"
\~
....
(~
"
The onsite inspection for the sub1ect well was conducted on Thursday, October 12, 2006 at approximately
8:30 a.m. Weather conditions were clear, cool and sunny. In attendance at the onsite inspection were the
following individuals:
Bill Wilson
Lisa Gilbert
Michael Tyler
Dave Jeppesen
Mark Lowry
John Longinetti
John Floyd
Steve Hopkins
Lisa Smit~1
Randy Smrth
David Gibson
1.
Geologist
Archeologist Technician
Petroleum Engineering Tech
Visual and Rec Specialist
Range Specialist
Range Conservationist
Surveyor
Drilling and Operations Engineer
Permitting Agent
Permitting Agent
Dirt Contractor
EXISTING ROADS
a.
b.
c.
d.
Vehicles will travel only on deSignated travel ways shown on the map.
e.
Existing roads will be maintained and kept in good repair during all drilling and completion
operations associated with this well.
f.
2.
Ali proposed access roads are within the lease boundary and a road right of way will not be
necessary.
There will be approximately 0.3 miles of existing access road to be upgraded and 0.3 miles
of new access to be constructed.
b.
The new access road will be constructed as a flat bladed road. Surfacing material will be
placed along the new access to a depth of approximately 4 inches. The running surface of
the road will be a minimum of 14 feet with a maximum disturbed width of 32 feet.
c.
Approximately 2 or 3turnouts will be constructed along the proposed route to allow traffic to
pass safely.
d.
Where the approach leaves Highway 50, it will be modified to meet NDOT standards. The
approach will meet the highway at a 90 degree angle. For the protection of the Old Lincoln
Highway (which parallels Highway 50 on the west side), the approach will be constructed by
placing a minimum of 4" of fill material over the Old Highway road bed. This will prevent
damage to the old road bed. In addition - approximately 6 inches of gravel will be placed on
the fill material covering the Old Lincoln Highway. No topsoil will be removed from the old
road bed.
e.
After the road crosses through the Highway fence line -the remainder of the road construction
will include salvaging the top 12" of topSOil in a windrow along the edge of the road and
immediately seeding it with the same interim seed mixture as used for the pad. Reclamation
will be similar to that for the location pad: regarding, ripping the road surface, recovering with
the salvaged topsoil, and final seeding.
f.
Gravel used for pad or access road construction may be placed only after the underlying
topsoil has been salvaged. It may be removed prior to regrading and ripping or left to be
incorporated in the reclamation procedures outlined above.
g.
Culverts, when deemed necessary by the location contractor, will be installed during
construction.
3.
4.
h.
The existing gate in the Highway fence line will be replaced with acattle guard to meet NDOT
standards. If requested by the BLM, a gate will be constructed adjacent to the cattle guard.
i.
If production is established, the road to the tank battery site will be upgraded and graveled
as necessary to provide for all weather use.
j.
Surface disturbance and vehicular travel will be limited to the approved location, tank battery
site and approved access road. Any additional area needed will be approved in advance.
b.
c.
d.
If production is established, aproduction facility layout will be submitted via Sundry Notice at
that time. Anticipated production is not known at this time.
b.
All production facilities, including the pump, pump house, storage tanks, and treater will be
painted an earthtone color to blend with the environment.
c.
All flowlines from the well site to battery site will be buried below frost line depth
(approximately 48 inches).
d.
A dike will be constructed completely around trle production facilities (I.e. production tanks,
water tanks, and/or heater-treater). The dikes for the production facilities will be constructed
of compacted subsoil and hold the capacity of the largest tank.
5.
e.
Produced hydrocarbons shall be put in test tanks on location during completion work.
f.
All site security guidelines identified in 43 CFR 3162.7 regulations will be adhered to.
Produced water for drilling purposes will be obtained from awater well to be drilled on the well
pad, at the south end of the reserve pit.
b.
c.
The well will be turned over to the Bureau of land Management at the end of drilling
operations for their continued use for wildlife and stock grazing purposes.
d.
A water well may be accepted by the Ely District upon completion of operations. Please
submit the following information to the Ely District Office, Bureau of land Management, HC
33, Box 33500, Ely, NV 89301-9408:
1.
2.
3.
4.
5.
6.
e.
6.
Operator requests that BlM allow operator to use water well for future well drilling,
completion, or rework activities in the area.
CONSTRUCTION MATERIALS
a.
If additional gravel is needed (other than that found in the access road or wellpad), then it will
be purchased from a permitted BlM gravel pit or local private source.
7.
8.
b.
No construction materials will be removed from Federal lands unless previously authorized.
c.
All gravel pit permits will be filed with the BLM by the dirt contractor.
b.
The rnud tanks will be emptied into the reserve pit. The reserve pit and drilling fluids
contained in the pit will be allowed to dry before backfilling, or pas will be siphoned out and
dispOsed of in amanner approved by the authorized officer of the BLM before the reserve pit
is backfilled. Pit walls will not be breeched so as to drain fluids to the surrounding surface.
c.
All wastes that accumulate during the drill ing operations will be contained in atrash cage or
dumpster. Wastes will be removed periodically from the location and taken to an approved
landfill.
d.
Immediately after removal of the drilling rig, all garbage (metal containers, etc.) and debris on
the site will be removed from the site. The reserve pit will not be utilized for trash disposal.
e.
f.
Chemical toilets with holding tanks will be utilized. All sewage will be disposed of in
accordance with county and state regulations. The permittee will comply with all state laws
and regulations pertaining to disposal of human waste.
g.
The produced fluids will be produced into a test tank until such time as construction of
production facilities is completed. Any spills of oil, gas salt water or other produced fluids will
be cleaned up and removed.
ANCILLARY FACILITIES
A temporary camp may be located on site to house drilling and completion crews during operations.
However, due to the close proximity to Ely, crews will be housed in local motels.
WELLSITE LAYOUT
a.
Prior to any removal of topsoil along the access road or on the wellpad, snow will be removed
and stockpiled adjacent to the road bed Dr well pad.
b.
Any large trees will be cut prior to construction. The remainder of the trees will be pushed off
and stockpiled adjacent to the wellpad. These trees will be saved for use in final reclamation.
c.
The operator will be responsible for taking steps to mitigate the spread or increased densities
of invasive weeds that result from implementation of the proposed action. The operator will
implement the Ely Field Office Noxious Weed Prevention Schedule and SOPs for weed
treatments, with special emphasis on the following actions. Prior to entering the site, all
construction, drilling equipment, and vehicles will be washed down and cleaned to prevent
the importation of noxious weed seeds from prior places of work. Vehicles will stay on roads
and avoid driving through any weed patched. All seeds used in reclamation will be certified
weed-free. The operator will assist in monitoring for noxious and invasive weeds during the
life of the project, until reclamation is complete.
d.
The top 12" of topsoil, where available. from pad construction will be salvaged, stockpiled
separately from any other material. The topsoil will be seeded immediately with the interim
seed mix in order to stabilize the soil and help preventthe establishment of invasive and non
native weeds. An additional interim seeding may be required.
e.
f.
Cuts and fills and cross sections are also shown on the location layout.
g.
The location of the reserve pit, with respect to the pad and other facilities is shown on the
location layout.
h.
A 12 mil plastic liner will be installed in the reserve pit to prevent loss of drilling fluids through
seepage.
i.
For the protection of livestock and wildlife, all pits containing toxic liquids will be fenced with
3-strands of barbed wire with one strand of smooth wire on the bottom. For the protection
of migrating waterfowl, the pits will be flagged overhead during migration periods. Any oil on
the surface of the pit will be burned off, or otherwise removed. In addition, white flagging will
be tied on the top wire of the reserve pit fencing.
10.
RECLAMATION OF SURFACE
a.
The rathole and mousehole will be filled in immediately after the rig is removed.
b.
Interim seeding will be done as soon as possible on any topsoil piles or windrow piles. A
seed mixture for interim reclamation will be provided by the BLM.
b.
Pad reclamation will consist of recontourin g, ripping, re-spreading the topsoil, and reseeding
with the final seed mixture which should be planted between October 1 and March 15.
Performance standards for revegetation success are that the reclaimed area will have at least
100% oft the perennial canopy cover of the existing adjacent plant cover. The site will be
evaluated by the Ely BLM for vegetative progress after at least one full growing season. If not
successful, the BLM reclamation specialist will review the reclamation procedures with the
operator to decide on the best course of action to achieve success.
c.
The operator or his contractor will contact the Bureau of Land Management in Ely, Nevada
(775) 289-1800, 48 hours prior to commence of site reclamation work and upon completion
of restoration measures.
d.
All disturbed areas will be recontoured to conform as near as possible to the natural contour.
This includes removing all berms and backfilling all cuts.
e.
All disturbed areas will be ripped in both directions (criss-cross) to break up the compacted
soils. The stockpiled topsoil will be evenly spread over the disturbed area.
f.
The operator will be responsible for complete control of any noxious weeds that become
established within the project area during the life of this project through final reclamation. This
would include the responsibility for control of noxious weeds along the access roads, pad
location, and any water and gravel sources.
g.
Noxious and invasive weeds, which may be introduced due to soil disturbance and
reclamation, will be treated by methods to be approved by the authorized officer. These
methods may include biological, mechanical, cultural or chemical. Should chemical methods
be approved, the lessee must submit a Pesticide Use Proposal to the authorized officer 60
days prior to the planned application date. All BLM and Ely Field Office SOPs for weed
treatments will be complied with. Copies of al\ Pesticide Application Reports will be provided
to the Ely Field Office Weed Coordinator and to the Nevada Department of Agriculture.
11.
12.
h.
i.
If the well is plugged and abandoned, the surface casing will be cut off three (3) feet below
reclaimed ground surface {with a metal plate affixed to the top. The metal plate will be
inscribed with the operator's name, well number, well location (1/4 114, Section, TownShip,
Range, etc.) aM federal lease number.
j.
If the water well on location is taken over by the BLM, then the access road will not be
reclaimed and will be left in place for use by the grazing lessee.
SURFACE OWNERSHIP
Welisite
Roads -
OTHER INFORMATION
a.
AClass III archeological study has been conducted by Kautz Environmental. No significant
cultural resources (eligible for the NRHP) were found during the field inspection and
clearance for this project has been recommended. Acopy of this report will be submitted
directly to the appropriate agencies by Kauthz Environmental..
b.
If sub-surface cultural materials are found during any work phase, the BLM must be notified
immediately. Construction will cease until the resource has been properly investigated and
mitigated.
c.
The BLM will be notified 48 hours in advance of any construction at the drilling or wellsite,
unless otherwise authorized.
13.
d.
Sundry Notice and Report of Wells" (Form 3160-5) will be filed for approval for all changes
of plans and other operations in accordan ce with 32 CFR 3164.
e.
The dirt contractor will be provided with an approved copy of the surface use plan.
1.
Surface operations will follow the Surface Operating Standards and Guidelines for Oil and
Gas Exploration, Gold Book and the Conditions of Approval (COAs) contained in the Egan
Resource Management Plan, Oil and Gas Leasing Amendment and Record of Decision.
PERMITCO INC.
Lisa L. Smith
14421 County Road 10
Ft. Lupton, CO 80621
303/857-9999
CERTIFICATION
I hereby certify that I, or persons under my direct supervision, have inspected the proposed drill site
and access route; that I am famiiiar with the conditions which currently exist; that the statements
made in this plan are, to the best of my knowledge, true and correct; and that the work associated
with the operations proposed herein will be performed by Plains Exploration and Production
Company, its contractors and subcontractors in conformity with this plan and the terms and
conditions under which it is approved. This statement is subject to the provisions of 18 U.S.C. 1001
for the filing of a false statement.
November 9 2006
Date:
1
":f~lft.l?~ ~ )
;, .f
,.'
j'
LEGEND:
PROPOSED LOCATION
TOPOGRAPHIC
MAP
LEGEND:
EXISTING ROAD
- - - - - - - - - - PROPOSED ACCESS ROAD
-""~ __ ~~'*"r'.'~~'C__~
mil
LEGEND:
pf DISPOSAL WELLS
PRODUCING WELLS
SHUT IN WELtS
II
-+-
ABANDONED WELLS
. . TEMPORARILY ABANDONED
SCALE: 1~ = 50'
DATE: 10-02-06
10-18-06'
NOTE:
:>
"~
1. 63.8
C-16..J' ..
tm. pit)
~I
.~"
~~
35'
~ 59."
Z
,
\"...
.-):
g~.
Q:ju
~ -2.
0:: V)
(I)~
:s; 0
'-
1Il~
.~
Q::~
W
ill
\\
(6" Deep)
,..,
,....
.())
tJ)
I.
' .,""
~
\
1"
\
'I'
~ a=\ ~
rr-~.
1.670''"'11;
Sfoc~p"e..
Sta. 0+00
:~
_~
TM __
C-19~C.::s.2J
\
C-l.3)
(Mm. pit) Reserve Pd Bac~fill . I. 60.9'
.;.).\
I. \570'
\.
~
u.
"0
It)
III
.~
'"
Sto. 1+00
-l
W/2' of Freeboard
11,140 Bb/$. :I:
. 1. 49.8'
C-3.4'
1+50
,',JI.F-s.?
..,.
I.
I
U
'F,h .J Sto.~
125'
.)
7356.8:
7355.7
..,.a:J
~ f-Zt-/-
r f
aN
X-Section
Scale
1865' FSL
905' FEL
DATE: 10-02-06
Revised: 10-18-06
3S'
Finished Grade
--- - -
12S"
~;;;~ilij~i.EE~\\\
80'
--
-- -
125'
3S'
CUT
STA. 1+50
35'
80'
125'
Slope= 1 1/2: 1
(Tjp.)
~":-'
Preconstruction
. / Grade
..
STA. 1+00
125'
125'
---
----
NOTE:
Topsoil should not be
Stripped Below Finished
Grade on Substructure Area.
~::"'::.':~-~
....~::~.:.~
STA. 0+00
* NOTE:
APPROXIMA TE YARDAGES
(6") Topsoil Stripping
EXCESS MATERIAL
Remaining location
TOTAL CUT
11.010CU.YDS.
FILL
EXCESS UNBALANCE
(After Rehabilitation)
Cu. Yds.
DA TE: 10-02-06
Revised: 10-18-06
NOTE:
Flare Pit is to
be located a min.
of 100' from the
Well Head.
'0
I"
I-----l
!<:
--'
FLARE PIT
~
I
PIPE RACKS
I-----l
pOGHOUSE
125'
35'
RIG
II)
!<:
Z
W
ill
wl-~
'0
RESERVE PITS
........
ex:
g:
::>
::i
Sto. 1+00
(8' Oeep)
TOILET
W/2' of Freeboard
= 11.140 Bbls. ::t
Totol Pit Volume
3,300 CU. Yds.
w
a..
o...J
L----L_-f_---ll HOPPER
(f)
~O
tuEL
TRASH
SNOlllflndllS llfH3D3:J
ARCHEOLOGY
A Class III Archeological Survey for the above mentioned location has been conducted by
Kautz Environmental. Noi significant cultural resources (eligible for the NRHP) were found and
clearance for the project has been recommend. A copy of this report will be submitted
directly to the appropriate agencies directly by Kautz Environmental..
Section 27, T18N, R 61E, X=4,362,371' & Y=664,647', Lat: 39.397 Long: 115.0879
WELL
LOCATION
CTYI STATE
RIG
Planned TO
7,362.27
25.7
7.387.97
GL MSL
RKBGL
RKB MSl
171/2"
1.629'
121/4"
t4,750'
I~i
I
1
1
1
...
\.)Jf2t't...!~
t.
.
t
,..t
~
1
o
. . .
1
I~ "
(~~C:~I
1 ,.~ ~ : . . . .""'-t:1
.
II
I
1I
Field: Wildcat
Permit No.: 888
By:
G.P. Hertfelder
RECEIVED
Frnn 31&)'5
NDO
AUG 1 4 2007
UNITED STATES
DEPARTMENT OF THE INTERIOR
(February 2005)
FORM APPROVED
OMBNo.1004-0137
Expires: March 31,2007
MANAGEMENT
N/A
7. If Unit or CAlAgreement, Name and/or No.
N/A
Iii Well
DGasWell
DOther
12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATORE OF NaIlCE, REPORT, OR OTIlER DATA
TYPE OF SUBMISSION
Notice of Intent
TYPE OF ACTION
Acidiu
D Alter Casing
Deepen
Fracture Treat
D Casing Repair
o New Construction
o Subsequent Report
o
Change Plans
Plug and Abandon
o Final Abandonment Notice D Convert Injection o
DPlugBack
to
Production (StartiResume)
D Reclamation
D Recomplete
D Ten:porarily Abandon
Water Shut-Off
DWell Integrity
DOther _ _ _ _ __
D Water Disposal
13. Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date ofany proposed work and approximate duration thereof.
If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all peninent markers and zones.
Attach the Bond under which the work will be performed or provide the Bond No. on fIle with BLMlBIA. Required subsequent reports must be fIled within 30 days
following completion of the Involved operations. Ifthe operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed once
testing has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamatioll, have been completed, and the operator has
determined that the site is ready for ftnal inspection.)
PXP plans to begin P & A activities today July, 31, 2007.
Please see attached P & A program.
Date
-;
/0
'Date
------------------~~
P.j>roval, if any, are attached. Approval of this notice'j .
fI'.I~~.~,1egalpr:~~tl!ble.titlf;:O ~~:19
/3/
Office
AUG 1 0 2007
MineraJs ManEllJ8l1'8nt
Title 18 US.c. Section 1001 and Tide43 U.S.c. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United
States any false, fictitious or fraudulent statements or representations ~ to anymatter within its jurisdiction.
(Instructions on page 2)
~
Plains Exploration and Production Co. (PXP)
P&A Plan
Pluto 27-1
307-262-7760
location: 1,848.84' FSL & 908.44' FEL, Section 27, T 18N, R 61E M.D.B.M. or approximately
15.3 miles northwest of Ely, Nevada in White Pine County, Latitude: 39 0 23' 49.2099" &
Longitude 115 0 05' 19.75546" (NAD 83).
Elevations: 7,387' RKB-MSL (based on 7362' GL-MSL, 25' RKB-GL-Nabors 148)
Drilled TO: 9,643' RKB
Directions:
From Ely Nevada, take highway 50 west for 15.3 miles. Tum left (south) onto existing lease
road for 0.5 miles.
1. TIH Open ended to 6,500'. C&CM to final drilling mud weight, 10.1 ppg.
2. RU Cementers. M&P balanced 53 sack Class C cement (Plug #1) with additives (13.5 ppg 1
1.7 cuftl sack).
3. POOH to 9-5/8" CP and WOC for a total of 6 hours or until surface samples are hard.
4. TIH and tag plug @ 6,330'. Spot 10.1 ppg abandonment mud from 6,330' to 5,636'.
5. POOH to 5,636'.
6. M&P balanced 62 sack Class C cement (Plug #2) with additives (13.5 ppg 11.7 cuftl sack)
from 5,636' to 5,512'.
7. POH to 9-518" casing shoe. WOC for a total of 6 hours or until surface samples are hard.
8. Pump reserve pit fluids down well. Record number of bbls pumped from reserve pit. TIH
and spot 10.1 ppg abandonment mud from 5,512' to 4,570'.
9. POH to 4,570'. M&P balanced 130 sack Class C cement (Plug #3) with additives (13.5 ppg
/1.7 cuftJ sack) from 4,570' to 4,445'.
10. POH to 4,000'. WOC for a total of 6 hours or until surface samples are hard.
11. TIH and tag plug @ 4,445'. Spot 10.1 ppg abandonment mud from 4,445' to surface'
12. POOH laying down OP to 70',
13. M&P 12 sacks Class C cement (Plug #4) with additives (13.5 ppg I 1.7 cuftJ sack) leaving
plug from 80' to 30' MO (Base of cellar).
14. Circulate clean with freshwater. POOH.
15. NO BOPs, remove 9-5/8" x 13518" 3M starting head and cut-off surface and conductor pipe
at base of cellar.
16. Weld 36" capping plate over conductor and surface pipe. Remove culvert pipe, fill cellar
with native soil and level surface. Set in concrete a 4" 00 by 10' long steel maker post. The
marker post must be 4 feet above ground level. The marker must bear the name of the
operator and the name, number and description of the location of the well. Plains
Exploration and Production Company. Pluto # 27-1. 1.848.84' FSL & 908.44' FELt! Section
27. T 18N. R 61E MoD.S.M. White Pine County. NV. This information must be bead-welded
or stamped directly to the marker pipe. The top of the pipe must be closed with a cement
plug, screw cap or welds.
17.Clean pits, pick up all debris and ROMO Nabors 148. Restore location to close to its
condition when operations were commenced as practicable.
'\
TO
:t12,OOO'
DEPTH,
RKB
U"UKMIo\
CAS
FLUIDS
7,362.27
25.7
7.387.97
1.629'
4,750'
1
1
l;~~~:
i
<. -,
1~~
...
I~
-
I'
tWi-~I
o :
it...
8-314"
:t9.643'
52448
Nabors 148
#: 27-033 -05318
Field: Wildcat
Permit No.: 888
G.P.
I-IArtf..ltiArl
Pluto 27-1
307-262-7760
Date: 07/31/07
AFE #: 52448
API#: 27-033-05318
Permit: 888
location: 1,848.84' FSL & 908.44' FEL, Section 27, T 18N, R 61E M.D.B.M. or approximately
15.3 miles northwest of Ely, Nevada in White Pine County, Latitude: 39 0 23' 49.2099" &
Longitude 1150 05' 19.75546" (NAD 83).
Elevations: 7,387' RKB-MSL (based on 7362' GL-MSL, 25' RKB-GL-Nabors 148)
Drilled TD: 9,643' RKB
Directions:
From Ely Nevada, take highway 50 west for 15.3 miles. Turn left (south) onto existing lease
road for 0.5 miles.
1. TIH Open ended to 6,500'. C&CM to final drilling mud weight, 10.1 ppg.
2. RU Cementers. M&P balanced 53 sack Class C cement (Plug #1) with additives (13.5 ppg /
1.7 cuftl sack).
3. POOH to 9-5/8" CP and WOC for a total of 6 hours or until sUlface samples are hard.
4. TIH and tag plug @ 6,330'. Spot 10.1 ppg abandonment mud from 6,330' to 5,636'.
5. POOH to 5,636'.
6. M&P balanced 62 sack Class C cement (Plug #2) with additives (13.5 ppg / 1.7 cuftl sack)
from 5,636' to 5,512'.
7. POH to 9-5/8" casing shoe. WOC for a total of 6 hours or until surface samples are hard.
8. Pump reserve pit fluids down well. Record number of bbls pumped from reserve pit. TIH
and spot 10.1 ppg abandonment mud from 5,512' to 4,570'.
9. POH to 4,570'. M&P balanced 130 sack Class C cement (Plug #3) with additives (13.5 ppg
/1.7 cuftl sack) from 4,570' to 4,445'.
10. POH to 4,000'. WOC for a total of 6 hours or until surface samples are hard.
11. TIH and tag plug @ 4,445'. Spot 10.1 ppg abandonment mud from 4,445' to surface'
12. POOH laying down DP to 70'.
13.M&P 12 sacks Class C cement (Plug #4) with additives (13.5 ppg /1.7 cuftl sack) leaving
plug from 80' to 30' MD (Base of cellar).
14. Circulate clean with freshwater. POOH.
15. ND BOPs, remove 9-5/8" x 13-5/8" 3M starting head and cut-off surface and conductor pipe
at base of cellar.
16. Weld 36" capping plate over conductor and surface pipe. Remove culvert pipe, fill cellar
with native soil and level surface. Set in concrete a 4" 00 by 10' long steel maker post. The
marker post must be 4 feet above ground level. The marker must bear the name of the
operator and the name, number and description of the location of the well. Plains
_ _ .
'"L. __.
ll
nAn nAt r-t""ll " ""'1'\ AAI ,...r-,
n __ J.! _ _
~.
. _1_
.t..~_.
~I
_i!_
'"
I""\'"i _
n""'J',J
<iii
.:
Contact Infl
PXPC ---
CONTACTS
CONTACT LIST
t'
Houst,
d Lafavett, -
Office
OQE!fations Fax
Home
Cell
713 579-6204
ahertfeldercalpxp.com
805-934-8227 805-937-0237
805-703-0349
wmcbridecalplainsxp.com
337354-5010 337988-9021
337 316-6297
713-579-6099 281-292-9798
713-305-1984
713-579-6173 281-3674430
832-213-7346
713-569-0096
ooenal/l)olainsxo.com
337-354-5013 337-988-2663
337-316-2748
rrav@plainsxp.com
713-579-6172 218438-7483
713907-7712
Reaulatorv
A - - - _.- -----BLM
BLM, John Menghini
Service
Sheriff
EMS
Fire
State Police (NHP)
Hospital
-_
...
Reno, Nevada
Reno, Nevada
Ely, Nevada
775861-6400
775861-6573 (0)
775223-1359 (C)
775289-1964 (C)
Carson City.
Nevada
- -
Municipality
White Pine County
Ely Sheriff Department
Dispatches
Ely Fire Department
White Pine County
William B. Rivie
Location
Ely Nevada
Ely, Nevada
Ely, Nevada
Elko, Nevada
Ely, Nevada
Phone
775 289-8808
775 2894833
or 911
775 289-2345
775 753-1298
775 289-3001
Pluto 271
Date: 07/31/07
Well: Pluto 27-1
County: White Pine
307-262-7760
AFE #: 52448
API#: 27-033-05318
location: 1,848.84' FSL & 908.44' FEL, Section 27, T 18N, R 61E M.D.B.M. or approximately
15.3 miles northwest of Ely, Nevada in White Pine County,
Longitude 1150 05' 19.75546" (NAO 83).
,0
CONTACT LIST
PXPC
Infl
CONTACTS
d Laf:
Home
Office
Operations Fax
Cell
713579-6204
lqhertfelder@pxP.com
805-934-8227 805-937-0237
805-703-0349
wmcbride@.olainsxo.com
337 316-6297
713-579-6099 281-292-9798
713-305-1984
713-579-6173 281-367-4430
832-213-7346
bhughes@plainsxP.com
713-569-0096
laoena@olainsxO.com
337-354-5013 337-988-2663
337-316-2748
rrav@.olainsxo.com
713-579-6172
218438-7483
_
_-_ __
_
_
_-_ _-_ __
Reaulatorv A .,.
... --~.---
...........
...............
...............
.......
.........
......
713907-7712
_-_ _-_ _ ...........
.....
..........
BLM
BLM, John Menghini
Reno, Nevada
Reno, Nevada
Ely, Nevada
775861-6400
775861-6573 (0)
775 223-1359 (C)
775289-1964 (C)
Carson City,
Nevada
775684-7045 (0)
775721-1774 (C)
Nevada Division of
Minerals (NDOM)
Emeraencv Contacts
Service
Sheriff
EMS
Fire
State Police (NHP)
Hospital
Munic!palj!y
White Pine County
Ely Sheriff Department
Dispatches
Ely Fire Department
White Pine County
William B. Rivie _ _
....
Location
Ely Nevada
Ely, Nevada
Ely, Nevada
Elko, Nevada
Ely, Nevada
Phone
775289-8808
775 289-4833
or 911
775 289-2345
775753-1298
775289-3001
Chris!,l L. Morris
From:
Sent:
To:
Subject:
Christy L. Morris; Cowand, Scott; Graves, Jim; Hanks, Gayle; Hertfelder, Gary; Hughes, Bob;
PO:
Back load drill pipe and miscellaneous rig equipment. Clean location
24 hr Summary: Wait on daylight. Back load drill pipe (7 loads) and miscellaneous equipment (6 loads). Clean
Forecast:
PXP
WELL:
PLUTO_27-1
ACTIVITY: WAIT ON
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
ORIL
TO:
30
PROGRESS: 0
HRS:
0.00
DAYLIGHTS
RIG RELEASED AT 24:00 HRS
RIG:
Qty
MODEL
DATE:
SIZE
IADC
FROM
TVD: 30
TO
LGTH
HRS
RPT No:
89
105 DSS:
FOREMAN:M1KE SISTRUNK
API#:
2703305318
AFE#:
52448
CASING:
in. SHOE MD:
N1 N2 N3 WOB
RPM
MUD PROPERTIES
BHA#:
Description
0.0.
Length
Time:
307-462-0409
PH NBR:
NABORS 148
Oil:
VISC:
pH:
Chi:
10 sec Gel:
10 min Gel:
Ex Lime:
PV:
ElecStab:
YP:
MBT:
FROM
00:00
06:00
18:00
Angle
TO
06:00
18:00
00:00
TVD
HRS
6.00
12.00
6.00
5.500
10.00
5.500
10.00
P1:
95
0
95
0
PUMP#3
2.93
2.93
SLOW PUMP RATES
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
0.00
Mud Used
SURVEYS
MD
PUMP#2
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
CA:
Pm:
WL:
HTHP:
FC:
HYDRAULICS
Sid Pipe:
#Cyl:
00:00 Solids:
MW:
8/5/2007
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
Used
COSTS SUMMARY
Code
20
250
430
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
RIG COSTS
OVERHEAD
MISCELLANEOUS
Costs
1,500
137,000
18,000
250
15,675
II
$7,922,904
...
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV WHITE PINE
LAFAYEITEJHOUSTON
DRIL
TD:
30
PROGRESS: 0
HRS:
0.00
RIG:
Qty
MODEL
IADC
SIZE
FROM
DATE:
RPT No:
88
104 DSS:
FOREMAN:MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
in. SHOEMD:
CASING:
TVD: 30
PHNBR:
NABORS 148
TO
LGTH
HRS
N1 N2 N3 WOB
307-462-0409
RPM
MUD PROPERTIES
BHA#:
Description
O.D.
Length
Time:
MW:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
Elec Stab:
YP:
MBT:
FROM
00:00
06:00
18:00
Angle
TO
06:00
18:00
00:00
HRS
6.00
12.00
6.00
PUMP#2
3
5.500
10.00
5.500
10.00
95
0
95
0
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#3
2.93
2.93
SLOW PUMP RATES
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
Mud Used
V. Sect.
+N/-S
+EJ-W
Mud Additive
D.L.
Used
II
COSTS SUMMARY
Code
20
250
430
610
710
730
810
24.00
0.00
Dir.
TVD
SURVEYS
MD
PUMP#1
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
Std Pipe:
#Cyl:
00:00 Solids:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
Ex Lime:
PV:
8/4/2007
Description
CONTRACT LABOR
TRANSPORTATION LAND
RIG COSTS
ENVIRONMENTAL
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
18,000
18,000
1,01
1,17E
250
3,994
$43,932
$7,750,479
PXP
WELL:
PLUTO_27-1
LAS VEGAS
FIELD:
NV
WHITE PINE
STATE:
AREA:
LAFAYETTEIHOUSTON
DRIL
CLASS:
RIG CONTR: NABORS DRILLING
TRIPI BIT#
Qty
MODEL
DATE:
TO:
30
PROGRESS: 0
HRS:
0,00
RIG:
IADC
SIZE
FROM
87
RPT No: 103 DSS:
FOREMAN:MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
in, SHOE MD:
CASING:
TVD: 30
PHNBR:
NABORS 148
TO
LGTH
HRS
N1 N2 N3 WOB
RPM
MUD PROPERTIES
BHA':
Description
0,0,
Length
Time:
MW:
VISC:
pH:
Chi:
Wl:
HTHP:
FC:
PV:
307-462-0409
I
FROM
00:00
06:00
18:00
TO
06:00
18:00
00:00
TVD
HRS
6,00
12,00
6,00
PUMP12
5,500
10,00
5,500
10,00
95
0
95
SPM:
liner Id:
S,l.:
Rod Dia:
Eff%:
GPM:
PUMPl3
2,93
2,93
SLOW PUMP RATES
Elec Slab:
SPM:
PRSR:
MBT;
0,0
0,0
0,0
AV(DC):
PSI Drop:
HPlin2:
0,0
0,0
0,0
0,00
PUMPl1
3
AV(DP):
Jet Vel:
Bit HP:
MD
HYDRAULICS
SId Pipe:
#Cyl:
00:00 Solids:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
Ex Lime:
YP:
8/3/2007
SURVEYS
Dir,
V, Sect
Mud Used
+NI-S
+EI-W
Mud Additive
D.l.
Used
WAIT ON DYLIGHT
RIGGING DOWN
~AIT ON DAYLIGHT
COSTS SUMMARY
Code
20
430
460
730
810
Description
CONTRACT LABOR
RIG COSTS
DIRECTIONAL SERVICESILWt:
OVERHEAD
MISCELLANEOUS
Costs
1.500
18,000
233.855
250[1
25,360
..
---
.............
--
............
- - -
.........
$278,965
$7,706,547
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TO:
30
PROGRESS: 0
HRS:
0.00
TRIPI BIT#
Qly
MODEL
SIZE
IADC
FROM
TO
LGTH
TVD: 30
HRS
PH NBR:
N1 N2 N3 WOB
RPM
MUD PROPERTIES
BHA';
Description
0.0.
Length
Time:
MW:
10 sec Gel:
10 min Gel:
Chi:
WL:
HTHP:
FC:
CA:
Pm:
Pf:
Ex Lime:
PV:
Elec Stab:
YP:
MBT:
307 -462-0409
I
Dir.
TVD
TO
00:30
06:00
HRS
0.50
5.50
06:00
09:30
09:30
10:00
3.50
0.50
10:00
00:00
14.00
PUMPl2
5.500
10.00
5.500
10.00
95
0
95
0
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMPl3
2.93
2.93
SLOW PUMP RATES
SPM:
PRSR:
0.0
0.0
0.0
AV(OC):
PSI Drop:
HP/in2:
0.0
0.0
0.0
Mud Used
SURVEYS
FROM
00:00
00:30
0.00
PUMPl1
3
AV(DP):
Jet Vel:
BiIHP:
MD
HYDRAULICS
SId Pipe:
#Cyl:
00:00 Solids:
Oil:
VISC:
pH:
81212007
86
RPT No: 102 DSS:
FOREMAN:MIKE SISTRUNK
API#:
2703305318
52448
AFE#:
in. SHOEMD:
CASING:
NABORS 148
RIG:
DATE:
V. Sect.
+N/-S
+EJ-W
Mud Additive
D.L.
Used
COSTS SUMMARY
Code
20
250
350
360
400
430
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
CEMENTING AND SERVICES
MUD/FLUIDS/CHEMICALS
CASINGfTUBING/HAMMER EQ
RIG COSTS
WATER
COMMUNICAnONS
RENTAL EQUIPMENT
OVERHEAD
MISCelLANEOUS
1,500
250
1,500
250
16,393
24.00
Costs
1,500
18,000
98,057
450
22,425 1 I
20,000 I
..
_-_
$180,325
$7,427,582
PXP
WELL:
PLUTO_27-1
ACTIVITY: W.O.C
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
VllHITE PINE
NV
LAFAYETIE/HOUSTON
DRIL
TO:
4,460
PROGRESS: 0
Qty
MODEL
IADC
SIZE
DATE:
HRS:
0.00
85
101 DSS:
FOREMAN:MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1,590
RIG:
NABORS 148
PH NBR:
FROM
TO
RPT No:
TVD: 4,460
LGTH
HRS
0
0.00
N1 N2 N3 WOB
RPM
0.0.
Lenglh
ChI:
200 CA:
5 Pm:
WL:
HTHP:
FC:
SId Pipe:
#Cyl:
10.3 Oil:
60 10 sec Gel:
9.9 10 min Gel:
VISC:
pH:
7
10
40
0.3
5 Pf:
2 Ex Lime:
PV:
26 Elec Stab:
YP:
26 MBT:
Angle
TVD
SPM:
Linerld:
S.L.:
Rod Dia:
Eff%:
GPM:
1240 PUMP#1
3
90
5.500
10.00
PUMP#2
95
264
95
264
PUMP#3
3
90
5.500
10.00
2.93
2.93
SLOW PUMP RATES
25
SPM:
PRSR:
57
442
450
AV(DP):
Jet Vel:
BitHP:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
56
0.0
0.0
0.0
0.00
Mud Used
SURVEYS
MD
HYDRAULICS
O[):OO SOlids:
Time:
MW:
307-462-0409
[)
MUD PROPERTIES
BHA':
Description
8/1/2007
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
Used
MUD MAN
FROM
00:00
TO
01:00
HRS
1.00
01:00
02:30
06:30
09:30
02:30
06:30
09:30
13:00
1.50
4.00
3.00
3.50
13:00
13:30
0.50
13:30
15:30
16:30
17:30
18:00
18:30
19:00
15:30
16:30
17:30
18:00
18:30
19:00
00:00
2.00
1.00
1.00
0.50
0.50
0.50
5.00
COSTS SUMMARY
Code
20
250
1
360
430
440
550
610
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION -LAND
MUDIFLUIDS/CHEMICALS
RIG COSTS
BITSIHOLE OPENERS/UNDERI
WATER
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
3,625
450
20,000
15,000
1,500
1,013
250
4.331
250
4,792
$52,711
$7.247,257
PXP
WELL:
PLUTO_27-1
ACTIVITY: UD BHA
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TD:
6,336
PROGRESS: 0
HRS:
0.00
TRIP# BIT#
MODEL
IADC
SIZE
FROM
TO
31
Qty
O.D.
Length
Time:
N1 N2 N3 WOB
0
RPM
10.3
60
9.9
100
5.5
WL:
HTHP:
FC:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
2 Ex Lime:
PV:
25 Elec Stab:
YP:
27 MBT:
11
Std Pipe:
# Cyl:
7
10
40
0.3
0.25
1400 PUMP#1
3
TO
02:30
03:00
03:30
07:00
HRS
2.50
0.50
0.50
3.50
07:00
08:30
14:00
14:30
15:00
08:30
14:00
14:30
15:00
15:30
1.50
5.50
0.50
0.50
0.50
15:30
18:00
2.50
18:00
19:30
1.50
19:30
21:00
21:00
22:30
1.50
1.50
22:30
23:30
1.00
23:30
00:00
0.50
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#3
PUMP#2
90
5.500
10.00
3
90
5.500
10.00
95
264
95
264
2.93
2.93
SLOW PUMP RATES
25
SPM:
PRSR:
57
442
56
450
AV(DP):
Jet Vel:
BitHP:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
0.00
SURVEYS
Dir.
V. Sect.
Mud Used
+NI-S
+E/-W
Mud Additive
D.L.
Used
1
1
1
1
3
1
MUD MAN
PALLETS
POLYPAC R
SHRINK WRAPPING
SP-101
TAX
FROM
00:00
02:30
03:00
03:30
HYDRAULICS
00:00 Solids:
VISC:
pH:
ChI:
Angle
PH NBR:
307-462-0409
MUD PROPERTIES
BHA#:
Description
MW:
MD
84
100 DSS:
FOREMAN:MIKE SISTRUNKIMIKE MACALLISTEf;
2703305318
API#:
52448
AFE#:
in. SHOE MD: 4,495
CASING: 9.625
TVD: 6,336
HRS
LGTH
0.00
0
7/31/2007
RPT No:
NABORS 148
RIG:
DATE:
CREW
RID WEATHERFORD
CIRCULATE I SAFETY,
5 STDS,
EXISTS,
STANDS,
COSTS SUMMARY
Code
20
250
360
400
430
460
510
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUDIFLUIDSICHEMICALS
CASINGfTUBINGlHAMMER EQ
RIG COSTS
DIRECTIONAL SERVICESILWC
OPEN HOLE LOGfFORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
1,242
928
6,75C
20,000
C
1,600
1,500
250
5,901
250
4,112
$45,234
$7,194,546
PXP
DATE:
7/30/2007
WELL:
PLUTO_27-1
FIELD:
STATE:
LAS VEGAS
WHITE PINE
NV
TO:
AREA:
CLASS:
LAFAYETTE/HOUSTON
DRIL
AFE#:
52448
HRS:
0.00
CASING:
RIG:
NABORS 148
PH NBR:
STDS)
WHILE WAITING ON CASING
TRIP# BIT#
32
Qty
1
BHAI:
DeScription
MULESHOE
TVD: 9,643
9,643
PROGRESS: 0
FROM
IADC
SIZE
TO
LGTH
HRS
0.00
0
83
99 DSS:
FOREMAN: MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
RPT No:
N1 N2 N3 WOB
RPM
MUD PROPERTIES
32
O.D.
5.000
Length
8.23
Time:
00:00 Solids:
MW:
10.3 Oil:
63 10 sec Gel:
Chi:
100 CA:
WL:
5.5 Pm:
FC:
Pf:
2 Ex Lime:
PV:
27 Elec Stab:
YP:
30 MBT:
Angle
TVD
FROM
00:00
01:00
02:00
TO
01:00
02:00
03:30
HRS
1.00
1.00
1.50
03:30
17:00
17:00
20:30
13.50
3.50
20:30
22:00
23:30
22:00
23:30
00:00
1.50
1.50
0.50
8
11
1400 PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
90
5.500
10.00
3
90
5.500
10.00
95
264
95
264
40
0.3
Eff%:
0.25
GPM:
PUMP#2
PUMP#3
2.93
2.93
SLOW PUMP RATES
25
SPM:
PRSR:
57
442
56
450
AV(DP):
Jet Vel:
Bit HP:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
0.0
0.0
0.0
8.23
Dir.
Mud Used
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
CASING
24.00
Std Pipe:
#Cyl:
SURVEYS
MD
HYDRAULICS
11
VISC:
pH:
HTHP:
Used
MILGEL
32
MUD MAN
PALLETS
POLYPAC R
SODA ASH
TACKLE
1
1
5
20
2
1
TAX
COSTS SUMMARY
Code
20
250
360
410
430
460
Description
CONTRACT LABOR
Costs
2.700
18,903
2,042
13,578
TRANSPORTATION - LAND
MUDIFLUIDS/CHEMICALS
DRILLING CASING
510
550
RIG COSTS
DIRECTIONAL SERVICES/LWl:
OPEN HOLE LOG/FORMATIOI\
WATER
670
710
730
810
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
20,000
0
1.600
1,500
250
5,901
250
5,315
................. _ -
$72,039
$7,149,313
PliR7
................_
13'?
nate
i/:.ol;!f
Operator
Time to Close
Accumulator pressure at
Accumulator psi at
start
BOP
close
Annular
-
Pipe ram
Pipe ram
Pipe ram
Blind ram
HCR
valve(s)
HCR
~ve(s)_
c:
~-------- ....
'--
_.
/47t' fs;L'""
Time_toI bOld
ill
accumulator pressure to 3 000 .
,A.
t/)?l$ d~....
pSI.
flPbI2 Rig Manager
~p
'
pSI.
0
/A?~:4ll.. min..
t/Uv~
_ .Ill?t'um!!?f-
h.uI3',~iJ-uf~
3;(1" #t*ni'r
1Ad
COf~~ ~4-)
'l J ?1,,,,,,e/ ~e
f'~'f
I:er:.u
... ~ ~"".tnMc561!..e.
1fIIIIN!ia.~l+~~~
.. ...:.JP.~~78 _ ..... type~,,1te iI.us ....... 0. . . 6':.3'-'. . . 4. ~S-
()ptmIfiIIr
1'a ReR . . . . . type ..:sr~ ltli ....... ,1-- cbe..J:.;j
~A.ND RAM l'IIEVI:NTDS
BOP
Timil to Cbe
A=lmu1lWr psi It
start
AnnulIr
77';) ?5L
-6- 54..
lIP 70 ?57
2~
nr
/(;z 7 ~
psi.
~~4.min.
if'lAb/..) Rig Manager
i'X?
vvc..:; j//,
.llI~
::-t
'!:-';I-;.<;;<r:
10000
,,,:: III
- '.lI
0000
7
8000
!
\ ~ n
Cemen Line
7000
TSS}#9
T"t#lO&#ll
eooo
fI)
w
a:
~I !5000
~ ~
w
a:
l-
~0
Test #I 1
Tes1 #8
T7
l-
r-
t-
41000
T"t\
T"t\ IT"r
r-
Test #3
(')
nI
.1"
r--
o l/
l~
00:23:33
"r..t
~,":khlhll,~"'1 .,.......
1(0)
Ii
i
,
i
iil
...
2000
I~
4
r:r
r:r
3000
III
11:29:33
It-'
{t~l
t-
13:33:33
Tlmt hh:mm:tl
t f t Ir
r L-Jl
16:39:33
o
17:43:33
...
Choke Drawing
#7
Mud cross
Check
#10
#9
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
AREA:
CLASS:
MODEL
SIZE
IADC
HRS:
0.00
CASING:
RIG:
NABORS 148
PHNBR:
FROM
TO
32
Qty
1
BHA':
Description
MULESHOE
82
98 DSS:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
AFE#:
52448
TVD: 9,643
TO:
9,643
PROGRESS: 0
LGTH
HRS
0
0.00
RPM
N1 N2 N3 WOB
0.0.
5.000
Length
8.23
MW:
10.1 Oil:
48 10 sec Gel:
9.3 10 min Gel:
VISC:
pH:
I
Chi:
100 CA:
5.5 Pm:
WL:
HTHP:
FC:
pf:
Sid Pipe:
#Cyl:
21
YP:
17 MBT:
512 PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
4
6
40
0.2
0.2
2 Ex Lime:
PV:
HYDRAULICS
10
00:00 Solids:
Time:
[)
MUD PROPERTIES
32
7/29/2007
RPT No:
DATE:
PUMP#2
5500
10.00
3
82
5.500
10.00
95
0
95
240
PUMP#3
2.93
2.93
SLOW PUMP RATES
Elec Stab:
SPM:
PRSR:
24
57
442
56
450
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
AV(DP):
Jet Vel:
BitHP:
8.23
Mud Used
SURVEYS
MD
TVD
Angle
0.0
0.0
0.0
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L
Used
M-IWATE
MILGEL
MUD MAN
PALLETS
SHRINK WRAPPING
FROM
00:00
TO
00:30
HRS
0.50
00:30
03:00
03:00
03:30
2.50
0.50
03:30
06:00
07:30
09:30
06:00
07:30
09:30
10:00
2.50
1.50
2.00
0.50
10:00
11:30
1.50
11:30
16:00
4.50
16:00
18:00
2.00
18:00
00:00
6.00
RIHTO SHOE
24.00
16
7
1
1
1
25
SODA ASH
TAX
TRUCKING
1
600
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
Costs
2,700
1,611
20,000
DIRECTIONAL SERVICES/LWI:
OPEN HOLE LOGIFORMATIOI'I
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
104,462
1,500
250
5,901
250
13,667
$150,341
$7,077,274
PXP
DATE:
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
INHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TD:
9,643
PROGRESS: 0
HRS:
0.00
RIG:
BHA#:
Description
Qty
1
1
1
6
12
1
11
SIZE
8.750
IADC
445X
TVD: 9.643
PH NBR:
LGTH
HRS
0.00
0
MUD PROPERTIES
30
0.0.
8.750
6.000
6.000
6.000
5.000
6.500
5.000
BIT
BIT SUB
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
81
97 OSS:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
RPT No:
NABORS 148
TO
FROM
9.643
8.601
Length
0.75
3.00
1.26
181.13
365.36
3240
334.91
Time:
00:00
10.1
55
8.3
100
5.5
MW:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
Solids:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
2 Ex Lime:
PV:
24 Elec Stab:
YP:
25 MBT:
7/28/2007
307-462-0409
I
3
0
5
6
8
40
0
0.1
Std Pipe:
#Cyl:
MD
TO
06:30
HRS
6.50
06:30
07:00
0.50
07:00
15:30
8.50
15:30
18:00
2.50
18:00
00:00
6.00
24
V.Sect.
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#2
95
270
95
270
PUMP#3
3
92
5.500
10.00
SPM:
PRSR:
57
442
56
450
256.6 AV(DC):
68.9 PSI Drop:
13.5 HP/in2:
326.2
42.9
0.2
Mud Used
+N/-S
+E/-W
= Total
Mud Additive
D.L.
24.00
R
LOG
2.93
2.93
SLOW PUMP RATES
FROM
00:00
0
G
4
NO
918.81
Dir.
TVD
2300 PUMP#1
3
92
5.500
10.00
SURVEYS
Angle
L
H
HYDRAULICS
11
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
D
FC
Used
DUO-VIS
M-IWATE
MUD MAN
PALLETS
POLYPAC R
SACK BLACK
SHRINK WRAPPING
SP-101
TAX
10
24
1
1
33
10
1
11
1
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
Costs
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICESlLWD
OPEN HOLE LOG/FORMATIOr-.
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
8.263
20,000
0
1,600
1,50C
250
5,901
25(J
4,046
Hours Today
Total Daily Cost:
Cumulative Cost To Date:
$44,510
$6,926,933
PXP
WELL:
FIELD:
STATE:
AREA:
CLASS:
PLUTO_27-1
LAS VEGAS
NV WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TO:
RIG:
BHAtt:
Description
Qty
1
1
1
6
12
1
11
SIZE
~.750
IADC
445X
FROM
9,643
ILGTH
HRS
0
0.00
MUD PROPERTIES
30
O.D.
8.750
6.000
6.000
6.000
5.000
6.500
5.000
BIT
BIT SUB
CROSSOVER
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVY WEIGHT DP
PHNBR:
NABORS 148
TO
length
Time:
0.75 MW:
3.00
VISC:
1.26
pH:
181.13
365.36 Chi:
32.40 Wl:
334.91 HTHP:
FC:
Oil:
10 sec Gel:
10min Gel:
CA:
Pm:
Pf:
2 Ex Lime:
PV:
23 Elec Stab:
YP:
21 MBT:
307-462-0409
5
7
40
0.2
0.2
Std Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff %:
GPM:
Angle
TVD
FROM
00:00
02:00
06:00
TO
02:00
06:00
07:30
HRS
2.00
4.00
1.50
07:30
00:00
16.50
PUMP#3
PUMP#2
92
5.500
10.00
3
92
5.500
10.00
95
270
95
270
2.93
2.93
SLOW PUMP RATES
25
SPM:
PRSR:
57
442
56
450
256.6
68.9
13.9
AV(DC):
PSI Drop:
HP/in2:
326.2
44.1
0.2
918.81
Mud Used
SURVEYS
MD
2200 PUMP#1
3
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
80
HYDRAULICS
11
00:00 Solids:
10.4
48
9
100
5.3
DSS:
96
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
TVD: 9,643
9,643
PROGRESS: 0
HRS:
0.00
712712007
DATE:
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
WASH AND REAM LEDGE F/5,31 0' TO 5,400', WASH & REAM
Used
DUO-VIS
MILGEL
MUD MAN
PALLETS
POLYPAC R
SACK BLACK
SHRINK WRAPPING
SP-101
TAX
5
1
1
1
40
36
3
35
1
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
DeSCription
Costs
CONTRACT LABOR
MUD/FLUIDSIGHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LI.NC
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
11,594
20,00C
0
1,600
1,500
250
5,901
250
4,380
$48,175
$6,882,423
PXP
WELL:
FIELD:
STATE:
AREA:
CLASS:
PLUTO_27-1
TD:
9,643
PROGRESS: 0
0.00
HRS:
NABORS 148
RIG:
TRIP# BIT#
28
BHA#:
Description
Qty
1
1
1
12
1
12
SIZE
FROM
IADC
TO
TVD: 9,643
PH NBR:
N1 N2 N3 WOB RPM
0
~O
MUD PROPERTIES
29
O.D.
8.750
6.500
6.500
6.000
5.000
6.500
5.000
BIT
BIT SUB
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
lGTH
HRS
0.00
0
length
0.75
3.00
1.26
181.13
365.36
32.40
368.56
Time:
10.7
42
9
100
5.6
WL:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
3
5
40
0.2
0.2
PV:
Pf:
2 Ex Lime:
22 Elec Slab:
YP:
12 MBT:
24
HTHP:
FC:
307-462-0409
I
Sid Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
TVD
Angle
PUMP#2
PUMP#3
3
90
5.500
10.00
95
264
95
264
2.93
2.93
SLOW PUMP RA lES
57
442
56
450
-517,4
0.0
0.0
AV(DC}:
PSI Drop:
HP/in2:
SPM:
PRSR:
-359.3
0.0
0.0
952.46
Mud Used
SURVEYS
MD
2175 PUMP#1
3
90
5.500
10.00
AV(DP}:
Jet Vel:
BitHP:
Tolal BHA length:
HYDRAULICS
12
00:00 Solids:
MW:
VISC:
pH:
Chi:
78
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRll
7/25/2007
DATE:
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
Used
DUO-VIS
M-I WATE
MUD MAN
PAllETS
SHRINK WRAPPING
TAX
FROM
00:00
08:00
08:30
13:00
TO
08:00
08:30
13:00
15:00
HRS
8.00
0.50
4.50
2.00
15:00
00:00
9.00
5
56
1
1
2
1
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
DeScription
Costs
CONTRACT LABOR
MUD/FlUIDS/CHEMICAlS
RIG COSTS
DIRECTIONAL SERVICES/LWC
OPEN HOLE lOG/FORMATIOl\
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
1,720
20,000
2,350
1,600
1,50C
25C
5,901
250
3,627
$39,898
$6,764,511
Chris~
From:
Sent:
To:
Cc:
Subject:
L. Morris
Hertfelder, Gary IGHertfelder@pxp.com]
Tuesday, July 24, 2007 4:18 PM
Christy L. Morris; John_Menghini@nv.blm.gov
Hertfelder, Gary
Pluto 27-1 Well
As you know we have been attempting to recover the fish. However, the all fishing attempts have been unsuccessful.
Thus our plan moving forward is to make a hole conditioning run prior to running a dipmeter log (8600'- 6900'). Based on
the evaluation of the processed dip meter log, three possibilities exit, 1} lay a 200 ft (8682' - 8482') cement plug on top of
fish, side track around fish and drill to planned TO of 12000 ft., 2} lay 200 ft (8682' - 8482') cement plug and drill to new
bottomhole location (BHL) and 3) Plug and abandon the well. What forms are required for sidetracking the well?
*****************~******************
PXP
DATE:
WELL:
PLUTO_27-1
ACTIVITY: WASHING/REAMING AT
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFA YETIElHOUSTON
DRIL
TO:
9,643
PROGRESS: 0
HRS:
0.00
7,720'
RPT No: 93 DSS:
77
CUTIING RETURNING AT SHALE FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
RIG:
I TRIP# I BIT# I
MODEL
FROM
IADC
I SIZE
BHM:
Description
1
1
1
TO
12
1
1:
I LGTH I HRS
10
1000
API#:
AFE#:
CASING:
2703305318
52448
9.625
in. SHOE MD: 4,495
PH NBR:
307-462-0409
I RPM I I
~O
0.0,
8.750
6.500
6.500
6.000
5.000
6.500
5.000
Length
Time:
0.75 MW:
3.00
VlSC:
1.26
pH:
181.13
365.36 Chi:
32.40 WL:
368,56 HTHP:
FC:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
40
0.2
Pf:
0.2
24 Elec Slab:
YP:
23 MBT:
2160 PUMP#1
3
Angle
TVD
SPM:
PRSR:
25
952.46 I
Dir.
I V, Sect.
5.500
10.00
3
90
5.500
10.00
95
264
264
PUMP#3
95
0
2.93
2.93
SLOW PUMP RATES
AV(DP):
Jet Vel:
Bit HP:
57
442
56
450
-517.4 AV(DC):
0.0 PSI Drop:
0,0 HPlin2:
-359.3
0.0
0.0
Mud Used
SURVEYS
MD
PUMP#2
90
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
5
7
2 Ex Lime:
PV:
+N/-S
+EI-W
Mud Additive
D.L.
Used
DUO-VIS
M-I WATE
MUD MAN
TAX
TRUCKING
FROM
00:00
03:30
16:00
18:00
22:00
I R
HYDRAULICS
Std Pipe:
#Cyl:
11
00:00 Solids:
10.7
51
9
100
5.5
I 0 I 0 I LIB I G I 0
JjO
MUD PROPERTIES
29
BIT
BIT SUB
PROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
TVD: 9,643
NABORS 148
28
Qty
7/2412007
80
1
500
22:00
00:00
24.00
COSTS SUMMARY
Code
Description
Costs
0
20
360
430
460
510
550
670
710
730
810
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWlJ
OPEN HOLE LOGIFORMATlO,.,.
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
2,700
2,550
20,000
11,901
1,60(
1,50(
250
46,344
250
8,710
$95,805
$6,724,612
PXP
WELL:
FIELD:
STATE:
AREA:
CLASS:
PLUTO_27-1
ASSEMBLY,
LAS VEGAS
WHITE PINE
NV
LAFAYETIEfHOUSTON
DRIL
RIG:
Qty
1
1
1
1
1
6
12
1
1
1
SIZE
MODEL
BHA#:
Description
OVERSHOT
EXTENSION-FISHING
TOP sub
bentjt dp
BUMPER SUB
STEEL DC
HEAVY WEIGHT DP
CROSSOVER
JARS
CROSSOVER
HEAVY WEIGHT DP
IADC
FROM
PHNBR:
NABORS 148
TO
LGTH
HRS
0
0.00
Nl N2 N3 WOB
25
RPM
MUD PROPERTIES
28
0.0.
8.125
Length
2.76
3.00
1.18
31.69
11.80
181.13
365.76
3.00
32.40
3.00
182.88
Time:
10.5
52
9
100
5.4
Oil:
10 sec Gel:
10min Gel:
CA:
Pm:
5
7
40
0.2
0.2
Pf:
2 Ex Lime:
PV:
23 Elec Stab:
YP:
25 MBT:
Angle
FROM
00:00
TO
01:00
HRS
1.00
01:00
03:00
2.00
03:00
05:00
2.00
05:00
10:30
10:30
14:00
5.50
3.50
14:00
19:00
5.00
19:00
21:00
21:00
00:00
2.00
300
SId Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
1200 PUMP#l
3
54
5.500
10.00
PUMP#2
95
158
95
161
PUMP#3
3
55
5.500
10.00
2.93
2.93
SLOW PUMP RATES
25
SPM:
PRSR:
57
442
56
450
AV(DP):
Jet Vel:
Bit HP:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPfin2:
0.0
0.0
0.0
818.60
Dir.
TVD
76
307-462-0409
Mud Used
SURVEYS
MD
DSS:
HYDRAULICS
11
00:00 Solids:
MW:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
92
7/23/2007
TVD: 9,643
TD:
9.643
PROGRESS: 0
0.00
HRS:
DATE:
V.Sect.
+Nf-S
+Ef-W
Mud Additive
D.L.
Used
DUO-VIS
M-I WATE
MUD MAN
PALLETS
SHRINK WRAPPING
TAX
TRUCKING
8
176
1
1
5
1
600
COSTS SUMMARY
Code
20
250
360
430
460
510
540
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION -LAND
MUD/FLUIDSfCHEMICALS
RIG COSTS
DIRECTIONAL SERVICESfLWlJ
OPEN HOLE LOGfFORMATION
FUEL/LUBE/ELECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
2,376
3,651
20,000
11,901
1,600
11,502
1,500
250
5,901
250
6,163
24.00
$67,794
$6,628,807
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETIElHOUSTON
DRIL
9,643
TD:
PROGRESS: 0
HRS:
0.00
75
RPT No: 91 DSS:
depth), LITHOLOGY: 90% SHALE, FOREMAN:MIKE SISTRUNKIMIKE MACALLISTER
MODEL
QIy
1
1
1
1
1
1
1
18
IADC
SIZE
BHA':
Description
OVERSHOT
EXTENSION-FISHING
TOP JUG
CIRCULATING SUB
BUMPER SUB
CROSSOVER
JARS
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
FROM
TVD: 9,643
NABORS 148
RIG:
7/22/2007
DATE:
TO
HRS
!LGTH
0
0.00
API#:
AFE#:
CASING:
2703305318
52448
in. SHOE MD: 4,495
9.625
PH NBR:
307-462-0409
N1 N2 N3 WOB
5
RPM
MUD PROPERTIES
28
0.0.
8.125
Length
Time:
2.76 MW:
3.00
VISC:
1.18
pH:
2.64
11.80 Chi:
3.00 Wl.:
32.40 HTHP:
3.00 FC:
181.13 PV:
548.65
YP:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
7
10
40
0.2
2
Pf:
2 Ex Lime:
Std Pipe:
#Cyl:
Angle
TO
04:30
HRS
4.50
04:30
09:30
09:30
12:00
5.00
2.50
12:00
16:30
4.50
16:30
21:00
4.50
21:00
21:50
0.83
21:50
23:00
1.17
23:00
00:00
1.00
SPM:
Liner Id:
SL:
Rod Dia:
Eff%:
GPM:
95
158
95
161
PUMP#3
2.93
2.93
SLOW PUMP RATES
26 Elec Stab:
24
29 MBT:
57
442
SPM:
PRSR:
56
450
0.0 AV(DC):
0.0 PSI Drop:
0.0 HP/in2:
0.0
0.0
0.0
Mud Used
V. Sect.
+N/-S
+EJ-W
Mud Additive
D.L.
24.00
3
55
5.500
10.00
Used
1
184
1
1
4
1
DUO-VIS
M-IWATE
MUD MAN
PALLETS
SHRINK WRAPPING
TAX
FROM
00:00
789.56
Dir.
TVD
PUMP#2
SURVEYS
MD
1200 PUMP#1
3
54
5.500
10.00
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
11
00:00 Solids:
10.5
61
9
100
5.4
COSTS SUMMARY
Code
Description
Costs
0
20
360
430
460
510
550
670
710
730
810
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWD
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
2'70~
1,86
20,000
11,901
1,600
1,500
250
5,901
250
4,597
$50,568
$6,561,013
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TO:
TRIP. BiTt
MODEL
RR8 fl(RC
BHA#:
Description
Qty
1
1
1
3
18
1
5
IADC
445X
FROM
9,643
TO
LGTH
HRS
0
0.00
N1 N2 N3 WOB
RPM
O.D.
8.750
6.000
6.000
6.000
5.000
6.500
5.000
Length
Time:
1.00 MW:
3.00
VISC:
1.26
pH:
89.27
548.65 Chi:
32.34 WL:
153.28 HTHP:
FC:
307-462-0409
10.5 Oil:
46 10 see Gel:
9 10 min Gel:
100 CA:
5.4 Pm:
Pf:
2 Ex Lime:
PV:
23 Elee Stab:
YP:
19 MBT:
4
6
40
0.2
0.2
Std Pipe:
'Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
1750 PUMP#1
3
Angle
TVD
PUMP#2
77
5.500
10.00
3
82
5.500
10.00
TO
05:30
HRS
5.50
05:30
06:30
1.00
06:30
07:30
1.00
07:30
10:00
10:00
17:30
2.50
7.50
17:30
18:00
0.50
18:00
22:00
22:00
00:00
4.00
200
95
226
95
240
24
SPM:
PRSR:
57
442
56
450
221.4
63.3
10.2
AV(DC):
PSI Drop:
HPlin2:
281.5
37.5
0.2
828.80
Dir.
Mud Used
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L
24.00
PUMP#3
Used
:1
DUO-VIS
M-IWATE
MUD MAN
PALLETS
SHRINK WRAPPING
TAX
FROM
00:00
2.93
2.93
SLOW PUMP RATES
SURVEYS
MD
HYDRAULICS
11
00:00 Solids:
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
~2 32 ~2 ~5
MUD PROPERTIES
27
BIT
BIT SUB
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
PH NBR:
NABORS 148
RIG:
SIZE
8.750
74
90 DSS:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
API.:
2703305318
52448
AFE.:
in. SHOE MD: 4,495
CASING: 9.625
TVD: 9,643
9,643
PROGRESS: 0
0.00
HRS:
7/21/2007
RPT No:
ASSEMBLY
26
DATE:
230
1
1
5
1
COSTS SUMMARY
Code
20
350
360
430
460
510
550
670
710
730
810
Description
CONTRACT LABOR
CEMENTING AND SERVICES
MUDIFLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWO
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
10,110
2,526
20,000
11,901
1.600
2,513
250
5,901
250
5,775
$63,525
$6,510,445
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
LAS VEGAS
WHITE PINE
NV
LAFA YETTE/HOUSTON
CLASS:
DRIL
MODEL
TRIP# BIT#
25
OVER SHOT
0
Qty
1
1
1
1
1
16
1
5
SIZE
BHA#:
Description
OVERSHOT
EXTENSION-FISHING
CROSSOVER
CIRCULATING SUB
BUMPER SUB
HEAVYWEIGHT DP
JARS
HEAVY WEIGHT DP
NABORS 148
RIG:
FROM
73
89 DSS:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
52448
AFE#:
RPT No:
TVD: 9,643
TO:
9,643
PROGRESS: 0
0.00
HRS:
TO
lGTH
HRS
0
0.00
0.0.
Length
2.72
4.00
1.43
2.64
11.80
548.65
32.34
153.28
Time:
00:00 Solids:
MW:
10 Oil:
9.625
PH NBR:
307-462-0409
N1 N2 N3 WOB
VISC:
pH:
80 10 sec Gel:
9.1 10 min Gel:
Chi:
100 CA:
WL:
5.5 Pm:
HTHP:
Pf:
FC:
2 Ex Lime:
PV:
29 Elec Stab:
YP:
38 MBT:
RPM
Angle
9,025
9,119
9,214
9,309
9,404
9,501
9,597
FROM
TVD
0.26
0.26
0.18
0.26
0.70
0.97
1.49
00:00
TO
01:00
HRS
1.00
01:00
06:30
06:30
09:00
5.50
2.50
09:00
10:30
12:00
12:30
14:30
10:30
12:00
12:30
14:30
16:30
1.50
1.50
0.50
2.00
2.00
16:30
19:00
2.50
19:00
20:00
1.00
20:00
22:30
23:00
22:30
23:00
23:30
2.50
0.50
050
23:30
00:00
0.50
9,11~
9,214
9,309
9,404
9.501
9,597
11
15
40
0.2
0.2
Sid Pipe:
#Cyl:
3520 PUMP#1
PUMP#2
SPM:
Liner Id:
S.L.:
Rod Dia:
Eft %:
GPM:
86
5.500
10.00
3
87
5.500
10.00
95
252
95
255
PUMP#3
2.93
2.93
SLOW PUMP RATES
25
SPM:
PRSR:
57
442
56
450
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
0.0
0.0
0.0
756.86
Dir.
9,02E
HYDRAULICS
9
Mud Used
SURVEYS
MD
~5
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
CASING:
MUD PROPERTIES
26
7/20/2007
DATE:
136.0C
136.0C
136.0C
136.0C
136.00
136.00
136.00
V. Sect.
-13.31
-13.6f
-13.94
-14.21
-14.78
-15.79
-17.28
+N/-S
-13.37
-13.68
-13.94
-14.21
-14.78
-15.79
-17.28
+E/-W
12.91
13.21
13.4
13.7~
14.2
15.2'
16.6E
Mud Additive
D.L.
0.19
0.00
0.06
0.06
0.46
0.28
0.54
Used
DUO-VIS
M-IWATE
MUD MAN
PALLETS
1
50
SHRINK WRAPPING
1
1
TAX
COSTS SUMMARY
Description
Code
Costs
0
20
250
360
430
460
510
550
670
710
730
810
CONTRACT LABOR
TRANSPORTATION - LAND
2.700
1,214
MUD/FLUIDS/CHEMICALS
972
RIG COSTS
DIRECTIONAL SERVICESILWD
20,000
11,901
1,600
1,500
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
250
5,901
250
4.629
j
$50,917
$6,446,920
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
AREA:
CLASS:
DRIL
RIG:
BHA':
Description
QIy
1
1
1
3
19
1
5
MODEL
H30
SIZE
6.750
IADC
445X
FROM
9,643
TVD: 9,643
AFE#:
NABORS 148
TO
HRS
LGTH
0.00
0
O.D.
8.750
6.625
6.500
6.500
5.000
6.500
5.000
Length
0.75
3.00
1.66
89.27
587.55
32.07
153.68
Time:
00:00 Solids:
MW:
10 Oil:
83 10 sec Gel:
9.1 10 min Gel:
Chi:
100 CA:
WL:
5.4 Pm:
Pf:
HTHP:
FC:
307-462-0409
RPM
~5
30 Elec Stab:
YP:
41
13
17
40
0.2
0.2
Std Pipe:
#Cyl:
3520 PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
86
5.500
10.00
3
87
5.500
10.00
95
252
95
255
FROM
00:00
02:30
03:00
06:00
06:30
TO
02:30
03:00
06:00
06:30
07:30
TVD
0.26
0.26
0.18
0.26
0.70
0.97
1.49
HRS
2.50
0.50
3.00
0.50
1.00
07:30
11:00
3.50
11:00
00:00
13.00
Dir.
9,02~
9.11E
9.214
9.309
9.404
9,501
9,597
PUMP#2
PUMP#3
2.93
2.93
SLOW PUMP RATES
24
MBT:
SPM:
PRSR:
57
442
56
450
240.9
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
362.0
0.0
0.0
Mud Used
SURVEYS
Angle
867.98
9,025
9.119
9.214
9.309
9,404
9.501
9,597
HYDRAULICS
9
AV(DP):
JetVe!:
BitHP:
MD
'5
2 Ex Lime:
PV:
9.625
PH NBR:
N1 N2 N3 WOB
VISC:
pH:
52448
CASING:
MUD PROPERTIES
24
BIT
BIT SUB
CROSSOVER
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVY WEIGHT DP
72
RPT No: 88 DSS:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
2703305318
API#:
PICK-UP FISHING
TOOLS
TO:
9.643
PROGRESS: 0
0.00
HRS:
7/19/2007
DATE:
136.0C
136.0(
136.0C
136.0C
136.0C
136.0C
136.0C
V. Sect.
-13.31
-13.6f
-13.94
-14.21
-14.78
-15.76
-17.28
+N/-S
-13.37
-13.6!
-13.9~
-14.21
-14.7t
+E/-W
12.91
13.21
13.4E
13.7~
14.2
-15.7~
15.2~
-17.2t
16.6S
Mud Additive
D.L.
0.1S
0.00
0.08
0.08
0.46
0.28
0.54
Used
DUO-VIS
M-IWATE
2
63
1
1
1
MUD MAN
PALLETS
SHRINK WRAPPING
TAX
COSTS SUMMARY
Code
20
250
360
430
460
510
550
670
Description
CONTRACT LABOR
Costs
2.700
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
2.871
1.880
20.0('0
RIG COSTS
DIRECTIONAL SERVICES/LVVD
OPEN HOLE LOG/FORMATIOr-.
WATER
11.901
1.600
710
730
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
1,500
250
5,901
250
810
MISCELLANEOUS
4.885
II
24.00 = Total Hours Today
$53,739
$6.396.003
PXP
PLUTO_27-1
WELL:
FIELD:
STATE:
AREA:
CLASS:
BHA#:
Descriotion
Qty
1
1
1
1
1
9
19
1
5
TO:
9,643
PROGRESS: 306
HRS:
12.00
SIZE
6.750
IADC
445X
FROM
TO
9,643
8.611
PH NBR:
LGTH
HRS
1.029 53.50
Nl N2 N3 WOB
3 3 3
RPM
MUD PROPERTIES
22
0.0.
8.750
6.750
2.250
5.250
6.750
6.000
5.000
6.500
5.000
BIT
TRU TRACK
STOP SUB
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
TVD: 9.643
NABORS 148
RIG:
Length
0.90
30.95
2.63
1.77
5.62
274.45
576.51
32.07
153.28
7/18/2007
ACTIVITY: POOH
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TRIP# BIT#
MODEL
23
12
M616
DATE:
Time:
MW:
VISC:
pH:
Chi:
WL:
00:00
10
64
9.1
100
5.5
HTHP:
FC:
Solids:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
2 Ex Lime:
PV:
26 Elec Stab:
YP:
32 MBT:
307-462-0409
Angle
MD
9.025
9,119
9,214
9,309
9,404
9,501
9,597
FROM
00:00
08:00
08:30
11:00
TO
08:00
08:30
11 :00
14:00
TVD
0.26
0.26
0.18
0.26
0.70
0.97
1.49
HRS
8.00
0.50
2.50
3.00
14:00
15:00
15:30
16:00
16:30
15:00
15:30
16:00
16:30
18:30
1.00
0.50
0.50
0.50
2.00
18:30
22:30
4.00
22:30
00:00
1.50
9,02e
9,1H
9,21~
9,309
9,40~
9,501
9,597
9
12
40
0.2
0.2
Std Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
3520 PUMP#l
3
PUMP#2
86
5.500
10.00
3
87
5.500
10.00
95
252
95
255
PUMP#3
2.93
2.93
SLOW PUMP RATES
24
SPM:
PRSR:
57
442
56
450
240.9
165.9
72.7
AV(DC):
PSI Drop:
HP/in2:
306.2
245.7
1.2
1078.18
SURVEYS
Dir.
V.
136.0(
136.0(
136.0C
136.0C
136.0C
136.0C
136.0C
Mud Used
Sect.
-13.3
-13.6f
-13.9<1
-14.21
-14.7S
-15.79
-17.2e
+N/-S
-13.37
-13.6e
-13.~
-14.21
-14.78
-15.79
-17.28
+E/-W
12.91
13.21
13.46
13.7~
14.2
15.2e
16.6f
Mud Additive
D.L.
0.19
0.00
0.08
0.08
0.46
0.28
0.54
24.00
HYDRAULICS
8
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
71
Used
M-IWATE
MUD MAN
PALLETS
SACK BLACK
SHRINK WRAPPING
SP-l01
TAX
48
1
1
15
1
18
1
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
Description
Costs
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWC
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
3,952
2C,OOO
11,~01
1,600
1,500
250
5,901
250
4,805
$52,859
$6,342,265
Chris~
L. Morris
MichaeLTyler@blm.gov
Friday, July 20, 2007 10:03 AM
John_Menghini@nv.blm.gov; Christy L. Morris
PXP Pluto BOPE Test
From:
Sent:
To:
Subject:
Great Morning
Just returned from the location. PXP has decided to get fish out of hole before they conduct
the BOPE test. I met with the Schlumberger Testers today. They do off-shore BOPE testing and
I feel very good about the test being done properly when it is done. They might be days or
just hours getting the fish out of the hole and then conducting the test.
Will be out of the office this afternoon and this weekend. My wife and I are celebrating our
34 th anniversary so we might be out of town. Will have my eel if needed.
Thanx J
MRT
Michael R. Tyler
BLM Nevada
Oil & Gas Inspector
775-289-1964
775-289-1966 f
775-296-0818 c
Chris!l L. Morris
MichaeLTyler@blm.gov
Christy L. Morris
John_Menghini@nv.blm.gov
Update.
From:
Sent:
To:
Cc:
Subject:
Witnessed Csg J Cement & BOPE test over weekend and Monday.
Cement went well also. Cement pumped with full returns to surface during the job.
Cement weight and yield were lighter due to deeper Csg run. Water separated from cement in
Replaced
I talked with John M and he agreed. If they have problems they will test.
,Jj
;'
DY Exploration. Toano Draw 15-19. John Taylor called today. Rig moving on to the Toano Draw
Have you tried to call or email me this week? Have had no missed calls or VM. All other calls
Thanx J
MRT
Michael R. Tyler
BLM Nevada
Oil & Gas Inspector
775-289-1964
775-289-1966 f
775-296-0818 c
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
LAS VEGAS
Vv'HITE PINE
NV
LAFAYETIE/HOUSTON
AREA:
CLASS:
TO:
RIG:
BHA.:
Description
QIy
1
1
1
1
1
9
19
1
5
SIZE
B.750
NABORS 148
TO
FROM
8,611
9,643
IADC
445X
LGTH
HRS
1,029 53.50
0.0.
8.750
6.750
2.250
5.250
6.750
6.000
5.000
6.500
5.000
Length
0.90
30.95
2.63
1.77
5.62
274.45
576.51
32.07
153.28
Time:
00:00 Solids:
MW:
10 Oil:
AFE#:
52448
CASING:
9.625
PH NBR:
307-462-0409
N1 N2 N3 WOB
3 3
3
VISC:
pH:
64 10 sec Gel:
9.1 10minGel:
Chi:
100 CA:
WL:
5.5 Pm:
FC:
Pf:
2 Ex Lime:
PV:
26 Elec Stab:
YP:
32 MBT:
HTHP:
7/18/2007
71
RPT No: 87 055:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
RPM
MUD PROPERTIES
22
BIT
TRU TRACK
STOP SUB
FLOAT SUB
FILTER SUB
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVYWEIGHT DP
TVD: 9,643
9,643
PROGRESS: 306
HRS:
12.00
DRIL
MODEL
TRIP# BIT#
12
23
~616
DATE:
FROM
00:00
08:00
08:30
11:00
14:00
15:00
15:30
16:00
16:30
TVD
Angle
9,025
9,119
9,214
9,309
9,404
9,501
9,597
TO
08:00
08:30
11:00
14:00
15:00
15:30
16:00
16:30
18:30
0.26
0.26
0.18
0.26
0.70
0.97
1.49
HRS
8.00
0.50
2.50
3.00
1.00
0.50
0.50
0.50
2.00
18:30
22:30
4.00
22:30
00:00
1.50
9,1H
9,21~
9,30E
9,4~
9,501
9,59
9
12
40
0.2
0.2
Std Pipe:
# CyI:
3520 PUMP#l
PUMP#2
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff %:
GPM:
86
5.500
10.00
3
87
5.500
10.00
95
252
95
255
PUMP#3
2.93
2.93
SLOW PUMP RATES
24
SPM:
PRSR:
57
442
56
450
240.9
165.9
72.7
AV(DC):
PSI Drop:
HP/in2:
306.2
245.7
1.2
1078.18
Dir.
9,02~
HYDRAULICS
8
Mud Used
SURVEYS
MD
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
136.00
136.0C
136.0C
136.0C
136.0C
136.0C
136.0C
V. Sect.
-13.37
-13.6S
-13.94
-14.21
-14.7f
-15.7E
-17.2E
+N/-S
-13.3
-13.6f
-13.~
-14.21
-14.7S
-15.75
-17.2S
+E/-W
12.91
13.21
13.4E
13.n
14.2
15.2~
16.6e
Mud Additive
D.L.
0.19
0.00
0.08
0.08
0.46
0.28
0.54
Used
M-IWATE
48
1
MUD MAN
PALLETS
1
15
1
SACK BLACK
SHRINK WRAPPING
SP-l01
TAX
18
1
COSTS SUMMARY
Code
Description
Costs
0
2,700
3,952
20
360
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
430
460
510
550
RIG COSTS
DIRECTIONAL SERVICES/LWC
OPEN HOLE LOG/FORMATION
WATER
670
710
COMMUNICATIONS
RENTAL EQUIPMENT
730
810
OVERHEAD
20,000
11,901
1,600
1,500
250
5,901
250
4,805
MISCELLANEOUS
$6,342,265
...............
_-_ ............... _ -
PXP
WELL:
PLUTO_27-1
ACTIVITY: DRILLING @
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV WHITE PINE
LAFAYETTE/HOUSTON
DRIL
9,337
TO:
PROGRESS: 426
23.50
HRS:
TRIP# BIT#
MODEL
M616
12
BHA#:
Description
Qty
1
1
1
1
9
19
1
5
SIZE
~.750
FROM
8,611
IADC
445X
TO
HRS
LGTH
723
41.50
0.0.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
Length
0.90
33.30
1.79
5.60
274.45
576.51
32.07
153.29
70
86 DSS:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
PHNBR:
N1 N2 N3 WOB
3 3 3 5
RPM
9.9 Oil:
60 10 sec Gel:
9.1 10 min Gel:
100 CA:
5.5 Pm:
Pf:
2 Ex Lime:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
PV:
23 Elec Slab:
YP:
30 MBT:
307-462-0409
I
11
40
0.2
0.2
3520 PUMP#1
3
Angle
MD
8,736
8,832
8,929
9,025
9,119
9,214
9,309
0.70
0.88
0.44
0.26
0.26
0.18
0.26
FROM
00:00
TO
10:30
HRS
10.50
10:30
11 :00
11:00
00:00
0.50
13.00
8,736
8,832
8,929
9,025
9,119
9,214
9,309
5.500
10.00
95
252
95
255
PUMP#3
0
0
2.93
2.93
SLOW PUMP RATES
24
SPM:
PRSR:
57
442
56
450
240.9 AV(DC):
165.9 PSI Drop:
72.0 HP/in2:
362.0
243.3
1.2
136.0C
136.0C
136.0C
136.0C
136.0C
136.0C
136.0C
-11.2C
-12.15
-12.95
-13.3t
-13.6B
-13.94
-14.21
Mud Used
+N/-S
-11.2C
-12.H
-12.9E
-13.3
-13.6E
-13.9~
-14.21
+E/-W
10.81
11.72
12.51
12.91
13.21
13.46
13.72
Mud Additive
D.L.
0.21
0.19
0.45
0.19
0.00
0.08
0.08
AROP 22.6'
Used
DO
M-IWATE
MUD MAN
PALLETS
SACK BLACK
SHRINK WRAPPING
SP-101
TAX
19
36
1
1
40
2
7
1
COSTS SUMMARY
Code
20
360
430
460
510
540
550
670
710
730
810
24.00
1077.91
SURVEYS
Dir.
V. Sect.
TVD
PUMP#2
3
87
5.500
10.00
86
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
AV(DP):
Jet Vel:
BiIHP:
Total BHA Length:
HYDRAULICS
Std Pipe:
#Cyl:
00:00 Solids:
Time:
MW:
7/17/2007
RPT No:
MUD PROPERTIES
22
BIT
TRUTRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
TVD: 9,337
NABORS 148
RIG:
23
DATE:
Description
CONTRACT LABOR
MUDIFLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWC
OPEN HOLE LOG/FORMATION
FUEULUBE/ElECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
4,096
20,000
11,901
1,600
17,139
2,453
250
5,901
250
6,629
$72,919
$6,289,406
PXP
WELL:
PLUTO_27-1
ACTIVITY: DRILLING
FIELD:
STATE:
AREA:
LAS VEGAS
WHITE PINE
NV
LAFA YETTE/HOUSTON
TO:
8,908
PROGRESS: 297
CLASS:
DRIL
23
BHA':
Description
Qty
1
1
1
1
9
19
1
SIZE
B.750
69
85 DSS:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
AFE#:
52448
HRS:
18.00
CASING:
NABORS 148
PH NBR:
FROM
8,611
lADe
445X
TVD: 8,908
TO
LGTH
HRS
18.00
297
Nl N2 N3 WOB
3 35
3
3
RPM
MUD PROPERTIES
O.D.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
Length
0.90
33.30
1.79
5.60
274.45
576.51
32.07
153.29
Time:
00:00 Solids:
MW:
9.9 Oil:
VISC:
pH:
61 10 sec Gel:
9.1 10 min Gel:
Chi:
100 CA:
WL:
5.3 Pm:
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
26 Elec Stab:
YP:
25 MBT:
Angle
8,357
8.451
8.546
FROM
00:00
06:00
TO
06:00
00:00
0.18
0.35
0.18
HRS
6.00
18.00
8,35
8,451
8.54
8
6
9
40
0.2
0.2
Std Pipe:
#Cyl:
PUMP#2
3
5.500
10.00
3
84
5.500
10.00
95
252
95
246
2.93
2.93
86
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#3
0
0
SPM:
PRSR:
57
442
56
450
236.6
163.0
68.2
AV(DC):
PSI Drop:
HP/in2:
355.6
234.7
1.1
Mud Used
136.00
136.0(
136.0(
V. Sect.
-9.44
-9.76
-10.07
+N/-S
+E/-W
-9.4~
9.12
-9.76
-10.0
9.4~
9.7
Mud Additive
D.L.
0.00
0.18
0.18
16.5'
DUO-VIS
M-IWATE
5
1
13
MUD MAN
PALLETS
1
1
SACK BLACK
SHRINK WRAPPING
SP-l0l
TAX
30
3
17
1
COSTS SUMMARY
20
250
360
430
460
510
DeScription
CONTRACT LABOR
Costs
2.700
2,816
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG COSTS
4,368
DIRECTIONAL SERVICES/LWD
730
810
MISCELLANEOUS
550
670
710
Used
DD
Code
24.00
1077.91
Dir.
TVD
HYDRAULICS
SURVEYS
MD
3520 PUMP#l
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
7/16/2007
RPT No:
RIG:
22
BIT
TRUTRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVY WEIGHT DP
DATE:
20,000
11,901
1,600
1,500
250
7,241
250
5.263
$57,889
$6,216.487
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
111
12
MODEL
H30
RIG:
~616
BHA#:
Qty
1
1
9
19
1
5
SIZE
~.750
~.750
IADC
445X
445X
NABORS 148
FROM
TO
7,516
8,611
8,611
0.0.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
BIT
TRU TRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
LGTH 1 HRS
1,092 1111.50
0.00
84 DSS:
68
FOREMAN: MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
AFE#:
52448
CASING:
9.625
PH NBR:
307-462-0409
Length
0.90
33.30
1.79
5.60
274.45
576.51
32.07
153.29
h3
MW:
10 Oil:
75 10 sec Gel:
9 10 min Gel:
VISC:
pH:
Chi:
100 CA:
WL:
5.4 Pm:
HTHP:
10
14
40
0.2
0.2
Pf:
FC:
2 Ex Lime:
PV:
30 Elec Stab:
YP:
36 MBT:
o
2
Angle
8,357
8,451
8,546
TVD
0.18
0.35
0.18
R
PP
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
84
5.500
10.00
3
86
5.500
10.00
95
246
95
252
2.93
2.93
PUMP#2
PUMP#3
0
0
57
442
56
450
Jet Vel:
BitHP:
236.6
163.0
68.9
AV(DC):
PSI Drop:
HP/in2:
355.6
237.1
1.1
1077.91
Dir.
8,35f
8,451
8,546
BIG
o
NO
10
3175 PUMP#l
3
Mud Used
SURVEYS
MD
D 1 L
NO 1ft.
Std Pipe:
#Cyl:
AV(DP):
HYDRAULICS
00:00 Solids:
Time:
7/15/2007
RPT No:
MUD PROPERTIES
22
Description
TVD: 8,605
TO:
8,611
PROGRESS: 79
HRS:
6.00
LAFAYETIE/HOUSTON
DRIL
TRIP#I BIT#
BREAKING
IN PDC BIT
22
23
DATE:
136.0C
136.0C
136.0C
V. Sect.
-9.4~
-9.7f
-10.0
+N/-S
-9.44
-9.7f
-10.0f
+E/-W
9.1.
9.4.
9.73
Mud Additive
D.L.
0.00
0.18
0.18
Used
DUO-VIS
M-IWATE
MUD MAN
SP-l0l
2
34
1
22
TAX
FROM
00:00
06:00
07:30
TO
06:00
07:30
12:00
HRS
6.00
1.50
4.50
12:00
12:30
12:30
15:00
0.50
2.50
15:00
15:45
0.75
15:45
16:30
17:00
18:30
19:00
20:00
21:00
16:30
17:00
18:30
19:00
20:00
21:00
00:00
0.75
0.50
1.50
0.50
1.00
1.00
3.00
TO DRIlJ.ING JARS
HANGE OUT DRILLING JARS
IH TO SHOE
EST TI-MM & MWD TESTED OK
HANGE DIES ON TOP DRIVE PIPE HANDLER
RIH TO 7,330'
WASH & REAM FI7,330' TO 7,615' WHILE PPUMPING SWEEP,
WORK PIPE ON CONNECTIONS (VERY TIGHT)
COSTS SUMMARY
Code
20
360
430
440
460
510
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
BITS/HOLE OPENERS/UNDERI
we
550
670
710
730
DIRECTIONAL SERVICES/L
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
810
MISCELLANEOUS
Costs
2,700
4,320
20,000
21,OCO,
11,901
1,600
1,500
250
5,901
250
6,942
$76,364
$6,158,597
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFA YETTE/HOUSTON
DRIL
TD:
8,532
PROGRESS: 225
HRS:
23.00
TRIP# BIT#
11
22
BHA#:
Description
Qty
1
1
1
1
9
19
1
5
MODEL
H30
RIG:
SIZE
8.750
67
83 DSS:
FOREMAN: MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
RPT No:
13'
LITHOLOGY 100% SHALE
FROM
7,516
TVD: 8,532
PH NBR:
NABORS 148
TO
LGTH
HRS
1,013 105.50
RPM
N1 N2 N3 WOB
45
0 0
MUD PROPERTIES
21
0.0.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
BIT
TRUTRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVY WEIGHT DP
Length
0.75
33.30
1.79
5.60
274.45
576.51
32.40
153.29
Time:
10
56
9
100
5.4
VISC:
pH:
Chi:
WL:
HTHP:
FC:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
2 Ex Lime:
PV:
28 Elec Stab:
YP:
20 MBT:
307-462-0409
I
9
6
9
40
0.2
0.2
Std Pipe:
#Cyl:
Angle
8,357
8,451
FROM
00:00
09:30
10:00
16:30
23:30
TO
09:30
10:00
16:30
23:30
00:00
TVD
0.18
0.35
HRS
9.50
0.50
6.50
7.00
0.50
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
95
246
95
252
PUMP#3
3
86
5.500
10.00
2.93
2.93
SLOW PUMP RATES
24
57
442
SPM:
PRSR:
56
450
236.6 AV(DC):
173.1 PSI Drop:
77.8 HP/in2:
355.6
267.7
1.3
Mud Used
136.0(
136.0(
V.Sect.
-944
-9.76
+N/-S
-9.4~
-9.7f
+E/-W
9.1.
9.4.
Mud Additive
D.L.
0.00
0.18
Used
DUO-VIS
MILGEL
MUD MAN
SP101
TAX
1
1
1
1
1
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
24.00
1078.09
Dir.
8,35
8,451
PUMP#2
SURVEYS
MD
3175 PUMP#1
3
84
5.500
10.00
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
00:00 Solids:
MW:
7/1412007
DATE:
Description
Costs
CONTRACT LABOR
MUDIFLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWD
OPEN HOLE LOG/FORMATIOl'<
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
1,388
20,000
11.901
1.600
2,513
250
5,901
250
4,650
$51,153
$6.082.233
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFA YEITE/HOUSTON
DRIL
8,113
TO:
PROGRESS: 253
HRS:
23.50
RIG:
22
BHA#:
Description
Qty
1
1
1
1
9
19
1
5
MODEL
H30
SIZE
B.750
IADC
FROM
7,516
445X
DATE:
AROP 12.8'
TVD: 8,107
TO
LGTH
HRS
597
61.00
RPT No:
65
81 DSS:
FOREMAN:MIKE SISTRUNK/MIKE MACALLISTER
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
PH NBR:
NABORS 148
N1 N2 N3 WOB
20 0 0 45
RPM
MUD PROPERTIES
21
0.0.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
BIT
TRU TRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
Length
0.75
33.30
1.79
5.60
274.45
576.51
32.40
153.29
Time:
10.1
57
9
100
5.3
VISC:
pH:
Chi:
Wl.:
HTHP:
FC:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
40
0.2
P1:
0.2
26 Elec Stab:
YP:
21 MBT:
5
8
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
90
5.500
10.00
3
91
5.500
10.00
95
264
95
267
7,506
7,602
7,696
7,791
7.886
7,979
8,074
0.18
0.09
0.18
0.26
0.09
0.35
0.18
Dir.
FROM
00:00
02:00
07:00
TO
02:00
07:00
07:30
HRS
2.00
5.00
0.50
07:30
00:00
16.50
7,501
7,59
7,691
7.78
7.881
7.97~
8.06E
PUMP#2
PUMP#3
2.93
2.93
SLOW PUMP RATES
24
57
442
SPM:
PRSR:
56
450
252.3 AV(DC):
184.6 PSI Drop:
95.2 HP/in2:
379.1
307.4
1.6
Mud Used
SURVEYS
TVD
1078.09
2700 PUMP#1
3
AV(DP):
Jet Vel:
Bil HP:
MD
Sid Pipe:
ICy!:
2 Ex Lime:
PV:
307 -462-0409
HYDRAULICS
00:00 Solids:
MW:
7/12/2007
136.0C
136.0C
136.00
136.00
136.00
136.00
135.00
V.Sect.
-55.5f
-55.7
-55.8!:
-56.1~
-56.36
-56.61
-56.9~
+N/-S
-55.56
-55.7~
-55.89
-5615
-5636
56.61
-56.93
-+-E/-W
Mud Additive
DL
41.20
41.36
41.51
41.77
41.97
42.22
42.52
0.36
0.09
0.10
0.08
0.18
0.28
0.18
Usea
MIl..GEL
MUD MAN
PALLETS
SACK BLACK
SHRINK WRAPPING
SP101
TAX
15
1
1
15
2
12
1
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
Description
CONTRACT LABOR
MUD/FLUIDs/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICESfLVVD
OPEN HOLE LOG/FORMATIOI\
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
2.995
20,000
11,901
1.600
2.100
250
5,901
250
4,770
II
24.00
$52.467
$5,963,624
PXP
DATE:
711112007
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFA YETTE/HOUSTON
DRIL
TO:
7,860
PROGRESS: 202
HRS:
23.50
RIG:
TVD: 7,848
NABORS 148
API#:
AFE#:
CASING:
2703305318
52448
9.625
in. SHOE MD: 4,495
PH NBR:
307-462-0409
R
22
51
19
1
f;
MUD PROPERTIES
21
BHA#:
Description
Qty
0.0.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
BIT
TRUTRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
Length
0.75
33.30
1.79
5.60
274.45
576.51
32.40
153.29
Time:
MW:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
00:00
10.3
65
9.1
HYDRAULICS
11
Solids:
Oil:
10 sec Gel:
10 min Gel:
100 CA:
5.3 Pm:
Pf:
2 Ex Lime:
PV:
30 Elec Stab:
YP:
24 MBT:
Std Pipe:
ICy!:
6
9
40
0.2
0.2
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
1879 PUMP#1
3
74
5.500
10.00
PUMP#2
95
217
95
205
25
SPM:
PRSR:
57
442
Angle
6,872
6,992
7,200
7,318
7,413
7,506
7,602
6.40
6.50
6.40
2.90
0.18
0.18
0.09
301.3
198.0
0.8
1078.09
Mud Used
Mud Additive
D.L.
TVD
6,86
6,98
7,19
7,31
7,40
7,501
7,59
0.80
0.08
5.75
2.97
2.86
0.36
0.09
FROM
00:00
08:00
08:30
TO
08:00
08:30
13:30
HRS
8.00
0.50
5.00
13:30
00:00
10.50
24.00
56
450
200.5 AV(DC):
146.7 PSI Drop:
48.7 HP/in2:
SURVEYS
MD
o
o
2.93
2.93
SLOW PUMP RATES
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
PUMP#3
3
70
5.500
10.00
Used
DD
MILGEL
MUD MAN
PALLETS
SACK BLACK
SHRINK WRAPPING
SP-l01
15
2
9
TAX
COSTS SUMMARY
Code
20
360
430
460
510
550
610
670
710
730
810
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/L
OPEN HOLE LOG/FORMATIO!';
WATER
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2, 700
2,6281
20,000'
11,901
1,60C
1,50C
952
250
5,901
250
4,768,
$52.450
$5,911,158
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV WHITE PINE
LAFAYETIE/HOUSTON
DRIL
TD:
7,516
PROGRESS: 0
HRS:
0.00
RIG:
BHAI:
Descriotion
QIy
1
1
1
1
9
19
1
5
MODEL
H30
SIZE
8.750
IADC
445X
FROM
7,516
DATE:
62
RPT No: 78 DSS:
FOREMAN: BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
in, SHOE MD: 4,495
CASING: 9.625
TVD: 7,516
PH NBR:
NABORS 148
TO
LGTH
HRS
0
0.00
N1 N2 N3 WOB
0 20
RPM
O.D.
8,750
6.750
5,250
6,750
6.500
5.000
6.500
5.000
BIT
TRU TRACK
FLOAT SUB
FILTER SUB
STeEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
Length
Time:
0.75 MW:
33.30
VISC:
1.79
pH:
5,60
274.45 Chi:
576,51 WL:
32.40 HTHP:
153.29 FC:
00:00
10.3
72
9.1
100
5,3
8
12
0.2
0,2
Pf:
2 Ex Lime:
31
YP:
30 MBT:
MD
6,672
6,772
6,872
6,992
7,200
7,318
7,413
FROM
00:00
11:30
16:30
17:30
20:30
22:00
TO
11:30
15:30
17:30
20:30
22:00
00:00
4.50
5.60
6.40
6.50
6.40
2.90
0.18
HRS
11.50
5.00
1.00
3.00
1.50
2.00
6,66E
6,76E
6,86S
6,988
7,195
7,313
7,40B
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#2
95
401
95
0
PUMP#3
3
6.000
10.00
3.49
3.49
SLOW PUMP RATES
Elec Stab:
25
SPM:
PRSR:
57
403
58
418
190,5 AV(DC):
139.4 PSI Drop:
41.8 HP/in2:
286.3
178,8
0,7
1078.09
SURVEYS
V, Sect.
Dir.
TVD
Angle
2000 PUMP#1
3
115
6.000
10.00
AV(DP):
Jet Vel:
BiIHP:
Tolal BHA Length:
HYDRAULICS
Sid Pipe:
#Cyl:
SolidS:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
PV:
307-462-0409
~O
MUD PROPERTIES
21
7/9/2007
130.6e
136.3(
135.1(
136.0C
-47.5
-53,61
-61.H
-70.8
-67.n
-58.1
-55.5e
Mud Used
+N/-S
-47.5
-53.61
-61.15
-70.86
-67.72
-58.16
-55,60
+E/-W
Mud Additive
D.L
9.95
16.30
23.54
32.89
41.10
41.10
41.10
0.67
1.21
0.80
0.08
5.75
2.97
2.85
USdd
M-IWATE
MILGEL
MUD MAN
SHRINK WRAPPING
SP-101
21,
1
1
1
5
COSTS SUMMARY
Code
20
360
430
440
460
510
540
550
670
710
730
810
Description
Costs
CONTRACT LABOR
MUDIFLUIDS/CHEMICALS
RIG COSTS
BITS/HOLE OPENERS/UNDERI
DIRECTIONAL SERVICES/LIND
OPEN HOLE LOG/FORMATIOr-.
FUEULUBE/ELECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
3,471
20,000
13,100
11,901
1,600
11,870
1.500
250
5,901
250
7,254
$79,797
$5,581,110
PXP
WELL:
PLUTO_27-1
ACTIVITY: DRILLING
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETIE/HOUSTON
DRIL
TO:
7.445
PROGRESS: 209
HRS:
24.00
RIG:
BHA#:
Description
Qty
1
1
1
1
9
19
1
5
MODEL
H23
SIZE
B.750
FROM
7,100
IADC
445X
61
RPT No: 77 DSS:
FOREMAN: BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
in. SHOE MD: 4,495
CASING: 9.625
TVD: 7.445
PH NBR:
NABORS 148
TO
LGTH
HRS
228
27.50
RPM
iN1 N2 N3 WOB
tlO 0 tlO 45
0.0.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
BIT
TRUTRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT OP
JARS
HEAVY WEIGHT DP
Length
Time:
0.75 MW:
33.30
VISC:
1.79
pH:
5.60
274.45 Chi:
576.51 WL:
32,40 HTHP:
153.29 FC:
PV:
Oil:
10 sec Gel:
10minGel:
CA;
Pm:
Pf:
2 Ex Lime:
29 Elec Stab:
YP:
24 MBT:
10
Angle
6.672
6.772
6,872
6.992
7.200
7.318
7,413
FROM
00:00
TO
00:00
4.50
5.60
6.40
6.50
6.40
2.90
0.18
HRS
24.00
6,66~
130.6e
6.76f
136.3~
6.86~
136.10
136.00
6.98E
7.19E
7,31~
7,40f
5
13
0.2
0.2
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
115
6.000
10.00
6.000
10.00
95
401
95
0
PUMP#2
PUMP#3
3,49
3.49
SLOW PUMP RATES
25
SPM:
PRSR:
57
403
58
418
190.5 AV(OC}:
139.4 PSI Drop:
41.8 HP/in2:
286.3
178.8
0.7
1078.09
Oir.
TVD
Sid Pipe:
#Cyl:
Mud Used
SURVEYS
MD
2000 PUMP#1
3
AV(DP}:
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
00:00 Solids:
10.3
62
9.1
100
5,4
307-462-0409
MUD PROPERTIES
21
7/812007
DATE:
V. Sect.
-47.53
-5361
-61.15
-70.86
-67.72
-58.16
-55.60
+N/-S
-47.5~
+E/-W
-53.61
9.9f
16.3C
-61.1e
23.5~
-70.8
32.89
41.10
41.10
41.10
-67.7~
-58.1E
-55.6e
Mud Additive
O.L.
0.67
1.21
0.80
0.08
5.75
2.97
2.86
Used
40
M-IWATE
MILGEL
POLY PAC R
SP-101
17
1
13
24.00
Description
Costs
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWC
OPEN HOLE LOG/FORMATIOt.
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2.700
4.615
20.000
11,901
1.600
1,500
250
5.901
250
4.872
$53.589
$5.501.313
PXP
WELL:
PLUTO_27-1
ACTIVITY: DRLG
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TO:
7,236
PROGRESS: 19
3.50
HRS:
RIG:
BHA':
Description
Qty
1
1
1
1
9
19
1
5
MODEL
H23
SIZE
8.750
IADC
445X
FROM
7,100
DATE:
60
76 DSS:
FOREMAN:BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
52448
AFE':
in. SHOE MD: 4,495
CASING: 9.625
RPT No:
TVD: 7,236
PHNBR:
NABORS 148
TO
LGTH
HRS
19
3.50
N1 N2 N3 WOB
20 o 45
RPM
7
MUD PROPERTIES
21
0.0.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
BIT
TRUTRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
Length
0.75
33.30
1.79
5.60
274.45
576.51
32.40
153.29
Time:
MW:
10.3
68
9.2
100
5.3
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
2 Ex Lime:
Chi:
WL:
HTHP:
FC:
PV:
31
YP:
27 MBT:
307-462-0409
I
6
9
40
0.2
2
Std Pipe:
'Cy!:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
Angle
MD
6,472
6,572
6,672
6,772
6,872
6,992
7,200
FROM
00:00
01:00
06:00
06:30
07:00
10:00
16:00
17:00
18:00
20:00
21 :30
TO
01:00
06:00
06:30
07:00
10:00
16:00
17:00
18:00
20:00
21 :30
00:00
3.80
4.10
4.50
5.60
6.40
6.50
6.40
HRS
1.00
5.00
0.50
0.50
3.00
6.00
1.00
1.00
2.00
1.50
2.50
TVD
6,47e
6,57C
6,66g
6,76g
6,86S
6,988
7,19~
PUMPi!2
95
384
95
0
PUMPi!3
3
6.000
10.00
3.49
3.49
SLOW PUMP RATES
Elec Stab:
25
SPM:
PRSR:
57
403
58
418
182.5 AV(DC):
133.5 PSI Drop:
36.7 HP/in2:
274.2
163.9
0.6
1078.09
SURVEYS
Dir.
V.Sect.
156.1(
-36.6E
-42.3<
137.7C
130.6e
-47.5
136.3C
-53.61
-61.1~
136.1C
-70.8e
136.0C
-67.72
Mud Used
+N/-S
-36.6{
-42.3
-47.5
-53.61
-61.1~
-70.8
-67.72
+E/-W
0.8~
4.5/
9.91:
16.3C
23.54
32.ag
41.1C
24.00
2000 PUMPi!l
3
110
6.000
10.00
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
00:00 Solids:
VISC:
pH:
71712007
Mud Additive
D.L.
0.71
1.30
0.67
1.21
0.80
o.oa
5.75
Used
M-IWATE
MILGEL
POLYPAC R
POLY PAC UL
SP-l01
25
4
6
1
26
COSTS SUMMARY
Code
20
360
430
460
510
550
610
670
710
730
810
DeScription
CONTRACT LABOR
MUDIFLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICESlLvvtJ
OPEN HOLE LOGIFORMATION
WATER
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
8,435
20,000
16.719
1.600
1,500
1.965
250
5,901
250
5.932
$65,252
$5,447.724
PXP
WELL:
PLUTO_27-1
ACTIVITY: DRLG
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TO:
7,217
PROGRESS: 117
HRS:
19.00
RIG:
BHAt:
Description
Qty
1
1
1
2
1
1
1
6
1
5
MODEL
H23
SIZE
B.750
FROM
7,100
IADC
445X
TO
59
75 DSS:
FOREMAN:BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
in. SHOE MD: 4,495
CASING: 9.625
TVD: 7,217
PH NBR:
LGTH
HRS
117
19.00
N1 N2 N3 WOB RPM
110
0 20
0 ~O
MUD PROPERTIES
O.D.
8.750
6.500
6.500
6.500
6.500
6.500
6.500
5.000
5.000
6.500
5.000
Length
1.00
3.00
1.35
59.99
4.83
30.80
4.00
183.66
576.51
32.40
153.28
Time:
10.4 Oil:
10 sec Gel:
9.2 10 min Gel:
100 CA:
Pm:
Pf:
2 Ex Lime:
PV:
Elec Stab:
YP:
MBT:
307-462-0409
I
Angle
MD
6,272
6,372
6,472
6,572
6,672
6,772
6,872
FROM
00:00
05:00
TO
05:00
00:00
2.80
3.40
3.80
4.10
4.50
5.60
6.40
HRS
5.00
19.00
6,27e
6,37C
6,470
6,570
6,669
6,769
6,868
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
0.2
PUMP#2
95
209
95
209
PUMP#3
3
60
6.000
10.00
3.49
3.49
SLOW PUMP RATES
SPM:
PRSR:
24
57
403
58
418
198.6 AV(DC):
145.3 PSI Drop:
47.8 HP/in2:
298.5
198.1
0.8
1050.82
SURVEYS
Dir.
V. Sect.
TVD
2000 PUMP#1
3
60
6.000
10.00
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
HYDRAULICS
Std Pipe:
#Cyl:
00:00 Solids:
MW:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
7/6/2007
RPT No:
NABORS 148
20
BIT
BIT SUB
CROSSOVER
STEEL DC
STABILIZER
STEEL DC
STABILIZER
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVY WEIGHT DP
DATE:
146.5C
146.7C
156.10
137.70
130.60
136.30
136.10
-26.6
-31.1 e
-36.6E
-42.33
-47.53
-53.61
-61.15
Mud Used
+N/-S
+E/-W
-26.6
-31.H
-36.66
-42.33
-47.53
-53.61
-61.15
-5.1
-2.t!
0.8.
4.5
9.9f
16.3C
23.5~
Mud Additive
DL
Used
0.96
0.60
0.71
1.30
0.67
1.21
080
24.00
Description
CONTRACT LABOR
MUDIFLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOGIFORMATION
FUEULUBE/ELECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
1,100
20,000
1,600
6,095
1.500
250
5,901
250
3.940
$43.336
$5.382,472
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TO:
7,100
PROGRESS: 0
HRS:
0,00
RIG:
BHA#:
Description
Qty
1
1
1
2
1
1
1
6
1
5
MODEL
H23
SIZE
~.750
FROM
IADC
445X
TVD: 7,100
PH NBR:
LGTH
HRS
0
0.00
N1 N2 N3 WOB
20 ~O ~O
RPM
MUD PROPERTIES
20
D.o.
8.750
6.500
6.500
6,500
6.500
6.500
6.500
5.000
5.000
6.500
5.000
BIT
BIT SUB
CROSSOVER
STEEL DC
STABILIZER
STEEL DC
STABILIZER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
58
RPT No: 74 DSS:
FOREMAN:BRENT GILBERT/MIKE MACALLISTI
2703305318
API':
AFE#:
52448
in, SHOE MD: 4,495
CASING: 9.625
NABORS 148
TO
Length
1.00
3,00
1.35
59.99
4,83
30,80
4.00
183.66
576.51
32.40
153.28
MW:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
63
9.2
100
6,2
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
2 Ex Lime:
PV:
29 Elec Stab:
YP:
20 MBT:
307-462-0409
I
5
7
40
0.2
0.2
Std Pipe:
#Cyl:
2000 PUMP#1
3
SPM:
Liner Id:
S,L.:
Rod Dia:
Eff%:
GPM:
24
SPM:
PRSR:
Angle
6,272
6,372
6,472
6,572
6,672
6,772
6,872
2.80
3.40
3.80
4.10
4,50
5.60
6.40
FROM
00:00
02:30
03:30
07:00
TO
02:30
03:30
07:00
08:30
HRS
2.50
1.00
3.50
1.50
08:30
17:00
17:00
16:00
8.50
1.00
18:00
00:00
6,00
6,270
6,37(J
6,47(J
6,570
6,669
6,769
6,868
60
6.000
10.00
3
60
6.000
10.00
95
209
95
209
PUMP#3
0
0
58
418
198.6 AV(DC}:
145.3 PSI Drop:
47.8 HP/in2:
298,5
196.1
0.8
1050.82
Dir.
TVD
PUMP#2
57
403
Mud Used
SURVEYS
MD
3.49
3.49
SLOW PUMP RATES
AV(DP):
Jet Vel:
Bit HP:
HYDRAULICS
00:00 Solids:
10,4 Oil:
Time:
7/5/2007
DATE:
146.50
146,70
156.10
137.7(J
130,60
136.30
136.1(J
V.Sect.
-26.6
-31.15
-36,6e
-42.33
-47,53
-53.61
-61.15
+N/-S
-26.6
-31.1:
-36.6
-42.3'
-47,5~
-53.61
-61.1 E
+E/-W
-5.1
2, 1~
0.82
4,51
9.9~
16.30
23.504
Mud Additive
D.L.
Used
0.96
0.60
0.71
1.30
0,67
1.21
0.80
COSTS SUMMARY
Code
20
360
370
430
510
550
670
710
730
810
Description
Costs
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
CASED HOLE LOG/SLlCKLlNE,
RIG COSTS
OPEN HOLE LOG/FORMATIO~
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
1,100
147,050
20,(100
1,600
1,500
250
5,901
250
18,035
$196,386
$5,339,136
RECEIVED
J. '-..&11.1 J UJlU.......
I~LlUI
UNlItU~IAlt~
[February 2005)
E~~~~2
N/A
DGasWell
DOther
i3b.
3a Address
1021 Main, Suite 2100, Houston, TX. 77002
27-033-0531S
NE SE Section 27-T1SN-RI6E
TYPE OF SUBMISSION
TYPE OF ACTION
DACidize
D Notice of Intent
Subsequent Report
Minera'~5
ZOO7
N/A
rvruvl ttrr1\.Vv.c.u
DDeepen
D Alter Casing
D Casing Repair
D Change Plans
D Convert to Injection
D Fracture Treat
D
D
D
New Construction
Plug and Abandon
Plug Back
Production (StartlResume)
D Water Shut-Off
Reclamation
D
D
Recomplete
TemlXlrarily Abandon
D Well Integrity
00rher Change setting depth
Water Disposal
of9-5/S"
13. Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration therenf
If the proposal is to deepen directionally or recomplete horizontally. give subsurface locations and measured and true vertical depths ofall pertinent markers and zones
Attach the Bond under which the work \.\'iIJ be performed or provide the Bond ~o. on flIe with BLMlBLA.. Required subsequent reports must be filed within 30 days
following completion of the mvolved operations. [fthe operalion results in a multiple completion or recompletion in a new interial. a Form 3160-4 must be filed unce
testing has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed, and the operator has
determined that the site is ready for tlnal inspection.)
The original approved 95/S" casing setting depth was 7250', however, after drilling to 4750' severe lost circulation problems resulted in
borehole instability making it necessary to set casing. The 9-5/S" casing was set at 4495' or 255' off bottom. The casing was cemented with 270
bbls of9.5 ppg cement and 20 bbl of 15.S ppg Class G cement. No circulation or cement returns were observed during the cementing
operation. The Bottom plug was bumped with 600 psi, 2 bbls fluid bled back and the floats were holding. CIP 22:30 hours.
correct
Gary P. Hertfelder
Signature
6//9/01
Office
Date J UN 2 9 2007
Minerals Management
Title 18 U.S.c. Sectioo 1001 and Title 43 U.S.c. Section 1212, make it a crime for any person knov.ingly and willfully to make to any department or agency of the United
States any false. fictitious or fraudulent statements or representations as to any matter Within its jurisdiction
(Instructions on page 2)
PXP
Daily Report
July 3,2007
Operated - Drilling
WELL:
FIELD:
CTY/ST:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
10% SILTSTONE
90 % SHALE
24 hr Summary:
TOOH - RIG UP I BAKER ATLAS - GIH WI TRIPEl COMBO TAG @ 4712 - POOH - RUN CBl
OK- TRIPINHOLE TO 4735 REAM TO 7100 - RASIE MUD WT TO 10.0 PPG
Forecast:
lOG WI BAKER ATLAS
p XP
WELL:
PLUTO_27-1
FIELD:
LAS VEGAS
STATE:
NV WHITE PINE
AREA:
LAFAYETTE/HOUSTON
DRIL
CLASS:
RIG CONTR: NABORS DRILLING
TRIP# BIT#
MODEL
8
XRC
18
BHA#;
Qty
1
1
9
19
1
5
SIZE
6.750
FROM
TO
7,100
7,100
18
Description
7,100
0
0.00
NABORS 148
LGTH
HRS
0
0.00
Length
Time:
1.00 MW:
3.00 VISC:
274.45
.
576.51 pH.
32.40 Chi:
153.28 WL:
HTHP:
FC:
PV:
TVD: 7,100
N1 N2 N3 WOB
32 ~2 32 25
YP:
00:00 Solids:
10.1 Oil:
57 10 sec Gel:
'.
9.1 10 min Gel.
100 CA:
6.7 Pm:
Pf:
2 Ex Lime:
20 Elec Stab:
RPM
8
MD
Angle
TVD
6
9
40
0.2
0.2
16 MBT:
22
1800 PUMP#1
3
76
6.000
10.00
V. Sect.
PUMP#2
3
76
6.000
10.00
TO
00:30
04:30
05:30
05:30
07:30
08:30
09:30
07:30
08:30
09:30
12:30
12:30
15:30
15:30
00:00
PUMP#3
SPM:
PRSR:
57
403
58
418
251.8 AV(DC):
72.0 PSI Drop:
14.4 HP/in2:
378.4
46.7
0.2
Mud Used
+N/-S
+E/-W
D.L.
Mud Additive
Used
29
320
10
M-I BAR
M-I WATE
PALLETS
POLYPAC R
SHRINK WRAPPING
FROM
00:00
00:30
04:30
95
95
265
265
3.49
3.49
SLOW PUMP RATES
1040.64
SURVEYS
Drr.
HYDRAULICS
Sid Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eft %:
GPM:
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
7/2/2007
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
PH NBR: 307-462-0409
MUD PROPERTIES
O.D.
8.750
6.500
6.500
5.000
6.500
5.000
BIT
BIT SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
DATE:
HRS
Activity Last 24 Hours
0.50 BUILD SLUG, SLUG PIPE, TRIP OUT OF WELL
4.00 FINISH TOH/LOGGING
1.00 RlU BAKER HUGHES M/U RESISTIVITY. DENSITY NEWTRON
GAMARAY. CALPER TOOLS
COSTS SUMMARY
Code
Description
Costs
20
360
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
430
510
550
670
710
730
810
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2.700
3012
'
20.000
1,600
1,500
250
5.901
250
3,521
$38,734
$5,044,873
Chris!l L. Morris
From:
Sent:
To:
Subject:
Yes, we are. The last survey was 5 degrees at 6,747 ft. Thus, after drilling 930 ft from the previous survey of 0.18
degrees at 5815 ft the inclination had built to approximately 5 degrees. We will be logging the well with a dipmeter so we
will have directional survey data to current depth of 7100 ft.
Regards,
Gary
********************************.*.*
------------------------------'-,,,...-'--,-----,,---------_
. - ----
From: Christy L. Morris [mailto:clmorris@govmail.state.nv.us]
Sent: Monday, July 02, 2007 8:33 AM
To: Hertfelder, Gary
Subject: RE: Pluto 27-1 Morning Drilling Report
Need to keep an eye on the vertical deviation. What intervals are you planning on running surveys?
************************************
PXP
WELL:
PLUTO_27-1
FIELD:
LAS VEGAS
STATE:
NV WHITE PINE
AREA:
LAFAYETTE/HOUSTON
CLASS:
DRIL
RIG CONTR: NABORS DRILLING
TRIP# BIT#
10
17
MODEL
HI 23
BHA' :
TD:
PROGRESS:
HRS:
RIG:
lADe
517X
FROM
5,860
TO
18
Description
Qty
1
1
1
1
1
1
8
19
1
5
SIZE
~.750
BIT
NEAR BIT STB
OS' PONY COLLAR
STABILIZER DOUBLE BOX
STEEL DC
STABILIZER STRING
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
DATE:
7,100
134
9.50
NABORS 148
LGTH
HRS
1,236 69.00
RPT No:
70 DSS:
54
FOREMAN:BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
CASING: 9.625
In. SHOE MD: 4,495
PH NBR: 307-462-0409
TVD: 7,100
N1 N2 N3 WOB RPM
0 0 ~O 40
~O
MUD PROPERTIES
O.D.
8.750
6.500
6.500
6.500
6.500
6.500
6.500
5.000
6.500
5.000
Length
Time:
1.00 MW:
4.34 VISC'
7.53
.'
4.17 pH.
30.27 Chi:
4.83 WL:
243.18 HTHP:
576.51 FC:
32.40 PV:
153.28 YP:
00:00 Solids:
9.2 Oil:
44 10
G I'
sec e:
9.2 10 min Gel.
100 CA:
6.4 Pm:
Pf:
2 Ex Lime:
13 Elec Stab:
10 MBT:
MD
Angle
FROM
00:00
TO
09:30
09:30
10:00
13:00
14:00
17:30
20:00
21:00
22:30
23:00
10:00
13:00
14:00
17:30
20:00
21:00
22:30
23:00
00:00
TVD
3
4
40
0.2
0.2
20
SPM:
PRSR:
1800 PUMP#1
3
70
6.000
10.00
V. Sect.
PUMP#2
3
70
6.000
10.00
PUMP#3
95
95
244
244
3.49
3.49
SLOW PUMP RATES
57
58
403
418
0
0
231.9 AV(DC):
169.7 PSI Drop:
67.3 HP/in2:
1057.51
SURVEYS
Dlr.
HYDRAULICS
Std Pipe:
# Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff %:
GPM:
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
7/1/2007
348.4
236.5
1.1
Mud Used
+N/-S
+E/-W
D.L.
HRS
Activity Last 24 Hours
9.50 DRILL F/6,964' TI7,100 WOB: 35 TO 38, P #1: 70 SPM, P #2: 70
f.-ROP: 14.31
Mud Additive
Gode
Used
COSTS SUMMARY
Description
Costs
20
360
430
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
510
550
670
710
730
810
,
OPEN HOLE LOG/FORMATIOr.
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
3,342
20000
'
1,600
1,500
250
9,56S
250
3,921
I,
II
24.00
$43,131
$5,006,139
PXP
WELL:
PLUTO_271
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TO:
6.964
PROGRESS: 290
HRS:
23.00
RIG:
1
1
1
1
1
8
19
1
5
SIZE
~.750
FROM
5,860
IADC
517X
TVD: 6.964
PH NBR:
TO
LGTH
HRS
1.104 79.50
N1 N2 N3 WOB RPM
0 ~O 40
80
8.750
6.500
6.500
6.500
6.500
6.500
6.500
5.000
6.500
5.000
Length
1.00
4.34
7.53
4.17
30.27
4.83
243.18
576.51
32.40
153.28
Time:
VISC:
pH:
9.1 Oil:
41 10 sec Gel:
9.2 10 min Gel:
ChI:
100 CA:
WL:
6.4 Pm:
HTHP:
FC:
Angle
5,243
5.339
5.433
5,528
5,624
5,719
5.815
5,241
5,331
5,431
5,52
5,622
5.711
5.8P
0.35
0.26
0.26
0.23
0.35
0.18
0.18
FROM
00:00
TO
09:00
HRS
9.00
09:00
10:00
10:00
00:00
1.00
14.00
Pf:
2 Ex Lime:
PV:
11 Elec Stab:
YP:
10 MBT:
3
4
40
0.2
0.2
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
70
6.000
10.00
3
70
6.000
10.00
95
244
95
244
PUMP#2
PUMP#3
3.49
3.49
SLOW PUMP RATES
20
57
403
SPM:
PRSR:
58
418
231.9 AV(DC):
169.7 PSI Drop:
66.6 HPlin2:
348.4
233.9
1.1
Mud Used
137.81
136.31
V. Sect.
-16.6"
-17.00
-16.94
-16.53
-16.05
-15.61
-15.30
+N/-S
-16.6.
-17.0[]
-16.94
-16.53
-16.05
-15.61
-15.30
+E/-W
-3.30
-2.95
-2.81
-2.81
-2.81
-2.81
-2.81
~~~pfl'v-I
Mud Additive
D.L.
Used
0.32
0.09
0.51
0.03
0.12
018
0.00
\..
1057.51
Dir.
TVD
1800 PUMP#1
3
SURVEYS
MD
Std Pipe:
#Cyl:
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
HYDRAULICS
00:00 Solids:
MW:
307-462-0409
~O
MUD PROPERTIES
0.0.
BIT
NEAR BITSTB
05' PONY COLLAR
STABILIZER DOUBLE BOX
STEEL DC
STABILIZER STRING
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVY WEIGHT DP
53
RPT No: 69 DSS:
FOREMAN: BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4.495
NABORS 148
18
BHA':
Description
Qty
MODEL
HI23
6/30/2007
DATE:
COSTS SUMMARY
Code
20
360
430
510
550
670
710
730
810
DeScription
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
3,495
20,000
1,600
1,500
250
9,568
250
5,051
$44,413
$4,963,008
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETIElHOUSTON
DRIL
TD:
6,674
PROGRESS: 304
HRS:
23.50
RIG:
6/29/2007
DA TE:
RPT No:
68 DSS:
52
FOREMAN: BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
TVD: 6,674
NABORS 148
PH NBR:
307-462-0409
R
17
QIy
1
8
19
1
5
BHA#:
Description
MUD PROPERTIES
18
0.0.
8.750
6.500
6.500
6.500
6.500
6.500
6.500
5.000
6.500
BIT
NEARBITSTB
05' PONY COLLAR
STABILIZER DOUBLE BOX
STEEL DC
STABILIZER STRING
STEEL DC
HEAVY VVEIGHT DP
JARS
HEAVY VVEIGHT DP
5.000
Length
1.00
4.34
7.53
4.17
30.27
4.83
243.18
576.5111
32.40
153.28
HYDRAULICS
Std Pipe:
#Cyl:
1800 PUMP#1
PUMP#2
3
4
40
SPM:
Liner Id:
S.L.:
Rod Dia:
70
6.000
10.00
70
6.000
10.00
0.2
0.2
GPM:
95
244
95
244
00:00 Solids:
Time:
MW:
9.1 Oil:
45 10 sec Gel:
9.2 10 min Gel:
VISC:
pH:
100 CA:
6.4 Pm:
Chi:
'M...:
Pf:
HTHP:
FC:
Eff%:
2 Ex Lime:
PV:
13 Elec Stab:
YP:
12 MBT:
20
SPM:
PRSR:
56
393
Angle
5,243
5,339
5,433
5,528
5,624
5,719
5,815
FROM
00:00
TO
06:00
06:00
06:30
06:30
15:30
15:30
16:00
16:00
00:00
0.35
0.26
0.26
0.23
0.35
0.18
0.18
5,241
5,337
5,431
5,526
5,622
5,717
5,813
348.4
233.9
1.1
1057.51
Dir.
TVD
58
416
231.9 AV(DC):
169.7 PSI Drop:
66.6 HP/in2:
Mud Used
SURVEYS
MD
o
o
3.49
3.49
SLOW PUMP RATES
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
PUMP#3
137.81
136.31
V. Sect.
-16.62
-17.0C
-16.94
-16.53
-16.05
-15.61
-15.30
+N/-S
+E/-W
-16.6.
-3.3C
-17.0C
-2.9~
-16.9~
-2.81
-2.81
-2.81
-2.81
-2.81
-16.5~
-16.0E
-15.61
-15.3C
D.L.
Used
~~
~w
~~
O.ro
~12
~18
0.00
HRS I
Activity Last 24 Hours
6.00 IDRILL F/6,370' T/6.463', WOB: 35 TO-'H), P #1: 70 SPM, P #2: 70
GPM: 488, PSI: 1800, RPM: 60 TO 80, TORK: 7500 TO 9300,
_ROP: 15,5
0.50
RIG SERVICE
9.00
DRILL F/6,463' T/6,558', WOB: 35 TO 37, P #1: 70 SPM, P #2: 70
GPM: 488, PSI: 1800, RPM: 60 TO 80, TORK: 9300 TO 11000,
-ROP: 10.55
0.50
RIG SERVICE
8.00
DRILL F/6558' T/6,674', WOB: 37 TO 40, P #1: 70 SPM, P #2: 70
GPM: 488, PSI: 1800/1900, RPM: 75 TO 80, TORK: 8,000 TO
10,000, A-ROP: 14.5
Mud Additive
COSTS SUMMARY
Code
Description
Costs
o
20
360
430
460
510
550
670
710
730
810
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWO
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
2,700
7,014
20,000
7,418
1,600
59,118
250
9,568
250
10,7921
$118,710
$4,918,595
p XP
. WELL:
PLUTO_27-1
FIELD:
LAS VEGAS
STATE:
NV WHITE PINE
AREA:
LAFAYETTE/HOUSTON
CLASS:
DRIL
RIG CONTR: NABORS DRILLING
TRIP# BIT#
MODEL
17
10
FHI23
BHA.:
Qly
1
1
1
1
1
1
8
19
1
5
SIZE
~,750
TO:
6,370
PROGRESS: 395
HRS:
23,50
RIG:
NABORS 148
IADC
517X
FROM
5,860
TO
18
Description
BIT
DATE:
LGTH
HRS
510
33.00
RPT No:
67 DSS:
51
FOREMAN:BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
CASING: 9.625
in, SHOE MD: 4,495
PH NBR: 307-462-0409
TVD: 6,370
N1 N2 N3 WOB RPM
0 ~O 40
~O
Length
Time:
1.00 MW:
4,34 VISC:
7.53
.
4.17 pH.
30.27 ChI:
4.83 Wl.:
243.18 HTHP:
576,51 FC:
32.40 PV:
153.28 YP:
00:00 Solids:
9.1 Oil:
40 10 sec Gel:
'.
9,2 10 min Gel,
100 CA:
6.8 Pm:
Pf:
2 Ex Lime:
11 Elec Slab:
9 MBT:
MD
Angle
5,243
5,339
5,433
5,528
5,624
5,719
5,815
FROM
00:00
TO
17:30
17:30
18:00
18:00
00:00
TVD
2
3
40
0.2
0,2
18
SPM:
PRSR:
1800 PUMP#1
3
70
6.000
10.00
0.35
0.26
0.26
0,23
0.35
0.18
0,18
5,241
5,331
5,431
5,52
5.622
5,711
5,8P
137.81
136,31
V. Sect.
+E/-W
-16.6L
-3.30
-17,OC
-16,9<4
-17,OC
-16,94
-16.5:3
-16,05
-15,61
-15,30
-2.81
-2.81
-2.81
-2.81
-2.81
-16.5~
PUMP#2
3
70
6,000
10.00
PUMP#3
0
0
231.9 AV(DC):
169.7 PSI Drop:
66.6 HP/in2:
348.4
233,9
1,1
Mud Used
+N/-S
-16.6~
-16.0E
-15.61
-15.3C
95
95
244
244
3.49
3.49
SLOW PUMP RATES
56
58
398
418
1057.51
SURVEYS
Dir.
HYDRAULICS
Sid Pipe:
Cyl:
SPM:
Liner Id:
SL:
Rod Dia:
Eft %:
GPM:
AV(DP):
Jel Vel:
Bit HP:
Tolal BHA Length:
~O
MUD PROPERTIES
O,D.
8.750
6.500
6.500
6.500
6,500
6.500
6.500
5,000
6.500
5.000
6/28/2007
-2.9~
Mud Additive
D.L,
Used
0.32
0.09
0.51
0,03
0,12
0.18
0.00
HRS
Activity Last 24 Hours
17.50 DRILL F/5,975' T/6272' WOB: 35 TO 40, P #1: 70 SPM, P #2: 70
A-ROP: 16.97
20
COSTS SUMMARY
Description
CONTRACT LABOR
360
430
460
510
540
550
670
710
730
810
MUDIFLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LVI/[
OPEN HOLE LOG/FORMATIOtl
FUEULUBE/ELECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Code
Costs
2 700
'
2,259
20,000
7,418
1,600
15,897
1,500
250
10,808
250
6,268
$68,951
$4,799,885
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
elY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
Objective Zone is 12,000 ft Guilmette Umestone test
Planned 20" shoe @ 100' MD - 100' TVD
Planned 13-3/8" shoe near 1600' MD/1600' TVD
Planned 9-5/8' shoe near 7800' MD/7800' TVD
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
10% LIMESTONE
90 % SHALE
24 hr Summary:
DRILLING FI 5975 TO 6370 ( NO FLUID LOSS)
Forecast:
DRILL 8 % HOLE-
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PXP
FIELD:
STATE:
AREA:
CLASS:
RIG CONTR:
LAS VEGAS
WHITE PINE
NV
LAFA YETTE/HOUSTON
DRI!.
TD:
5,975
PROGRESS: 115
18.50
HRS:
NABORS DRILLING
RIG:
TRIP# BIT#
17
10
BHA':
Description
Qiy
1
1
1
1
1
8
19
1
5
MODEL
HI23
DATE:
PLUTO_27-1
WELL:
SIZE
B.750
IAOC
517X
FROM
5,860
TO
TVD: 5,975
LGTH
HRS
115
9.50
PHNBR:
Nl N2 N 3 WOB RPM
0 0 0 35
r75
MUD PROPERTIES
O.D.
8.750
6.500
6.500
6.500
6.500
6.500
6.500
5.000
6.500
5.000
Length
1.00
4.34
7.53
4.17
30.27
4.83
243.18
576.51
32.40
153.28
9.1
48
9
100
6.5
MW:
VISC:
pH:
Chi:
W1..:
HTHP:
FC:
Oil:
10 sec Gel:
3
5
10 min Gel:
CA:
40
0.15
Pm:
Pf:
2 Ex Lime:
PV:
16 Elec Stab:
YP:
15 MBT:
307-462-0409
0.15
Std Pipe:
#Cyl:
Angle
5,243
5,339
5,433
5,528
5,624
5,719
5,815
TVD
0.35
0.26
0.26
0.23
0.35
0.18
0.18
FROM
00:00
02:00
TO
02:00
08:00
HRS
2.00
6.00
08:00
09:30
11:30
13:30
14:30
09:30
11:30
13:30
14:30
00:00
1.50
2.00
2.00
1.00
9.50
5,62~
5,71
5,81
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
95
244
95
244
PUMP#3
3
70
6.000
10.00
3.49
3.49
SLOW PUMP RATES
20
SPM:
PRSR:
56
370
59
390
231.9 AV(OC):
169.7 PSI Drop:
66.6 HPlin2:
348.4
233.9
1.1
1057.51
Dir.
5,241
5,337
5,431
5,52
PUMP#2
Mud Used
SURVEYS
MD
1800 PUMP#1
3
70
6.000
10.00
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
50
HYDRAULICS
00:00 SolidS:
Time:
DSS:
66
NABORS 148
18
BIT
NEAR BITSTB
05' PONY COLLAR
STABILIZER DOUBLE BOX
STEEL OC
STABILIZER STRING
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
RPT No:
6/27/2007
137.81
136.31
V. Sect.
-16.6~
-17.0C
-16.94
-16.5~
-16.05
-15.61
-15.30
+N/-S
-1662
-17.0C
-16.94
-16.53
-16.05
-15.61
-15.30
+E/-W
Mud Additive
D.L.
-3.3e
-2.95
-2.81
-2.81
-2.81
-2.81
-2.81
A-ROP: 12.11
Used
0.32
0.09
0.51
0.03
0.12
0.18
0.00
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
Description
Costs
CONTRACT LABOR
M UD/F LU IDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LINC
OPEN HOLE LOG/FORMATtOr-.
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
6,579
20,000
5,350
1,600
2,453
250
9.568
250
4,875
$53,624
$4,730,934
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
30 % LIMESTONE
70 % SHALE
24 hr Summary:
TIH TO 4680 - WASH & REAM F/4680 TO 5860 - (WORK STUCK PIPE @ 5,330 & 5,795
DRILLING F/5860 TO 5,975 ( NO FLUID LOSS)
Forecast:
DRILL 8 % HOLE-
Thanks
Brent
PXP
WELL:
PLUTO_27-1
LAS VEGAS
NV WHITE PINE
LAFAYETTE/HOUSTON
DRIL
FIELD:
STATE:
AREA:
CLASS:
BHA# :
Qty
1
1
1
1
1
1
8
19
1
5
SIZE
8.750
8.750
IADC
445X
517X
BIT
NEAR BIT STB
05' PONY COLLAR
STABILIZER DOUBLE BOX
STEEL DC
STABILIZER STRING
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
RPT No:
65 DSS:
49
FOREMAN:BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
RIG:
PH NBR:
NABORS 148
FROM
TO
4,750
5,860
5,860
LGTH
HRS
1,110 163.50
0
0.00
N1 N2 N3 WOB
~O
0 20 40
'0 0 '0
RPM
33
MUD PROPERTIES
0.0.
8.750
6.500
6.500
6.500
6.500
6.500
6.500
5.000
6.500
5.000
Length
1.00
4.34
7.53
4.17
30.27
4.83
243.18
576.51
32.40
153.28
Time:
MW:
VISC
..
pH.
Chi:
WL:
HTHP:
FC:
PV:
YP:
00:00 Solids:
9.1 Oil:
42 10
G I
s~c e:
9.2 10 min Gel.
100 CA:
6.6 Pm:
Pf:
2 Ex Lime:
13 Elec Stab:
10 MBT:
307-462-0409
I
4
0
6
Angle
5,243
5,339
5,433
5,528
5,624
5,719
5,815
FROM
00:00
TO
09:00
09:00
13:30
13:30
16:30
17:00
18:30
21:00
16:30
17:00
18:30
21 :00
00:00
TVD
0.35
0.26
0.26
0.23
0.35
0.18
0.18
3
4
40
0.2
0.2
18
B G
0
E 1 CT
R
HR
SPM:
PRSR:
6.000
10.00
PUMP#2
3
116
6.000
10.00
PUMP#3
95
95
0
405
3.49
3.49
SLOW PUMP RATES
58
500
0
0
192.4 AV(DC):
140.8 PSI Drop:
38.1 HP/in2:
289.2
161.1
0.6
137.81
136.31
Mud Used
V. Sect.
-16.6;<
-17.0C
-16.94
-16.53
-16.05
-15.61
-15.30
+N/-S
-16.6;<
-17.0C
-16.94
-16.53
-16.05
-15.61
-15.30
+EI-W
-3.30
-2.9'i
-2.81
-2.81
-2.81
-2.81
-2.81
D.L.
Mud Additive
Used
0.32
0.09
0.51
0.03
0.12
0.18
0.00
HRS
Activity Last 24 Hours
9.00
DRILL F/5707' T/5814', WOB: 35 TO 40, GPM: 407 - PSI: 1800
-AROP: 17.00
4.50
PUMP OUT OF HOLE 15 STDS -NOTE HOLE CONDITIONS
24.00
1057.51
Dir.
5,241
5,331
5,431
5,526
5,622
5,717
5,813
fA
1800 PUMP#1
3
SURVEYS
MD
D
CT
HYDRAULICS
Std Pipe:
#Cyl:
SPM:
Liner Id:
S.L...
Rod Dia:
Eff %:
GPM:
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
6/26/2007
18
Description
DATE:
Code
20
360
430
460
510
540
550
670
710
730
810
COSTS SUMMARY
Description
Costs
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWD
OPEN HOLE LOG/FORMATION
FUEULUBElELECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
2,700
5,636
20,000
14,651
1,600
5,282
1,500
250
9,568
250
6,144
$67,580
$4,673,581
PXP
Daily Report
June 27,2007
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
FI 4680 TO 4880
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
100 % LIMESTONE
24 hr Summary:
DRLG FI 5707 TO 5860- PUMP OUT OF HOLE FI 5830 TO 4720- PUMP PILL FI DRY PIPE TOOH
-LAY DOWN TRU TRACK & BIT - M/U PACK ASSY TIH - CUT 500 FEET BAD DRLG LINE
Forecast:
REAM TO 5860- DRILL 8
y.. HOLE-
Thanks
Brent
STATE OF NEVADA
COMMISSION ON MINERAL RESOURCES
DIVISION OF MINERALS
400 W. King Street, Suite 106
Carson City, Nevada 89703
JIM GIBBONS
Governor
ALAN R. COYNER
Administrator
6-20-07
On site visit to Plains Exploration, Ely
Met with
Access road in good shape. Pad in good order.
Noble Rig, pulling out of hole, waiting for Schlumberger for cement bond log on 9 5/8 set in
very bad LC zone.
Requested the operator install a wind sock on the rig. Requested a copy of their schedule for
calibrating and tests gas detection equipment. Requested all safety training and drills be recorded
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV INHITE PINE
LAFAYETTE/HOUSTON
DRIL
TRIP# BIT#
15
BHA#:
Description
Qty
1
1
1
1
9
19
1
5
MODEL
23
SIZE
~.750
IADC
445X
TO:
5.707
PROGRESS: 357
HRS:
23.50
FROM
4.750
BIT
TRUTRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
TVD: 5.707
NABORS 148
TO
LGTH
HRS
152.50
957
PH NBR:
N1 N2 N3 WOB
Q 20 0 140
RPM
33
MUD PROPERTIES
17
0.0.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
Length
0.75
33.30
1.79
5.60
274.45
576.51
32.40
153.29
Time:
8.9 Oil:
51 10 sec Gel:
9.2 10 min Gel:
100 CA:
6.9 Pm:
PV:
Pf:
2 Ex Lime:
15 Elec Stab:
YP:
15 MBT:
Sid Pipe:
#Cyl:
3
5
40
0.15
0.2
1800 PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
Angle
5.053
5.148
5,243
5.339
5,433
5.528
5.624
0.35
0.26
0.35
0.26
0.26
0.23
0.35
FROM
00:00
TO
17:30
HRS
17.50
17:30
18:00
18:00
00:00
0.50
6.00
5.051
5.146
5,241
5.331
5,431
5.526
5.622
18
PUMP#2
6.000
10.00
3
116
6.000
10.00
95
0
95
405
PUMP#3
SPM:
PRSR:
58
500
192.4 AV(DC}:
140.8 PSI Drop:
37.2 HP/in2:
289.2
157.6
0.6
Mud Used
V.Sect.
73.43
73.93
74.44
74.95
75.37
75.78
76.27
+N/-S
73.43
73.93
74.44
74.9f
75.3
75.n
76.2
+E/-W
o.oe
o.oe
o.oe
o.oe
O.OC
O.OC
O.OC
Mud Additive
D.L.
Used
0.00
0.09
0.09
0.09
0.00
0.03
0.12
COSTS SUMMARY
Code
20
250
360
430
460
510
550
670
710
730
810
24.00
1078.09
Dir.
TVD
3.49
3.49
SLOW PUMP RATES
SURVEYS
MD
HYDRAULICS
00:00 Solids:
MW:
VISC:
pH:
Chi:
Wl:
HTHP:
FC:
48
307-462-0409
AV(OP}:
Jet Vel:
BitHP:
6/25/2007
ACTIVITY: DRILLING
RIG:
DATE:
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWC
OPEN HOLE LOGIFORMATlOIli
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
4,000
7.291
20,000
11,901
1,600
1.500
250
9.568
250
5.906
$64.965
$4.606.001
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/ST:
RIG:
SPUD;
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
Objective Zone is 12,000 ft Guilmette Umestone test
Planned 20" shoe @ 100' MD - 100' TVD
Planned 13-3/8" shoe near 1600' MD/1600' TVD
Planned 9-5/8' shoe near 7800' MD/7800' TVD
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
20% SHALE
20% SILTSTONE
60% SANDSTONE
24 hr Summary:
DRILLINGF/5,350TO 5,707
Forecast:
DRILL 8 % HOLE- BIT TRIP
Thanks
Brent
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJEcnYE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
Objective Zone is 12,000 ft Guilmette Limestone test
Planned 20" shoe @ 100' MD - 100' TVD
Planned 13-3/8" shoe near 1600' MD/1600' TVD
Planned 9-5/8' shoe near 7800' MD/7800' TVD
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SILTSTONE
24 hr Summary:
DRILLINGFI 4,985 TO 5,350
Forecast:
DRILL 8 :y. HOLE
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
CLASS:
DRIL
TRIPI BIT#
15
BHA#:
Description
Qty
1
1
1
1
9
19
1
5
MODEL
23
SIZE
B.750
lADe
445X
TD:
5,350
PROGRESS: 365
HRS:
23.50
FROM
4,750
BIT
TRUTRACK
FLOAT SUB
FILTER SUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
TVD: 5,350
PHNBR:
NABORS 148
TO
LGTH
HRS
600
129.00
RPM
33
N1 N2 N3 WOB
20
0 ~o 38
MUD PROPERTIES
17
O.D.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
Length
0.75
33.30
1.79
5.60
274.45
576.51
32.40
153.29
6/2412007
RIG:
DATE:
Time:
00:00 Solids:
MW:
8.9 Oil:
VISC:
pH:
48 10 sec Gel:
9.5 10 min Gel:
Chi:
100 CA:
WL:
28 Pm:
FC:
Pf:
2 Ex Lime:
PV:
13 Elec Stab:
YP:
12 MBT:
HTHP:
307-462-0409
I
Angle
4,771
4,866
4,959
5,053
5,148
5,243
5,339
FROM
00:00
15:00
TO
HRS
15.00
15:00
15:30
15:30
00:00
0.50
8.50
HYDRAULICS
3
5
40
0.3
0.25
PUMPl2
SPM:
Liner Id:
S.L.:
Rod Oia:
Eff%.:
GPM:
116
6.000
10.00
3
0
6.000
10.00
95
405
95
0
3.49
3.49
PUMPl3
SPM:
PRSR:
56
360
192.4 AV{DC):
140.8 PSI Drop:
37.2 HP/in2:
289.2
157.6
0.6
1078.09
Dir.
TVD
5.50
4.13
0.35
0.35
0.26
0.35
0.26
700 PUMPl1
Mud Used
SURVEYS
MD
Sid Pipe:
#Cyl:
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
47
V. Sect.
+N/-S
4,76g
61.2~
61.2~
4,86~
69.2.
4,951
72.8e
69.22
72.85
5,051
5,146
5,241
5,337
73.4
73.9
73.9~
74.~
74.9~
73.4~
74.44
74.95
+E/-W
O.OC
o.oe
0.00
0.00
0.00
0.00
0.00
Mud AddItIve
D.L.
Used
0.40
1.44
4.06
0.00
0.09
0.09
0.09
COSTS SUMMARY
Code
Costs
0
2,700
4,981
20
360
CONTRACT LABOR
MUDIFLUIDS/CHEMICALS
430
RIG COSTS
460
510
DIRECTIONAL SERVICES/LWL
20,000
11,901
1,600
710
RENTAL EQUIPMENT
730
810
OVERHEAD
MISCELLANEOUS
9,568
250
5,275
550
670
24.00
Description
1,500
250
$58,025
$4,541,036
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
LAS VEGAS
NV
WHITE PINE
AREA:
CLASS:
LAFAYETIE/HOUSTON
DRIL
TD:
4,750
PROGRESS: 235
HRS:
20.50
RIG:
BHA#:
Description
QIy
1
1
1
1
9
19
1
5
SIZE
~.750
IADC
445X
FROM
4,750
AFE#:
CASING:
9.625
PH NBR:
307-462-0409
N1 N2 N3 WOB
tz5
0 0
RPM
MUD PROPERTIES
17
O.D.
8.750
6.750
5.250
6.750
6.500
5.000
6.500
5.000
BIT
MUD MOTOR
FLOAT SUB
alTSUB
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
TVD: 4,750
LGTH
HRS
105.50
235
Length
75
0. 1
33.30
1.79
5.60
274,45
576.51
32.40
153.29
Time:
00:00 Solids:
MW:
8.9 Oil;
vise:
pH:
48 10 sec Gel:
9.5 10 min Gel:
ChI:
100 CA:
WL:
28 Pm:
13 Elec Stab:
YP:
12 MBT:
TVD
Angle
2,603
2,887
2,982
3,078
3,812
4,580
4,670
0.10
0.20
0.30
0.30
0.60
4.57
5.10
HRS
FROM
00:00
06:00
06:30
07:00
09:00
14:30
TO
06:00
06:30
07:00
09:00
14:30
15:30
6.00
0.50
0.50
2.00
5.50
1.00
15:30
18:00
18;00
00:00
2.50
6.00
2,98~
3,Q7a
3,81~
4,579
4,669
5
40
0.3
PUMP#2
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
116
6.000
10.00
3
0
6.000
10.00
95
405
95
0
PUMP#3
3.49
3.49
SLOW PUMP RATES
18
SPM:
PRSR:
67
250
192.4
140.8
37.2
AV(DC):
PSI Drop:
HP/in2:
289.2
157.6
0.6
1078.09
Dir.
2,60J
2,881
Mud Used
SURVEYS
MD
Sid Pipe:
#Cyl:
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
700 PUMP#1
2 Ex Lime:
PV:
52448
HYDRAULICS
0.25
Pf:
HTHP:
FC:
46
NABORS 148
TO
6/23/2007
DATE:
V. Sect.
2.2/
3.0;0
3.43
3.93
9.70
44.33
51.91
+N/-S
2.27
3.02
3.43
3.9:1
9.70
44.33
51.91
+E/-W
O.OC
O.OC
O.OC
O.OC
O.OC
0.00
0.00
Mud Additive
D.L.
Used
0.00
0.04
0.11
0.00
0.04
0.52
0.59
RIG SERVICE
CONNECTION
COSTS SUMMARY
Code
180
20
360
430
440
460
510
550
670
710
730
810
Description
LOCATION/LEASE/ROAD
CONTRACT LABOR
Costs
3,520
MUD/FLUIDS/CHEMICALS
RIG COSTS
2,700
2,008
20,000
BITSIHOLE OPENERS/UNDERI
DIRECTIONAL SERVICES/LWIJ
0
19,319
1,600
7,884
COMMUNICATIONS
RENTAL EQUIPMENT
250
9,568
OVERHEAD
MISCELLANEOUS
250
6,710
II
Total Daily Cost:
Cumulative Cost To Date:
$73,808
$4,483,011
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJEcnVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
Objective Zone is 12,000 ft Guilmette Limestone test
Planned 20" shoe @ 100' MD - 100' TVD
Planned 13-3/8" shoe near 1600' MD/1600' TVD
Planned 9-5/8' shoe near 7800' MD/7800' TVD
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
90% SHALE
10% SANDSTONE
24 hr Summary:
DRILLINGF/4750 TO 4985
Forecast:
DRILL 8 % HOLE
Thanks
Brent
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
6/21/2007
.
Wei
Felli
.IE
..... ,-,.
Q.
_.. _..
... _-
':jute
NEVADA
Elft..
! g II~
f
<>
-,,,
PLUTO 27-1
WILDCAT
WHITE PINE
C()U!ltv
_..... -
~ i ~ ~
~ f 8
Plrmanent Datum
GROUND LEVEL
Elft..
-"'K,.B_ _ _ __
25.0ft
-.U
K,8.
739211
OL
OF
7357ft
--.l.lSl..!
Ibon Plrm On"m
APISln.1 No.
Section
Township
27-033-05319
27
'BN
Rlngl
a.E
2o-Jun-2007
Run Nuntter
40195.
..82
..32.
OeDttlDrMler
SchluntJeraer DeoIh
BobnLog''''''''
TOIl Loglnlo....
50ft
WATER
CII'naFIuldTv..
Sall.1III'
Ulbrrl,
Don!!ly
Fluid leY.1
BITICAS'NGITU9ING STRING
9IIStz.
From
To
USIT .0
SGTJI
CAL.Y
15Ct.JM
150.JM
150.JM
12 250 In
'S90ft
4750.
9.625 in
40'_
N-90
Oft
4495ft
110 dogF
20-Jun-2007
110
11O
2200
150.JM
150.lt9
DSLT.fTB
DTC-H
,
t.:.
..
er,
,"
t,ll
ill'
'.""
,
,
','-'-.",.-
.
"'lit
'rr
~"""
(smlill Mlp
""'"
huplwee
Clllllflco1l1on
!AI
III(:~O
DElIO,.,,",,
IMAGE) -
1-1
LOO'l1 ~Z/9
l.00'l1 ~'l/9
LOO~H~/9
LOOlHl/9
LOO'l1 ~'l19
L.
L.OOZHZ/9
LOO~H~/9
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
LAS VEGAS
NV
WHITE PINE
LAFAYETTEIHOUSTON
DRIL
AREA:
CLASS:
MAINTANCE
TD:
4,750
PROGRESS: 0
HRS:
2.00
RIG:
BHA#:
Description
Qty
1
1
1
9
19
1
5
MODEL
DATE:
IADC
SIZE
FROM
TVD: 4,750
HRS
PHNBR:
N1 N2 N3 WOB
RPM
MUD PROPERTIES
16
O.D.
8.750
6.250
6.000
6.000
5.000
6.250
5.000
BIT
BIT SUB
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
LGTH
Length
1.00
3.00
1.27
274.45
576.51
32.49
153.28
Time:
00:00 Solids:
MW:
8.5 Oil:
VISC:
pH:
10 sec Gel:
9.4 10 min Gel:
Chi:
WL:
100 CA:
Pf:
2 Ex Lime:
PV:
Elec Stab:
YP:
MBT:
307-462-0409
I
2,603
2,887
2,982
3,078
FROM
0.10
0.20
0.30
0.30
00:00
01:30
TO
01:30
06:00
HRS
1.50
4.50
06:00
11:00
5.00
11:00
11:30
14:30
11:30
14:30
16:30
050
3.00
2.00
16:30
18:00
1.50
18:00
21:00
21:00
00:00
3.00
3.00
Dir.
2,603
2,887
2,982
3,On
700 PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
60
6.000
10.00
3
60
6.000
10.00
95
209
95
209
PUMP#2
PUMP#3
3.49
3.49
SLOW PUMP RATES
8
SPM:
PRSR:
67
250
-409.6
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
-284.5
0.0
0.0
Mud Used
SURVEYS
TVD
1042.00
Sid Pipe:
#Cyl:
AV(DP):
Jet Vel:
Bit HP:
MD
44
HYDRAULICS
0.5
Pm:
HTHP:
FC:
DSS:
60
NABORS 148
TO
6/21/2007
V. Sect.
+N/-S
2.21
2.21
3.02
3.4:1
3.93
3.02
3.43
3.93
+E/-W
Mud Additive
D.L.
0.00
0.00
0.00
0.00
Used
0.00
0.04
0.11
0.00
COSTS SUMMARY
Code
20
360
430
440
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
BITSIHOlE OPENERs/UNDERI
Costs
2,700
3,563
20,000
13.903
510
550
670
710
730
810
1.600
1.500
250
9.568
250
5,333
Ii
$58,667
$4,245,713
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
CONTINUE WI CASING BOND lOG - TIH - DRill FLOAT SHOE & 20 FEET OF HOLE TO 4515
lOSING FLUID @ 1 BBl PER HOUR - TAKE INJECTION RATE ON 9 5/8 X 13 3/8 ANNULUS 202
GPM @ 100 PSI- (PUMPED 160 BBl) TOOH - WAIT ON SCHlUMBERGER CEMENTERS (
Forecast:
- MIX & PUMP 500 SX THIXOTROPIC CEMENT DOWN 9 5/8 X 12 Y.t ANN -RE RUN CBl
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TO:
4,750
PROGRESS: 0
HRS:
2.00
RIG:
MODEL
XR+C
BHA#:
Qly
1
1
1
19
1
5
DATE:
SIZE
~.750
FROM
IADC
0.0.
8.750
6.250
6.000
6.000
5.000
6.250
5.000
BIT
BIT SUB
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
PH NBR:
N1 N2 N3iwoB
8 8
8 15
RPM
MUD PROPERTIES
16
Description
TVD: 4,750
LGTH
HRS
19.00
0
Length
1.00
3.00
1.27
274.45
576.51
32.49
153.28
MW:
8.5 Oil:
10 sec Gel:
9.4 10 min Gel:
VISC:
pH:
100 CA:
Chi:
WL:
0.5
Pm:
HTHP:
Pf:
2 Ex Lime:
FC:
PV:
ElecStab:
YP:
MBT:
307-462-0409
I
2,603
2,887
2,982
3,078
FROM
00:00
04:00
06:00
12:00
13:30
14:00
18:30
20:30
TO
04:00
06:00
12:00
13:30
14:00
18:30
20:30
00:00
0.10
0.20
0.30
0.30
HRS
4.00
2.00
6.00
1.50
0.50
4.50
2.00
3.50
2,60.
2,881
2,982
3,On
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
60
6.000
10.00
3
60
6.000
10.00
95
209
95
209
PUMPl2
PUMP#3
3.49
3.49
SLOW PUMP RATES
SPM:
PRSR:
67
250
198.6
156.3
45.2
AV(DC):
PSI Drop:
HPlin2:
252.5
185.3
0.8
1042.00
Dir.
TVD
Std Pipe:
#Cyl:
Mud.Used
SURVEYS
Angle
MD
700 PUMPl1
3
AV(DP):
Jet Vel:
BitHP:
43
HYDRAULICS
00:00 Solids:
Time:
DSS:
NABORS 148
TO
59
6/20/2007
V. Sect.
+N/-S
2.2
2.2
3.0~
3.0~
3.4~
3.42
3.92
3.9~
+E/-W
Mud Additive
D.L.
O.OC
O.OC
O.OC
O.OC
Used
0.00
0.04
0.11
0.00
COSTS SUMMARY
Code
20
360
370
430
440
510
540
550
60
670
710
730
760
810
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
CASED HOLE lOG/SLICKLINE,
Costs
2,700
RIG COSTS
BITS/HOLE OPENERS/UNDERI
OPEN HOLE LOGIFORMATIO,,"
FUEULUBE/ELECTRICITY
WATER
WELLHEAD EQUIPMENT
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
SHOREBASE SERVICES/CATE
MISCELLANEOUS
20.000
2,072
1,600
15,697
1,500
12,980
250
5,901
250
1,034
7,865
650
27,000
......
.... _-
$99.498
$4,189,670
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
elY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NY
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
NIU ROTATING HEAD - PIU BHA - TIH - TEST 9518 CASING - DRILL FLOAT SHOE - DRILL 50
FEET FIRM CEMENT - DRILL 20 FEET SOFT CEMENT - CIRC - TOOH - RUN CASING BOND
Forecast:
Thanks
Brent
PXP
WELL:
PLUTO_27-1
ACTIVITY: TESTING
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV WHITE PINE
LAFAYETTE/HOUSTON
DRIL
4,750
TO:
PROGRESS: 0
HRS:
17.00
TRIP# BIT#
15
Qty
1
1
2
1
3
19
1
5
MODEL
BHA#:
Description
BIT SMITH 12.25
BIT SUB
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
IADC
SIZE
FROM
42
58 DSS:
FOREMAN:BRENT GILBERT/MIKE MACALLISTI
API#:
2703305318
AFE#:
52448
CASING: 9.625
in. SHOE MD: 4,495
RPT No:
BOP
TVD: 4,750
NABORS 148
RIG:
TO
LGTH
HRS
0
85.00
PHNBR:
N1 N2 N3 WOB
RPM
0.0.
12.250
8.000
8.000
8.000
6.000
5.000
6.000
5.000
Length
1.50
28.72
59.53
2.45
91.87
576.51
32.40
153.29
Time:
8.5 Oil:
10 sec Gel:
9.4 10 min Gel:
100 CA:
WL:
Pm:
Pf:
2 Ex Lime:
HTHP:
FC:
PV:
Elec Stab:
YP:
MBT:
MD
Angle
2,603
2,887
2,982
3,078
0.10
0.20
0.30
0.30
FROM
00:00
00:30
03:30
06:00
09:00
TO
00:30
03:30
06:00
09:00
09:30
HRS
0.50
3.00
2.50
3.00
0.50
09:30
17:00
7.50
17:00
19:30
19:30
00:00
2.50
4.50
2,60
2,881
2,982
3,071l
0.5
700 PUMP#1
3
PUMP#2
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
60
6.000
10.00
3
60
6.000
10.00
95
209
95
209
PUMP#3
3.49
3.49
SLOW PUMP RATES
8
67
250
SPM:
PRSR:
-409.6
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
-1600
0.0
0.0
2.21
3.02
3.43
3.93
Mud Used
+N/-S
2.27
3.02
3.43
3.93
+E/-W
O.OC
O.OC
O.OC
O.OC
Mud Additive
D.L.
Used
0.00
0.04
0.11
0.00
24.00
946.27
SURVEYS
Dir.
V. Sect.
TVD
Std Pipe:
#Cyl:
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
00:00 Solids:
MW:
VISC:
pH:
Chi:
307-462-0409
MUD PROPERTIES
14
6/19/2007
DATE:
COSTS SUMMARY
Code
20
350
360
430
440
510
550
60
670
710
730
810
Description
CONTRACT LABOR
CEMENTING AND SERVICES
MUD/FLUIDS/CHEMICALS
RIG COSTS
BITSfHOLE OPENERS/UNDERI
OPEN HOLE LOG/FORMATIOf'.
WATER
WELLHEAD EQUIPMENT
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
92,584
650
20,000
2,072
1,600
1,500
22,743
250
10,803
250
13,241
$168,393
$4,090,171
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
PIU BOP - CUT 9 5/8 CSG-INSTALL B SECTION - NIU BOP - TEST BOP OK
Forecast:
- DRILL OUT FLOAT COLLAR- POOH FI CEMENT BOND LOG
Thanks
Brent
52448
$6,290,700
1.0
0.64
IPt
. Date'S -:dS-o,
Company
l6l.-M
'DOUB~ JACK
~/Lf/el
(J7/dlual
I
TE, nNG
fe0?
;Rig No(
b <it l'-\8
#1 WITH DRIlL PJPE & TEST PWG INSTAl .lED IN WElL HEAD.
ANNU~
FINALPSI of 80(:)
TIME \
1 .sf( .
PIPE'RAM~
FINAL P~~
..
IJ 00
35C(
. TIME_
{,
1!
~PSI
\1 6 0
. FlNALPSI
\~Ol?
'
TIME
35l;)(
TIME
ls:ec
..
HeR
IN~~I'~OO.
FINALPSI
'\~DD
..
TIME._ _ __
FINALPsr-- .
#8 WHEN DONE WITH THE RECORDED TIMES & PRFSSURES mERE SHOUID BE
#9 OPEN ANNUlAR
950
PRESSURE DROP .
#3 ACCUMUlATOR PSI SHOUID DROP AT 1100 PSI TO 950 PSI
PSI
.)
MINUI'ES
00
SEC.
:.
#5 OPEN VALVES TO NITROGEN BOTILES AND PRESSURE THE ACCUMUlATOR BACI'TO SHUT
OFF POINT. THEN OPEN AlL PIPE RAMS AND
BEFORE PULLING PLUG AND DRILL
PIPEOUTOFBOPo~
SfGNA11JRES:
L
jL.
.~
{. .'f/fj.
A.NNUJ'AR
~.,7Jj}
l~T 1
! tY
t!ut~-",,-,--=:==-=-'
___
. .
=::::::::::..'
..
Da t e
(c
d
4 u' e
"\.
~,
ompaoy
\ J\..A,?
I
'!
v\..1
I
j.)
~I -1
L.! "
Rig
1.1
. ,.{J'i~
. 10
/\"-t~ ~)q/?
#1 WITH DRILL PIPE & TEST PLUG INSTAI.l .ED IN WELL HEAD.
ANNUlAR
TIME
LC--
TIME
")e t
FINAL PSI
'0
l7 ')c
'J(.'-,
#5 OPEN PIPE RAMS TO SIMULATE BLIND RAMS/ RECORD TIME & PRESSURE
INITIAL PSI
C)O
FINAL PSI
l "700
TIME
t/ <;c:e'
.,:
HCR
17 0 D
INITIAL PSI
FINAL PSI
I "7 0 i)
TIME
\.
<,
ec .
#7 ON THREE RAM STACK CLOSE BOTIOM PIPE RAMSIRECORD TIME & PRESSURE
PIPE RAMS INITIAL PSI
,-
FINAL PSI,_ __
TIME_ _ __
#8 WHEN DONE WITH THE RECORDED TIMES & PRESSURES THERE SHOULD BE
#9 OPEN ANNULAR
"7' ') C/
PSI
PRESSURE DROP
#3 ACCUMUlATOR PSI SHOULD DROP AT 1100 PSI TO 950 PSI
2 MINUTE TIME TEST/ACtuMuLATOR PUMPS
#1 SHUT VALVES TO NITROGEN BOTILES.
MINUTES
"5 t(
SEC.
#5 OPEN VALVES TO NITROGEN BOTILES AND PRESSURE THE ACCUMULATOR BACT TO SHUT
OFF POINT. THEN OPEN ALL PIPE RAMS AND ANNULAR BEFORE PULLING PLUG:AND DRILL
PIPE OUT OF BOP.
SIGNATURES:
./ ~MY
/"
{~{J'
!/
~/ ;;tJI}y _ _ _ - - - - - - - - - - -_ _ _ _ __
_LZ.f."""",,=,- '....
'a-f~'L:.-
Chris!l L. Morris
John_Menghini@nv.blm.gov
Monday, June 18, 200710:04 AM
Hertfelder, Gary
Christy L. Morris; Lisa Smith; Michael Tyler; mike sistrunk
Re: Pluto 27-1 well
From:
Sent:
To:
Cc:
Subject:
see no problem in the change. I would ask that a subsequent Sundry Notice be submitted
outlining the finished job. I have an operational question. Are you going to run any type
of cement log to determine adequate cement job? With the lost circulation problems, a
competent cement job is going to be a challenge.
Please discuss the BlM's concerns and come up with a proposed solution.
Also, Michael Tyler will be out of the office until the end of June,
Thanks
John R. Menghini
Petroleum Engineer
134B Financial Blvd.
P.O. Box 12BBB
Reno, Nevada 8952B-BBB6
775-861-6573 direct line
775-861-6711 fax line
"Hertfeld
er, Gary"
<GHertfel
der@pxp.c
om>
B6/15/2eB
7 B1:29
PM
john menghini@blm.gov
To
"Christy Morris"
<clmorris@govmail.state.nv.us>,
We have elected to run 9-5/8 casing to the current TO of 47SB' because of inability to gain
circulation. After logging, we have been attempting to go back to bottom and drill ahead
with a motor and MWO, however, we are unable to circulate. We have made several unsuccessful
1
attempts at
the hole to
approve, is
in cleaning
4599 ft and 3799 ; _ to regain circulation. We are ill progress of staging out of
determine at what depth circulation can be established. Thus, our plan, if you
to run and cement the 9-5/8" casing to current TO of 4759', if we are successful
the well out to TO.
Are there any special forms or sundry notices, both state and federal that need to be
submitted for this change in the 9-5/8" casing point?
Thanks
************************************
Gary P. Hertfelder, P.E.
Drilling Manager
Plains Exploration & Production Company
291 S. Broadway
Orcutt, CA. 93455
VOICE: 895.934.8227
FAX: 895.937.9237
EMAIL: ghertfelder@pxp.com
CONFIDENTIALITY NOTE: The information contained in this email is legally privileged and
confidential information intended only for the use of the addressee named above. If the
reader of this email is not the intended recipient, you are hereby notified that any
dissemination, distribution or copy of this email is strictly prohibited. If you have
received this email in error, please immediately notify me by telephone and return the
original email to me via reply mail. Thank you.
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/ST:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
STAGE IN HOLE TO 4440 -BUILD RESERVE PIT VOLUME - ATTEMPT TO REAM F/4440
Forecast:
0.64
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NY
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
TOOH WI MAGNET ( NO PIN RECOVERED) MIU MOTOR ASSY - TIH TO 4446 -ATIEMPT TO
CIRC - STAGE OUT OF HOLE ATIEMPT TO CIRC @ 3700 - 3000- UNLOAD WATER @ 2000
TOH - REPAIR ELECTRICAL PROBLEM WI TOP DRIVE - LAY DIN MOTOR& MWD - TIH WI
CLEAN OUT ASSY ( SLICK) TO 2000 FEET
BACK GROUND GAS 20 UNITS
Forecast:
CLEAN OUT TO 4750 - RUN 9 5/8 CASING
Thanks
Brent
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
TRIP OUT OF HOLE TO JET SUB - POISTION JET SUB TO LAND OUT @ 1400 - TIH - CIRC
AND REAM F/4440 TO 4612 - TOH TO JET SUB - POISTION JETSUB TO LAND OUT @ 1400
Forecast:
PXP
PLUTO_27-1
WELL:
LAS VEGAS
NV
INHITE PINE
LAFAYETTEfHOUSTON
DRIL
FIELD:
STATE:
AREA:
CLASS:
MODEL
DATE:
TO:
4,750
PROGRESS: 0
HRS:
17.00
RIG:
SIZE
FROM
IADC
NABORS 148
TO
lS
Qty
1
1
2
1
3
19
1
5
SHA.:
Description
BIT SMITH 12.25
BIT SUB
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
TVD: 4,750
lGTH
HRS
51.00
0
PH NBR:
Nl
N2 N3 WOB
RPM
0.0.
12.250
8.000
8.000
8.000
6.000
5.000
6.000
5.000
Length
1.50
28.72
59.53
2.45
91.87
576.51
32.40
153.29
Time:
8.5 Oil:
10 sec Gel:
9.4 10 min Gel:
VISC:
pH:
Chi:
100 CA:
Pm:
WL:
HTHP:
FC:
0,5
Pf:
2 Ex Lime:
PV:
Elec Stab:
YP:
MBT:
SId Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
Angle
2,603
2,887
2,982
3,078
TVD
0.10
0.20
0.30
0.30
FROM
00:00
TO
03:00
HRS
3.00
03:00
03:30
04:00
05:30
06:00
07:00
18:00
21:30
22:00
22:30
03:30
04:00
05:30
06:00
07:00
18:00
21:30
22:00
22:30
23:30
0.50
0.50
1.50
0.50
1.00
11.00
3.50
0.50
0.50
1.00
23:30
00:00
0.50
PUMP#2
60
6.000
10.00
3
60
6.000
10.00
95
209
95
209
PUMP#3
SPM:
PRSR:
67
250
-409.6
0.0
0,0
AV(DC):
PSI Drop:
HPfin2:
-160.0
0.0
0.0
Mud Used
V. Sect.
+Nf-S
2.27
3.02
2.27
3.4~
3.43
3.93
3.9~
3.0l
+ Ef-W
Mud Additive
D.L.
0.00
0.00
0.00
0.00
24.00
946.27
Dir.
2,60
2,881
2,982
3,078
700 PUMP#l
3
SURVEYS
MD
3.49
3,49
SLOW PUMP RATES
AV{DP):
Jet Vel:
BitHP:
Total BHA Length:
307-462-0409
HYDRAULICS
00:00 Solids:
MW:
40
MUD PROPERTIES
14
6/17/2007
Used
0.00
0.04
0.11
0.00
COSTS SUMMARY
Code
20
360
430
510
550
670
710
730
810
Description
Costs
CONTRACT LABOR
MUDfFLUIDSfCHEMICALS
RIG COSTS
OPEN HOLE LOGfFORMA TION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
650
20,00C
1,600
1,500
250
13,188
250
5,393
$3,831,660
........
__
.. _-
PXP
PLUTO_27-1
WELL:
FIELD:
STATE:
AREA:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
Qty
1
1
2
1
3
19
1
5
MODEL
BHA#:
Description
BIT SMITH 12.25
BIT SUB
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
DATE:
lADe
SIZE
FROM
PH NBR:
NABORS 148
RIG:
TO
LGTH
HRS
34.00
0
N1 N2 N3 WOB
O.D.
12.250
8.000
8.000
8.000
6.000
5.000
6.000
5.000
Length
1.50
28,72
59.53
2.45
91.87
576,51
32.40
153.29
Time:
RPM
8.5 Oil:
10 sec Gel:
9.4 10 min Gel:
Chi:
Wl:
HTHP:
FC:
PV:
100 CA:
Pm:
0.5
P1:
SPM:
Liner Id:
SL:
Rod Dia:
Eff%:
GPM:
60
6.000
10.00
3
60
6.000
10.00
95
209
95
209
2,603
2,887
2,982
3,078
0,10
020
0,30
0.30
FROM
00:00
01:00
01:30
02:00
TO
01:00
01:30
02:00
03:00
HRS
1,00
0,50
0.50
1,00
03:00
03:30
03:30
05:00
0.50
1,50
05:00
05:30
0.50
05:30
07:00
08:30
09:00
10:00
10:30
15:30
16:30
18:00
20:00
07:00
08:30
09:00
10:00
10:30
15:30
16:30
18:00
20:00
21:00
1,50
1,50
0,50
1.00
0,50
5,00
1.00
1,50
2,00
1,00
21:00
22:00
22:00
00:00
1,00
2,00
Dir.
Elec Stab:
PUMPl2
PUMPl3
MBT:
SPM:
PRSR:
67
250
-409,6
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
-160.0
0.0
0.0
Mud Used
V, Sect.
+N/S
2,603
2,887
2.2f
3.0~
2.27
3,02
2,98~
3,43
3,93
3,92
3,078
3.49
3.49
SLOW PUMP RATES
SURVEYS
TVD
946.27
700 PUMPl1
3
AV(DP):
Jet Vel:
BitHP:
MD
Std Pipe:
ICyl:
2 Ex Lime:
"
307-462-0409
HYDRAULICS
00:00 Solids:
MW:
VISC:
pH:
YP:
39
MUD PROPERTIES
14
6/16/2007
TVD: 4,750
4,750
TD:
PROGRESS: 0
1700
HRS:
CLASS:
RIG CONTR: NABORS DRILLING
TRIPI BIT#
15
3.4~
+EI-W
Mud Additive
D.L.
0.00
0,00
0.00
0,00
Used
0.00
0,04
0.11
0,00
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
Description
Costs
CONTRACT LABOR
MUDIFLUIDSICHEMICALS
RIG COSTS
DIRECTIONAL SERVICESILWC
OPEN HOLE LOGIFORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2,700
650
20,000
10,200
1,600
1,50C
25C
13,188
250
5,034
$55,372
$3,782,177
PXP
DATE:
RPT No:
6/15/2007
DSS:
38
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
TD:
4,750
PROGRESS: 0
AFE#:
52448
CLASS:
DRIL
HRS:
17.00
CASING:
RIG:
NABORS 148
PH NBR:
TRIP# BI1#
FROM
IADC
SIZE
TO
15
Qty
1
3
1
3
19
1
5
BHA':
Description
BIT SMITH 12.25
STEEL DC 8"
CROSSOVER
STEEL DC 6"
HEAVY WEIGHT DP 5"
JARS SMITH
HEAVY WEIGHT DP 5"
TVD: 4,750
LGTH
HRS
17.00
0
N1 N2 N3
54
wos
RPM
40
MUD PROPERTIES
14
O.D.
12.250
8.000
8.000
6.000
5.000
6.000
5.000
Length
1.50
88.25
2.45
91.87
576.51
32.40
153.29
Time:
00:00 Solids:
MW:
8.5 Oil:
VISC:
pH:
10 sec Gel:
9.4 10 min Gel:
Chi:
100 CA:
WL:
Pm:
HTHP:
PV:
Elec Stab:
YP:
MBT;
0.5
SId Pipe:
#Cyl:
700 PUMP#1
PUMP#2
SPM:
Liner Id:
S.L.:
Rod Oia:
Eff%:
GPM:
60
6.000
10.00
3
60
6.000
10.00
95
209
95
209
3.49
3.49
SPM:
PRSR:
Angle
0.10
0.20
0.30
0.30
2,603
2,887
2,982
3,078
2,603
2,88(
2,982
3,078
PUMP#3
0
0
-409.6
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
-160.0
0.0
0.0
946.27
Dir.
TVD
67
250
Mud Used
SURVEYS
MO
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
Pf:
2 Ex Lime:
FC:
V. Sect.
2.27
3.02
3.4
3.93
+N/-S
2.21
3.02
3.4~
3.9J
+Ef-W
o.oe
o.oe
o.oe
o.oe
Mud Additive
D.L.
Used
0.00
0.04
0.11
0.00
FROM
00:00
01:00
04:00
04:30
07:00
TO
01:00
04:00
04:30
07:00
10:00
HRS
1.00
3.00
0.50
2.50
3.00
10:00
10:30
10:30
11:30
11:30
12:00
12:00
13:00
0.50
1.00
13:00
13:30
13:30
15:30
0.50
2.00
15:30
17:00
17:00
17:30
1.50
0.50
17:30
20:00
2.50
20;00
00:00
4.00
0.50
1.00
COSTS SUMMARY
Code
20
Description
Costs
360
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
430
460
RIG COSTS
20,000
DIRECTIONAL SERVICES/LWlJ
10,200
510
540
550
670
WATER
710
RENTAL EQUIPMENT
COMMUNICATIONS
730
OVERHEAD
810
MISCELLANEOUS
2,700
450
1,600
6.550
1,500
250
13,18
25C
5,669
$62,357
$3,726,805
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/ST:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
FISH FI PIN - MUI MOTOR ASSY NOTE:FlOWING 130,000 PPM THREW SEPERATOR WHilE
TRIPPING
Forecast:
PXP
PLUTO_27-1
WELL:
FIELD:
LAS VEGAS
STATE:
NV WHITE PINE
LAFAYETIE/HOUSTON
AREA:
DRIL
CLASS:
RIG CONTR: NABORS DRILLING
TRIP# BIT#
MODEL
DATE:
4,750
PROGRESS: 0
HRS:
17.00
RIG:
NABORS 148
IADC
SIZE
FROM
TO
13
QIy
1
1
2
1
3
19
1
5
BHA.:
Description
MAGNET
BIT SUB
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
TVD: 4,750
TO:
HRS
LGTH
17.00
0
N1 N2 N3 WOB
40
RPM
MUD PROPERTIES
12
O.D.
11.500
8.250
8.000
8.000
6.000
5.000
6.000
5.000
Length
Time:
2.72 MW:
2.90
VISC:
58.65
pH:
2.45
91.87 ChI:
576.51 WL:
32.40 HTHP:
153.28 FC:
PV:
00:00 Solids:
8.5 Oil:
10 sec Gel:
9.4 10 min Gel:
100 CA:
Pm:
Pf:
2 Ex Lime:
ElecStab:
VP:
MD
2,603
2,887
2,982
3,078
Angle
0.10
0.20
0.30
0.30
FROM
00:00
TO
04:30
HRS
4.50
04:30
06:30
06:30
18:00
2.00
11.50
18:00
21:00
3.00
21:00
22:00
1.00
22:00
00:00
2.00
TVD
2,60
2,887
2,982
3,07S
37
HYDRAULICS
0.5
MBT:
Std Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
SPM:
PRSR:
AV(DP):
Jet Vel:
8ItHP:
6/14/2007
700 PUMP#1
3
60
6.000
10.00
PUMP#2
3
60
6.000
10.00
PUMP#3
95
95
209
209
3.49
3.49
SLOW PUMP RATES
67
250
0
0
-409.6 AV(DC):
0.0 PSI Drop:
0.0 HP/in2:
-160.0
0.0
0.0
920.78
SURVEYS
Dir.
V. Sect.
2.27
3.02
3.43
3.93
+N/-S
2.27
3.02
3.43
3.93
+E/-W
O.OC
O.OC
O.OC
O.OC
Mud Used
Mud Additive
D.L.
0.00
0.04
0.11
0.00
Used
COSTS SUMMARY
Code
20
250
360
430
460
510
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWO
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
II
33,023
1,318
450
20,000
7,200
1,600
1,500
250
13,188
250
8,831
$87,610
$3,664,448
p XP
WELL:
PLUTO_27-1
FIELD:
LAS VEGAS
STATE:
NV WHITE PINE
AREA:
LAFAYETIE/HOUSTON
CLASS:
DRIL
RIG CONTR: NABORS DRILLING
MODE!"
TRIPI BIT#
7
GF20B
12
BHA' ;
1
1
1
1
1
1
3
1
3
19
1
5
FROM
00:00
02:00
TO
02:00
07:00
07:00
16:00
16:00
00:00
LGTH
HRS
265
34.00
TVD
Length
Time:
1.50 MW:
4.45 VISC:
7.91
H'
3.42 P .
28.95 Chi:
3.73 WL:
68.38 HTHP:
2.45 FC:
91.87 PV:
576.51 YP:
32.40
153.28
00:00
8.5
30
94
36
FOREMAN: BRENT GILBERT/JEFF BUMP
API':
2703305318
AFE':
52448
CASING: 13.375 in. SHOE MD: 1,590
PH NBR: 307-462-0409
N1 N2 N3 WOB
8 6 28 40
.
100
30
2
2
1
Solids:
Oil:
10 sec Gel:
10 . G I'
min e.
CA:
Pm:
Pf:
Ex Lime:
Elec Stab:
MBT:
RPM
I
2
0
2
V. Sect.
D
L
NO ~
B G
0
E 0 NO
R
LOG
HYDRAULICS
1
1
40
0.5
0.2
SId Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eft %:
GPM:
SPM:
PRSR:
700 PUMPl1
3
60
6.000
10.00
PUMP#2
3
60
6.000
10.00
PUMP#3
95
95
209
209
3.49
3.49
SLOW PUMP RATES
67
250
AV(DP):
Jet Vel:
Bit HP:
0
0
61.9 AV(DC):
74.1 PSI Drop:
10.2 HP/in2:
994.85
SURVEYS
Dir.
6/13/2007
MUD PROPERTIES
O.D.
12.250
8.000
8.000
6.000
8.000
8.000
8.000
6.000
6.000
5.000
6.500
5.000
Angle
FROM
TO
4,485
4,750
11
BIT
MD
SIZE
IADC
~2250 517X
Description
Qty
DATE:
119.0
41.7
0.1
Mud Used
+N/-S
+E/-W
D.L.
HRS
Activity last 24 Hours
2.00 CIRCULATE/CONDITION HOLE FOR WIPER TRIP AT 4750'.
5.00 SHORT TRIP FROM 4750' TO 4310', TRIP IN HOLE SAME
BACK TO BOnOM, POOH FOR WIRE LINE LOGS.
9.00 RIG UP BAKER ATLAS WIRE LINERS, RIH WITH LOG #1 WITH
HDIL, ZDL, CN, ORIT, DR,TO THE DEPTH OF 4656', POOH
AND LOG FROM 4656' TO 1610', LAY DOWN LOGGING
TOOLS.
MAKE UP LOGGING TOOLS FOR RUN #2, EARTH IMAGER,
6.00
RIH TO 4625' POOH LOGGING @ 5' PER HOUR.
Mud Additive
Used
20
COSTS SUMMARY
Description
CONTRACT LABOR
360
430
510
550
670
710
730
810
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Code
Costs
2700
'
450
20,000
46,710
1.500
250
10.291
250
8.215
24.00
---------------------------------
$90.366
$3.576,836
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
cry/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
FORMATION:
CHAINMAN SHALE
LrrHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
Forecast:
Thanks
JEFF
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NY
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
POOH
FORMATION:
CHAINMAN SHALE
LITHOLOGY:
70% SHALE
30% SANDSTONE
24 hr Summary:
TIH FROM 2608' TO 4000', SAFETY REAM TO SOnOM AT 4485', DRILLED FROM 4485' TO
Forecast:
PXP
WELL:
PLUTO_27-1
FIELD:
LAS VEGAS
NV WHITE PINE
STATE:
LAFAYEnE/HOUSTON
AREA:
DRIL
CLASS:
RIG CONTR: NABORS DRILLING
TRIP# I BIT# I MODEL
17
PF20B
12
BHA.:
Description
Qly
1
1
3
1
/319
15
IADC
112.250 1517X
TO:
4,750
PROGRESS: 265
HRS:
17,00
FROM
4,485
I
I
BIT
NEAR BIT STB
10' PONY COLLAR
STABILIZER
STEEL DC
STABILIZER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
TVD: 4,750
NABORS 148
TO
I LGTH
1265
I HRS
117.00
Length
Time:
1.50 MW:
4.45
VISC:
7.91
pH:
3.42
28.95 Chi:
3.73 WL:
88.38 HTHP:
2.45 FC:
91.87 PV:
576.51
YP:
32.40
153.28
994.85
100 CA:
30 Pm:
FROM
00:00
01:00
02:00
03:30
20:30
Angle
TO
01:00
02:00
03:30
20:30
00:00
HRS
1.00
1.00
1,50
17.00
3.50
TVD
DiL
SPM:
liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
1
1
40
0.5
Pf:
2 Ex Lime:
2 Elee Stab:
LIB
IG I
700 PUMP#1
3
60
6.000
10.00
PUMP#2
95
209
95
209
PUMP#3
3
60
6.000
10.00
SPM:
PRSR:
1 MBT:
+EJ-W
3.49
3.49
SLOW PUMP RATES
+N/-S
35
HYDRAULICS
I V. Sect.
I 10 I 0
U5
SId Pipe:
ICyl:
00:00 Solids:
8.5 Oil:
10 sec Gel:
9,5 10 min Gel:
SURVEYS
MD
I RPM I
MUD PROPERTIES
11
0.0.
12.250
8.000
8.000
8.000
8.000
8.000
8.000
6,000
6.000
5.000
6.500
5.000
6/12/2007
RIG:
I SIZE I
DATE:
D.L
67
250
AV(DP):
Jet Vel:
BiIHP:
II
81.9
74.1
10.2
119,0
41.7
0.1
AV(DC):
PSI Drop:
HPlin2:
Mud Used
Mud Additive
Used
COSTS SUMMARY
Code
20
250
360
430
510
540
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
FUELJLUBEJELECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
2,418
450
20,000
1,600
10,361,
1,500
1
2501
11,745
250
5,127
$56,401
$3,486,472
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
DRILLING AHEAD
FORMATION:
LITHOLOGY:
24 hr Summary:
COMPLETE INSTALLATION OF GAS BUSTER, CIRCULATE OUT 15,000 UNITS OF GAS AT
Forecast:
DRILL AHEAD,
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
RIG:
BHA':
Qty
1
1
1
1
1
1
3
1
3
19
1
5
SIZE
IADC
12.250 517X
FROM
4,485
PHNBR:
TO
LGTH
HRS
0
0.00
N1 N2 N3 WOB
8 ~8
RPM
12.250
8.000
8.000
8.000
8.000
8.000
8.000
6.000
6.000
5.000
6.500
5.000
Length
1.50
4.45
7.91
3.42
28.95
3.73
88.38
2.45
91.87
576.51
32.40
153.28
Time:
8.5 Oil:
30 10 sec Gel:
9.5 10 min Gel:
VISC:
pH:
100 CA:
Pm:
Chi:
WL:
HTHP:
FC:
1
1
40
0.5
30 Pf:
2 Ex Lime:
PV:
2 Elec Stab:
YP:
1 MBT:
430 PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
TVD
FROM
00:00
TO
20:30
HRS
20.50
20:30
23:00
2.50
23:00
00:00
1.00
PUMP#2
6.000
10.00
3
91
6.000
10.00
95
0
95
317
PUMP#3
3.49
3.49
SLOW PUMP RATES
8
SPM:
PRSR:
67
250
AV(DP):
Jet Vel:
Bit HP:
62.1
56.2
4.4
AV(DC):
PSI Drop:
HPlln2:
90.2
24.0
0.0
Mud Used
SURVEYS
Angle
994.85
HYDRAULICS
Std Pipe:
#Cyl:
00:00 Solids:
MW:
307-462-0409
MUD PROPERTIES
0.0.
BIT
NEAR BIT STB
10' PONY COLLAR
STABILIZER
STEEL DC
STABILIZER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
TVD: 4,498
NABORS 148
11
Descrip!ion
34
DEPTH 4498'.
4,498
TD:
PROGRESS: 0
HRS:
0.00
6/1112007
DATE:
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
Used
COSTS SUMMARY
Code
20
360
430
510
550
670
710
730
810
DeSCription
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
6,659
450
20,00C
1,600
1,500
250
5,424
250
3,613
$39,746
$3,426,037
Chris.!l L. Morris
Christy L. Morris
Monday, June 11, 2007 11 :03 AM
'Hertfelder, Gary'
'John_Menghini@nv.blm.gov'; MichaeLTyler@blm.gov; Usa Smith
RE: Pluto 27-1 Well
From:
Sent:
To:
Cc:
Subject:
Nevada does not allow gas release to air except when required for safety reasons and with approval by the Division.
During normal drilling we rarely encounter problematic gas concentrations. BlM onshore orders require flare systems
for consuming all gas. You might check with BlM on the specifics.
Christy L. Morris
Oi" Gas, and Geothermal Program Manager
Nevada Division of Minerals
400 West King Street, Suite 106
Carson City, NV 897034212
clmorris(;J~govmail. slale. nv. us
T: 775.684.7045
F: 775.684.7052
C: 775.721.1774
Sent:
Thank you Christy. Is it permitted to vent the gas to atmosphere while drilling?
************************************
_ _ _ _,_-............
"_~
__
<,_"",~
______
~",
._.,_a_.",,___ , ,
.. _",...___
Sent:
""'_~
'~"~_~".""_""
___"' __
___ >''''''''''__'____""",,_
"'~'-_''''_'''
Chris!l L. Morris
From:
Sent:
To:
Cc:
Subject:
Christy,
Good morning. As you can read from our daily drilling reports, we have encountered some gas after penetrating the
Chainman Shale. The gas is being brought to surface because of the underbalanced drilling operation (aerated mud
system). In a typical over balanced system the drilling fluid hydrostatic pressure would prevent any gas, except for the
small amount contained in the drilled cuttings, from entering the mud system. Because of the underbalanced operation
we will need to install a larger underbalanced drilling separator to safely separate the liquid from the gas and air.
Additionally the gas and air will be sent to a flare stack (with spark arrestor) so that any combustible mixture will be
ignited and burned. As a contingency a burn pit will be constructed including a flare line to allow by-passing the flare
stack if needed.
Are there any notification's or state, county or agency permits required for approval to flare of the gas while drilling the
well?
I have included a copy of the email to Lisa Smith, Permitco, who helps with any permitting that may be needed.
Thanks,
Gary
************************************
Chris!l L. Morris
Christy L. Morris
'Hertfelder, Gary'
From:
Sent:
To:
Cc:
Subject:
Gary,
Flaring the gas, using all best practices for control, is permitted within the drilling permit. Please note that wild fire in
Nevada is of extreme concern, you must take all precautions to eliminate the threat of fire which includes:
j'L
.))
trk-
Do not run flare line when wind speeds exceed 15 mph. ~ib'\ ubt~~ '1 t) J\\.U (~_..u...L'- ,~.-Jt
'-t..4<
Le .'iV~ y'\. () ~/'{...t~ <I..
Keep a dedicated fire watch person no more than 100' from the flare line when active. Wcttch person should remain on .
station a minimum of 1 hour after line extinguished to watch for hot spots.
t"1c- j ~\.UbC)lLt.'-'~ (If'....... L-LlCdLj-..,J"\..,O
Have appropriate fire fighting tools and water source available for suppression.
~i}:l-O- v.'/4r-~v . ' J,.A il~ I
{)C
I-L'r{)C b P , ' ..Jl. 'I tc--.,....t~, ~
However, no open pit burning is allowed in Nevada per NAC 455B.22067. You may contact the
of
for
more information, specifically Mr. Kennedy has answered questions on this before:
v::t
old
~au A~Quality
clmorris@govmail.state.nv. us
T: 775.684.7045
F: 775.684.7052
C: 775.721.1774
'-'
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJEcnYE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
PO:
Waiting on circulating equipment
FORMATION:
CHAINMAN SHALE (TOP @ 4,200')
LITHOLOGY:
100% SHALE @4,300'
24 hr Summary:
Drilled to 4,485', encountered gas, pulled to casing shoe, wait on circulating equipment
Forecast:
Rig up circulating gas buster's trip back to bottom and drill.
JEFF
52448
$6,290,700
1.0
0.64
PXP
WELL:
PLUTO_27-1
FIELD:
LAS VEGAS
STATE:
NV WHITE PINE
AREA:
LAFAYETTE/HOUSTON
CLASS:
DRIL
RIG CONTR: NABORS DRILLING
TRIP# BIT#
7
MODEL
12
BHAI:
Qty
1
1
1
1
1
1
3
1
3
19
1
5
12.250
8.000
8.000
8.000
8.000
8.000
8.000
6.000
6.000
5.000
6.500
5.000
FROM
00:00
TO
08:30
08:30
10:00
13:30
10:00
13:30
18:30
18:30
00:00
TVD
LGTH
HRS
0
0.00
49 DSS:
33
FOREMAN: BRENT GILBERT/JEFF BUMP
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1,590
PH NBR: 307-462-0409
N1 N2 N3 WOB
28 8 8
RPM
MUD PROPERTIES
0.0.
TO
11
BIT
N~AR BIT STB
10 PONY COLLAR
STABILIZER
STEEL DC
STABILIZER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
MD
FROM
4,485
Length
Time:
1.50 MIN:
4.45 VISC:
7.91
H'
3.42 P .
28.95 Chi:
3.73 WL:
88.38 HTHP:
2.45 FC:
91.87 PV:
576.51 YP:
32.40
153.28
00:00
8.5
30
95
.
100
30
Solids:
Oil:
10 sec Gel:
10 . G I'
min e.
CA:
Pm:
P1:
2 Ex Lime:
2 Elec Stab:
1 MBT:
V. Sect.
1
1
40
0.5
SPM:
PRSR:
430 PUMP#1
3
6.000
10.00
PUMP#2
3
91
6.000
10.00
PUMP#3
95
95
0
317
3.49
3.49
SLOW PUMP RATES
67
250
AV(DP):
Jet Vel:
Bit HP:
0
0
62.1 AV(DC):
56.2 PSI Drop:
4.4 HP/in2:
90.2
24.0
0.0
Mud Used
+N/-S
+E/-W
D.L.
HRS
Activity Last 24 Hours
8.50
CONTINUE TO MONITOR WELL AND WAIT ON CIRCULATING
EQUIPMENT.
1.50 POOH FROM 1,565' AND CHAGNE OUT BIT.
3.50 TRIP BACK IN HOLE WITH BIT #7 TO 1,565'.
5.00
CONTINUE MONITOR WELL AND WAIT ON TRUCK WiTH GAS
BUSTER. NOTE CRANE TRUCK WiTH GAS BUSTER AND
EQUIPMENT RAN OUT OF FUEL IN ROUTE AND ARRIVED ON
LOCATION @ 18:30 HRS.
5.50 OFF LOAD EQUIPMENT FROM TRUCK INSTALL OUTLET AND
INTAKE LINES ON GAS BUSTER, CUT AND WELD I-BEEMS
TO GAS BUSTER SKID FOR HIGHT AND SPOT IN PLACE TO
DETERMON MODIFACATION'S FOR FLOWLINE.
HYDRAULICS
Std Pipe:
# Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff %:
GPM:
994.85
SURVEYS
Dir.
611012007
RPT No:
SIZE
IADC
if2.250 445X
DesCfiption
DATE:
Mud Additive
Code
Used
COSTS SUMMARY
Description
Costs
20
CONTRACT LABOR
360
430
510
550
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
670
710
730
810
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
2 70~
,~
450
20,000
1 600
1:500
250
9,091
250
3,584
____-L__________________L-____-J,I
$39,425
$3,386,291
PXP
PLUTO_27-1
WELL:
TO:
PROGRESS:
HRS:
RIG:
SIZE
IADC
TRIPI BIT#
MODEL
GF20BVCPS ~2.250 445X
6
11
BHA#:
Description
1
1
1
1
1
1
3
1
3
19
1
5
FROM
00:00
TO
06:30
HRS
6.50
06:30
13:00
6.50
13:00
14:00
14:00
16:30
1.00
2.50
16:30
00:00
7.50
LGTH
HRS
1,049 52.00
12.250
8.000
8.000
8.000
8.000
8.000
8.000
6.000
6.000
5.000
6.500
5.000
Length
Time:
1.50 MW:
4.45
VISC:
7.91
pH:
3.42
28.95 Chi:
3.73 'M..:
88.38 HTHP:
2.45 FC:
91.87 PV:
576.51
YP:
32.40
153.28
00:00
8.5
30
9.5
100
30
TVD: 4,485
N1 N2 N3 WOB
8 8 8 ~3
Solids:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
2 Ex lime:
2 Elec Slab:
RPM
5
2
1
1
40
0.5
Sid Pipe:
#Cyl:
SPM:
liner Id:
S.l.:
Rod Dia:
Eff%:
GPM:
SPM:
PRSR:
430 PUMP#1
3
PUMPl2
3
91
6.000
10.00
6.000
10.00
PUMP#3
95
95
0
317
3.49
3.49
SLOW PUMP RATES
67
250
AV(DP):
JelVel:
BitHP:
62.1
56.2
4.4
0
0
AV{DC):
PSI Drop:
HP/in2:
90.2
24.0
0.0
994.85
SURVEYS
V. Sect.
Dir.
2.21
3.02
Mud Used
2,98~
3.4~
3,07S
3.93
3.9~
+E/-W
0.00
O.OC
0.00
0.00
Mud Addltlve
D.L.
Used
0.00
0.04
0.11
0.00
OF FLOW.
RIG SERVICE
WELL STATIC)
24.00
HYDRAULICS
1 MBT:
+N/-S
2.21
3.02
3.43
TVD
2.60.:
2,88,
32
MUD PROPERTIES
0.0.
TO
11
BIT
NEAR BITSTB
10' PONY COLLAR
STABILIZER
STEEL DC
STABILIZER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
MD
2.603
2,887
2,982
3,078
FROM
3,436
4,485
175
6.50
NABORS 148
6/9/2007
EQUIPMENT.
LAS VEGAS
FIELD:
NV WHITE PINE
STATE:
LAFAVETTE/HOUSTON
AREA:
CLASS:
DRIL
RIG CONTR: NABORS DRILLING
Qly
DATE:
COSTS SUMMARY
Code
20
360
430
510
550
670
710
730
810
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Cosls
2,700
450
20,000
1,600
1,500
250
10,843
250
3,759
$41,352
$3,346,866
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
LAS VEGAS
VllHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
CLASS:
4,310
TD:
PROGRESS: 435
IADC
MODEL
SIZE
TRIPI BiTt
~F20BVCPS ~2.250 445X
6
11
BHA':
Description
. 1
1
1
1
3
1
3
19
1
5
31
47 DSS:
FOREMAN: BRENT GILBERT/JEFF BUMP
API#:
2703305318
52448
AFE#:
TVD: 4,310
HRS:
2300
CASING:
RIG:
NABORS 148
PH NBR:
FROM
3,436
TO
N1 N2 N3 WOB RPM
75
8
8 8 33
LGTH
HRS
874
45.50
MUD PROPERTIES
11
O.D.
12.250
8.000
8.000
8.000
8.000
8.000
8.000
6000
6.000
5.000
6.500
5.000
BIT
NEAR BITSTB
10' PONY COLLAR
STABILIZER
STEEL DC
STABILIZER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
Length
1.50
4.45
7.91
3.42
28.95
3.73
88.38
2.45
91.87
576.51
32,40
153.28
00:00 Solids:
MW:
8.5 Oil:
VISC:
pH:
30 10 sec Gel:
9.5 10 min Gel:
Chi:
WL:
100 CA:
30 Pm:
1
1
40
0.5
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
2 Elec Stab:
YP:
1 MBT:
MD
2,603
2,887
2,982
3,078
00:00
08:00
TO
08:00
09:00
HRS
8.00
1.00
09:00
00:00
15,00
FROM
2,60
2,887
2,982
3,078
PUMP#2
3
6.000
10.00
3
91
6.000
10.00
95
0
95
317
SPM:
Liner Id:
S.L:
Rod Dia:
Eff%:
GPM:
PUMP#3
3,49
3.49
SLOW PUMP RATES
8
67
250
SPM:
PRSR:
AV(DP):
JelVel:
BiIHP:
62.1 AV(DC}:
56.2 PSI Drop:
4,4 HP/in2:
90.2
24.0
0.0
Mud U.ed
V. Sect
2,2t
3.02
3.43
3.9~
+N/-S
2.27
3.02
3.43
3.93
+EI-W
Mud Additive
D.L.
O.OC
O,OC
O.OC
O.OC
Used
0.00
0.04
0.11
0,00
COSTS SUMMARY
Code
20
360
430
510
540
550
610
670
710
730
810
24.00
994.85
Dir,
TVD
0,10
0.20
0.30
0,30
430 PUMPl1
SURVEYS
Angle
HYDRAULICS
Sid Pipe:
#Cyl:
Time:
6/8/2007
RPT No:
Qty
DATE:
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
FUEULUBElELECTRICITY
WATER
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
450
20,000
1,600
15,521
1,500
953
250
10,800
250
5,402
..... -
$59,426
$3,305,514
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
CLASS:
BHAI:
Qty
1
1
1
1
1
1
3
1
3
19
1
5
30
RPT No: 46 DSS:
FOREMAN: BRENT GILBERT/JEFF BUMP
API#:
2703305318
AFE#:
52448
TVD: 3,875
HRS:
17.50
CASING:
RIG:
NABORS 148
PH NBR:
FROM
3.436
TO
LGTH
HRS
439
22.50
N1 N2 N3 WOB RPM
8 38
8 ~8
iT5
MUD PROPERTIES
11
0.0.
Description
12.250
8.000
8.000
8.000
8.000
8000
8.000
6.000
6.000
5.000
6.500
5.000
BIT
NEARBITSTB
10' PONY COLLAR
STABILIZER
STEEL DC
STABILIZER
STEEL DC
CROSSOVER
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVYWEIGHT DP
Length
1.50
4.45
7.91
3.42
28.95
3.73
88.38
2.45
91.87
576.51
32.40
153.28
Time:
00:00 Solids:
MW:
8.5 Oil:
VISC:
pH:
30 10 sec Gel:
9.5 10 min Gel:
Chi:
100 CA:
WL:
30 Pm:
HTHP:
FC:
2 Ex Lime:
PV:
2 Elec Stab:
YP:
1 MBT:
Angle
2,603
2,887
2,982
3,078
FROM
0.10
0.20
0.30
0.30
TO
HRS
00:00
11:00
11.00
11:00
12:30
12:30
14:00
1.50
1.50
14:00
16:00
2.00
16:00
16:30
17:30
16:30
17:30
00:00
0.50
1.00
6.50
2,60J
2,887
2,982
3,07a
HYDRAULICS
Std Pipe:
#Cyl:
1
1
40
0.5
Pf:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#2
6.000
10.00
3
91
6.000
10.00
95
0
95
317
PUMP#3
3.49
3.49
SLOW PUMP RATES
8
67
250
SPM:
PRSR:
AV(DP):
Jet Vel:
BitHP:
62.1
56.2
4.4
AV(DC):
PSI Drop:
HP/in2:
90.2
24.0
0.0
994.85
Dir.
TVD
405 PUMP#1
3
Mud Used
SURVEYS
MD
61712007
DATE:
V. Sect.
2.27
3.02
3.43
3.93
+N/-S
2.2f
3.02
3.43
3.93
+EI-W
O.OC
O.OC
O.OC
O.OC
Mud Additive
D.L.
Used
0.00
0.04
0.11
0.00
COSTS SUMMARY
Code
20
360
430
460
510
540
550
610
670
710
730
810
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWD
Costs
2,700
450
20,000
5,350
1,600
10,575
1,500
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
103
250
10,800
250
5,358
$58,936
$3,248,088
PXP
Daily Report
June 8,2007
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJEcnVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
PO:
DRILLING AHEAD
FORMATION:
ELY LIMESTONE
LITHOLOGY:
24 hr Summary:
DRILLED TO 3,473', SHORT TRIPPED DUE TO EQUIPMENT FAILURE, TRIPPED BACK TO BOTTOM AND
CONTINUED TO DRILL FROM 3,743' TO 3,875'.
Forecast:
DRILLING AHEAD
Thanks
JEFF
52448
$6,290,700
1.0
0.64
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TO:
3,565
PROGRESS: 129
HRS:
5.00
RIG:
BHM:
1
1
1
BIT
NEARBITSTB
10' PONY COLLAR
~TABILIZER
1
1
1
1
iSTABILlZER
iSTEEL DC
PROSSOVER
~TEELDC
19
1
5
TO
12.25C
8.000
8.000
8.000
8.000
8.000
8.000
6.000
6.000
5.000
6.500
5.000
~EAVY WEIGHT DP
~ARS
HEAVY WEIGHT DP
PH NBR:
RPM
0
N1 N2 N3 WOB
8 B 8 ~8
MUD PROPERTIES
0.0.
~TEELDC
TVD: 3,565
HRS
ilGTH
129
5.00
Length
Time:
1.50 MW:
4.45
VISC:
7.91
pH:
3.42
28.95 Chi:
3.73 WL:
28.88 HTHP:
2.45 FC:
151.37 PV:
576.51
YP:
32.40
153.28
307-462-0409
I
8.5 Oil:
30 10 sec Gel:
9.7 10 min Gel:
40
0.5
Pf:
ExUme:
405 PUMP#l
3
SPM:
Liner Id:
S.L:
Rod Dla:
EIf%:
GPM:
Angle
2,603
2,887
2,982
3,078
0.10
0.20
0.30
0.30
FROM
00:00
06:00
TO
06:00
10:00
HRS
S.OO
4.00
10:00
10:30
10:30
18:00
0.50
7.50
18:00
19:00
1.00
19:00
00:00
5.00
2,60.:
2,88/
2,98"
3,07f
1 Elee Stab:
1 MBT:
PUMP#2
6.000
10.00
3
95
6.000
10.00
95
0
95
331
PUMP#3
0
0
62
550
SPM:
PRSR:
55
550
AV(DP):
Jet Vel:
Bit HP:
64.8 AV(DC):
58.7 PSI Drop:
5.1 HPlin2:
94.2
26.2
0.0
Mud Used
V. Sect.
2.2/
+N1-8
3.4~
2.2
3.0.
3.4.:
3.9~
3.9~
3.0~
+E/-W
0.0<
0.0<
0.0<
0.0<
Mud Additive
D.L
Used
0.00
0.04
0.11
0.00
SERVICE RIG
FPH.
24.00
994.85
Dir.
TVD
3.49
3.49
SLOW PUMP RATES
SURVEYS
MD
HYDRAUUCS
Std Pipe:
#Cyl:
00:00 Solids:
100 CA:
30 Pm:
6/6/2007
29
RPT No: 45 DSS:
FOREMAN: BRENT GILBERT/JEFF BUMP
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1,590
NABORS 148
11
Description
Qty
FROM
3,436
DATE:
COSTS SUMMARY
Code
20
360
430
460
510
540
550
S70
710
730
810
Description
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICESILWIJ
OPEN HOLE LOG/FORMATION
FUEULUBE/ELECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
2,700
450
20,00<
5,35C
1,SOC
3,824
l,5OC
25C
10,69!l
25C
4,662
I'
$51,285
$3,187,152
PXP
Daily Report
June 7, 2007
Operated - Drilling
WELL:
FIELD:
elY/Sf:
RIG:
SPUD:
OBJEC1"IVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
PO:
DRILLING AHEAD
FORMATION:
ELY LIMESTONE
LITHOLOGY:
90% LIMESTONE 10% CHERT
24 hr Summary:
POOH FOR BIT AND MORE COLLARS TIH BACK TO BonOM AND DRILLED FROM 3,436' TO 3,565'
Forecast:
DRILLING AHEAD
52448
$6,290,700
1.0
0.64
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFA YETTEfHOUSTON
DRIL
TO:
3,410
PROGRESS: 310
23.50
HRS:
RIG:
10
BHAII:
Description
Qty
1
1
1
1
1
1
1
1
3
19
1
5
IADC
SIZE
2.250 537
FROM
3,090
TO
LGTH
320
TVD: 3,41{)
HRS
:24 .00
PH NBR:
IN1 N2 iN3 WOB
8
8 8 ~8
RPM
00
MUD PROPERTIES
0.0.
12.250
8.000
8.000
8.000
8.000
8.000
8.000
8.000
6.000
5.000
6.500
5.000
Length
Time:
1.50
MW:
4.45
VlSC:
7.91
pH:
3.42
28.95 Chi:
3.73 WL:
28.88 HTHP:
2.45 FC:
91.87 PV:
576.51
YP:
32.40
153.28
00:00
8.5
30
9.7
100
30
307-462-0409
Angle
2,603
2,887
2,982
3,078
0.10
0.20
0.30
0.30
FROM
00:00
TO
16:00
HRS
16.00
16:00
16:30
16:30
00:00
0.50
7.50
2,603
2,887
2,982
3,07fl
1
1
40
0.5
Pf:
Sid Pipe:
ICy!:
405 PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
98
6.000
10.00
6.000
10.00
95
342
95
0
2 Ex Lime:
PUMP#2
PUMP#3
0
0
3.49
3.49
SLOW PUMP RATES
2 EIecStab:
1 MBT:
SPM:
PRSR:
AV(OP):
Jet Vel:
BiIHP:
55
550
62
550
67.0
60.7
5.6
AV(DC):
PSI Drop:
HPlin2:
97.4
27.9
0.0
Mud Used
V.Sect.
2.2/
3.0:./
3.4:1
3.93
+N/-8
2.2/
3.02
3.4
3.93
+E/-W
0.0(
0.0(
0.0(
O.OC
Mud Additive
D.L.
0.00
0.04
0.11
0.00
24.00
935.35
Dir.
TVD
B G
HYDRAULICS
Solids:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
SURVEYS
MD
615/2007
28
RPT No: 44 DSS:
FOREMAN: MIKE SISTRUNK/JEFF BUMP
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1,590
NABORS 148
10
BIT
NEARBITSTB
10' PONY COLLAR
STABILIZER
STEEL DC
STABILIZER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
DATE:
Used
MILGEL
SHRINK WRAPPING
TRUCKING
25
1
1
COSTS SUMMARY
Code
20
250
360
430
460
510
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWI:
OPEN HOLE LOG/FORMATION
550
670
710
730
810
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
600
1,91g
20,000
5,350
1,600
1,500
2&
12,212
25C
4,51fl
$49,699
$3,133,227
PXP
Daily Report
June 7,2007
Operated - Drilling
WELL:
FIELD:
Pluto 27-1
Wildcat
AFE:
AFEAmount:
crY/Sf:
WI:
NRI:
RIG:
SPUD:
OBlEcnVE:
CASING:
PO:
DRILLING AHEAD @ 3,436'
FORMATION:
ELY LIMESTONE
LITHOLOGY:
90% LIMESTONE 10% CHERT
24 hr Summary:
CONTINUED DRILLING AHEAD FROM 3,100' TO 3,410',
Forecast:
POSSABlE BIT TRIP DUE TO LACK OF ROP,
52448
$6,290,700
1.0
0.64
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TO:
3.410
PROGRESS: 310
23,50
HRS:
RIG:
TRIP# BIT#
MODEL
10
15
PF30
SIZE'
IADC
112.250 1537
FROM
3,090
0,0.
1
1
1
19
1
TVD: 3.410
PH NBR:
1LGTH IHRS
320
\24,00
12,250
8.000
8.000
8.
Len h
1.50
4.45
7.91
3.42
28.95
3.73
28.88
2.45
91.87
576.51
32.40
153.28
935.35
Time:
~8 ~8 ~8 ~8
~oo
8.5
30
9.7
100
30
VISC:
pH:
Chi:
WL:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
40
0.5
Pf:
HTHP:
FC:
2 Ex Lime:
PV:
2 Elec Stab:
VP:
1 MBT:
I0 I D I
405 PUMP#1
3
0.10
0.20
2,603
2.887
2,982
3.07
SPM:
PRSR:
O.
I
I
16:00
16:00
16:30
16:30
00:00
TO
HRS
Dir.
PUMP#3
PUMP#2
3
98
6.000
10.00
6,000
10.00
95
342
95
0
AV(DP):
Jet Vel:
BitHP:
62
55
550
550
67.0
60.7
5.6
AV(DC):
PSI Drop:
HPJin2:
97.4
27.9
0.0
I
Mud Used
V. Sect
2.2
3.0
3.4
3.9
0.3
00:00
FROM
TVD
Angle
3.49
3.49
SLOW PUMP RATES
SURVEYS
MD
IG I
liB
HYDRAUUCS
Std Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dla:
Eff%:
GPM:
00:00 Solids:
MW:
307-462-0409
MUD PROPERTIES
10
BIT
EARBITSTB
10' PONY COLLAR
TABILIZER
TEEL DC
TABILIZER
TEEL DC
ROSSOVER
TEELDC
HEAVY WEIGHT DP
ARS
HEAVY WEIGHT DP
NABORS 148
TO
6/5/2007
DATE:
+NI-5
2.2
3.0
3.4
3.9
+E/-W
0,
O.
O.
O.
0.00
0.04
0.11
0.00
r-Used
Mud AddlUve
D.L.
MILGEL
SHRINK WRAPPING
TRUCKING
25
COSTS SUMMARY
Code
20
250
360
430
460
510
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVlCES/LWC
OPEN HOLE LOGIFORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
600
1,919
20,000
5,350
1,600
1,500
250
12,212
250
4.518
$49.699
$3,133,227
PXP
Daily Report
June 6,2007
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJEcnVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
Objective Zone is 12,000 It Guilmette Limestone test
Planned 20" shoe 0 100' MD - 100' 1VD
Planned 13-3/S" shoe near 1600' MD/1600' TVD
Planned 9-5/S' shoe near 7S00' MD/7S00' TVD
PO:
DRilLING AHEAD @ 3,436'
FORMATION:
ELY LIMESTONE
LITHOLOGY:
90% LIMESTONE 10% CHERT
24 hr Summary:
CONTINUED DRILLING AHEAD FROM 3,100' TO 3,410',
Forecast:
POSSABlE BIT TRIP DUE TO LACK OF ROP,
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PXP
PlUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETIElHOUSTON
DRll
BHA#:
Description
1
1
1
TO:
PROGRESS:
HRS:
RIG:
1
1
1
1
1
3
19
1
5
SIZE
IADC
12.250 537
FROM
3,090
TO
3,100
10
0.50
TVD: 3,100
PH NBR:
NABORS 148
lGTH
HRS
10
0.50
N1 N2 N3 WOB
8 8 8 14
RPM
00
MUD PROPERTIES
10
0.0.
length
Time:
1.50 MW:
4.45
VISC:
7.91
pH:
3.42
28.95 ChI:
3.73 Wl:
28.88 HTHP:
2.45 FC:
91.87 PV:
576.51
YP:
32.40
153.28
12.250
8.000
8.000
8.000
8.000
8.000
8.000
8.000
6.000
5.000
6.500
5.000
BIT
NEARBITSTB
10' PONY COLLAR
STABILIZER
STEEL DC
STABILIZER
STEEL DC
CROSSOVER
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVYWEIGHT DP
27
43 DSS:
FOREMAN:MIKE SISTRUNK/JEFF BUMP
API#:
2703305318
52448
AFE#:
CASING: 13.375 in. SHOE MD: 1.590
AROP 18.6
Qty
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
2 Pf:
2 Ex Lime:
Angle
0.10
0.20
0.30
0.30
FROM
00:00
01:30
TO
01:30
02:00
HRS
1.50
0.50
02:00
04:00
2.00
04:00
07:00
09:00
14:00
16:00
07:00
09:00
14:00
16:00
23:30
3.00
2.00
5.00
2.00
7.50
23:30
00:00
0.50
TVD
2,603
2,887
2,982
3.078
0
1
1
40
0.5
0.2
Sid Pipe:
#Cyl:
SPM:
Unerld:
S.L.:
Rod Dia:
Eff%:
GPM:
2 Elec Stab:
8
1 MBT:
450 PUMP#1
3
58
6.000
10.00
PUMP#3
PUMP#2
3
6.000
10.00
95
202
95
0
3.49
3.49
SLOW PUMP RATES
SPM:
PRSR:
55
550
62
550
AV(DP):
Jet Vel:
BitHP:
39.6
35.8
1.1
AV(DC):
PSI Drop:
HPlin2:
0
0
575
9.7
0.0
935.35
V. Sect.
Dir.
Mud Used
2.2
3.0.
3.4~
3.9~
+N/-S
2.27
3.02
3.43
3.93
+EI-W
o.oe
O.OC
O.OC
O.OC
Mud Additive
D.L.
0.00
0.04
0.11
0.00
24.00
HYDRAULICS
00:00 Solids:
8.5
30
11
240
30
307-462-0409
SURVEYS
MD
2,603
2,887
2,982
3.078
61412007
WELL:
TRIP# Bin
MODEL
GF30
10
5
DATE:
Used
MUD MAN
COSTS SUMMARY
Code
20
250
360
430
460
510
540
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUDfFLUIDSfCHEMICAlS
RIG COSTS
DIRECTIONAL SERVICESflWC
OPEN HOLE lOG/FORMATION
FUEULUBElElECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
23,670
450
20,000
13.919
1.600
8,066
1.500
250
10.041
250
8,125
_-_ ................ _-
I
1
$89,371
$3,083.528
PXP
Daily Report
June 5,2007
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRl:
52448
$6,290,700
1.0
0.64
AROP 18.6
PO:
DRILLING AHEAD.
FORMATION:
ELY LIMESTONE
LITHOLOGY:
90% LIMESTONE 10% CHERT
24 hr Summary:
WASH AND REAM WITH VIRTITRACK FROM 2,987' TO 3,080' W/FULL RETURNS, RETURNS LOST AT 3,081',
ATTEMPT TO DRILL WITH AEREATED MUD, MOTOR WOULD NOT WORK, SPOT LCM PILL POOH LAY DOWN
VIRTITRACK, MAKE UP PACKED ASSY TIH WASH AND REAM WITH AEREATED DRILLING FLUID FROM 1,917' TO
BOTTOM @ 3,090', DRILLING FROM 3,090' TO 3,100
Forecast:
CONTINUE DRILLING AHEAD, WIPE HOLE AFTER 24 TO 36 HR'S OF DRILLING ..
Thanks
Mike
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
VVHITE PINE
LAFAYETTEIHOUSTON
DRIL
Qty
1
1
13
1
3
19
1
BHA.:
Description
42 DSS:
26
FOREMAN:MIKE SISTRUNK
API.:
2703305318
AFE.:
52448
CASING: 13,375 in, SHOE MD: 1,590
TVD: 3,090
TO:
3,090
PROGRESS: 158
HRS:
10,00
RIG:
SIZE
2.250
IADC
PH NBR:
NABORS 148
FROM I TO
1.590 13,090
I LGTH I HRS
11,120 174,50
0.0.
12,250
10.063
9.500
9,750
8,938
8.000
8.000
6.000
5,000
6.000
5,000
BIT
AUTOTRAK
FILTER SUB
CROSSOVER
CROSSOVER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHTDP
Length
1.00
33.09
5.63
2.14
3,03
85,90
2.45
91,87
Time:
00:00 Solids:
MW:
8.7 Oil:
VISC:
pH:
48 10 sec Gel:
11.2 10 min Gel:
Chi:
250 CA:
15 Pm:
WL:
Pf:
2 Ex Lime:
HTHP:
FC:
10
010 I L
MD
Angle
2,603
2.887
2,982
3,078
0.10
0,20
0.30
0,30
2,603
2.887
2,982
3,078
I R
IHP
o
5
22
40
1.2
0,2
PUMP#2
90
6,000
10.00
91
6.000
10,00
95
314
95
317
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#3
o
o
3.49
3.49
SLOWPUMP RATES
18
11 MBT:
55
SPM:
PRSR:
550
62
550
179,6
57,0
0.2
123.6 AV(DC):
85,7 PSI Drop:
21.0 HPlin2:
987,31
SURVEYS
Dir.
V. Sect,
TVD
BIG I 0
10 INO
IA
1400 PUMP#1
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
INO
HYDRAULICS
Sid Pipe:
'Cyl:
SPM:
Liner Id:
12 Elec Stab:
576.51/1 PV:
32.40 YP:
153.29
307-462-0409
I RPM I I
~2 ~2 ~2 ~O
MUD PROPERTIES
6/312007
RPT No:
VERTITRAK
DATE:
2.21
3,02
3,43
3.93
Mud Used
+NI-S
2.27
3.02
3,43
3.93
+E{-W
O,OC
O,OC
O.OC
O,OC
D,L.
0,00
0.04
0,11
0.00
Used
Mud Additive
DEFOAM X
MILGEL
MUD MAN
POL YPAC R
90
1
PRIMA SEAL
SHRINK WRAPPING
40
~==~===r==~==================~==========~\Ir~
FROM
00:00
07:00
07:30
10:30
TO
07:00
07:30
10:30
11 :00
11:00
14:30
14:30
17:30
17:30
18:30
18:30
19:00
19:00
19:30
22:30
19:30
22:30
00:00
COSTS SUMMARY
Code
20
250
360
430
440
460
510
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUDIFLUIDSICHEMICALS
RIG COSTS
BIT
DIRECTIONAL SERVICES/LWC
OPEN HOLE LOGIFORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,950
3,890
3,152
20,000
27,00C
13,919!
1,60C
1,00(J
250]
8,340
250
8,135
$89,486
$2,994,157
PXP
Daily Report
June 4,2007
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NY
Nabors #148
AFE:
AFEAmount:
WI:
.NRI:
52448
$6,290,700
1.0
0.64
PO:
POOH TO LAY DOWN VERTITRAK
FORMATION:
ELY LIMESTONE
LITHOLOGY:
100% LIMESTONE
24 hr Summary:
CONNECTIONS & DRILL F/2,932' TO 3.090', LOST COMPLETE RETURNS (160 BBLS LOST TO FORMATION)
POOH, HOLE TIGHT F/2,440' TO 2.120', POOH, CHANGE BIT, SURFACE TEST VERTITRAK (TEST OK), RIH TO SHOE,
Forecast:
LAY DOWN VERTITRAK, PICK UP ROTARY DRILLING BHA, RIH, CLEAN OUT TO BOTTOM, SET A LC
CEMENT PLUG.
Thanks
Mike
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
RIG:
BHA':
DescriDtion
QIy
19
1
15
FPH
TVD; 2,932
TO:
2,932
PROGRESS: 332
HRS:
23.50
SIZE I
IADC
12.250 1537
FROM
1,590
NABORS 148
TO
LGTH 1 HRS
962
164.50
CASING:
13.375
PH NBR:
307-462-0409
RPM
010
l!o ff8
MUD PROPERTIES
0.0.
12.250
10.063
9.500
9.750
8.938
8.000
8.000
6.000
5.000
6.000
5.000
BIT
IAUTOTRAK
FILTER SUB
CROSSOVER
CROSSOVER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
Length
1.00
33.09
5.63
2.14
3.03
85.90
2.45
91.87
576.51
32.40
153.29
Time:
00;00 Solids:
MW:
8.7 Oil:
VISC:
pH:
44 10 sec Gel:
11.2 10 min Gel:
Chi:
WL:
250 CA:
16 Pm:
HTHP:
FC:
Pf:
2 Ex Lime:
TAngle
2,60~1
2,887
0
5
15
40
3.4
0.7
0.1~1
0.20
2,60
2,88
BIG
PUMP#2
3
90
6.000
10.00
3
91
6.000
10.00
95
314
95
317
3.49
3.49
PUMP#3
o
o
18
9 MBT:
987.31
Dir.
TVD
1545 PUMP#1
AV(DP):
JelVel:
BitHP:
55
550
62
550
123.6
219.4
137.6
AV(DC):
PSI Drop:
HP/in2:
179.6
373.9
1.2
Mud Used
SURVEYS
MD
HYDRAULICS
Std Pipe;
'Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
11 Elec Stab:
PV:
YP:
612/2007
DATE:
V. Sect.
2.27
3.02
+N/-S
2.2
3.0~
+E/-W
0.00
0.00
Mud Additive
D.L.
0.00
0.04
Used
DEFOAMX
MILGEL
MUD MAN
50
7
7
3
POLYPAC R
Sapp
FROM
00:00
13:30
14:00
TO
13:30
14:00
00:00
HRS
13.50
0.50
10.00
SHRINK WRAPPING
TAX
COSTS SUMMARY
Code
20
360
430
460
510
550
610
670
24.00
Description
Costs
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
3,806
2,891
RIG COSTS
DIRECTIONAL SERVICES/L
OPEN HOLE LOG/FORMATION
WATER
ENVIRONMENTAL
COMMUNICATIONS
20,000i
13,919
1,600
1,0001
2,050
710
730
OVERHEAD
250
8,340
2501
810
MISCELLANEOUS
5,411
RENTAL EQUIPMENT
$59,517
$2,904,671
PXP
Daily Report
June 4,2007
Operated - Drilling
WELL:
FIELD:
CTY/ST:
RIG:
SPUD:
OBlEcnVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
DRILLING @ 3,024' AROP 15.3 FPH WITH FULL RETURNS
FORMATION:
ELY LIMESTONE
LITHOLOGY:
24 hr Summary:
DRILL F/2,600' TO 2,932' AROP 14.2 FPH, RIG SERVICE, (MUD LOSSES- 50 BBLS THROUGH DESANDER)
Forecast:
CONNECTIONS, DRILL WITH VERTITRAK, BIT CHANGE TRIP
Thanks
Mike
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETIElHOUSTON
DRIL
TRIP# BIT#
9
BHA#:
Description
Qly
1
1
1
1
1
3
1
3
19
1
5
MODEL
r-n X9844
SIZE
IADC
12.250 445X
FROM
TO
2,190
2,600
TVD: 2,600
HRS
LGTH
41.00
630
PH NBR:
N1 N2 IN3 WOB
0 0 t!0 ~8
RPM
MUD PROPERTIES
9
O.D.
12.250
10.063
9.500
9.750
8.938
8.000
8.000
6.000
5.000
6.000
5.000
BIT
IAUTOTRAK
FILTER SUB
CROSSOVER
CROSSOVER
STEEL DC
CROSSOVER
STEEL DC
HEAVYWEIGHT DP
JARS
HEAVY WEIGHT DP
Length
1.00
33.09
5.63
2.14
3.03
85.90
2.45
91.87
576.51
32.40
153.29
Time:
8.7 Oil:
42 10 sec Gel:
11.810minGel:
300 CA:
20 Pm:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
5 Elec Stab:
YP:
8 MBT:
Angle
TVD
1.00
3.50
2.90
3.00
FROM
00:00
03:30
TO
03:30
06:00
HRS
3.50
2.50
06:00
08:30
2.50
08:30
14:30
6.00
14:30
15:30
1.00
15:30
00;00
8.50
0
10
11
40
4.8
1.3
Sid Pipe:
ICyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#2
97
310
95
303
PUMP#3
3
87
6.000
10.00
3.56
3.49
SLOW PUMP RATES
18
SPM:
PRSR:
120.1
213.1
126.2
AV(DC):
PSI Drop:
HPlln2:
174.5
352.8
1.1
Mud Used
V. Sect.
13.9~
33.1e
36.76
43.45
+N/-S
13.99
33.15
36.76
43.45
+EI-W
0.00
0.00
0.00
0.00
Mud Additive
D.L.
0.06
0.51
0.94
0.08
AROP8'
24.00
987.31
Dir.
1,60
2,092
2,155
2,285
1314 PUMP#1
3
87
6.000
10.00
SURVEYS
MD
1,603
2,092
2,156
2,286
24
307-462-0409
AV(DP):
JelVel:
BitHP:
Total BHA Length:
DSS:
HYDRAULICS
00:00 Solids:
MW:
40
NABORS 148
RIG:
6/1/2007
DATE:
Used
DEFOAM X
MILGEL
MUD MAN
Sapp
SHRINK WRAPPING
SODIUM BICARBONATE
TAX
TRUCKING
2
140
1
33
6
21
1
1
COSTS SUMMARY
Code
20
350
360
430
460
510
550
670
710
730
810
Description
CONTRACT LABOR
CEMENTING AND SERVICES
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWt:
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1.500
68,744
4,481
20.000
13,919
1.600
1,000
250
9.021
250
12.077
$132.842
$2,845.154
PXP
Daily Report
June 4,2007
Operated - Drilling
WELL:
FIELD:
CTY/S'f:
RIG:
SPUD:
OBJECllVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
DRILLING @ 2,675' WITH FULL RETURNS
FORMATION:
ELY LIMESTONE
LITHOLOGY:
80% L1MESTONE- 20% CHERT
24 hr Summary:
DRILL LC CEMENT PLUG F/2,140' TO 2,429' NO LOSSES TO FROMATION, DRILL NEW HOLE F/2,429' TO 2,454' NO
LOSSES TO FORMATION, CLEAN OUT MUD PUMP SUCTIONS IN SURFACE SUCTION PIT (PLUGED INSIDE MUD
Pin. DRILL F/2.454' TO 2.502', RELACE # 2 MUD PUMP LINER, DRILL FI2.502' TO 2,600' AROP 11.5 FPH
LOST APPROXIMATELY 60 BBLS OF DRILLING FLUID OVER SHALE SHAKERS & DESANDER
Forecast:
CONNECTIONS, DRILL WITH VERTITRAK
Thanks
Mike
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TO:
PROGRESS:
HRS:
RIG:
BHA':
Description
Qty
1
1
1
1
1
3
1
3
19
1
DATE:
IADC
SIZE
12.250 445X
FROM
TO
2,190
2.429
23
39 DSS:
FOREMAN: MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1,590
RPT No:
10'
TVD: 2,429
2.429
220
2.00
NABORS 148
IlGTH
HRS
459
24.00
PH NBR:
N1 N2 N3 WOB RPM
120 120 0 38
~o
MUD PROPERTIES
0.0.
12.250
10.063
9.500
9.750
8.938
8.000
8.000
6.000
5.000
6.000
5.000
BIT
~UTOTRAK
FilTER SUB
CROSSOVER
CROSSOVER
STEel DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
Length
Time:
1.00 MW:
33.09
VISC:
5.63
pH:
2.14
3.03 Chi:
85.90 Wl:
2.45 HTHP:
91.87 FC:
576.51 PV:
32.40
YP:
153.29
00:00 Solids:
8.7 Oil:
34 10 sec Gel:
9.8 10 min Gel:
200 CA:
20 Pm:
pf:
307-462-0409
I
0
5
6
Angle
2.10
FROM
00:00
00:30
TO
00:30
02:30
HRS
0.50
2.00
02:30
04:00
04:00
08:30
1.50
4.50
TVD
2,316
160
0.3
0.25
95
303
95
307
PUMP#3
3
88
6.000
10.00
3.49
3.49
SLOW PUMP RATES
5 Elec Stab:
18
SPM:
PRSR:
119.5 AV(DC):
212.1 PSI Drop:
124.3 HP/in2:
173.7
349.4
1.1
987.31
Mud Used
Dir.
V. Sect.
42.46
+N/-S
42.46
+EI-W
0.00
D.l.
0.09
24.00
PUMP#2
SURVEYS
MD
2,317
720 PUMP#1
3
87
6.000
10.00
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
SId Pipe:
ICy!:
SPM:
linerld:
S.l.:
Rod Dia:
Eff%:
GPM:
2 Ex lime:
10 MBT:
5/31/2007
Mud Additive
COTTON SEED HUllS
MllGEL
MUD MAN
SHRINK WRAPPING
SODIUM BICARBONATE
TAX
TRUCKING
Used
6
35
1
1
6
1
1
COSTS SUMMARY
Code
20
250
360
430
460
510
540
550
610
670
710
730
810
Description
Costs
CONTRACT LABOR
1,500
TRANSPORTATION - LAND
9.198
3,056
MUD/FLUIDS/CHEMICALS
RIG COSTS
20,000
DIRECTIONAL SERVICES/LWD
13.919
OPEN HOLE lOG/FORMATION
1,600
FUEUlUBElElECTRICITY
11.207
WATER
2.000
ENVIRONMENTAL
1,797
COMMUNICATIONS
250
RENTAL EQUIPMENT
9.841
OVERHEAD
250
MISCELLANEOUS
7,462
$82,083
$2,712,312
'$IIH'""
PXP
FROM
TO
Date:
5/31/2007
PLUTO_27-1
HRS
Ph
Op
0
0
TR
PUllED 5 STD, PUMP 30 BBlS TO CLEAR DRill PIPE, POOH TO SHOE AT 1,590'
CM
WOC, WHilE WOC BUilD SURFACE VOLUME, MOVE TRASH PUMP FROM SETTLING RESERVE PIT
TO ACTIVE RESERVE PIT
08:30
09:00
0.50
09:00
12:30
3.50
12:30
13:30
1.00
PUMP 125 BBlS TO ESTABLISH RETURNS (FLUID lEVEL AAPROXIMATElY 960' FROM SURFACE)
14:30
1.00
0
0
CI
13:30
TR
14:30
15:30
1.00
CI
15:30
16:00
0.50
CM
99.5 BBlS eMT SLURRY (93 SKS) 12.0 PPG PUMPING PRESSURE 121 PSI
PUMPING PRESSURE 147 PSI
DISPLACE WI 27.6 BBlS FRESH WATER
CEMENT PLUG IN PLACE @ 16:00 HR 5/31/07
GOT RETURNS AFTER 71.1 BBlS INTO PLUG JOB (80%)
PIPE DRY BUT NOT ON A VACUUM
16:00
16:30
0.50
TR
POOH 10 STANOS, PUMP EO 30 BBlS TO CLEAR ORlll PIPE (RETURNS AFTER PUMPING 22 BBlS
(FLUID lEVEL APPROXIMATELY 168' FROM SURFACE)
16:30
17:30
1.00
TR
POOH
17:30
19:30
2.00
TR
19:30
22:00
2.50
TR
RIH WNERTITRAK (SURFACE TEST AND EVERY 5TH STAND, TESTS OK), TAG CMT @ 1,920'
22:00
00:00
2.00
DC
PXP
Daily Report
June 1, 2007
Operated - Drilling
WELL:
FIELD:
CTY/SIT:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
DRilLING @ 2,454' WITH FULL RETURNS
lOST TO THE FORMATION PAST 24 HRS, AAPROXIMATElY 700 BBlS
FORMATION:
ELY LIMESTONE
LITHOLOGY:
80% LlMESTONE- 20% CHERT
24 hr Summary:
POOH,RIH OPEN ENDED TO SET LC CEMENT PLUGS, 1ST PLUG @ 2,185', PLUG LENGHT 400'- 58 BBL-12 PPG
SLURRY, RIH TAG CEMENT @ 2,273', SET SECOND CEMENT PLUG @ 2,273', PLUG LENGHT 683'- 99.5 BBL-12 PPG
SLURRY, POOH, PICK-UP VERTITRAK, RIH, TAG CEMENT PLUG @ 1,920', DRILL CEMENT PLUG W/FULL RETURNS
Forecast:
CONNECTIONS, DRill & SURVEY
Thanks
Mike
PXP
WELL:
FIELD:
STATE:
AREA:
CLASS:
PLUTO_27-1
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TD:
2,429
PROGRESS: 112
HRS:
13.50
RIG:
BHA':
Description
Qty
3
1
13
19
1
i5
lADe
SIZE I
12.250 1445X
FROM 1 TO
2,190
12,429
1LGTH 1 HRS
1239
122.00
TVD: 2,429
PH NBR:
N1 IN2 INS I WOB
I RPM I
148
~f<>Jo ~8
MUD PROPERTIES
O.D.
12.250
10.063
9.500
9.750
8.938
8.000
8.000
6.000
5.000
6.000
5.000
Length
1.00
33.09
5.63
2.14
3.03
85.90
2.45
91.87
576.51
32.40
153.29
00:00 Solids:
MW:
8.6 Oil:
Std Pipe:
#Cyl:
VlSC:
pH:
34 10 sec Gel:
8.8 10 min Gel:
2
3
SPM:
Liner Id:
Chi:
WL:
50 CA:
20 Pm:
Pf:
2 Ex Lime:
240
0.05
0.05
I0 I D
PUMP#2
87
6.000
10.00
84
6.000
10.00
Angle
95
303
95
293
PUMP#3
GPM:
o
o
17
I I SPM:
PRSR:
116.8
207.2
114.6
AV(DC):
PSI Drop:
HPtin2:
169.7
329.7
1.0
Mud Used
V. Sect.
+N/-S
+E/-W
Mud AddlUve
D.L.
Used
DRILLING PAPER
FED SEAL
MILGEL
MUD MAN
SHRINK WRAPPING
SP-101
FROM
00:00
02:30
06:30
TO
02:30
06:30
08:00
HRS
2.50
4.00
1.50
08:00
17:00
17:30
17:00
17:30
19:30
9.00
0.50
2.00
19:30
20:00
20:00
21:30
0.50
1.50
21:30
00:00
2.50
24.00
987.31
Dir.
TVD
Rod Dia:
Eff%:
SURVEYS
MD
BIG
1200 PUMP#1
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
3.49
3,49
SLOW PUMP RATES
4 MBT:
YP:
S.L:
10 Elec Stab:
PV:
307-462-0409
HYDRAULICS
Time:
HTHP:
FC:
5/30/2007
NABORS 148
BIT
~UTOTRAK
FILTER SUB
CROSSOVER
CROSSOVER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
DATE:
18
184
163
1
4
2
TAX
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
Description
Costs
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICEStLWt:
OPEN HOLE LOGtFORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
1.500,
6,49C
20,000
13,91S
1,60C
5.000
250
9.841
250
5,885
$64.735
$2.630,229
PXP
Daily Report
May 31,2007
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
RIGGING-UP BJ TO SET LOST CIRCULATION CMT PLUG
LOST TO THE FORMATION WHILE DRILLING 3,500 BBLS
FORMATION:
EL Y LIMESTONE
LITHOLOGY:
24 hr Summary:
RIH TO BOTTOM @ 2,317' (NO FILL), DRILL TO 2,349', LOSING MUD@A RATE OF 280+ BBLS/HR, BUILD SURFACE
VOLUME, DRILL TO 2,417', RIG SERVICE, HOLE PACKED OFF, WORK PIPE AND REGAIN CIRCULATION, DRILL TO
2,429' LOSING MUD AT A RATE OF 300+ BBLS/HR, WHILE BUILDING SURFACE VOLUME; HOLE STARTED FALLING
IN, AERATE MUD TO HELP CLEAN HOLE, POOH TO SET CMT LOST CIRCULATION PLUG @ 2,325' BACK TO 1,925'
Forecast:
SET CMT PLUG; TOP OF PLUG @ 1,925', BonOM OF PLUG @ 2,325',POOH, WAIT ON CMT (4HRS)
IF NO PLUG; POOH, SET SECOND CMT PLUG, IF TAG CMTAND NO LOSSES WHILE CIRCULATING,
DRILL, IF LOSSES OCCUR; POOH, LAY DOWN VERTITRAK, RIH OPEN ENDED, SET SECOND PLUG.
Thanks
Mike
PXP
i
WELL :
PlUTO_27-1
LAS VEGAS
FIELD:
STATE:
NV INHITE PINE
LAFAYETIE/HOUSTON
AREA:
DRll
CLASS:
RIG CONTR: NABORS DRilLING
MODEL
TRIP# Bin
MX9844
9
BHA':
Description
Qty
1
1
1
1
1
3
1
3
19
1
DATE:
TO:
2.317
PROGRESS: 0
0.00
HRS:
RIG:
IADC
SIZE
12.250 445X
FROM
2.190
TVD: 2.317
PH NBR:
lGTH
HRS
127
8.50
N1 N2 N3 WOB
20
0
RPM
MUD PROPERTIES
9
0.0.
12.250
10.063
9.500
9.750
8.938
8.000
8.000
6.000
5.000
6.000
5.000
BIT
IAUTO TRAK
FilTER SUB
CROSSOVER
CROSSOVER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
length
1.00
33.09
5.63
2.14
3.03
85.90
2.45
91.87
576.51
32.40
153.29
Time:
0
2
3
8.6 Oil:
38 10 sec Gel:
8.7 10 min Gel:
VISC:
pH:
50 CA:
20 Pm:
ChI:
WL:
240
0.05
0.05
Pf:
2 Ex Lime:
HTHP:
FC:
PV:
307-462-0409
I
Angle
644
914
1.190
1.603
2.092
2,156
2.286
TVD
2.00
1.50
1.75
1.00
3.50
2.90
3.00
FROM
00;00
TO
06:00
HRS
6.00
06:00
06:30
09:30
10;30
06:30
09:30
10:30
12:30
0.50
3.00
1.00
2.00
12:30
14:30
2.00
14:30
16:30
2.00
16;30
19;30
3.00
19:30
20:30
1.00
20:30
21;00
21:00
21:30
0.50
0.50
21:30
22:30
22:30
00:00
1.00
1.50
PUMP#2
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
87
6.000
10.00
95
303
95
293
PUMP#3
3.49
3.49
SLOW PUMP RATES
SPM:
PRSR:
20
7 MBT:
116.8
207.2
114.6
AV(DC):
PSI Drop:
HPlin2:
169.7
329.7
1.0
987.31
Dir.
644
914
1.1ge
1.603
2,091
2.155
2.2B5
3
84
6.000
10.00
Mud Used
SURVEYS
MD
Std Pipe:
#Cyl:
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
1000 PUMP#1
3
10 Elec Stab:
YP:
21
HYDRAULICS
00:00 Solids:
MW:
DSS:
37
FOREMAN:MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1.590
NABORS 148
TO
5/29/2007
V. Sect.
10.13
18.3S
26.20
36.11
55.31
58.88
65.57
+N/-S
10.13
18.3S
26.20
36.11
55.31
58.8B
65.5f
+E/-W
Mud Additive
D.L.
o.oe
O.OC
o.oe
0.37
0.19
0.09
0.18
0.51
0.94
0.08
0.00
O.O(]
O.OC
O.OC
Used
FED SEAL
MUD MAN
PAllETS
SHRINK WRAPPING
TAX
152
1
1
3
1
COSTS SUMMARY
Code
20
360
430
460
510
550
670
710
730
810
Description
CONTRACT LABOR
MUDlFlUIDS/CHEMICAlS
RIG COSTS
DIRECTIONAL SERVICES/lWC
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1.500
4.099
20.000
13.919
1,600
1.250
250
11.196
250
5.406
Ii
II
...
__ ..........
__ __
....
__ .. _........ _
$59,470
$2.565,494
"
PXP
Date:
- _.
5/29/2007
PLUTO_27-1
FROM
TO
HRS
Ph
Op
23:30
00:00
0.50
TR
PXP
Daily Report
May 30,2007
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
SPUD:
OBJECTIVE:
CASING:
PO:
DRILLING @ 2.347' AROP 12 FPH
LOST TO THE FORMATION WHILE DRILLING 359 BLLS = 143 BBLS/HR
TOTAL LOSSES PAST 24 HRS= 1,678 BBLS
FORMATION:
ELY LIMESTONE
LITHOLOGY:
90% LlMESTONE~ 10% CHERT
24 hr Summary:
BUILD VOLUME & CONDITION IN SURFACE PITS, SPOT 355 BBLS LCM PILL FROM SURFACE TO BonOM OF
HOLE (2,317'), POOH, CHANGE VERTITRAK FROM HIGH RPM MM TO LOW RPM MM. RIH VERTITRAK, NOT
WORKING, POOH, RIH TO BonOM OPEN ENDED, WL SURVEY @ 2,286'~3 DEGREES, CIRCULATE HOLE VOLUME
(355 BBLS) OVER SHALE SHAKERS TO REMOVE LCM FROM THE HOLE VOLUME, POOH, PICK~UP THIRD
VERTITRAK, SURFACE TEST SAME TESTED OK), RIH TO DRILL.
Forecast:
DRILL WNERTITRAK, WL SURVEY
Thanks
Mike
PXP
FIELD:
STATE:
AREA:
CLASS:
RIG CONTR:
LAS VEGAS
NV WHITE PINE
LAFAYETTE/HOUSTON
DRll
TRIP# BI1#
MODEL
MX9844
9
BHA#:
1
3
1
3
19
1
5
FROM
2,190
TO
LGTH
HRS
127
8.50
PH NBR:
N1 N2 N3 WOB
0 ~O '8
RPM
0.0.
12.250
10,063
9,500
9,750
8.938
8.000
8.000
6.000
5.000
6.000
5.000
BIT
AUTOTRAK
FLOW SUB
CROSSOVER
CROSSOVER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
Length
1.00
33,09
5.63
2.14
3.03
85.90
2.45
91,87
576,51
32.40
153.29
Time:
50 CA:
20 Pm:
W1..:
HTHP:
FC:
PV:
Pf:
2 Ex Lime:
0
2
5
240
0,05
0,05
Std Pipe:
'ICyl:
SPM:
liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
13 Elee Stab:
YP:
22
9 MBT:
1700 PUMP#1
3
85
6.000
10,00
305
644
914
1,190
1,603
2,092
2,156
0.75
2.00
1.50
1.75
1.00
3.50
2.90
Dlr,
FROM
00:00
01:00
TO
01:00
02:30
HRS
1.00
1.50
02:30
06:00
3.50
06:00
16:00
10,00
16:00
21:00
5.00
21 :00
21 :30
21 :30
00:00
0.50
2.50
30e
64~
91~
1,19C
1,60~
2,091
2,15E
PUMP#2
PUMP#3
3
85
8,000
10,00
0
0
SPM:
PRSR:
116.0 AV(DC):
205,8 PSI Drop:
113.7 HP/in2:
168.5
329,1
1.0
Mud Used
SURVEYS
TVD
987,31
95
95
296
296
3.49
3.49
SLOW PUMP RATES
AV(DP):
Jet Vel:
BitHP:
MD
HYDRAULICS
00:00 Solids:
8,7 Oil:
44 10 sec Gel:
8,7 10 min Gel:
MW:
VISC:
pH:
Chi:
307-462-0409
~O
MUD PROPERTIES
Description
Qty
IADC
SIZE
12.250 445X
20
TVD: 2,317
TO:
2,317
PROGRESS: 127
HRS:
850
NABORS 148
RIG:
NABORS DRilLING
1
1
1
PlUTO_27-1
WELL:
5/28/2007
DATE:
V, Sect.
2.0e
10.1'
18.3f
26.2C
36.11
55.31
58.88
+N/-S
2.0e
10.13
18.38
26.20
36.11
55.31
58,88
+E/-W
o.oe
o.oe
o.oe
o,oe
0.00
0.00
0.00
Mud Additive
D.l.
0.25
0.37
0.19
0.09
0.18
0.51
0.94
Used
CEDER FIBER
DRILLING PAPER
GEL EX
MllGEl
MUD MAN
PALLETS
SHRINK WRAPPING
SODA ASH
SP-101
242
90
6
248
1
2
18
4
33
COSTS SUMMARY
Code
I
20
250
360
430
460
510
550
670
710
730
810
DeScription
Costs
CONTRACT LABOR
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICESIlWD
OPEN HOLE lOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
1,500
1,683
12,175
20,000
13.919
1,600
1,250
250
9.841
250
6.247
J
24.00
$68,715
$2.506.024
PXP
Daily Report
May 29,2007
Operated - Drilling
WELL:
FIELD:
CTY/~:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
po:
24 hr Summary:
POOH, PICK-UP VERTITRAK-SURFACE TEST OK, RIH WASH 100' TO BOTTOM (NO Fill), SLIDE DRill F/2,190' TO
2,317'
2,190' TO 2.240' lOSSES 14 BBlS/HR
2,240' TO 2,280' lOSSES 28 BBlS/HR
2,240 TO 2,310' lOSSES 257 BBlS/HR
@ 2,317' lOST COMPLETE RETURNS
lOST TO FORMATION WHilE DRilLING 1,415 BBlS
lOST TO FORMATION WHilE REGAINGING CIRCULATION 1,540 BBlS
TOTAL lOST TO FORMATION 2,955 BBlS
REGAINED CIRCULATION W/1 ,200 CFM AND 520 PSI AIR PRESSURE
POOH TO SHOE. BUilDING SURFACE VOLUME TO 8.7 PPG-44 VIS-WITH 15 lBS/BBl lCM
Forecast:
FINISH SPOTTING LCM PILL, POOH TO X-OVER SUB, INSTALL CROW'S FOOT. RIH TO BOTTOM,
WIRELINE SURVEY @2,272', ATTEMPT TO REGAIN CIRCULATION USING AERATED DRILLING FLUID,
TEST VERTITRAK AND MM FOR OPERATION IN AERATED DRILLING FLUID. IF WORKING PROPERLY
DRILL AHEAD, IF NOT WORKING- POOH & PICK UP PAC,KED ROTARY DRILLING BHA
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV WHITE PINE
LAFAYETTE/HOUSTON
DRIL
BHA.:
Descriotion
QIy
1
1
1
1
1
3
1
3
19
1
5
DATE:
SIZE
12.250
12,250
IADC
445X
FROM
TO
1.635
2.190
2.190
0.0.
BIT
AUTOTRAK
FLOW SUB
CROSSOVER
CROSSOVER
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
12.250
10.063
9.500
9.750
8.938
6.000
8.000
6.000
5.000
6.000
5.000
Length
Time:
1.00 MW:
33.09
VISC:
5.63
pH:
2.14
3.03 Chi:
65.90 WL:
2.45 HTHP:
91.87 FC:
576.51 PV:
32.40
YP:
153.29
N1 N2 N3 WOB
5 5 5
P2 j:l2 ~2
RPM
10 Oil:
46 10 sec Gel:
8.7 10 min Gel:
3
7
240
0.05
Pf:
0.05
Std Pipe:
'Cyl:
SPM:
liner Id:
S.L:
Rod Dia:
Eff%:
GPM:
2 Ex Lime:
PUMP#2
6.000
10.00
6.000
10.00
95
0
95
0
FROM
00:00
TO
09:00
Dir.
HRS
9.00
09:00
15:30
6.50
15:30
18:30
3.00
18:30
19:30
1,00
19:30
23:00
3.50
23:00
00:00
1.00
V. Sect.
14 Elec Stab:
22
10 MBT:
PUMP#3
0
0
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
0.0
0.0
0.0
Mud Used
+N/-S
+E/-W
Mud Additive
D.L.
3.49
3.49
SLOW PUMP RATES
SURVEYS
TVD
B IG
987.31
PUMP#1
3
AV(DP):
Jet Vel:
BitHP:
MD
HYDRAULICS
00:00 Solids:
50 CA:
16.2 Pm:
19
307-462-0409
PH NBR:
MUD PROPERTIES
DSS:
35
FOREMAN:MIKE SISTRUNK
API#:
2703305316
AFEt:
52448
CASING: 13.375 in. SHOE MD: 1.590
TVD: 2.190
HRS
LGTH
23.50
573
0,00
0
5/27/2007
Used
CEDER FIBER
FED SEAL
GEL EX
MILGEL
MUD MAN
PALLETS
SHRINK WRAPPING
SP-101
67
240
5
230
1
2
12
35
COSTS SUMMARY
Code
20
250
360
430
460
510
550
670
710
730
810
DeSCription
Costs
CONTRACT LABOR
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG COSTS
DIRECTIONAL SERVICES/LWI:
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
1.500
10.148
11,837
20.000
6,59C 1
1.600
500
250
9.841
250
6.252
$68.768
$2.437.309
PXP
Daily Report
May 29,2007
Operated - Drilling
WELL:
FIELD:
CTY/ST:
RIG:
SPUD:
OBlEcnVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
po:
CIRCULATING 3~' OFF BOTTOM, PUMPING 580 GPM W/FULL RETURNS WHILE DECODING VERTITRAK
SIGNALS
24 hr Summary:
WHILE WAITING ON PARTS TO REPAIR TOP DRIVE: RIH TO BOTIOM @2,100', NO FILL, PUMPED 100 BBl OF HIG
VIS (70+) lCM (45lBS/BBl) PIll, WORKING PIPE AND TREATING SURFACE PIT VOLUME TO 8.6 PPG, 40-45- VIS, 7
9 BlD/BBl lCM IN ATIEMPT TO REGAIN CIRCULATION.
AFTER PUMPING 750 BBlS OF TREATED MUD (100 BBlS W/44 lBS/BBl lCM) ESTABLISHED PARTIAL RETURNS;
30%, BUilD SURFACE SYSTEM BACK TO 1000 BBlS OF 8.6 PPG, 45 VIS. W/15 lBS/BBl lCM. CIRCULATE AND
CONDITION HOLE FOR VERTITRAK RUN. RETURNS ARE 95%+ @ PUMPING RATE OF 210 GPM. 0 RETURNS @ 530
GPM, 530 GPM IS MINIMUM RATE FOR VERTITRAK STEERING RIBS TO REMAIN lOCKED.
lOST THE FORMATION APPROXIMATELY 1,100 BBlS OF 8.6 PPG, 42 VIS, 15 PPB lCM FLUID.
SHUT OFF MUD PUMP, WORK PIPE WHilE WAITING ON lCM Pill TO WORK.
ESTABLISH PUMP RATE OF 580 GPM FOR 1 MIN. "0" RETURNS REDUED PUMP RATE TO 530 GPM FOR 3 MIN. "0"
FINISHED POOH, PICK-UP VERTITRAK TOOLS, RIH DC's, TEST MWD (TEST OK), RIH TO 2090' , WASH 60' TO 2,160'
Forecast:
Thanks
Mike
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
MODEL
Qty
1
3
1
3
19
1
5
BHA#:
Description
AUTOTRAK
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVY WEIGHT DP
IADC
SIZE
2.250
HRS:
15.00
CASING:
RIG:
NABORS 148
PH NBR:
FROM
1,635
TO
HRS
IlGTH
453
15.00
N1 N2 N3 WOB RPM
5
5
30
5 ~
MUD PROPERTIES
0.0.
12.250
8.000
8.000
6.500
5.000
6.500
5.000
Length
6.32
85.90
2.45
91.87
576.51
32.40
153.29
00:00 Solids:
MW:
8.6 Oil:
VISC:
pH:
53 10 sec Gel:
8.8 10 min Gel:
2
3
200 CA:
20 Pm:
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
8 Elec Slab:
YP:
6 MBT:
60
0.1
0.15
Std Pipe:
#Cyl:
PUMP#2
6.000
10.00
6.000
10.00
95
0
95
0
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
FROM
00:00
03:00
04:00
06:00
07:30
09:00
TO
03:00
04:00
06:00
07:30
09:00
00:00
TVD
0.75
2.00
1.50
1.75
1.00
HRS
3.00
1.00
2.00
1.50
1.50
15.00
Dir.
30!
644
91~
1,19C
1,60
PUMP#3
3.49
3.49
SLOW PUMP RATES
16
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
Mud Used
SURVEYS
Angle
948.74
305
644
914
1,190
1,603
PUMP#1
3
AV(DP):
Jel Vel:
Bit HP:
MD
HYDRAULICS
Time:
Chi:
WL:
17
TVD: 2,070
TD:
2,070
PROGRESS: 453
5125/2007
DATE:
V. Sect.
2.00
10.1 ~
18.3f
26.2C
36.11
+N/-S
+E/-W
2.00
10.13
18.38
26.20
36.11
0.00
0.00
0.00
0.00
0.00
Mud Additive
D.L
Used
0.25
0.37
0.19
0.09
0.18
COSTS SUMMARY
Code
20
360
430
440
510
550
670
710
730
810
Description
Costs
0
1,500
CONTRACT LABOR
MUD/FLUIDS/CHEMICALS
RIG COSTS
450
20,000
BITS/HOLE OPENERS/UNDERI
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
5.920
1.600
1,100
250
12,389
250
4,346
24.00
...........
$47,805
$2,325,696
PXP
Daily Report
May 29,2007
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NY
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
5244S
$6,290,700
1.0
0.64
po:
MIST DRILLING @ 2,170'
24 hr Summary:
DRILL TO 1,635', UNLOAD HOLEW/AIR, POOH LAYDOWN ROTARY BHA, PICK-UP AIR HAMMER, R/H,
DRILL FROM 1,623' TO 2,070' AROP 30.2 FPH
FROM MIDNIGHT TO 06:00 am 5/26/07
DRILL FROM 2,070' TO 2,170'
LITHOLOGY
100% LIMESTONE
FROMATION
POSSIBLE ELY LIMESTONE
Forecast:
MIST DRILL UNTIL NABORS TOP DRIVE TECH. ARRIVES LOACATION, POOH REPAIR TOP DRIVE, RIH,
DRILL
Thanks
Mike
PXP
Daily Report
May 25,2007
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NY
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
po:
~C~NGUP~RHAMMERANDHAMMERBIT
NOTE!
FORMATION- ARCTURUS
24 hr Summary:
REPLACE TOP DRIVE UPPER IBOP, TEST ROTARY HOSE. 4" STAND PIPE VALVE, UPPER & LOWER
IBOP'S, RIG DOWN (WORK ON TOP DRIVE, INSTALL WEAR BUSHING, PICK-UP BHA, RIH, TAG fc@
1,547', DRILLE FC, SHOE JOINT & SHOE, 5' OPEN HOLE, TEST SHOE TO EMW OF 10.5 PPG (HELD OK),
CONNECTIONS, INSTALL RT HEAD, DRILL TO 1,623'
Forecast:
DRILL WITH AIR HAMMER & SURVEY
Thanks
Mike
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
VlJHITE PINE
LAFAYElTEfHOUSTON
DRIL
HAMMER BIT
TVD: 1,623
TD:
1,623
PROGRESS: 33
HRS:
1.00
RIG:
5/24/2007
DATE:
RPT No:
16
32 DSS:
FOREMAN:MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1,5901
PH NBR:
NABORS 148
3017-462-04019
R
6
BHAI:
Description
Qty
1
12
3
19
1
5
MUD PROPERTIES
6
O.D.
12.2501
8.250
8.01010
8.0001
6.0100
BIT
JUNK BASKET
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
5.010101
6.2501
5.0001
Length
1.801
7.52
85.90
2.45
91.87
576.61
32.40
153.29
951.84
Time:
HYDRAULICS
Std Pipe:
#Cyl:
00:00 Solids:
MW:
01
8.6 Oil:
35 10 sec Gel:
8.8 10 min Gel:
VISC:
pH:
2010 CA:
201 Pm:
Chi:
WL:
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
8 Elec Stab:
YP:
6 MBT:
PUMP#1
3
PUMP#2
6.0001
101.0101
6.0010
10.010
95
01
95
0
SPM:
Liner Id:
S.L.:
Rod Dia:
2
3
60
0.1
Eff%:
0.15
GPM:
MD
FROM
00:00
015:010
016:0101
019:0101
11:0101
019:0101
11:0101
16:301
3.0101
2.0101
5.501
16:301
18:301
18:301
21:301
2.0101
3.0101
21:301
22:0101
22:001
22:301
01.501
01.501
22:301
23:301
23:301
0101:0101
1.0101
01.501
TVD
Dir.
AV(DP):
Jet Vel:
BitHP:
01.01
0.0
0.01
I V. Sect.
AV(DC):
PSI Drop:
HPlin2:
Mud Used
+Ef-W
01
SPM:
PRSR:
16
I
+ Nf-S
01
3.49
3.49
SLDW PUMP RATES
SURVEYS
Angle
PUMP#3
Mud Additive
D.L.
0.01
0.0
01.01
--
Used
MUD MAN
SODIUM BICARBONATE
15
COSTS SUMMARY
Code
201
2701
3601
4001
4301
4401
5101
5501
6701
7101
7301
8101
Description
CONTRACT LABOR
MISCELLANEOUS
MUDfFLUIDSfCHEMICALS
CASINGfTUBINGfHAMMER EQ
RIG COSTS
BITSfHOLE OPENERSfUNDERI
OPEN HOLE LOGfFORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,5001
71D!
650
17,2019
201,01010
17,010101
1,60101
7501
2501
9,8401
2501
6,9015
$76,664
$2,277,891
PXP
Daily Report
May 24,2007
Operated - Drilling
WELL:
FIELD:
CTY/sr:
RIG:
SPUD:
OBlEcnVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
po:
PICKING UP BHA
24 hr Summary:
TORQUE BOLTS ON BOP STACK, KILL LINE, MOVED CHOKE MANIFOLD HOUSE TO INSTALL CHOKE
LINE SPOOL, INSTALL CHOKE LINE SPOOL AND MOVE HOUSE BACK, TORQUE BOLTS ON CHOKE
LINE, PREFORM ACCUMULATOR TEST AS PER BLM SPECS. (REPLACED DRIVE CHAIN ON
ACCUMULATOR TRIPLEX & OVERHAUL BOTH AIR PUMPS)
PRESSURE TEST:
ANNULAR 250 PSI LOW-1,500 PSI HIGH
RAMS 250 PSI LOW-3,000 PSI HIGH
CHOKE MANIFOLD, HCR, KllLINE VALVES 250 PSI LOW-3,OOO PSI HIGH
STD PIPE VAVES, MUD PUMP VALVES, ROTARY HOSE, UPPER & LOWER IBOP's VALVES 250 PSI LOW
3,000 PSI HIGH, CHANGED OUT "0" RING IN STD PIPE & UPPER IBOP ON TOP DRIVE.
Forecast:
FINISH PICKING UP BHA, RIH, SERVICE TOP DRIVE, DRILL FC, SHOE, 5' OF HOLE, FORMATION TEST
TO EMW 10.5 PPG (157 PSI SURFACE PRESSURE), CLEAN OUT TO 1,629' DRILL 5', IF NO JUNK IN
HOLE, BLOW HOLE DRY, POOH, PICK UP AIR HAMMER AND HAMMER BIT, RIH, DRILL
Thanks
Mike
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
RIG:
BHA#:
Description
Qty
19
IADC
SIZE
2.250 425X
FROM
1,590
PHNBR:
NABORS 148
TO
LGTH
HRS
0
0.00
RPM
N1 N2 N3 WOB
O.D.
12.250
8.250
8.000
8.000
6.000
5.000
6.250
5.000
Length
1.80
7.52
85.90
2.45
91.87
576.61
32.40
153.29
VISC:
pH:
8.6 Oil:
35 10 sec Gel:
8.8 10 min Gel:
Chi:
WL:
200 CA:
20 Pm:
MW:
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
8 Elec Stab:
YP:
6 MBT:
0
2
3
60
0.1
0.15
16
Std Pipe:
ICyl:
FROM
00:00
TO
06:00
HRS
6.00
06:00
08:00
2.00
08:00
10:00
2.00
10:00
12:00
2.00
12:00
16:00
4.00
16:00
00:00
8.00
SPM:
Liner Id:
S.L.:
Rod Dia:
Elf%.:
GPM:
PUMPt2
6.000
10.00
6.000
10.00
PUMPt3
95
0
95
0
3.49
3.49
SLOW PUMP RATES
0
0
SPM:
PRSR:
0.0
0.0
0.0
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
Mud Used
SURVEYS
TVD
951.84
PUMPt1
3
AV(DP):
Jet Vel:
BitHP:
MD
HYDRAULICS
00:00 Solids:
Time:
307-462-0409
~2 32 ~2
MUD PROPERTIES
BIT
JUNK BASKET
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
JARS
HEAVYWEIGHT DP
15
RPT No: 31 DSS:
FOREMAN: MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1.590.
TVD: 1,590
TD:
1.590
PROGRESS: 0
HRS:
0.00
5/23/2007
DATE:
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
Used
COSTS SUMMARY
Code
180
20
250
270
360
430
510
550
610
670
710
730
810
Description
Costs
LOCATION/LEASE/ROAD
CONTRACT LABOR
TRANSPORTATION - LAND
MISCELLANEOUS
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
1.20C
3,405
4.938
0
450
20,000
1,600
1,150
772
250
9,840
250
2.193
$46.048
$2,201,227
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJEcnVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
po:
24 hr Summary:
WOC FROM BJ BAKERSFIELD YARD, COMPLETED 3 RD CMT TOP JOB (PUMPED 99 BBLS 12.0 PPG
CMT), WELD ON 13-3/8" CASING HEAD, STACKED SPACER SPOOL, DSA, MUD-X, DOUBLE GATE RAM,
Forecast:
COMPLETE CHOKE MANIFOLD HOUSE, TEST BOP's, INSTALL WEAR BUSHING, PICK-UP ROTARY
DRILLING BHA, RIH, DRILL FLOAT COLLAR, SHOE + 5', TEST FORMATION TO 10.5 PPG EMW (157 PSI
SURFACE PRESSURE), CLEAN OUT & DRILL TO 1635', BLOW HOLE DRY, POOH AND PU AIR HAMMER,
Daily Cost:
$269,169
PXP
WELL:
PLUTO_27-1
Qty
MODEL
14
30 DSS:
FOREMAN: MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
CASING: 13.375 in. SHOE MD: 1,590
TVD: 1,590
TO:
1,590
PROGRESS: 0
HRS:
0.00
RIG:
IADC
SIZE
FROM
NABORS 148
TO
LGTH
HRS
PHNBR:
RPM
N1 N2 N3 WOB
MUD PROPERTIES
BHA':
Description
Length
O.D.
Time:
8.6 Oil:
35 10 sec Gel:
8.8 10 min Gel:
ChI:
200 CA:
20 Pm;
WL:
P1:
HTHP:
FC:
2 Ex Lime:
PV:
8 Elec Stab:
YP:
6 MBT:
307-462-0409
I
0
2
3
60
0.1
0.15
16
Sid Pipe;
ICyl:
SPM;
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
FROM
06:00
Angle
TO
07:00
HRS
1.00
07:00
09:00
2.00
09:00
14:00
14:00
00:00
5.00
10.00
PUMP#3
0
0
0.00
0.00
SLOW PUMP RATES
0
0
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
0.0
0.0
0.0
0.00
Dir.
TVD
PUMP#2
Mud Used
SURVEYS
MD
PUMP#1
AV(DP):
Jet Vel:
BitHP:
Total BHA length:
HYDRAULICS
00:00 Solids:
MW:
VISC:
pH:
5/22/2007
RPT No:
HOUSE
FIELD:
LAS VEGAS
STATE:
NV
WHITE PINE
AREA:
LAFAYETIE/HOUSTON
DRll
CLASS:
RIG CONTR: NABORS DRilLING
TRIP# Bin
DATE:
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
Used
COSTS SUMMARY
Code
20
250
270
350
360
410
430
440
510
60
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MISCELLANEOUS
CEMENTING AND SERVICES
MUDlFlUIDSICHEMICALS
DRilLING CASING
RIG COSTS
BITSIHOlE OPENERS/UNDERI
OPEN HOLE LOG/FORMATION
WELLHEAD EQUIPMENT
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAO
MISCELLANEOUS
Costs
1,500
2,046
0
200,79C
450
1,741
20,000
9,785
1,600
3,372
250
14,811
250
12,574
....
-- --- ....
...
.......
$269,169
$2,155,179
PXP
Daily Report
Operated - Drilling
WELL:
FIELD:
elY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
po:
Cementing through 1.9 parasite string for top job, with full returns
24 hr Summary:
RAN 40 JTS CASING. TAG @ 1589' WASHED l' PUMPED ONE CASING VOLUME (NO RETURNS).
RIGGED BJ CMETED CASING. BUMPED PLUG. PRESSURE TEST CASING TO 1,500 PSI- HELD 30MIN.
OK. PUMPED 200 SKS, NO RETURNS, WOC, CUT OFF 20' AND ROUGH CUT 13-3/8" RIH W/1.9 PARASITE
STRING BETWEEN 20" AND CASING, TAG AT 162'. PUMPED 30 BBLS, ESTABLISHED RETURNS. KEEP
Forecast:
Daily Cost:
$50,144
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETIE/HOUSTON
DRIL
TD:
1,629
PROGRESS: 0
HRS:
0.00
RIG:
BHA#:
QIy
1
1
1
21
SIZE
~7.500
FROM
IADC
445X
TO
N1 N2 N3 WOB
RPM
MUD PROPERTIES
0.0
17.500
8.000
8.000
5.000
BIT
BIT SUB
CROSSOVER
HEAVY WEIGHT DP
lVD: 1,629
LGTH
HRS
0
0.00
Length
1.80
2.00
2.45
638.00
Time:
MW:
VISC:
pH:
CA:
Pm:
HTHP:
FC:
Pf:
Ex Lime:
PV:
Elec Stab:
VP:
MBT:
Std Pipe:
FROM
Angle
TO
lVD
03:00
04:00
3.00
1.00
04:00
05:00
1.00
05:00
08:00
3.00
08:00
09:00
1.00
09:00
10:00
10:00
16:30
1.00
6.50
16:30
18:30
18:30
20:30
2.00
2.00
0
0.00
PUMP#3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%.:
GPM:
0.00
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
644.25
Dir.
Mud Used
V. Sect.
+N/-S
+EJ-W
Mud Additive
D.L.
Used
HRS
00:00
03:00
PUMP#2
SURVEYS
MD
250 PUMP#1
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
13
ICyl:
8.6 Oil:
35 10 sec Gel:
10 min Gel:
Chi:
DSS:
HYDRAULICS
00:00 Solids:
WL:
29
5/21/2007
FOREMAN:MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
CASING: 20
in. SHOE MD: 122
PH NBR: 307462-0409
NABORS 148
Description
RPT No:
DATE:
RIG DOWN BJ
RETURNS
24.00
COSTS SUMMARY
Code
20
270
360
430
510
540
670
710
730
810
Description
CONTRACT LABOR
MISCELLANEOUS
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
FUElfLUBEJELECTRICITY
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
0
450
20,000
1,600
14,156
250
9.547
250
2.388
$50.144
$1,663,474
PXP
PLUTO_27-1
FROM
TO
HRS
Ph
Op
20:30
00:00
3.50
CI
00:00
Date:
. - -,
5/21/2007
_ ....... _.......
MONITOR AND FILL HOLE WHILE WAITTING ON CMT TO ARRIVE LOCATION TO FINISH TOP JOB.
ETA 04:00
Chris!l L. Morris
Cc:
MichaeLTyler@blm.gov
Monday, May 21,20073:32 PM
John_Menghini@nv,blm.gov; Christy L Morris
Shonna_Dooman@nv,blm.gov
Subject:
Wells
From:
Sent:
To:
N-80835
PXP
Pluto 27-1
20-May-07 18 Jts 13 3/8" Csg with 1.9" parasite string ran in well bore.
Hung up. Removed. 1.9" Parasite string detached coming out of hole.
1.9" parasite string removed and decision to run 13 3/8"
without 1.9" parasite string.
21-May-07
sks 15.8 #
1589' 13 3/8" J-55 54.4# Csg. Cement with 870 sks 12. 5 # & 434
Class G cement. No returns to surface
Cement with 200 sks 15.8 # Class G cement Top Job 1" 100'
No returns to surface.
Will wait 6 hrs. Run in with 1.9" pipe to tag cement and determine next phase of
cement.
N-1134A
MAKOIL
Munson Ranch 11-44
PXP
Da ily Report
May 21,2007
Operated - Drilling
WELL:
FIELD:
crY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFEAmount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
po:
24 hr Summary:
RAN 17 JTS CASING & 14 JTS 1,9" PARASITE STRING TO 684' PARASITE STRING HANGING-UP IN
HOLE, POOH WITH CASING, LEFT 5' OF PARASITE STRING IN HOLE, RIH WITH BIT, TAG @ 1583' WASH
AND REAM TO BOTTOM @ 1629' WITH ERRATIC TORQUE (0 TO 15,000 FT/LBS), SPOT LCM PILL,
POOH (NO DRAG ON TRIP OUT) RIG-UP AND RUN CASING, CASING STOPPED AT 1589', RIG DOWN
Forecast:
CEMENT CASING, WOC, INSTALL CASING HEAD, NIPPLE-UP AND TEST BOP'S
Daily Cost:
$117,825
PXP
Daily Report
May 21,2007
Operated - Drilling
WELL:
FIELD:
CTY/Sf:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27Ml
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PXP
Daily Report
May 21,2007
Operated - Drilling
WELL:
FIELD:
CTY/ST:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
po:
24 hr. Summary:
PICK-UP BIT, RIH WASH AND REAM 33' TO BOTTOM. POOH (NO DRAG), RIG AND LOG HOLE WITH
BAKER ATLAS (LOG DEPTH 1582') WATER LEVEL 800', RIG DOWN BAKER ATLAS, RIH TO 1403' REAM
BRIDGE F/1403' TO 1493', WAHS TO BOTTOM, LOST 750 BBLS WHILE WASHING, REAMING AND
CONDITIONING HOLE, POOH, RIG WEATHERFORD STARTED RUNNING 13-3/8" CASING WITH 1.9"
PARASITE STRING
Forcast:
FINISH POOH WITH CASING & PARASITE STRING, RIH WITH CASING (LESS PARASITE STRING),
Daily Cost:
$71,821
PXP
Daily Report
May 21,2007
Operated - Drilling
WELL:
FIELD:
CTY/ST:
RIG:
SPUD:
OBJECTIVE:
CASING:
Pluto 27-1
Wildcat
White Pine County, NV
Nabors #148
AFE:
AFE Amount:
WI:
NRI:
52448
$6,290,700
1.0
0.64
PO:
Summary:
Drilled from 925' to 1629' AROP 46.9 fph, survey @ 1190 - 1.75, @ 1603 - 1.0,
PUMP OUT THE HOLE WITH THE AIR HAMMER, replaced reserve pit liner on South
end.
Lithology:
60% Sandstone
40% Limestone
24 hr. Forecast:
LOG WELL, MAKE CLEAN OUT TRIP FOR CASING AND HEAL HOLE FOR LOST
Thanks,
Mike
PXP
WELL:
FIELD:
STATE:
AREA:
CLASS
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
1,629
TO:
PROGRESS: 0
000
HRS:
DRIL
BHA#:
Description
Qly
1
1
1
21
SIZE
IADC
17.500 445X
FROM
TO
0.0.
17.500
8.000
8.000
5000
Length
1.80
2.00
2.45
638.00
307-462-0409
PH NBR:
N1 N2 N3 WOB
RPM
Solids:
FROM
00:00
TO
07:00
HRS
7.00
07:00
14:00
7.00
14:00
14:30
16:00
14:30
16:00
16:30
050
1.50
0.50
16:30
17:00
18:00
18:30
19:30
17:00
18:00
18:30
19:30
00:00
0.50
1.00
0.50
1.00
4.50
OiL
MW:
Oil:
VISC:
pH:
10 sec Gel:
10mln Gel:
Chi:
Wl:
CA:
Pm:
HTHP:
FC:
Pf:
Ex Lime:
PV:
Elec Stab:
YP:
MBT:
PUMP#2
SPM:
Liner Id:
S.L:
Rod Dia:
Eft %:
GPM:
PUMP#3
0.00
0.00
SLOW PUMP RATES
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
0.0
0.0
0.0
Mud Used
V. Sect.
+NI-S
+EI-W
Used
Mud Additive
D.L
POOH, NO DRAG
RIG SERVICE
24.00
250 PUMP#l
SURVEYS
TVD
644.25
HYDRAULICS
Std Pipe:
#Cyl:
Time:
AV(DP):
Jet Vel:
Bit HP:
MD
MUD PROPERTIES
BIT
BIT SUB
CROSSOVER
HEAVY WEIGHT DP
TVD: 1,629
LGTH
HRS
0.00
0
12
FOREMAN:MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
in. SHOE MD: 122
CASING: 20
NABORS 148
RIG:
512012007
PLUTO_27-1
DATE:
COSTS SUMMARY
Code
20
250
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MISCELLANEOUS
MUD/FLUIDSICHEMICALS
CASINGfTUBINGIHAMMER EQ
DRILLING CASING
RIG COSTS
OPEN HOLE LOG/FORMATION
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
?70
360
400
410
430
510
670
710
730
810
Costs
1,500
1,949
0
450
31,828
47,082
20,000
1,600
250
9,547
250
3,369
__ ..... __ ._-_.......
$117,825
$1,833,330
PXP
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
RIG CONTR:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
NABORS DRILLING
MODEL
TRIP# BIT#
1RR 15JS
BHA#:
Qly
1
1
1
. 21
TO:
PROGRESS:
HRS:
RIG:
IADC
SIZE
17.500 445X
FROM
TO
11
27 DSS:
FOREMAN:MIKE SISTRUNK
API#:
2703305318
AFE#:
52448
in. SHOE MD: 122
CASING: 20
0.0.
17500
8.000
8.000
5.000
BIT
BIT SUB
CROSSOVER
HEAVY WEIGHT DP
TVD: 1.629
1.629
0
0.00
PH NBR:
NABORS 148
HRS
LGTH
0.00
0
N1 N2 N3 WOB
RPM
MUD PROPERTIES
Description
Length
1.80
2.00
2.45
638.00
Time:
Solids:
MW:
VISC:
pH:
Oil:
Chi:
WL:
CA:
Pm:
HTHP:
FC:
Pf:
Ex lime:
PV:
Elec Stab:
YP:
MBT:
307-462-0409
I
TVD
FROM
00:00
TO
01:00
HRS
1.00
01:00
04:00
3.00
04:00
05:00
1.00
05:00
07:00
07:00
15:00
2.00
8.00
15:00
17:00
17:00
19:00
2.00
2.00
19:00
20:00
1.00
20:00
22:00
2.00
22:00
23:30
1.50
23:30
00:00
0.50
HYDRAULICS
Std Pipe:
#Cyl:
SPM:
liner Id:
S.L.:
Rod Dia:
Eft %:
GPM:
10 sec Gel:
10 min Gel:
PUMP#2
PUMP#3
0
0
0.00
0.00
SLOW PUMP RATES
SPM:
PRSR:
SURVEYS
Angle
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
644.25
250 PUMP#1
AV(DP):
Jet Vel:
BltHP:
,
5/19/2007
RPT No:
ACTIVITY:
WELL:
DATE:
Dir.
Mud Used
V. Sect.
+N/-S
+E/-W
Mud Additive
D.l.
Used
COSTS SUMMARY
Code
20
250
270
360
430
510
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MISCELLANEOUS
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
0
0
450
20.000
41,301
250
4,650
250
3,420
$1,715,505
.......
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETIE/HOUSTON
DRIL
TRIP# BIT#
MODEL
3
f..-18
TO
FROM
153
1,629
LGTH
HRS
1,472 4500
26
PHNBR
RPM
40
Nl N2 N3 WOB
5/18/2007
DSS:
10
FOREMAN:MIKE SISTRUNK
2703305318
API#
AFE#:
52448
in. SHOE MD: 122
CASING
20
NABORS 148
RIG:
SIZE
IADC
17.500 D5X5
RPT No:
TVD 1,629
TO:
1.629
PROGRESS: 704
15.00
HRS:
DATE:
307-462 -0409
I
BHA#:
Description
Qty
1
1
2
1
3
24
MUD PROPERTIES
0.0,
17,500
8,625
8,000
8,000
6,000
5.000
BIT
~UTOTRAK
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
Length
1,80
4,67
85,90
2.45
91,87
729,80
Time:
01:00 Solids:
MW:
8,6 Oil:
VISC:
pH
36 10 sec Gel:
B.9 10 min Gel:
Chi:
WL:
200 CA:
20 Pm:
HYDRAULICS
Std Pipe:
#Cyl:
2
3
60
0,1
0,15
Pf:
2 Ex lime:
HTHP:
FC:
250 PUMP#1
SPM:
Liner Id:
SL:
Rod Dia:
Eff%:
GPM:
9 Elec Stab: /
YP:
6 MBT:
SPM:
PRSR:
0,0
0,0
0,0
305
604
914
1,190
1,603
0,75
2,00
1.50
1,75
1,00
HRS
6,50
0,50
8.50
0.50
FROM
00:00
06:30
07:00
15:30
TO
06:30
07:00
15:30
16:00
16:00
16:30
16:30
19:00
0.50
2,50
19:00
22:30
3.50
22:30
23:30
23:30
00:00
1,00
0,50
DiL
00
0,0
0,0
Mud Used
V Sect,
2,00
9,11
18,64
26,46
36,37
305
604
914
1.190
1,603
+NI-S
2,00
9,17
18.64
26.46
36,37
+EI-W
O,OC
OOC
O,OC
O,OC
O,OC
Mud Additive
DL.
0.25
0.42
0,16
0.09
0,18
DRILL F/1190' TO 1629' AROP 51,6 FPH 5500 CFM AT 475 PSI
SURVEY
WL SURVEY @ 1629' 1 DEGREE
2400
AV(DC):
PSI Drop:
HPlin2:
916.49
SURVEYS
TVD
Angle
MD
0,00
AV(DP):
Jet Vel:
BilHP:
Total BHA Length
0,00
PV:
PUMP#3
PUMP#2
Used
FED SEAL
120
COSTS SUMMARY
Code
20
250
270
360
430
510
540
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MISCELLANEOUS
MUD/FLUIDS/CHEMICALS
Costs
1,500
0
12,058
2,866
RIG COSTS
OPEN HOLE LOG/FORMATION
FUEULUBElELECTRICITY
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
20,000
1,600
4,686
250
11,593
250
2,137
$56,940
$1,643,684
PXP
WELL:
FIELD:
STATE:
AREA:
CLASS:
PLUTO_27-1
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
SIZE
IADC
7.500 D5X5
TRIP# BIT#
MODEL
C18
3
BHA#:
Description
Qly
1
1
1
3
24
TO:
925
PROGRESS; 573
HRS:
22.50
CASING 20
RIG:
FROM
153
TVD: 0
PH NBR:
NABORS 148
TO
LGTH
HRS
768
30.00
N1 N2 N3 WOB
)
RPM
;39
MUD PROPERTIES
0.0
BIT
AUTOTRAK
STEEL DC
CROSSOVER
STEEL DC
HEAVY VVEIGHT DP
17500
8.625
8.000
8.000
6.000
5.000
Length
1.80
4.67
8590
2.45
91.87
729.80
511712007
DATE:
Time:
VISC:
pH:
8.6 Oil:
35 10 sec Gel:
89 10 min Gel:
ChI:
WL:
60 CA:
20 Pm:
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
8 Elec Stab:
YP:
8 MBT:
307 -462-0409
I
Angle
305
604
914
0.75
2.00
1.50
30t
60~
914
FROM
00:00
TO
12:30
HRS
12.50
12:30
13:00
13:00
16:30
0.50
3.50
16:30
17:00
17:00
23:00
0.50
6.00
23:00
23:30
23:30
00:00
0.50
0.50
3
0.1
0.15
SPM:
Liner Id:
SL
Rod Dia:
Eff%:
GPM
16
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
V. Sect.
2.00
9.17
18.64
+N/-S
+E/-W
2.00
9.17
1864
Mud Additive
DL
0.00
000
0.00
Used
0.25
0.42
0.16
PRESSURE
COSTS SUMMARY
PRESSURE
Code
PRESSURE
PRESSURE
20
250
270
360
400
430
510
550
670
710
730
810
Description
Costs
CONTRACT LABOR
TRANSPORTA TION - LAND
MISCELLANEOUS
MUD/FLUIDS/CHEMICALS
CASINGITUBING/HAMMER EQ
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
1,500
0
12,058
450.1
2,290
20,000
1,600
2,220
250
11,967
250
2,026
PUMP#3
0.00
0.00
SLOW PUMP RATES
Mud Used
24.00
916.49
Dir.
TVD
PUMP#2
SURVEYS
MD
250 PUMP#l
AV(DP):
Jet Vel:
BitHP
Total BHA Length:
HYDRAULICS
SId Pipe:
#Cyl:
01 :00 Solids:
MW:
$54,611
$1,586,744
PXP
WELL:
PLUTO_27-1
ACTIVITY: Drilling
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TO:
280
PROGRESS: 0
HRS:
0.00
TRIP# BIT#
MODEL
1
~SDSSCH
BHA#;
Description
QIy
1
I 1
I 2
,1
3
I
'S
IADC
SIZE
126.000
FROM
33
TO
PH NBR:
N1 N2 N3 WOB
RPM
O.D.
17.500
8.625
8.000
8.000
6.000
5.000
Length
1.80
4.67
85.90
2.45
91.87
151.70
Time:
Chi:
200 CA:
20 Pm:
WL:
HTHP:
FC:
,
,
8.6 Oil:
35 10 sec Gel:
8.9 10 min Gel:
VISC:
pH:
Pf:
2 ExUme:
PV:
8 Elec Stab:
YP:
6 MBT:
2
3
60
0.1
0.15
16
Std Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
250 PUMP#1
TVD
FROM
00:00
03:00
03:30
TO
03:00
03:30
08:00
HRS
3.00
0.50
4.50
08:00
10:00
2.00
10:00
13:00
3.00
13:00
16:00
16:00
18:00
3.00
2.00
18:00
19:00
19:00
23:00
1.00
4.00
23:00
23:30
23:30
00:00
0.50
0.50
PUMP#2
PUMP#3
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
0.0
0.0
0.0
338.39
Mud Used
SURVEYS
Angle
AV(DP):
Jet Vel:
8itHP:
MD
0.00
0.00
SLOW PUMP RATES
HYDRAUUCS
01 :00 Solids:
MW:
307-462-0409
~5
28 28 28 10
MUD PROPERTIES
BIT
AUTO TRAK
STEEL DC
CROSSOVER
STEEL DC
HEAVY WEIGHT DP
TVD: 0
LGTH
HRS
34.50
420
5/16/2007
8
RPT No: 24 DSS:
FOREMAN: MIKE SISTRUNK
API#:
2703305318
52448
AFE#:
in. SHOE MD: 122
CASING: 20
NABORS 148
RIG:
DATE:
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L
POOH 1 STD
HRS
PONY DC, STAB. 1-8" DC, STAB, 1-8" DC, STB, 1-8" DC, X-O, 3
6-112" DC. TO DRILL WITH MUD
Used
COSTS SUMMARY
Code
20
250
270
360
430
510
610
670
710
730
810
Description
CONTRACT LABOR
TRANSPO~TA TION - LAND
MISCELLANEOUS
MUD/FLUIDS/CHEMICALS
RIG COSTS
OPEN HOLE LOG/FORMATION
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
0
2,813
450
20,000
1.600
941
250
11,497
250
1,824
$41,125
$1,532.133
PXP
DATE:
5115/2007
WELL:
PLUTO_27-1
ACTIVITY: Drilling
RPT No:
FIELD:
STATE:
AREA:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
280
TO:
PROGRESS: 123
FOREMAN:ROLAN LISLE
API#:
2703305318
AFE#:
52448
CLASS:
DRIL
HRS:
3.50
CASING:
RIG:
NABORS 148
PHNBR:
Qty
IADC
SIZE
26.000
FR OM
33
TO
TVD: 0
LOTH
HRS
34.50
420
N1 N2 N3 WOB RPM
8 8 ~8 5000 35
MUD PROPERTIes
BHA.:
Description
0.0.
Length
TIme:
12:00 Solids:
MW:
8.6 Oil:
VISC:
pH:
35 10 sec Gel:
8.9 10 min Gel:
200 CA:
20 Pm:
Chi:
WL:
HTHP:
Pf:
FC:
Ex lime:
PV:
8 ElecStab:
YP:
6 MBT:
DSS:
23
FROM
00:00
01:00
02:30
07:30
09:30
10:00
12:00
18:00
Angle
TO
01:00
02:30
07:30
09:30
10:00
12:00
18:00
18:30
TVD
HRS
1.00
1.50
5.00
2.00
0.50
2.00
6.00
0.50
18:30
19:00
20:00
19:00
20:00
21:00
0.50
1.00
1.00
21:00
00:00
3.00
HYDRAULICS
3
Std Pipe:
f# Cyl:
2
3
SPM:
Liner Id:
S.l.:
Rod Dia:
60
0.1
250 PUMP#1
PUMP#3
PUMP#2
Eff%:
0.15
0.00
0.00
GPM:
16
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
0.00
Mud Used
SURVEYS
MD
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.l.
Used
20
RU. AirComp & Make Modifications
250
PU.IMU. Air Hammer Bit, Installed Top Rot. Head Housing, MU. &
Install Rot. Head Rubber, PU. 3 Jts, 5" HWDP. & Tagged At 157'
270
Blew Hole Down WI Air, Add 6 Gals. Soap & Water, Hit WI Air To
360
Dry Up
430
Drlg. From 157' To 187' (30' In 1/2 Hr. :: 60 FPH. )
510
Boulder Fellin On Top Of Bit, Worked Free & Started Misting
540
Rack Back Std. HWDP., PU.I MU. 3 - 61/2" DC's, RIH. WI Std.
670
HWDP.
Drlg. From 187' To 280' ( 93'In 3 Hrs. = 31 FPH. ), Worked Each Jt.
710
Due To Boulder's, Compressor's On line 3, Air Pressure 300, Air
730
CFM 2450
810
COSTS SUMMARY
Description
Costs
1,500
CONTRACT LABOR
TRANSPORTATION -LAND
MISCELLANEOUS
C
2,81
MUDIFLUIDS/CHEMICALS
45C
20,000
RIG COSTS
OPEN HOLE LOGIFORMATION
FUELILUBE/ELECTRICITY
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
1,600
18,733
250
11,497
250
2,714
_ __ _
..
....
_ ...... _
$59,807
$1,491,008
PXP
DATE:
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV WHITE PINE
LAFAYETIEJHOUSTON
DRIL
TO:
157
PROGRESS: 0
HRS:
0.00
RIG:
Qty
MODEL
MSDSSCH
lADe
SIZE
26.000
FROM
33
6
RPT No: 22 DSS:
FOREMAN:ROLAN LISLE
API#:
2703305318
52448
AFE':
CASING: 20
in. SHOE MD: 122
PH NBR: 307-462-0409
TVD: 0
NABORS 148
TO
LGTH
HRS
297
31.00
N1 N2 N3 WOB
~8
~S
RPM
DS
MUD PROPERTIES
BHA':
Description
O.D.
Length
Time:
00:00
8.6
35
8.9
200
20
MW:
VISC:
pH:
Chi:
WL:
HTHP:
FC:
PV:
YP:
6 MBT:
Std Pipe:
#Cyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
3
2
3
60
0.1
0.15
Angle
TVD
PUMPl2
PUMP#3
0
0
0.00
0.00
SLOW PUMP RATES
SPM:
PRSR:
16
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/ln2:
0.0
0.0
0.0
0.00
Mud Used
SURVEYS
MD
250 PUMPl1
AV(DP):
JelVel:
Bit HP:
Total BHA Length:
HYDRAUUCS
Solids:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
Pf:
Ex Lime:
8 Elec Stab:
511412007
Dir.
V. Sect
+N/-S
+EJ-W
Mud Additive
D.L.
Used
FROM
00:00
08:00
TO
08:00
00:00
HRS
8.00
16.00
COSTS SUMMARY
Code
20
250
270
430
510
550
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MISCELLANEOUS
RIG COSTS
OPEN HOLE LOG/FORMATION
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
4,385
5,978
20,000
1,600
1,000
250
9,316
250
1,915
I
Total Daily Cost:
Cumulative Cost To Date:
--
.......- - -.....
--~
... -
$46,194
$1,431,201
I
I
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETTE/HOUSTON
DRIL
TO:
157
PROGRESS: 0
HRS:
0.00
RIG:
Qty
SIZE
26.000
TO
TVD: 0
LGTH
HRS
31.00
297
PHNBR:
N1 N2 N3 WOB
~8 ~8 8
RPM
MUD PROPERTIES
BHA#:
Description
0.0.
Length
Time:
8.6 Oil:
35 10 sec Gel:
8.9 10 min Gel:
Chi:
Wl:
200 CA:
20 Pm:
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
8 ElecStab:
YP:
6 MBT:
307-462-0409
I
0
2
3
60
0.1
0.15
Std Pipe:
#Cyl:
MD
Angle
PUMP#2
SPM:
Liner /d:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#3
0.00
0.00
SLOW PUMP RATES
16
SPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HP/in2:
0.0
0.0
0.0
0.00
Mud Used
SURVEYS
TVD
250 PUMP#1
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
HYDRAULICS
2.6
12:00 Solids:
MW:
VISC:
pH:
5/13/2007
AFE#:
52448
CASING:
in. SHOE MD:
NABORS 148
FROM
33
IADC
DATE:
Dir.
V. Sect.
+N/-S
+E/-W
Mud Additive
D.L.
Used
MILGEL
10
FROM
00:00
02:00
03:00
06:00
06:30
09:30
12:00
13:00
TO
02:00
03:00
06:00
06:30
09:30
12:00
13:00
14:00
HRS
2.00
1.00
3.00
0.50
3.00
2.50
1.00
1.00
14:00
15:30
15:30
00:00
1.50
8.50
il
COSTS SUMMARY
Code
160
20
250
270
350
360
440
450
510
540
550
670
710
730
810
Description
DOWNHOLE EQUIPMENT
CONTRACT LABOR
TRANSPORTATION -LAND
MISCELLANEOUS
CEMENTING AND SERVICES
MUDIFLUIDS/CHEMICALS
BITSIHOLE OPENERs/UNDER!
MOB/DEMOB RIG COSTS
OPEN HOLE LOG/FORMATION
FUEULUBE/ELECTRICITY
WATER
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
23,996
1,500
4,385
21,188
131,429
538
16,774
20,000
1,600
5,421
1,000
250
9,316
250
9,623
..........
..........
__ ......... _-
$247,270
$1,385,007
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
LAS VEGAS
WHITE PINE
NV
LAFAYETTEJHOUSTON
DRIL
TO:
157
PROGRESS: 0
HRS:
0.00
CLASS:
TRIP# BfT#
MODEL
MSDSSCH
1
Qty
1
1
1
1
3
1
BHA#:
Description
HOLE OPENER
CROSSOVER
CROSSOVER
STRING REAMER
STEEL DC
CROSSOVER
SIZE
26.000
lADe
FROM
33
4
RPT No: 20 DSS:
FOREMAN:ROLAN LISLE
API#:
2703305318
AFE#:
52448
in. SHOE MD:
CASING:
TVD: 0
NABORS 148
RIG:
TO
HRS
LGTH
297
31.00
PH NBR:
N1 N2 N3
8 :>8
8
WOS
RPM
MUD PROPERTIES
0.0.
26.000
4.580
2.420
26.000
8.000
8.000
Length
7.85
4.58
2.42
5.40
85.90
2.70
Time:
00:00 Solids:
MW:
8.6 Oil:
VISC:
pH:
Chi:
200 CA:
WL:
20 Pm:
Pf:
Ex Lime:
PV:
8 Elec Slab:
VP:
6 MBT:
307 -462-0409
I
2
3
60
0.1
0.15
250 PUMP#1
3
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%.:
GPM:
100
6.000
10.00
3
100
6.000
10.00
95
349
95
349
FROM
00:00
16:00
17:00
17:30
20:00
21:00
TO
16:00
17:00
17:30
20:00
21:00
00:00
HRS
16.00
1.00
0.50
2.50
1.00
3.00
PUMP#2
PUMP#3
3.49
3.49
SLOW PUMP RATES
SPM:
PRSR:
16
0.0
92.9
27.0
AV(DC):
PSI Drop:
HPlin2:
27.9
66.2
0.1
Mud Used
SURVEYS
Dir.
TVD
108.85
Sid Pipe:
#Cyl:
AV(DP):
Jet Vel:
BitHP:
MD
HYDRAULICS
2.6
36 10 sec Gel:
HTHP:
FC:
5112/2007
DATE:
V. Sect.
+N/-S
+EJ-W
Mud Additive
D.L.
Used
COSTS SUMMARY
Code
20
270
380
450
510
670
710
730
810
Description
Costs
CONTRACT LABOR
MISCELLANEOUS
MUDIFLUIDS/CHEMICALS
MOB/DEMOB RIG COSTS
OPEN HOLE LOG/FORMATION
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
1,500
710
1,518
20,000
1,600
250
9,316
250
1,842
24.00
I
Tolal Daily Cost:
Cumulative Cost To Date:
-
--
$36,986
$1,137,737
PXP
WELL:
PLUTO_27-1
ACTIVITY:
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFA YETIElHOUSTON
DRIL
TD:
157
PROGRESS: 157
HRS:
15.50
RIG:
Qty
BHA':
Description
SIZE
126.000
IADC
FROM
33
DATE:
3
RPT No: 19 DSS:
FOREMAN:ROLAN LISLE
APfI:
2703305318
52448
AFE':
in. SHOEMD:
CASING:
TVD: 0
PH NBR:
NABORS 148
TO
LGTH
HRS
31.00
297
N1 N2 N3 WOB RPM
8 28
8 ~OOOO 170
MUD PROPERTIES
1
O.D.
Length
Time:
00:00 Solids:
MW:
VISC:
pH:
Chi:
WL:
8.6
36
8.9
200
20
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
HTHP:
FC:
Pf:
2 Ex Lime:
PV:
9 Elec Stab:
YP:
6 MBT:
307-462-0409
TVD
Angle
HYDRAULICS
2.6
0
2
3
60
0.1
0.15
Sid Pipe:
ICyl:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PUMP#2
95
349
95
349
3.49
3.49
PUMP#3
3
100
6.000
10.00
16
SPM:
PRSR:
0.0 AV(DC):
92.9 PSI Drop:
27.0 HP/in2:
0.0
66.2
0.1
0.00
Mud Used
SURVEYS
MD
250 PUMP#l
3
100
6.000
10.00
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
5111/2007
Dir.
V. Sect.
+NI-S
+EI-W
Mud Additive
D.L.
Used
MILGEL
FROM
00:00
02:00
03:00
06:00
TO
02:00
03:00
06:00
10:30
HRS
2.00
1.00
3.00
4.50
10:30
12:30
15:30
12:30
15:30
00:00
2.00
3.00
8.50
COSTS SUMMARY
Code
20
250
270
360
450
510
670
710
730
810
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MISCELLANEOUS
MUD/FLUIDS/CHEMICALS
MOBIOEMOB RIG COSTS
OPEN HOLE LOG/FORMATION
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
1,500
2,400
71C
1.518
20.000
1.600
250
9.316
250
1,842
$39.386
$1.100.751
PXP
WELL:
PLUTO_27-1
FIELD:
STATE:
AREA:
LAS VEGAS
NV
WHITE PINE
LAFAYETIElHOUSTON
CLASS:
DRIL
TO:
157
PROGRESS: 17
5.00
HRS:
RIG:
BHA#:
Qty
1
1
3
1
SIZE
26.000
IADC
FR OM
33
TVD: 0
PH NBR:
LGTH
HRS
140
15.50
RPM
0
N1 N2 N3 WOB
8 )8 '8 15000
MUD PROPERTIES
0.0.
Description
MSDSSHC
BIT SUB
STEEL DC
CROSSOVER
2
RPT No: 18 DSS:
FOREMAN:ROLAN LISLE
API#:
2703305318
AFE#:
52448
in. SHOEMD:
CASING:
NABORS 148
TO
26.000
8.563
7.750
8.000
Length
2.30
1.89
85.90
2.70
00:00 Solids:
MW:
8.6 Oil:
VISC:
pH:
40 10 sec Gel:
200 CA:
20 Pm:
HTHP:
FC:
Pf:
2.6
Std Pipe:
ICy!:
2
3
SPM:
Liner Id:
S.L.:
Rod Oia:
Eff%:
GPM:
75
6.000
10.00
60
0.1
0.15
2 Ex Lime:
Angle
TVD
PUMP#2
95
262
3.49
0.00
PUMP#3
SPM:
PRSR:
0.0
34.9
1.4
10.4
9.3
0.0
AV(DC):
PSI Drop:
HP/in2:
92.79
Mud Used
Mud Additive
SURVEYS
MD
6 MBT:
AV(DP):
Jet Vel:
BitHP:
Total BHA Length:
250 PUMP#1
3
12 Elec Stab:
PV:
YP:
307-462-0409
HYDRAULICS
Time:
Chi:
WL:
5110/2007
DATE:
Dir.
V. Sect.
+NI-S
+E/-W
D.L.
Used
GEL EX
MILGEL
Sapp
SODA ASH
FROM
TO
HRS
00:00
00:30
02:00
03:00
06:00
07:30
08:00
10:30
11:30
12:00
12:30
00:30
02:00
03:00
06:00
07:30
08:00
10:30
11:30
12:00
12:30
18:00
0.50
1.50
1.00
3.00
1.50
0.50
2.50
1.00
0.50
0.50
5.50
18:00
19:30
19:30
21:00
1.50
1.50
21:00
22:00
22:00
00:00
1.00
2.00
1
50
1
8
Build Volume
DRILLING
Build Volume
DRILLING
Build Volume
DRILLING To 157'
Circulate, Mix & Pump High Vis Sweeps
Trip Outlln Hole ( Hole Clean)
Circulate & Pump Sweep
TRIPS (INCLUDING BHA WORK)
Rig Up & Run 20" Csg., Stopped At 60', Worked Pipe ( No
Progress ). Cut Off Csg. & Rig Up To Cir.
Cir. & Worked Pipe ( No Progress)
Rig Down Cir. Head, Rack Back 1 Std. DP. & Lay Down 60' Of 20"
Csg.
MU. BHA. (26" Bit & Bit Sub)
RIH. W/ BHA., Did Not Tag Anything
24.00
COSTS SUMMARY
Code
20
270
360
450
510
610
670
710
730
810
Description
Costs
CONTRACT LABOR
MISCELLANEOUS
MUDIFLUIDS/CHEMICALS
MOB/DEMOB RIG COSTS
OPEN HOLE LOG/FORMATION
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
0
1,500
7H]
888
20,000
1.600
828
250
9.316
250
1.732
I
I
Total Daily Cost:
Cumulative Cost To Date:
$37,074
$1,061,365
PXP
WELL:
PLUTO_27-1
FIELD:
LAS VEGAS
NV Vl/HITE PINE
STATE:
AREA:
LAFAYETTE/HOUSTON
DRIL
CLASS:
RIG CONTR: NABORS DRILLING
TRIP# BIT#
MODEL
MSDSSCH
1
Qty
1
1
1
BHAI:
Description
MSDSSHC
BIT SUB
STEEL DC
DATE:
SIZE
26.000
RPT No:
FROM
33
TO
LGTH
HRS
1,00
16
16 DSS:
FOREMAN:ROLAN LISLE
API#:
2703305318
AFE#:
52448
in. SHOE MD:
CASING:
TVD: 0
TD:
15
PROGRESS: 16
1.00
HRS:
NABORS 148
RIG:
IADC
PH NBR:
N1 N2 N3 WOB RPM
8 8 ~8 5000 60
MUD PROPERTIES
1
0.0,
26.000
8.563
7,750
Length
2.30
1.89
28,95
nme:
MW:
VlSC:
pH:
Chi:
00:00
8,6
46
8.9
200
20
WL:
HTHP:
FC:
5/8/2007
3
8
60
0,1
0,15
Pf:
1 Ex Lime:
12 Elec Stab:
VP:
12 MBT:
12
Std Pipe:
ICy!:
SPM:
Liner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
200 PUMP#1
3
75
6,000
10.00
PUMP#2
PUMP#3
SPM:
PRSR:
0.0 AV(DC):
34.9 PSI Drop:
1.4 HP/in2:
10,4
9.3
0.0
Mud Used
SURVEYS
TVD
33.14
95
262
0
3,49
0,00
SLOW PUMP RATES
AV(DP):
Jet Vel:
BHHP:
MD
HYDRAULICS
7,1
Solids:
Oil:
10 sec Gel:
10 min Gel:
CA:
Pm:
PV:
307-462-0409
Dir.
V. Sect.
+N/-S
+EI-W
Mud Additive
D.L.
Used
GEL EX
MILGEL
SODA ASH
FROM
00:00
06:00
18:00
21:00
23:00
TO
06:00
18:00
21:00
23:00
00:00
HRS
6.00
12.00
3.00
2.00
1.00
COSTS SUMMARY
Code
20
250
360
420
450
540
550
610
670
710
730
810
CON
24.00
1
45
2
Description
CONTRACT LABOR
TRANSPORTATION -LAND
MUDfFLUIDS/CHEMICAlS
RIG PARTS & SUPPLIES
MOB/DEMOB RIG COSTS
FUEULUBElELECTRICITY
WATER
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
0
19,941
1,500
5,256
807
1.198
18,000
2,148
800
207
300
9.316
250
1.600
2,069
_._
$63,392
$954,207
PXP
WELL:
PLUTO_27-1
ACTIVITY:
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYElTEfHOUSTON
DRIL
TD:
0
PROGRESS: 0
HRS:
0.00
RIG:
Qty
MODEL
IADC
SIZE
TVD: 0
NABORS 148
FROM I
TO
I LGTH I
HRS
PH NBR:
I RPM I
MUD PROPERTIES
BHA':
Deseriolion
II Time:
Length
O.D.
51712007
DATE:
307-462-0409
I
I0 I
MW:
Std Pipe:
#Cyl:
Angle
LIB I G
VISC:
pH:
10 see Gel:
10 min Gel:
Chi:
WL:
CA:
Pm:
HTHP:
FC:
Pf:
ExUme:
SPM:
Uner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PV:
EleeSlab:
YP:
MBT:
PUMP#1
PUMP#2
18:00
PUMP#3
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
0.00
Mud Used
TVD
V. Sect.
Dir.
+ Nf-S
+EI-W
Mud Additive
D.L.
GEL EX
MILGEL
SODA ASH
FROM
00:00
06:00
I 0 I
SPM:
PRSR:
SURVEYS
MD
HYDRAULICS
Solids:
Oil:
AV(DP):
Jet Vel:
Bit HP:
Total BHA Length:
44
70
2
HRS
6.00
12.00
06:00
Used
1) ({
v'l
:
I !l
!.
j
'
j-t
/.,
f)
.v
,
I /; ; '
-' l
'20
,r
r {, I .. (
COSTS SUMMARY
Code
I'! ,.:
250
360
420
450
540
550
610
670
710
730
810
CON
Description
CONTRACT LABOR
TRANSPORTATION - LAND
MUD/FLUIDS/CHEMICALS
RIG PARTS & SUPPLIES
MOB/DE MOB RIG COSTS
FUELlLUBElELECTRICITY
WATER
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
19.941
1,500
5.256
1,494
1,198]
368.000
2.148'
8001
207
300'
1
16.061
250
1.600
19.941
$438.696
$912,825
PXP
WELL:
PLUTO_27-1
ACTIVITY:
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
WHITE PINE
NV
LAFAYETTE/HOUSTON
DRIL
TO:
0
PROGRESS: 0
HRS:
0.00
RIG:
Qty
MODEL
IADC
SIZE
FROM
TVD: 0
PH NBR:
NABORS 148
TO
LGTH
HRS
N1 N2 N3 WOB
RPM
MUD PROPERTIES
BHA#:
Description
0.0.
Length
5/412007
DATE:
307462-0409
I
Solids:
MW:
Oil:
VISC:
pH:
10 sec Gel:
10 min Gel:
Chi:
WL:
CA:
Pm:
HTHP:
FC:
Pf:
ExUme:
Std Pipe:
ICyl:
PV:
Elec Stab:
YP:
MBT:
PUMP#1
MD
TVD
FROM
00:00
06:00
TO
06:00
18:00
HRS
6.00
12.00
18:00
00:00
600
PUMP#2
PUMP#3
SPM:
Uner Id:
S.L.:
Rod Dia:
Eff%:
GPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPlin2:
0.0
0.0
0.0
0.00
Mud Used
SURVEYS
Angle
HYDRAULICS
TIme:
AV(DP):
Jet Vel:
Bit HP:
Dir.
V. Sect.
+Nf-S
+E/-W
Mud Additive
D.L.
Used
COSTS SUMMARY
Code
20
450
610
670
710
730
810
CON
Description
CONTRACT LABOR
MOBfDEMOB RIG COSTS
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EaUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
0
1,500
18,000
1,177
300
8,016
250
0
1,462
$30,705
$455,525
PXP
PLUTO_27-1
ACTIVITY:
FIELD:
STATE:
AREA:
CLASS:
LAS VEGAS
NV
WHITE PINE
LAFAYETIEfHOUSTON
DRIL
TO:
0
PROGRESS: 0
HRS:
0.00
RIG:
TRIP# BIT#
Qty
MODEL
IADC
SIZE
FROM
11 DSS:
FOREMAN:ROLAN LISLE
API#:
2703305318
52448
AFE#:
CASING:
in. SHOEMD:
TVD: 0
NABORS 148
TO
LGTH
HRS
PH NBR:
N1 N2 N3 WOB
RPM
MUD PROPERTIES
BHA#:
Description
0.0.
Length
5/3/2007
RPTNo:
WELL:
DATE:
Time:
Solids:
MW:
Oil:
VISC:
pH:
10 sec Gel:
10 min Gel:
Chi:
WL:
CA:
Pm:
HTHP:
FC:
Pf:
Ex Lime:
PV:
Elec Stab:
YP:
MBT:
307-462-0409
I
Std Pipe:
#Cyl:
FROM
00:00
06:00
TO
06:00
18:00
HRS
6.00
12.00
18:00
00:00
6.00
Dir.
PUMP#2
PUMP#3
Eff%:
GPM:
PRSR:
0.0
0.0
0.0
AV(DC):
PSI Drop:
HPfin2:
0.0
0.0
0.0
Mud Used
V. Sect.
+Nf-S
+E/-W
Mud Additive
D.L.
Used
COSTS SUMMARY
Code
180
20
450
550
610
670
710
730
810
CON
24.00
SPM:
Liner Id:
S.L.:
Rod Dia:
SURVEYS
TVD
0.00
HYDRAULICS
PUMP#1
AV(DP):
Jet Vel:
BitHP:
MD
Description
LOCATION/LEASE/ROAD
CONTRACT LABOR
MOBfDEMOB RIG COSTS
WATER
ENVIRONMENTAL
COMMUNICATIONS
RENTAL EQUIPMENT
OVERHEAD
MISCELLANEOUS
Costs
0
0
1,500
18.000
0
1,177
300
8,016
250
4.341
1.679
__.__ __ _ _ _
..
..
..
....
.....
$35.263
$426,282
PXP
....
Plain. Ex
No.
........
1VD
Cum"'" ca.a
Rolan Lisle
AFEAIRount
APE.,..
........ T_
PlODIIIiId T.D.
OHC: $6,290,700
$381,863
159,923
12,000'
r:-
TlmeLop
From I To
0:00
6:00
52448
NV
Dllwca.a
AFENo
White Pine
Pluto 271
10
May 2,2007
o.taIIs of Opendon
TImtI
-- -..........
18:001~6:001-6.lJ()IWait
..........
IHands Threw Rocks From Location Into Reserve Pit & Tore The Linina. AttempfTo
II1tch Tomorrow I Truck WI Mud Pump Tore Up Richt Post Down At Cattle Guard
(To Me This Is A Nabors Problem II! )
Dttw
ConducfDr
8urfIIoI
............
LIMr
UnIr
0.0.
36"
20"
beoth
33'
~hoeTest
NJA
0
0
0
0
0
0
24.00
ca.na
ProcIuoIIort UMr
lAnale
V. Section
0
TVD
lAzimuth
0
mme
MudReoord
In
~
Weiaht
Mud Colt
CwnMud
Gas
IJnIbI
DalYEnar.1
CwnEngr
Boo
0
0
Gels
isoIds
Total
~
DdIIlnti
DucI'IpIion
SO
0.0.
length
CG
IsTG
trG
BIt No.
!sand
ieEe
Size
~.
0
0
~SIza
0
0
0
0
!sPM
Fl GPM
$troke
Amps
$urf. Press.
SIowPUmll
MIll
...
0
0
!'P.
Depth
!!w.
1M SPM
BltReoord
!Type
Pm
Pf
,..
SertaI No.
Nozzles
laItTeat:
Depth Out
~Teat:
lei
POiUIum
IDei:IIh In
'-uct AddItI. .:
0
UnIts
Irotallength
iJarS.N.
Hours
0
0
BOPT....
~Rep(8)
0.00 rootage
~V\J.ROP
IservIce
trotal
..... On I.ocItIon
!woe
Ic.m.t on LOCIItIon
Ic.m.t on Locdon
IAvOP
lWind
Fuel on LOCIItIon
FuelUHd
~VDC
RlORIBSIG
!seas
0
0
~WIW
lAccidents:
Full Crews
'otIbIIIW_
0
0
0
0
Torqu __Qr11
WI..
~0If
~_o.
Pump No.
1
PIckUp
DoaIea
Make
Daoch
trOl'QU8
om
EaItIWest
J
TotIII DrIlled ca
bailvMud I
NorIhISouth
Out
'JIIc.
PV
yp
iAPlWl
krHPc.
I
I
WeelIIer'
[amp;
...YeS
Yes
XNo ~Boat:
Xno SuDDlv Boat/Tug:
01
@I
mph
RIIDOft NO:
DIIIa
PXP
May 1, 2007
~"''''No.
AFENo.
8tIIII
Pluto 271
RIa
1uI.....iIIor
TYD
Cum......... ec.t
Dlllveo.t
Rolan Lisle
.... 8hoIT_
P~T.D.
AFEAmount
DHC: $6,290,700
$198,306
36,280
52448
NV
White Pine
12,000'
DIMlfit 8Dud
AFEDIMl
P..... 00enIII0n
TlrMLoa
EIapad
Det.I. 01 0pendIan
n...
To
From
0:00
6:00
6:00
18:00
18:00
0:00
24.00
lculna
Drive
Conductor
8wface
InIIIrmMIIMI
LIIw
LIIw
~Uner
0.0.
36'
20'
Dep(h
33'
Shoe Test
NlA
0
0
0
0
0
0
0
0
0
0
0
0
~DI~8ufwy
IAngIe IAzimuth
I 0
TVD
MUd RtIGOI'd
In
rrlme
Out
V. Section
NorthI8outh
EIIstIWeIIt
DoaIIa
Mud Cost
Cum Mud
Dally Mud
Total 0IfIIIId
ICumEngr
DIIIv Engl'.
\Jepth
Total
WeIght
~.
DeICI'iptIon
0.0.
UniIIl
Boo
$0
0
0
LengIh
IsTG
rrG
0
0
DrilHnj
..
a-
PumP No.
Mrg,
Stroke
Uner8lze
PV
0.00
o.
Fl
Gels
Ampe
1r0ltll
O.OC PIckUp
MI
~
~
o.
0
0
0.00
'PNI
0.00
Sand
I3itNo.
0.00 SIze
~C
PH
0
0
0.00 Mfa.
0.00 iType
APIWL
HTHPG..
Em.
TonNe . . . DrIIa
0.00
WI.
O.OC $1ack0lf
PI
O.
lIAr
o.
CI
Potasium
MUd AddItIvea:
O.
OIaIlength
Unlta
arS.N.
:::iIIIIC
Hours
SPM
GPM
0
0
Slow .PvIYIt
0
0
....W.
BOPT. . .
latTest:
Next Test:
Out
In
P1IrtIorIMI
PXPRap(a)
0.00 Footage
Jiours
Rig
[A\Ig. ROP
ServIce
Total
~ on LOCIIIIon
RPM
bement on LOCIIIIon
AVDP
Wind
Filii on LOCIIIIon
FuelUMd
AVDC
$eas
tremp.
.....w.....
brilw.....
Accidents:
uHCrews
0
0
0
0
..... On LOCIIIIon
MI IGPM
pP
0
0
Surf. PnIas.
..... .,_.
BltRtlGOld
PlmpDelll
1
~ORIBSIG
(J
Weather CondItIoIw
!crew
.-Yes XNo
Boat:
Yes _X_no Supply Boat!Tug:
@I
mph
PXP
~ MCI Well
r"' Ncx
....
-
White Pine
No.
Pluto 27-1
~
8uDIIrwIIlor
Rolan Lisle
52448
eum...... ec.t
1.Mt8hoeT_
ProcIoMd T.D.
12,000'
~Antount
DHC: 56,290,700
5162,026
50,767
p....,....
TVD
AF&No.
NY
DllllVec.t
00iInId0n
TIme Log
E.......
To
Fn:wn
o.tIIIIII ~ 0pntJ0n
111M
0:00
6:00
6:00
18:00
18:00
0:00
24.00
c.tna
PnMIuction u.
Drtw
36"
ConcIucIIDr
8urfIIca
1ntiInnId1...
Un.-
Un.-
20"
0ePIh
33'
Shoe Test
NlA
0
0
0
0
0
0
0
0
P,D.
IAnaie
Depth
Mud Record
In
AzImuth
TVD
OUt
trim!
v. SectIon
0
Mud Coat
Cum Mud
DallyMud I
Dally Enar.
Total
DeIcrIpIon
0.0.
Ea8tIWe8t
DoaIea
$0
BGG
CG
0
0
Length
eTG
TG
0
0
DrtIIInG
~.
NotthISotIIIl
Gas
CumEnar
Weight
I
I
Pv
T.,....Mdar..
~
~
~W1..
HniPC
SolIds
Torque
PIckUp
RotatIngwt,
islackOll'
BltRec:ord
~No.
OIW
Sand
CEC
pH
PlIIIIP DID
1
0
0
0
Stroke
LilwSlze
0
0
8PM
Ft.
Amps
GPM
!surf. PnMB.
1M
1M $PM
1M GPM
Slow Pump
0
0
0
pP
Depth
M.W.
aMa.
rt'ype
$erial No.
Pm
~.
~
BOPT_
Last Test:
Next Test:
NozzIea
[)epIhOUt
et
Potasiurn
Add......:
.-ud
Unb
otaILangth
arS.N.
30
Depth
Cake
PumDNo.
Make
...... OnLGCllon
PemeN an LOOIIIIon
c...nt an LGCIIon
16
FtlllIlllI.ooIIIIIII
Barite
SP-101
14
Soda Ash
15
..... lIMd
Pa&lbltWM
DrtIIw.t.r
Hours
Depth In
0.00 ootIIge
PenIonnII
PXPRep(s}
Hours
IAw.ROP
Rig
r.vos
trotal
ftPM
Wind
Seas
IAVDP
IA,VDC
RlORIBSIG
Accidents:
Full Crews
w.lher CondIIIona
Temp.
j'8S
---Y8S
mph
,..,.
,_lin!
".l~,<
PIIII
PXP
.....
........... WellNo.
.........
RIa
AFEAaIaunt
CUmuIIIM CGIt
P..,....T.D.
DHC: $6,290.700
$110,997
23,667
PraaI_
52448
NV
DellvCGlt
Rolan Lisle
TVD
DIDttt
AFENo
White Pine
Pluto 27-1
IMtShoeTtIIt
12.000'
o..frllDud
AFEo..
0aarIIII0n
TIme Lag
EIQMd
To
o.bIIItI of Operadon
TIN
From
0:00
6:00
6:00
18:00
18:00
0:00
...,..
24.00
Ic.tna
b.D.
~
!shoe Test
DrIw
ConducIor
36"
20"
33'
0
0
N/A
IAneIIe
~
0
Azimuth
In
OUt
DlllyMud
IludCoet
Mud
ICum_~
Total
[)epth
DescripGon
0.0.
PV
yp
HTHPCl
0
0
0
0
0
0
..
UnIIs
$0
CG
0
0
Length
isTG
iTG
0
0
Stroke
Liner Size
SPM
Fl iGPM
Amps
PnIas.
Isurt.
,Pump
RotaIlno WI.
BitReconI
a.
ft.
MIl SPM
MIl iGPM
pP
SlllckOff
isoIIds
PumDNo.
PIckUp
cake
0
Pwnp_DMa
~.
~
iTorque
DoaIea
ToIIII DnIIed G.
~
~
ProducItonl,.lntr
e.uwesl
1
J
ToraueaICIDna
Gels
~Wl
0
0
Dttlllnsi
Viae.
Cum
DIlly Engr.
~fIigI'It
Untr
I.Mt DlrectIoMIIurwv
V.SectIon I
NorthISouth
0
Mud RAIGonI
Tme
liner
0
0
1VD
0
.............
0
0
0
0
Pm
Bit No.
PePIh
0
0
0
0
$and
Size
Mfa.
Type
M.W.
CEC
pH
Pm
SerIal No.
Nozzles
DeplhOUt
fir
~
I
iTotli Length
UnIta
~arS.N
~ On LocItIon
~"""Oft loaIIon
~ Oft LOCIIIIon
Filii Oft LocatIon
FuelUMd
PoIIIbIeWlAr
DntIw.....
Hours
&OPT....
0
0
Last Test:
Next Test
In
0.00 Footage
PMIonnIII
PXPRep(a)
RIg
DepIh
Pni..aililft
udAdd......:
0
0
Hours
~vg. ROP
~
~
~VDP
~Ind
~WDC
~S
RlORIBSIG
~emp.
SeMoe
Totli
Accidents:
..YeS
ullCrews
yes
W. . . . CondItIcIIw
2Lno CrewBoaI:
_no Supply BoatITug:
@I
mph
.~
~~
....
LMMnWelNo.
Pluto 271
Dllllvca.t
Rolan Lisle
TVD
Dead!
52448
NY
APEAInaunt
CumulllMt CoM
6
ME No.
White Pine
8uDIII'YIIIor
IRIIDOft NO:
RIa
DIII8
OHC: $6,290,700
$15,653
Last8hoeT. .
12,000'
DIMI frllPud
APE DIIvII
P.......t 0DenIII0n
EIIpMd
TIme L.oa
DebIIIe 01 0penItI0n
TIme
From
To
6.00 Wait On Daylights
0:00
6:00
6:00
0:00 18.00 Continue To Drill & Drive 36" PiDe From 22' To 33' No Proaress Welded On Excess
24.00
Calna
Dnve
CanduaIDr
........
0
0
0
73
0
0
0
0
Q.O.
~
Shoe Test
IAngie
1:lctptI1.
0
lIudRecord
In
hime
Azimuth
TVD
".............
LIrMIr
LIn
0
0
0
0
0
0
0
0
V. SectIon
0
DailY
Mud
ICumMud
ICUm Enar
PtmpData
Gas
UnIIa
BGG
PumDNo.
Make
$0
CG
Mfg.
STG
IG
length
Istnlke
......... Slze
PtPlh
Weight
Mac
PV
yP
DePih
Gels
~orque
AnIPII
~Up
11M
Pake
aM PM
RotatinaWl
Slack Off
SolIds
APlWl
~THPCD..
DrlUlna
Deecription
.1.
0.0.
0
,
Total DIllIN 0
Total
[)c)gIeg
Dally Enar.
e.tIWeat
lIudCotlt
OUt
ProductIon LIn
IsPM
Fl GPM
800. Press.
Slow pump
pp
BltReconl
0
0
0
0
0
'pIW
Bit No.
Sand
PePIn
0
0
Size
M.W.
CEC
Mg.
pH
Type
0
0
Pm
Pf
Mf
SerIal No.
Nozzles
PepnOut
CI
Potasium
Mud AddItIwa:
Un...
otaI Length
arS.N.
><
Hours
&OPT.-
DePih In
0.00 Footage
Hours
0
0
...... Test:
Next Test:
0
0
P........
PXPRep(s)
Rig
1/0100
1/0100
A'JII.ROP
BerII On LCICIIiort
\\lOB
RPM
AYDP
AVDC
SeNice
0taI
W........ ConcIHIona
I\NInd
[seas
FIMIIUMd
IBLORIBSIG
Pot.IIIew...
AcckIents:
Full Crews
MW...
-Y8S
emp.
X no Crew Boat:
__no Supply BoatITug:
@I
1
12
3
16
moh
.~.'
"
PXP
DIll
....
~anCI_No.
8uDIrvIIIor
52448
AFEAInount
ProDaetd T.D.
DHC: $6,290,700
$15,653
4,767
,......
TVD
AFENo.
CumuIIIlwe Colt
DdVCoIt
Rolan Lisle
NY
White Pine
Pluto 271
~
RIDOrtNO:
LMt8hoeT_
12,000'
TIme Log
From
0:00
7:00
EIepMd
To
7:00
0:00
Deteile of 0penIIi0n
TIme
7.00 Wait On Daylights
17.00 Wait On 36" Csa. Run 20' Of Csg. Hole Still Sloughing, 120 Ton Crane On Location
Received 5 Loads Of Rig ( Pit System, Sub Section & Crew Dog House ), Wait On
Daylights
24.00
DrIve
Conduetar
Surface
1ntiImIIICI...
IJnIr
IJnIr
p.O.
DePth
$hoe Test
0
0
0
0
CnIna
IAngie IAzImuth
TVO
Mud Record
ToIIII DrIlled 0
UnitI
In
Out
DaiIv Mud
PabEnarJ
Weiaht
Description
PI
0.00
yp
0.00 lJepCh
Gels
0
0
0.00 Torque
0.00 PIckUp
0
0
0.00
'M.
0.00 Slack Off
0
0
~.
APIWl
HTHPCL
~.
Total
aoo
CG
$TG
$0
DrIIIN
~e
0.0.
length
rrG
$oIkIs
0.00
0.00 ~No.
~.
CEe
P III'IP Dete
Pump No.
1
0
0
Make
Mfg.
Stroke
UnerSize
0Iw
Dogleg
hlme
Cum Mud
CumEnar
EastIWeet
Mud Colt
ProductIon IJnIr
Ft
0
0
SPM
K;PM
_Record
2
0
0
8Iaw.PIInIp
SPM
GPM
0
0
0
0
pp
0epCh
0
0
0.00 Size
M.W.
0.00 Mfa.
0.00 Type
0
0
0
0
pH
0
0
Pm
Pf
0.00
0.00
OepthOut
0
0
Mf
0
0
CI
Potasium
0
Mud AddHIv.:
0
0
..sst Test: I
NextTeet: I
0.00
bePth In
0
0
0
0
PXPRap(s)
Rig
Total Length
lInia
arS.N.
0
~
Hours
O.
Hours
Avg. RaP
..... On I.OCIIIon
waB
Icen-t on lONIIon
~onlONIIon
FuM on location
~VOP
~VOC
FUlllIMd
1fy000BSlG
Pcabl.WaW
DrillWaW
Accidents
FJ.l11 Crews
BOPT. . .
PW1IOIIMI
Service
trots!
w.tw CondHIona
Wind
Seas
emp.
---yes .X_no Crew Boat:
-.-Yes
no lSuPDlv BoatITua:
0
110100
110100
mph
~~,
INI'IOrl No:
PXP
Pluto 27-1
RIa
....
AFENo
ProDaIed T.D.
DHC: $6,290,700
$23,113
5,030
Proar-
APE Amount
CunluIIItMt Coet
DlllvCoet
Rolan Lisle
1VO
52448
NY
White Pine
8uDIrvIIIor
..... _ _ No.
I..MtlhoeT8IIt
12,000'
APE DIM
DlMfrllDud
0DeNII0n
TIme Log
a.p.d
'fIlM
To
From
0:00
7:00
7:00
18:00
18:00
0:00
DebIIIs of 0penId0n
24.00
c.tna
DrIve
Q.D.
DePth
~~Test
IAnoIa
08PIh
0
TIme
DepIh
0
0
0
Mud ReoorcI
In
0
0
0
0
out
0
Cum Mud
Gas
OIIIIY Enat.1
Cum~enar
aoo
Total
PV
DIIII::ription
0
yp
Gels
LIner
$0
CG
Length
STG
[G
DrIllInG
O.D.
.....
IsPM
GPM
Ampe lSurf. Prets.
0
0
0
0
0
0
O.DC
PlckUo
toM
0
0
aM
o.
P-ke
0
0
0.00
iSouds
prw
Sand
0
0
0
0
0.00
0.00 BIt No.
0.00
iCEC
Wt
Slack Off
Fl
toM
BItReoorcl
0
0
0
0
pP
0
0
0
0
sIZe
M.W.
0.00 ~.
0.00 'Type
0
0
0
0
Pttt
Pt
0.00
$erial No.
0
0
0
0
0
0
0
0
0
0
0
Total Length
0.00 [)apCh In
0.00 ootage
0
0
0
0
PXPRep(s)
Hours
Rig
~vg.ROP
ServIce
a......!._
"ud AddItivR:
0
UnItI
JarS.N.
Hours
o.
Last Teat:
NaxtTeat:
..... On LOCIIUon
0
0
0
0
C-- onLOCllUon
RPM
~VDP
AVDC
IWind
0
0
~ onLOCllUon
0
0
Full on Location
Full UNcI
PoIIb/ew.....
Pt1IIw
0
0
0
0
RlORIBSlG
Accidents:
I
PWIIOIIMI
0
0
Total
w..thIN' CondItIons
@I
mph
~emp.
no ~rewBoat:
_no ~upply BoatfT~ _
vesX
FuH<::rews_ '-~
.......
<
BOPT...
.,.
IsPM
GPM
PH
0
0
SIowPuIIID
0
0
0
IMr
0
0
0
0
0.00 Daoth
0.00 ITorque
~SIze
0
0
DnIII
0
0
PuIl'lD DIIIa
1
PumP No.
0
0
~.
O.DC
00aIea
Ea8tlWeat
0
0
0
0
0
UnIts
0
0
Torque _
PnMIuctIon LIner
0
0
0
TotIII DIlled 0
Dally Mud
LIner
Mud CollI
VIle.
0
0
TVD
Weight
APIWl
ffiHPG.
0
0
0
Azimuth
0
.............
Surface
CanducIor
-,
PXP
.....
.....
paaut
AFE.Amaunt
CuMuIIIIMI ec.t
Rolan Lisle
PI. . . .
PIODI*d T.D.
TVD
52448
NV
Dldlvec.t
8uDeriIIOr
AFENo.
White Pine
Pluto 27-1
April 25,2007
~"'WelINo.
IFIIDort No:
DHC: $6,290,700
$18,083
2,363
.... 8hoeTaet
DIMI frl8rIud
12,000'
REDM
P""'" 00eratI0n
,
T1meLoa
From
0:00
6:00
18:00
E......
o.taIIa of Opendlon
TIme
To
6.00 Wait On Davliaht
6:00
18:00 12.00 Prep Pad Wait On Rat Hole Machine On Location At 1730 Hrs.
0:00
6.00 Wait On Daylight
.......
24.00
~II
Ottve
Conductor
I..............
Utw
LIIw
0
0
0
0
0
0
0
0
p.O.
DePth
~Teet
0arIth
'AnGie
MudRecon:I
In
Azimuth
TVD
v. SectIon
Nor\hISouIh
Mud eo.t
Out
DdyMud
Tme
DeIly Enar.
Depth
~eIght
IVIac.
~
jyp
Total
0.0.
Unb
~G
0
0
CG
Length
eTG
rrG
Pt.mDNo.
Make
Mfg.
StRIke
,-"*SIzB
0
0
SPM
C3PII
Torque Md DI1Ia
0.00
0.00
0
0
0.00
O.DC
o.
0.00
~1Ids
0.00
'oIw
Sand
0.00 Size
0
0
0.00 MI'g.
0.00 Type
~
iAPlWl
IiTHPCl.
r.
CEC
pH
baoth
Ft.
Irorque
AmP'
PlckUo
wt.
Slack Off
... IsPM
Pf
o.
Mf
0
0
CI
IPotasium
[IIud AddItIveI:
Unita
~arS.N.
0
.;;JIOC
Hours
o.
0.00
0
0
0
0
~w.
pP
Out
0
0
0
0
1.....
SIowPumD
Mftl
BltReconJ
O.
Surf. PnIss.
..
F'm
Irota! Length
Pimp DID
..
Dogleg
Gas
$0
EII8tIWeIt
TotIII DrIIIIId 0
Cum Mud
CumEnar
DrIllIng
DneripIIon
0
BOPT...
Last Test:
NexiTest
1l0l00
1l0l00
In
footage
Personnel
PXP Rep(a)
IseMce
rrotal
Ayg. ROP
BIllIe On LOCIIIIon
Woa
0
0
~on LOCIIIIon
c....m on LOCIIIIon
0
0
[Wind
~eas
Fuel on LOCIIIIon
Fuel UtIIId
t...VDP
AVec
[Temp.
Pet.b!e ......
DI1IIWItIr
IRJORIBSIG
Accidents:
Full Crews
W...... CcIndIttoM
mph
"
PXP
....
...... andw.ltNo.
Pluto 271
RIa
White Pine
beDIti'
Mike Sistrunk
1VD
"...
52448
Cum......... eo.t
10,691
$
PI'GDII*Id T.D.
ItFEMaunt
DHC: $6,290,700
$15,721
.... 8hoeT. .
a...frllaud
12,000'
AFENo
NV
Dlllveo.t
8uDerwIIIor
,-
~~
~.
ItFEDINII
aa.ntIIon
EIapHd
TIme Loa
DetIIIIs 01 ()perIItIan
TN
From
To
0:00
0:00 24.00 Waitting on Martin's Rat Hole to show-up. truck broke down outside of town
will arrive location 4/25107
24.00
c.lina
DrIve
Conductior
Burflloe
InWmedlIitIt
LIner
LIMr
b.o.
Deoth
0
0
0
0
0
0
0
0
0
0
0
0
Shoe Teat
IAnaill IAPnuth
DePth
lIudReoonI
In
Weight
DIIIIv Mud I
DIIIIv Enar.1
CwnMud
SO
CwnEngr
$0
Total
SO
Make
0
0
~troke
0.00
yp
o.
~s
0
0
trorque
0.0( PIckUp
o.
0.0( ~Off
SoIkIa
'PIW
!sand
bec
0.00
0.0( iBitNo.
0.0(
PH
Pm
Pt
,..
lei
Potaaium
.... AddItIwe:
trotal Length
UnItII
..... .......
0
0
0
0
0
0
0
0
0
0
Depth
Islze
M.W.
0.0( iMfg.
0.0(
0.00
o.
0
0
lJar S.N.
...... Oft Locdoft
Ic.mewtt onl.oalilon
0
0
~ onl.OOllllon
. . . . Oft Location
;;;IIIoC
Hours
500 gals
...... UIId
43 gals
Poe.DIe WItIr
MWItIr
wt.
8IowPunID
.,~
0
0
PF'"
0.0(
0
0
0
0
UnerSize
SPY
t.Ig.
0
0
trG
Ps IIID Dada
1
PumDNo.
0
0
~.
APfWl
HrHPCL
bake
PV
Length
DoaIea
0
EMtIWtIIl
~
~
~
IsTG
DrlIInci
0.0.
lIudCOllt
Out
0
Dapth
TVD
TIme
PnMIuctIon LIner
3000 gals
,
BitReoonl
trYPl'
0
0
Iserial No.
0
0
"'Test
0.'\1
r-..t.Out
0
0
~Test
O.
0.00
In. .....
0
0
PxPRep(s)
~urs
0
1
In
&OPT....
Penonnel
~.ROP
Service
tf/oa
~otaI
iAVDP
IAVDC
!wind
0
0
~eas
WORIBSIG
[Accidents:
!FUll Crews_
yes
I
I
...... CorIdIIIou
tremp.
I
42
no Ic:rew Boat:
~sl.o---no ~~ BoatlTua:
mph
pae.
PXP
...
RIa
White Pine
Mike Sistrunk
PnlaI_
'"*-'I ToO.
TVD
DII:IIh
AFENo
NY
CumuilllMt eo.t
Dllllveo.t
8uDIrYiIIar
Pluto 27-1
.R8DOrtNO:
AFEAInounI
DHC:
$3,455
3,455
lMt8hoeTeet
o..frl8aud
AFEo..
12,000'
0D8rIItI0n
EIiIpeed
TlmeLaa
o.tIIIIa of Opel'1ldon
TI....
From
To
0:00
0:00 24.00 Move camD to Pluto 27-1 location riaaed UD water electric Dower & Communications
24.00
om..
CasIna
ConducIor
8urfIIoe
ProducIIon LIIMr
LIIMr
LIIMr
hdllrmldlllle
b.D.
Deoth
iShoe Teat
a..t DlnictIoMIlurvey
PePlh
IAngIe
I
Azimuth
V. SecIIon
TVD
Mud Record
In
Out
WJme
lIudCoet
Cum Mud
CumEnar
Daily Mud
Daily Engr.
Total
Weight
DescripIIon
0.0.
TotaIDrt.... ~
UnIts
PumpDala
PumP No.
$0
Gee
SO
BGG
Make
$0
CG
STG
G
IstIOke
DrlllIIG
~.
L.engItI
IsPM
Ft ~
Ampa ~.PnNtI.
~UP
RofatIngWl
iSIack Off
Cake
Solids
1M
1M
BltReconf
Slow PUII'ID
SPM
pP
fJIfl
~No.
!sand
Isize
CEC
pH
Ma.
iType
Pm
Serial No.
Pf
Nozztes
!.rm Test: I
Mf
p.pthOut
Next Test:
CI
DePIh In
PotasIum
Mud AdcIIIJwa:
Unltl
Total L.engItI
JarS.N.
Hours
papth
M.W.
BOPT....
PwIIor.iMI
0.00 Footage
PXPRtp(s)
Hours
RIg
Ava. ROP
SeMce
a.tt. On LOCIIIon
woe
Total
CemInt on LOCIIIon
RPM
AVDP
Wind
AVDC
Seas
CImIIIt on LOCIIIon
Full on LOCIIIon
JnerSize
Deoth
iTOItIUII
Gels
Dogleg
P'!...
APIWl
HTHPft_
EaItIWest
NorWSoutI'I
w..tw CondIIIoM
FUIIUMd
IRIORIBSIG
~WIItiIr
IAccidents:
_yeS
PrtuWlltilr
FuIlC~
__ _ ---YtIS
II
mDt1
Temp.
no Crew Boat: NA
._no iSupply BoatlI~NA_ _
Chris!l L. Morris
From:
Sent:
To:
Cc:
Subject:
Christy L Morris
We have not received the required completion and plugging reports nor the mud log (2 copies)
PXP is out of compliance on this well and will not be allowed any further activity in the
state until this is taken care of. Further there are punitive fines which could be imposed.
Please take the necessary steps to relay the required reports and mud log to this office as
soon as possible.
Nevada appreciates your interest in our oil industry and wishes to continue a cordial working
relationship. We trust PXP to fulfill the terms of their drilling permit as has always been
If there are extraordinary circumstances which prohibits Plains from meeting the terms of
If you have sent the required items and we have passed in the mail, I apologize for this
reminder.
Sincerely,
Christy l. Morris
Oil, Gas, and Geothermal Program Manager Nevada Division of Minerals 499 West King Street,
T: 775.684.7945
F: 775.684.7952
C: 775.721.1774
-----Original Message----
From: Hertfelder, Gary [mailto:GHertfelder@pxp.com]
Sent: Tuesday, February 19, 2998 9:56 AM
To: Christy l. Morris
Cc: linda Wells; Kennedy, Shelia; Hertfelder, Gary
Subject: RE: Pluto 27-1 reports required
Thank you Christi,
I will pass this reminder on to Shelia Kennedy of our Houston permitting
group.
Thank you for your patience.
Thanks again,
Gary
************************************
Gary P. Hertfelder, P.E.
1
-g'~~
eo(.)'i ,;20 .f 2
~
~
:g0'1
....J
'7
0:: t;; ~ ~
3 :5 g
1-2<
~ ~
D..
~
~
.. g
() it
Elev.:
Wi
~ 2
1-0
It
D'ivisior
W Q
WOI.LO(/)I
:E ::::!
C"'?_
D......J
Permanent Datum:
Log Measured From:
8 1il
.3 ~ ()
27-033-05318
..
K.B.
Section
27
7382 ft
G.L.
7357ft
D.F.
_~80UNDJ"EVEL
K.B.
Elev.:
25.0 ft
7357 ft
above Perm. Datum
Township
l8N
Range
61 E
Drilling Manager
Plains Exploration & Production Company
201 S. Broadway
Orcutt, CA. 93455
VOICE: 805.934.8227
FAX: 805.937.0237
EMAIL: ghertfelden@pxp.com
CONFIDENTIALITY NOTE: The information contained in this email is
legally privileged and confidential information intended only for the
use of the addressee named above. If the reader of this email is not the
intended recipient, you are hereby notified that any dissemination,
distribution or copy of this email is strictly prohibited. If you have
received this email in error, please immediately notify me by telephone
and return the original email to me via reply mail. Thank you.
-----Original Message----
From: Christy L. Morris [mailto:clmorris@govmail.state.nv.us]
Sent: Tuesday, February 19, 2998 9:23 AM
To: Hopkins, Steve; Hertfelder, Gary
Cc: Linda Wells
Subject: Pluto 27-1 reports required
Importance: High
Steve and Gary,
You were notified on January 18 this year by Linda Wells of our office
that the subject well needs the completion and plugging reports
submitted. Those forms are attached and can also be found in pdf form on
our website www.minerals.state.nv.us
Please complete and submit asap. These forms are required within 30
days of plugging the well. PXP is out of compliance at this time.
If you are not the persons to contact on this please forward to the
appropriate personal and notify me of the correct contact.
Thank you for your attention to this matter.
Christy L. Morris
Oil, Gas, and Geothermal Program Manager
Nevada Division of Minerals
400 West King Street, Suite 106
Carson City, NV 89703-4212
clmorris@govmail.state.nv.us
T: 775.684.7945
F: 775.684.7952
c: 775.721.1774
Christy L. Morris
r(
From:
Sent:
:J;i:
l,)1\~ v\
To:
Cc:
Subject:
Attachments:
Importance:
.A
G.~ \.(....
""'"';;>'Y
L..
'Y'V"';;>
Tues
r ary 19, 2008 9:23 AM
Linda e s
High
You were notified on January 18 this year by Linda Wells of our office that the subject well
needs the completion and plugging reports submitted. Those forms are attached and can also be
found in pdf form on our website www.minerals.state.nv.us Please complete and submit asap.
These forms are required within 3e days of plugging the well. PXP is out of compliance at
this time.
If you are not the persons to contact on this please forward to the appropriate personal and
Christy L. Morris
Oil, Gas, and Geothermal Program Manager Nevada Division of Minerals 4ee West King Street,
T: 775.684.7e45
F: 775.684.7e52
C: 775.721.1774
Linda Wells
From:
Sent:
To:
Subject:
linda Wells
Friday, January 18, 2008 1:01 PM
'ghertfelder@pxp.com'
Pluto 27-1
Gary
The Division of Minerals needs a completion and plugging report on the Pluto 27-1, DOM #888. This well will become
public the end of January and these reports need to be submitted before the end of January. The forms can be
downloaded from our web site at minerals.state.nv.us - under programs go to the Oil and Gas tab and look under the
forms.
If you have questions please contact me at the information listed below.
STATE OF NEVADA
DIVISION OF MINERALS
400 W. King Street, Suite 106
I2?J
I:8J
Permit Number
Company Name
Farm or Lease
888
Well No.
Plains Exploratio
NVM 80835
27-1
o
o
County
Field or Area
Date
Wildcat
July 31,2007
DETAILS OF WORK
(State names of and expected depths to objective zones or formations: show sizes, weights. and lengths of proposed
casing~; injticate mudding jobs, cementing pOints. and ALL other pertinent data.) Attachments permitted if n~ce~sJY.
PXP plans to plug and abandon the Pluto 27-1 well beginning today, July 31,2007. Attached is the proposed
P & A procedure.
I understand that this plan of work must receive approval in writing of the Division of Minerals before operations
may be commenced.
Company
Address
Approved by=--~",-...6-"-:;';=;:;"";:::--_ __
Houston, TX 77002
Position
Ga!y' Hertfelder
Date
Name
DO NOTW~BELOW
&:.~~cA.I
~/~
Position
Signature
"
(5/22/2007 LV)
{J.< (/y<-' (/
RINIJl\lU>
FORM APPROVED
OM BNo. I004'() 137
Expires: Millth 31, 2007
S. Lease Serial No.
NVN-8083S
,f OilWell
Gas Well
N/A
Other
TYPE OF SUBMISSION
o Subsequent Report
TYPE OF ACTION
Acidize
o Alter Casing
o Casing Repair
o Change Plans
o Convert to Injection
o Deepen
o Fracture Treat
o New Construction
o Plug and Abandon
Plug Back
Production (StartlResume)
o
o
Water Disposal
o Reclamation
o Recomplete
Water Shut-Off .
DWell Integrity
[Z]Other Relocate Water Well
Temporarily Abandon
13. Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof.
If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths ofall pertinent markers and zones.
Attach the Bond WIder which the work will be performed or provide the Bond No, on file with BLMlBIA Required subsequent reports must be filed within 30 days
following completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 must be filed once
testing has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed, and the operator has
determined that the site is ready for fmal inspection.)
Plains Exploration and Production Company requests permission to move the water well along the access road, approximately 1.00' northeast of
the wellpad. The well wlU be drilled with a truck mounted rig, Immediately adjacent to the road, within the area that was previously inventoried
for archeology. New coordinates for the water well are:
39.1.3.869 N (WGS 84)
Date
certifY that the applicant holds legal or equitable title to those rights in the subject lease
IOfficeM'
Director
Date
MAY 2 2 2007
Inera
Title 18 U.S,c, Sedioo 1001 and Title43 U.S.C.Sectioo 1212, make ita crime forany person knowingly and willfully to make to"'anY'department or agency of the United
Slates any false, fictitious or fraudulent statements or representations as to 8nymalter within its jurisdiction,
(Instructions on page 2)
~-~
-..~~~
'\ to,
----------
--------
1",
!.ll .. \_
PROP()<:FD
tJ
.\Cr,,," R(;\D
paSTl"\'~ m\CK
Hf ~~ ;"fy:j --.~
*;
ill
V'
.'.'"
"\ :_,_._}.).:_ !
"" ..... _--
.:
:._ ... ~~
~._;':_)".C"'~_'
PI r ro FFDRR\L #2"'-1
SE( lION 2". I18N. R61F.I\1.D.M.
1865' FSL 90S' f EI
TOP 0 G RAP HIe 1 0 09 06
:\1 A P
MONTH DAY
YEAR
SCALE: 1"=_' DRAWN BY: L.K. REVISED: 10-20-G6
II
;0..5
Li'~' '~;cn
-\ :'1. l_._. ..I;; .~
.~J.l.J
.. U". Of
rl, Vi\[:'
01
E U f!
~M
~PR
.~.
NDO M
UNITED STATES
DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
9ta!lUt use
N/A
7. IfUnit or CNAgreement, Name and/or No.
o Gas Well
N/A
o Other
Ja Address
FORM APPROVED
OM BNo. l!l1J4.Q1J7
713/579-6036
12. CHECK APPROPRIATE BOX(ES) TO INDICATE NA1URE OF NJIKF, REPORT, ffi 0Il-IER DATA
TYPE OF SUBMISSION
o
o
o
o
o
o
o
Subsequent Report
Final Abandonment Notice
TYPE OF ACTION
Acidize
Alter Casing
Casing Repair
Change Plans
Convert to Injection
o
o
o
o
o
Deepen
Fracture Treat
New Construction
Plug and Abandon
Plug Back
o
o
o
Reclamation
Recomplete
DTemporarily Abandon
DWell Integrity
ILlOther Increase Pad Size
Water Disposal
13. Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date ofany proposed work and approximate duration thereof.
Ifthe proposal is to deepen directionally or recomplele horizontally, give subsurface locations and measured and true vertical depths ofall pertinent markers and zones.
Attach the Bond under which the work will be perfonned or provide the Bond No. on file with BLMlBIA Required subsequent reports must be filed within 30 days
following completion ofthe involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Fonn 3160-4 must be filed once
testing has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed, and the operator has
detennined that the site is ready for fmal inspection)
Plains Exploration and Production Company requests permission to increase tbe pad size as sbown on the attacbed diagram.
All disturbance will remain witbin tbe area which was previously cleared by a Class 111 Arcbeological clearance (450' x 450' area) and as
RECEIV~>
APR 1 6 2007
~P/l
Division of Miner(l.<
Date
~P.l?ro~e!bt. ___ -:-LS1 J:~_qry J,,1. JohnsoQ _____ ~i1iil~@'S Management IDate APR 1 3 Z007
Condlhons ofapproval, If any. are attached. Approval ofthis notice does not warrant or
certiiY that the applicant hol~s legal or equitable title to those rights in the subject lease
which would entitle the aoohcant to conduct ollCrations thereon.
IOffice
Mmerals Management
Title 18 U.S.C SectioolOOI and Title43 u.sc Sectioo1212, make it a crime for any person knowingly and willfully to make to any department or agency ofthe United
States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.
(Instructions on page 2)
SCALE: 1"
=:
50'
~-13.4'
~.
DATE: 10-02-06
Revised: 10-18-05
Revised: 04-03-07
NOTE:
'"
~ C-1.5 j
I~ ' - t \
EI. 56.8
(8' Dfttp)
125' )
1r
I .\
F.11
1~-.::::>
....;
510._
I'PF-5.5
~Cb
~~
~~
Q:j
1 .~:.
a: i7i ,
II)
~
~
~~
~ 9.._
II)~
CI::
Sio. 1+00
--
Iboij'
\
....
~I'--
"
....
::!'"
g
..............
'" --......
-,
510. 0+00
F-7.7'
EI. 476'
Elev. Graded Ground 01 Location SlaKe
as
So.
zoo
"
II
.
X-Sectton
Scale
1"
= 50'
DATE: 10-02-06
Revised: 10-18-06
Revised: 04-03-07
70'
125'
Finished GrodB
-- ';~~:~if!S;JZ;ill~~~~
-~,
S TA 3+80
40'
80'
-- -
--
125'
11'1.
~.' ::.:::.r"';2;!!H.. :.
CUT
STA. 1+80
--
40'
BO'
125'
Slope= 1 1/2: 1
(7jp.)
~"'~:":C':~~
- - / ' ';;;':d~nstruction
STA. 1+00
-- --- -- --
40'
125'
~LL<"&'
-....:::.. ::.'.~ .
,,'
NOTE:
Topsoil should not be
Stripped Below Finished
Grode on Substructure Area.
--
\\
STA. 0+00
* NOTE::
-- -- --\
APPROXIMATE YARDAGES
(6") Topsoil Stripping
Remaining Location
TOTAL CUT
FILL
EXCESS MATERIAL
EXCESS UNBALANCE
(After Rehabilitation)
Cu. Yds.
SCALE: 1 = 50'
DATE: 10-02-06
Revised: 10-16-06
Revised: 04-03-07
70'
in
r-
NOTE'
Aare Pit is to
bfJ locatfJd a min.
of 100' from the
Well Head.
oo
N
I----i
FlARE PIT
PIPE RACKS
t.>
I----i
in
N
DOG HOUSE
r--I
40'
125'
RIG
~ II
g
lit
I?E
TOIl.T
1..--'-_+_...11 HOPPER
"
!.!.QQ.
~O
a.
If)
mASH
~o
UiNTAH ENGINEERING .t LAND SURVEYING
86 So. ZOO .I'a.d Yft1ICII, UtGla 84018 (486) 189-10'"
ex NV-040-07-038
Plains Exploration & Production Co. has submitted a Sundry Notice to increase the size of the
well location pad that was authorized in the DRlFONS~ dated March 21,2007, for
.
Environmental Assessment # NV-040-06-057. The hole location would not be moved. This
increase is needed to accommodate a larger drill rig than previously anticipated and to provide
room for the placement of the increased amount of grubbed trees and topsoil stockpiles.
Disturbance would increase by 2.1 acres, from 2.4 acres to 4.5 acres. The expansion would fit
into the area previously inventoried for cultural resources and the other resources analyzed in the
EA. No additional data collection would be necessary. The estimated disturbance for the
proposed action consists of:
Approved
Disturbance
Upgrade Existing 2.track
Road Co~struction
Well pad disturbance
Total
0.3 miles x 20 ft
0.3 miles x 30 ft
450 ft x 450 ft
Revised
Disturbance
0.7
0.7
1.1
2.4
1.1
~
4.2 acres
6.3 acre.~
Eagle Exploration, Inc would follow the same conditions of approval that were issued for the
original APD. Archeologists would still be on site to monitor for possible buried cultural
features.
Plan Conformance
The Proposed Action is in conformance with the Proposed Egan Resource Management Plan
(R.:.\1P) and Final Environmental Impact Statement (PElS), September 21, 1984, which states
the public lands shall remain open and available for mineral exploration and development
unless withdrawal or other administrative action is clearly justified in the national interest" (page
44
This decision is subject to administrative review in accordance with 43 eFR 3165. Any request for
administrative review of this decision must include infonnation required under 43 CFR 3165.3(b) (State
Director Review), including all supporting documentation. Such a request must be filed in writing with
the State Director, Bureau of Land Management, 1340Financial Boulevard, Reno, Nevada 89502, no later
than 20 business days after this Decision Record is received or considered to have been received .
.Any party who is adversely affected by the State Director's decision may appeal that decision to the
Interior Board of Land Appeals, as provided in 43 CFR 3165.4.
Contact Person
TOTRL P.12l4
15). The Egan Resource Management Plan: Oil and Gas Leasing Amendment and Record of
Decision, May 1994, specifically incorporates oil and gas leasing into the land use plan.
The White Pine County Land Use Plan (LUP) (May 1998) does not specifically address oil and
gas leasing. However, the proposed action is consistent with this LUP, which encourages
exploration and development for mineral resources.
Plan of Operations
The proposal is designed in conformance with all bureau standards and incorporates appropriate best
management practices, required and designed mitigation measures determined to reduce the effects on the
environment.
A surface use plan of operations describing all proposed surface-disturbing activities has been reviewed
and is approved pursuant to Section 17 of the Mineral Leasing Act, as amended.
Compliance with the Energy Policy Act .of 2005
The proposed activity has been determined to be statutorily categorically excluded from NEPA
documentation in accordance with Section 390 of the National Energy Policy Act of 2005. The proposed
action falls within the parameters of category number 1.
Individual surface disturbances ofless than five (5) acres so long as the total surface disturbance on
the lease is IIOt greater than 150 acres and site-specific analysis in a document prepared pursuant to
NEPA has been previously completed..
The proposed increase in disturbance for this ex is 2.1 acres. A total project disturbance of4.2
acres was authorized in the DRlFONSI. dated March 21, 2007. for Environmental Assessment #
r have decided to authorize the increase in pad distW'bance as requested through Sundry Notice submitted
by Plains Exploration on April 3, 2007. The Conditions of Approval (COAs) specified in the approved
Application to Drill for Pluto Federal 27-1 remain unchanged. These COAs and/or tenns and conditions
provide justification for this decision and may not be segregated from project implementation without
further NEPA review. In addition, I have reviewed the plan confonnance statement and have determined
that the proposed activity is in confonnance with the applicable land use plan(s). Further, I have
reviewed the proposal to ensure the appropriate exclusion category as described in Section 390 of the
'Energy Policy Act 0[2005 has been correctly applied. It is my determination that no further
environmental analysis is required.
Ld~
J
--
."
-.---
~;i()k
Date
/U~1~
MAR 2, 8 Z007
In Reply Refer To:
IJ:-I~
~'-(
TAKE PRIDE"
INAMERICA
!:'ECEIVED
~.'
N-80835
3160 (NV-920)
3 0 2007
lSI(ln of
Tabatha Parker
c/o Pennitco Inc.
14421 County Road 10
Ft. Lupton, Colorado 80621
Dear Ms. Parker:
Enclosed is the approved Application for Pennit to Drill (APD) for well_._ _ _ __
T.18N., R.61E., sec. 27, Federal lease N-80835, White Pine County, Nevada. Attached to the
APD are Conditions of Approval which were developed from the Environmental Assessment
prepared by the Ely Field Office and the drilling program review conducted by this office.
Please ensure all personnel responsible for construction; drilling and reclamation of this location
are familiar with the Conditions of Approval.
Should you have any questions regarding this pennit, please contact John Menghini, Division of
Mineral Management, at (775) 861-6573.
Sincerely,
NV-923 (w/3160-3)
Minerals
FOlTll 3160-3
(September 2001)
,
~ECEIVED
UNITED STATE
DEPARTMENTOFTHEINBCfo
BUREAU OF LAND MANAGE
2007
FORM APPROVED
OMB No. 1004-0136
Expires January 31, 2004
5. Lease Serial No.
NDOM
NVN-80835
6. IfIndian, Allottee or Tribe Name
III
DRllL
N/A
7. If Unit or CA Agreement, Name and No.
REENTER
N/A
b. Type of Well:
Gas Well
2. Name of Operator
Other
7131579-6204
1021 Main, Suite 2100, Houston, TX, 77002
14421 County Road 10
Fort Lupton, CO 80621
4. Location of Well (Report location clearly and in accordance with any State requirements. ")
At surface
113. State
locallon to nearest
18. lJJstancetrom
pl'9PR~ location
to nearest \\ell, dnlhng, completed,
1865'
1280
40 Acres
20. BLM IBIA Bond No. on file
~one
12,000'
~.=timated duratIOn
. "prilL~07
__
24. Attachments
7357' GL
---_ .. _..
WYBOOO296
...
30 Days
,
10~~
The following, completed in accordance wilb Ibe requirements of Onshore Oil and Gas Order No, I, sball be attacbed to Ibis fonn~
.. ' '<to,::
't:'~
4. Bond to cover the operations unless covered by an existing bond on file (see
2. A Drilling Plan,
Item 20 above).
3. A Surface Use Plan (if the location is on National Forest System Lands, the
5. Operator certification.
authorized officer.
25. Si
I Name (printed/Typed)
I
,Revised 1-8-07
Venessa Lanamacher
111912006
on Co.
: Name (printeisrf3ary
I
Title
L. Johnson
Date
1 MAR
26 2007
Office
Minerals Management...1
bIds le8!lfr R'\1!itable title fO IP2e riMis injhe subject lease which would entitle the applicant to
Title 18 U.S.c. Section 100land Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the
United States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.
BY,
fitl!EJlPVED
9!00
A.M. JAN 09 2007
NEVADA STATE QFfJCI
Agency Contacts
BUREAU OF LAND MANAGEMENT
Nevada State Office
PO Box 12000 (1340 Financial Blvd)
Reno NY. 89520-0006
(775) 861-6400
Petroleum Technician:
Michael Tyler
24 Hr. Telephones:
m75tyler@blm.gov
Petroleum Engineer:
Office Telephone:
Cell:
jmenghin@nv.blm.gov
(775) 296-0818
John Menghini
(77 5) 861-6573
(775) 223-1359
Christy Morris
Office Telephone:
(775) 684-7045
(775) 721-1774
Cell:
(775) 684-7052
Fax:
clmorris@govmail.state.nv.us
I. Approval of this APD does not warrant or certify that the applicant holds legal or equitable title to those rights in
the subject lease which would entitle the applicant to conduct operations thereon. In addition, approval of this APD
does not imply that the operator has legal access to the drilling location. When crossing private surface 43 CFR
3814 regulations must be complied with and when crossing public surface off-lease the operator must have an
approved right-of-way.
2. All operations shall conform to the Code of Federal Regulations, 43 CFR 3160, Bureau of Land Management
Onshore Orders and the Nevada Division of Minerals Oil and Gas chapter 522 - Oil and Gas General Provisions.
3. A complete copy of the approved APD must be at the drill site during the construction of the roads and drill pad,
the drilling of the well, and the completion of the well.
4. The spud date will be reported orally to the Authorized Officer 24 HOURS PRIOR TO SPUDDING, unless
otherwise required in site specific conditions of approval.
5. Verbal notification shall be given to the Authorized Officer at least 24 hours in advance offormation tests, BOP
tests, running and cementing casing (other than conductor casing), and drilling over lease expiration dates.
6. A progress report must be filed a minimum of once a month starting with the month the well was spudded and
continuing until the well is completed. The report must be filed by the 25th of each month on a Sundry Notice (Form
3160-5). The report will include the spud date, casing information such as size, grade, weight, hole size, and setting
depth, amount and type of cement used, top of cement, depth of cementing tools, casing test method, intervals tested,
perforated, acidized, fractured and results obtained and the dates all work done.
7. Deviate from the approved APD must receive prior approval. If you want to change your operations in any way,
you must first receive approval from BLM and from the NDOM.
8. Any information you desire to be held confidential must be clearly marked "CONFIDENTIAL INFORMATION"
on each page.
9. All survey monuments found within the area of operations shall be protected. Survey monuments include, but are
not limited to: General Land Office and Bureau of Land Management Cadastral Survey Corners, reference comers,
witness points, U. S. Coast and Geodetic benchmarks and triangulation stations, military control monuments, and
recognizable civil (both public and private) survey monuments. In the event of obliteration or disturbance of any
survey monuments, the incident shall be reported in writing to the Authorized Officer.
10. If at any time the facilities located on public lands authorized by the terms of the lease are no longer included in
the lease (due to a contraction in the unit or other lease or unit boundary change) the BLM will process a change in
authorization to the appropriate statue. The authorization will be subject to appropriate rental or other financial
obligation determined by the authorized officer.
I L A copy of the completion report and all test information obtained from this well shall be submitted to this office
within 30 days after the well is completed.
12. No later than the fifth business day after any well begins production on which royalty is due anywhere on a lease
site or allocated to a lease site, the operator must notify the BLM by letter or sundry notice of the date on which such
production commenced. The date is defined as follows: the date on which liquid hydrocarbons are first sold or
shipped from a temporary storage facility, such as a test tank, and for which a run ticket is required to be generated,
or the date on which liquid hydrocarbons are first produced into a permanent storage facility, whichever occurs first.
If you intend to sell from a test tank, it must be calibrated as specified in Onshore Order Number 4, Part C, and
sealed in accordance with Onshore Order Number 3. You can initially notify orally, but you must follow-up with a
letter or sundry notice. Reference is made to 43 CFR 3162.4-I(c). As a minimum, such notice must provide the
following information:
a. Operator's name, address and telephone number.
b. Well name and number.
c. Well location (14 14 Section, Twp., Rge., MDBM).
d. Date well placed in a producing status.
both.
e. The nature of the well's production, i.e., crude oil, natural gas, or
f. The lease communitization, or unit number applicable.
13. Hydrogen Sulfide Contingency Plan. A contingency plan will be submitted when required by this office.
However, minimum safety precautions must be taken at all times. Personal safety equipment, including a portable
hydrogen sulfide detector situated in a position to detect gas from the well, and two or more OSHA-approved
protective breathing apparatus must be on location. If company policy requires more than this, please supply this
office with a copy of the company plan or requirement, if not already submitted.
14. Abandonment program approval must be obtained prior to plugging the well. Following an oral approval, a
sundry notice titled "Notice ofIntent to Abandon" will be submitted to this office within five business days. Failure
to obtain approval prior to commencement of abandonment operations shall result in immediate assessment under 43
CFR 3163.I(b) (3). Notice: if no logs are run (mud or electric), all open sections of hole will be filled with cement
in a manner which precludes interzonal migration of fluids.
15. Directional surveys (inclination and azimuth) shall be run on the well wherever the inclination exceeds 10
degrees or the projected bottom hole location is within 200 feet of the spacing unit or lease or unit boundary.
16. Pursuant to 43 CFR 3162.7-1 (b), production testing will be permitted into test tanks only. No oil will be
permitted into the reserve pit except in emergency situations.
17. The State of Nevada (NAC 522A.215) requires that samples of cuttings shall be collected at a minimum of30
foot intervals from surface to the surface casing point, and on 10 foot intervals from surface casing shoe to total
depth. A minimum of two 15 milliliter sets of cuttings per sampling interval must be cleaned, dried, and placed in 3"
x 5" sample envelopes, properly identified and sent prepaid to the Nevada Bureau of Mines and Geology (NBMG)
University of Nevada, Reno, Mail Stop 178, Reno, Nevada 89557-0088. You may contact David Davis at (775)
784-6694 x 133.
Note: the cuttings are not to be sent to the Division of Minerals. The cuttings are due within 15 days of completion
of the well. The operator will be responsible for the cost of any further handling of the samples by the NBMG
18. Two copies of all logs run on the well and where possible, one copy of the computed logs in electronic format
such as LAS or PDF are to be submitted to the NDOM within 30 days of the date of being run.
19. All BOPE tests of 5000 psi or greater shall be conducted by an independent contractor. Test charts and test
results are to be submitted to the Bureau of Land Management within 48 hrs. of completion of the test.
will assist in monitoring for noxious and invasive weeds during the life of the project, until reclamation is complete.
management actions for the conservation of migratory birds. A qualified wildlife biologist will survey the area for
nesting migratory birds. If any are found, operations will be postponed until after July 15.
27. An access permit will be obtained for the approach and access onto U.S. 50. For more information, contact the
NDOT District III Office at (775) 289-1700.
28. Due to the proximity to U.S. 50, Plains Exploration & Production Co. must emphasize dust control measures for
reasons of air quality, safety, and visual impacts. Operations must comply with Nevada air quality regulations.
29. An Oil & Gas exploration waiver must be obtained from the Nevada State Engineer's Office for drilling an on
site water welL A water well may be accepted by the Ely District or a permittee upon completion of operations.
Please submit the following information to the Ely District Office, Bureau of Land Management, HC 33, Box 33500,
Ely, NV 89301-9408:
Attachment 4
Species
Seeds/Lb
Seed rate*
lbslac
Seeds/sq ft
Penstemon palmeri
(Palmer penstemon)
610,000
0.5
Agropyron cristatum x
desertorum
(Hycrest Crested Wheatgrass)
225,000
2.0
10
Secale cereale
(Cereal rye, sterile)
18,000
10
Achnatherum hymenoides
Indian ricegrass, Nezpar 141,000
4.0
12
Total
3.4 Ibs/ac
24 seeds/sq ft.
Substitutions can be made depending on seed price and availability. Contact the BLM if substitutions are required.
* Seed rate - Adjust listed pounds/acre for pure live seed.
Pure Live Seed poundsiacre Seed rate (listed above lbs/acre)
(%germination) (%purity)
Attachment 5
Seed List for Pancake Federal 21-1 Final Reclamation
Species
Seeds/Lb
Seed rate*
lbsiac
Seedsisq ft
Agropyron cristatum x
desertorum
(Hycrest Crested Wheatgrass)
225,000
2.0
10
Oryzopsis hymenoides
(Indian ricegrass)
141,000
2.0
Sitanion hystrix
(Squirrel tail)
192,000
2.0
10
Poa sandbergii
(Sandberg's bluegrass)
925,000
0.5
Linum lewisii
(Appar Blue Flax)
293,000
0.25
Penstemon palmeri
(Palmer penstemon)
610,000
0.25
Winterfat
2.0
Globemallowor
Princess Plume
0.25
Total
9.25 lbsiac
?? seeds/sq ft.
Substitutions can be made depending on seed price and availability. Contact the BLM if substitutions are required.
STATE OF NEVADA
JIM GIBBONS
Governor
Rr~EIVED
FEB 1 6 2007
ALLEN BIAGGI
Director
TRACY TAYLOR. P.E.
:Jivision of Minerals
State Engineer
Waiver OG-239
http://water.nv.gov
The well driller's report when shall bare this waiver number, OG..239.
If an artesian flow condition is encountered in any well, the water shall be
controlled as required in NRS 534.060(3). The total use of water from this well shall
not exceed 750,000 gallons. Records of water use shall be kept and filed in this office
not later than thirty (30) days following the end operations or expiration of this waiver.
!'~PO
Rt'v I 1171
"~..,
Page 2
February 14.2007
Any well drilled under this waiver shall be plugged and abandoned pursuant to
NAC 534.420 within thirty (30) days following the completion of the project or expiration
of this waiver.
This temporary use water well waiver expires April 30. 2007.
This waiver does not grant or infer any rights of ingress or egress, nor any
appropriation of water and shall not be deemed to result in the development of any
equity. It is expressly understood that this waiver does not relieve the operator of the
permitting requirements of any other state, local or federal agency..
If you have any questions please call 775-684-2BOO.
Sincerely,
;2d/J4
Tim Hunt, P.E.
Staff Engineer III
TH/sg
cc:
United States Bureau of Land Management, Ely Field Office (re: NVN-BOB35)
Nevada Division of Minerals
Plains Exploration and Production Company
Las
STATE Of N EVADA
COMMISSION ON MINeRAL RESOURCES
Las
VL~gils.l\cvada
81)119
(702) 4R6-4343
Br...,,:h:
Suik#120-1\
OfVISION OF MINERALS
.111\1 CIRHO"';
VI'WIN
;\L\N R. COYNER
Administrator
An Application for Permit to Drill and Oil or Gas Well has been issued by the
Commission on Mineral Resources.. Division of Minerals to Plains Exploration & Production
Company, 14421 C01mty Road 10, Fort Lupton, CO 80621,303-857-9999, for the following
well:
Permit Number 888~ API Number 27-033-05318, has been assigned to the Pluto 27-1
well. The well is located in the SW'A NE'A SE of Section 27, T18N, R61E, in White Pine
County. The location ofthe well is 1865' from the south line and 905' from the east line of the
section. The elevation is 7351" and the proposed depth ofthe well is 12,000'. The proposed
well is located 15.5 miles northwest ofEly, Nevada.
The pennit was issued January 30, 2007 and will expire on January 30, 2009 in the event
that the well is not drilled.
,"tlrgt'~.\""7d{ ,\liniJl,';!
,Jr... Chainuan;
(;~nt:nlll)uh.ic
STATE Of NEVADA
COMMISSION ON MINERAL RESOURCES
DIVISION OF MINERALS
400 W. King Street, Suite 106
Car:-;on City, Nc vada R9703
(775) bR4-7040 F <.IX (775) 6R4-7052
http://m i nerals.~tate. nv. u:-;i
.I1MCIBBOl"S
COl'('rUOr
L,,~ VC~;tS
Branch:
177 t E. Flamingo Rd.
'ill ild!l2U-A
Las V\.'gas,l\<?vatJa 8<)11<)
(70:!\ ,~86-43 ..D
Fa~
(711'!l4X6-4.H5
,\I..\N
n. ('O\,NEI~
Administrator
January 30,2007
Venessa Langmacher
Re:
. I)
{-f
-l
(Z4Ld~ 'VJtLt..-L--:J-;
(../
/'
'
Linda Wells
Administrati ve Assistant IV
Enclosures
Cc:
STATE OF NEVADA
COMMISSION ON MINERAL RESOURCES
RECEIVED
!}EI,: \)
1 ZOOG
)\vision of Minerals
(Application must be accompanied by $200 pennit fee. Submit proposed drilling program with this application.)
+-+
I
-L..L
I
27
Section
Locate well correctly.
It is proposed to drill the well to a depth of
12,000
feet using a rotary rig. The elevation is
7357
feet above sea level. The KB will be
t3SS'
If this is a wildcat we", attach plat by licensed surveyor showing location.
The status of a bond for this well is conformance with NRS 522.230 of the Nevada Revised Statues is _ _ _ _ __
Current Nationwide Bond
If bond posted with U.S. Government, what is name of surety company?
Liberty Mutual InSUrance Company
_________________________ .Bondnumbe~
wyB~
I cerlify that I have personal knowledge of the facts above stated and that t
Signed
Name
Vanessa Langmacher
Position
Date
27-033-05318
Approval date
By
Form 2
.20--.OL
888
Permit No.
API No.
November 28
a(Q:J2./~~
(REV 511012001lV)
Operator:
Plains Exploration and Production Company
Well:
Pluto 27-1
, T.
SE
\14, Sec.---.n
Location: ---"..:.=_
Lease: N-80835
N, R. _61_E.
Agency Contacts
BUREAU OF LAND MANAGEMENT
Petroleum Technician:
Michael Tyler
24 Hr. Telephones:
(775) 289-1964
michael_tyler@nv.blm.gov
John Menghini
Petroleum Engineer:
(775) 861-6573
Office Telephone:
(775) 223-1359
Cell:
jmenghin@nv.blm.gov
I. Approval of this APD does not warrant or certify that the applicant holds legal or equitable title to those rights in
the subject lease which would entitle the applicant to conduct operations thereon. In addition, approval ofthis APD
does not imply that the operator has legal access to the drilling location. When crossing private surface 43 CFR
3814 regulations must be complied with and when crossing public surface off-lease the operator must have an
approved right-of-way.
2. All operations shall conform to the Code of Federal Regulations, 43 CFR 3160, Bureau of Land Management
Onshore Orders and the Nevada Division of Minerals Oil and Gas chapter 522 - Oil and Gas General Provisions.
3. A complete copy ofthe approved APD must be at the drill site during the construction of the roads and drill pad,
the drilling ofthe well, and the completion ofthe well.
4. The spud date will be reported orally to the Authorized Officer 24 HOURS PRIOR TO SPUDDING, unless
otherwise required in site specific conditions of approval.
5. Verbal notification shall be given to the Authorized Officer at least 24 hours in advance of formation tests, BOP
tests, running and cementing casing (other than conductor casing), and drilling over lease expiration dates.
6. A progress report needs to be filed a minimum of once a week starting with the week the well was spud and
continuing until the well is completed. This report may be by mail, fax or email. A complete set of daily drilling
reports must be submitted upon completion of the well. The report will include the spud date, casing information
such as size, grade, weight, hole size, and setting depth, amount and type of cement used, top of cement, depth of
cementing tools, casing test method, intervals tested, perforated, acidized, fractured and results obtained and the
dates all work done.
7. Deviation from the approved APD must receive prior approval. [fyou want to change your operations in any
way, you must first receive approval from the BLM and from the NOOM.
8. Any information you desire to be held confidential must be clearly marked "CONFIDENTIAL "on each page.
9. All survey monuments found within the area of operations shall be protected. Survey monuments include, but are
not limited to: General Land Office and Bureau of Land Management Cadastral Survey Comers, reference comers,
witness points, U. S. Coast and Geodetic benchmarks and triangulation stations, military control monuments, and
recognizable civil (both public and private) survey monuments. In the event of obliteration or disturbance of any
Pluto 27-1
survey monuments, the incident shall be reported in writing to the Authorized Officer.
10. If at any time the facilities located on public lands authorized by the terms of the lease are no longer included in
the lease (due to a contraction in the unit or other lease or unit boundary change) the BLM will process a change in
authorization to the appropriate statue. The authorization will be subject to appropriate rental or other financial
obligation determined by the authorized officer.
11. A copy of the completion report and all test information obtained from this well shall be submitted within 30
days after the well is completed.
12. No later than the fifth business day after any well begins production on which royalty is due anywhere on a lease site or
allocated to a lease site, the operator must notify the BLM by letter or sundry notice of the date on which such production
commenced. The date is defined as follows: the date on which liquid hydrocarbons are first sold or shipped from a
temporary storage facility, such as a test tank, and for which a run ticket is required to be generated, or the date on which
liquid hydrocarbons are first produced into a permanent storage facility, whichever occurs first. If you intend to sell from a
test tank, it must be calibrated as specified in Onshore Order Number 4, Part C, and sealed in accordance with Onshore Order
Number 3. You can initially notify orally, but you must follow-up with a letter or sundry notice. Reference is made to 43
CFR 3 162.4-I(c). As a minimum, such notice must provide the following information:
a. Operator's name, address and telephone number.
b. Well name and number.
c. Well location (Y.! 1;4 Section, Twp., Rge., MDBM).
d. Date well placed in a producing status.
e. The nature of the well's production, i.e., crude oil, natural gas, or both.
13. An Hydrogen Sulfide (H2S) Contingency Plan as outlined in Onshore Order No.6 will be submitted when required by
this office. However, minimum safety precautions must be taken at all times. Personal safety equipment, including a portable
hydrogen sulfide detector situated in a position to detect gas from the well, and two or more OSHA-approved protective
breathing apparatus must be on location. If company policy requires more than this, please supply this office with a copy of
the company plan or requirement, ifnot already submitted.
14. Abandonment program approval must be obtained prior to plugging the well. Following an oral approval, a sundry notice
titled "Notice ofIntent to Abandon" will be submitted within five business days. Failure to obtain approval prior to
commencement of abandonment operations shall result in immediate assessment under 43 CFR 3163.1 (b) (3). Notice: ifno
logs are run (mud or electric), all open sections of hole will be filled with cement in a manner which precludes interzonal
migration of fluids.
IS. Directional surveys (inclination and azimuth) shall be run on the well wherever the inclination exceeds 10 degrees or the
projected bottom hole location is within 200 feet ofthe spacing unit or lease or unit boundary.
16. Pursuant to 43 CFR 3162. 7-1 (b), production testing will be permitted into test tanks only. No oil will be permitted into
the reserve pit except in emergency situations.
17. The State of Nevada (NAC 522A.2l5) requires that samples ofcuttings shall be collected at a minimum 000 foot
intervals from surface to the surface casing point, and on 10 foot intervals from surface casing shoe to total depth. A
minimum of two 15 milliliter sets of cuttings per sampling interval must be cleaned, dried, and placed in 3" x 5" sample
envelopes, properly identified and sent prepaid to the Nevada Bureau of Mines and Geology (NBMG) University of Nevada,
Reno, Mail Stop 178, Reno, Nevada 89557-0088. You may contact David Davis at (775) 784-6694 x 133.
Note: the cuttings are not to be sent to the Division of Minerals. The cuttings are due within IS days of completion
of the well. The operator will be responsible for the cost of any further handling ofthe samples by the NBMG
required to meet standards set out in this permit condition.
18. Two copies of all logs run on the well and where possible, one copy of the computed logs in electronic format such as
LAS or PDF are to be submitted to the NDOM within 30 days ofthe date of being run.
19. All BOPE tests of 5000 psi or greater shall be conducted by an independent contractor. Test charts and test results are to
be submitted to the Bureau of Land Management within 48 hrs. of completion of the test.
Prepared For:
PLAINS EXPLORATION AND PRODUCTION COMPANY
By:
PERMITCO INC.
14421 County Road 10
Ft. lupton, Colorado 80621
303/857-9999
I..
~ ~C\\:.
~\\')~
. ~t~~\\tr''''
\F3~r~
i'..\
. . . 1964
- Smce
LOCATION PHOTOS
TAKEN BY: J.F.
PHOTO
526B.12' (G.L.O.)
BASIS OF ELEVATION
,.......
o
.J
cj
'-'
ov
N
c.o
BASIS OF BEARINGS
,...."
.J
13
o
o
t:l
'-'
'0
o00
27
I.()
of StonllS
'""
P
o
o
~
-..;::.
It)
'0
o
o,....
tl
905'
.
L..
'0
o
10
'0
o
'0
"~
C\j
'10
c.o
.-
!t)
00
2633.40' (G.L.O.)
"is
~
N89'51'W -
THIS IS TO
CERTIFY THAT THE
FIELD NOTES Of' ACTUAL SUR
SUPERVISION AND THAT THE S
BEST OF MY KNOv.u:DGE AND ~Ai""/
Ii
H
UINTAH ENGINEERING
85 SOUTH
LEGEND:
L = 90'
SYMBOL
(NAD 83)
39'23'49.25"
(39.397014)
LATITUDE =
LONGITUDE = 11505'19.85" (115.088847)
(NAD 27)
LATITUDE = 39'23' 49.48" (39.397078)
LONGITUDE = 115'05'16.76" (115.087989)
200 EAST
&
-
LAND SURVEYING
VERNAL. UTAH
84078
(435) 789-1017
SCALE 1"
DATE SURVEYED:
1000'
IDATE DRAWN:
10-01-06
PARTY
10-02-06
REFERENCES
J.F.
S.P.
WEATHER
WARM
C.G.
G.L.O. PLAT
FILE PLAINS EXPLORATION &
PRODUCTION COMPANY
24. Attachments
The following, completed in accordance with the requirements of Onshore Oil and Gas Order No. I, shall be attached to this form:
Attached
2. A Drilling Plan
Plains Exploration & Production Co. proposes to drill a well to 12,000' to test the Guilmette Limestone
formation. If productive, an open hole completion will be done from 7200' . 12,000'. If dry, the well will be
plugged and abandoned as per BlM and State of Nevada requirements. See Onshore Order No.1 attached.
3. A Surface Use Plan (ifthe location is on National Forest System Lands, the SUPO shall be filed with the Appropriate
Forest Service Office.
Attached
4. Bond to cover the operations unless covered by an existing bond on file (see Item 20).
5. Operator certification.
Plains Exploration & Production Co. has been deSignated by proper lease interest owners to conduct
operations on the subject lands. Plains Exploration & Production Co. agrees to be responsible under the
terms and conditions of the lease for the operations conducted on the leased lands.
6. Such other site specific information and/or plans as may be required by the authorized officer.
1.
Subsea
0'
7,356'
Rib Hill SS
1,600'
5,756'
Ely LS
3,100'
4,256'
5,600'
1,756'
Joana Limestone
7,200'
156'
7,700'
-344'
8,200'
-844'
12,000'
-4,644'
Formation
Arcturus LSW
! Pilot
Shale
Guilmette Limestone
I
LT.D.
2.
Substance
Formation
Dee.th
Oil
5,600'
Oil
Joana Limestone
7,200'
Oil
Guilmette Limestone
8,200'
All shows of fresh water and minerals will be reported and protected.
open.
When testing t~le kill line valve(s) the check valve shall be held open or the ball removed.
Pipe and blind rams shall be activated each trip, however, this function need not be performed more
A BOPE pit level drill shall be conducted weekly for each drilling crew,
All of the above described tests and/or drills shall be recorded in the drilling log.
* Revised 112-07
The choke manifold, BOP extension rods and hand wheels will be located outside the substructure.
The hydraulic BOP closing unit will be located at least 100 feet from the well head, with the remote
control unit on the rig floor. The casing head and BOP will be flanged 5,000 psi w.p. Kill line will be
2" Ld. with burst pressure rating of 5,000 psi. These items will be pressure tested concurrently with
BOP's. The BOP will be tested when the stack is first installed on trle well. It will also be tested at
each casing shoe and at least every 30 days. BOP and choke manifold sizes will be in accordance
with API-RP-53 as per the attached. See attached schematic of choke manifold.
4.
a.
The size and rating of the BOP stack is shown on the attached diagram.
b.
A choke line and a kill line are to be properly installed. The kill line is not to be used as a
fill-up line.
c.
The accumulator system shall have a pressure capacity to provide for repeated operation of
hydraulic preventers.
d.
Drill string safety valve(s), to fit all drill string connections in use, are to be maintained on the
rig floor while drilling operations are in progress.
The proposed casing and cementing program shall be conducted as approved to protect
and/or isolate all usable water zones, potentially productive zones, lost circulation zones,
abnormally pressured zones, and any prospectively valuable deposits of minerals. Any
isolating medium other than cement shall receive approval prior to use. The casing setting
depth shall be calculated to position the casing seat opposite a competent formation which
will contain the maximum pressure to which it will be exposed during normal drilling
operations. Determination of casing setting depth shall be based on all relevant factors,
including; presence/absence of hydrocarbons; fracture gradients; usable water zones;
formation pressures; lost circulation zones; other minerals; or other unusual characteristics.
All indications of usable water shall be reported.
b.
Casing design shall assume formation pressure gradients of 0.44 to 0.5 psi per foot for
exploratory wells (lacking better data).
c.
Casing design shall assume fracture gradients from 0.70 to 1.00 psi per foot for exploratory
wells (lacking better data).
* Revised 1-12-07
d.
Casing collars shall have aminimum clearance of 0.422 inches of all sides in the hole/casing
annulus, with recognition that variances can be granted for justified exceptions.
e.
All waiting on cement times shall be adequate to achieve aminimum of 500 psi compressive
strength at the casing shoe prior to drilling out.
1.
All casing except the conductor casing, shall be new casing that meets or exceeds API
standards for new casing.
g.
The surface casing shall be cemented back to surface either during the primary cement job
or by remedial cementing.
h.
All indications of usable water shall be reported to the authorized officer prior to running the
next string of casing or before plugging orders are requested, whichever occurs first.
i.
Surface caSing shall have centralizers run as follows: 1on the shoe jOint, 1on the first collar
from the bottom and 1 on the second collar.
j.
Top plugs shall be used to reduce contamination of cement by displacement fluid. Abottom
plug or other acceptable technique, such as a suitable preflush fluid, inner string cement
method, etc. shall be utilized to help isolate the cement from contamination by the mud fluid
being displaced ahead of the cement slurry.
k.
All casing strings below the conductor shall be pressure tested to 0.22 psi per foot of casing
string length or 1500 psi, whichever is greater, but not to exceed 70 percent of the minimum
internal yield. If pressure declines more than 10percent in 30 minutes, corrective action shall
be taken.
I.
On all exploratory wells, and on that portion of any well approved for a5M BOPE system or
greater, apressure integrity test of each casing shoe shall be performed. Formation at the
shoe shall be tested to a minimum of the mud weight equivalent anticipated to control the
formation pressure to the next casing depth or at total depth of the well. This test shall be
performed before drilling more than 20 feet of new hole.
m.
I Pureose I Deeth I
I Tree I New/Used
Hole Size
I 0.0. I
Weillht
60'
171/2" RHM
20 11
1/4" Wall
P.E.
New
Surface
1,200'
17-1/2"
13-3/8"
54.5
J--55
STC
New
Intermediate
7,250'
121/4"
9-5/8"
40#
HCN80
LTC
New
Production
12,000'
8-3/4"
Conductor
Grade
/'
n.
o.
Surface
TOC @ Surface
Lead: 652 sx 35:65 Poz/G, 6% Gel, 1 gps defoamer, 13.6 ppg, 1.53 cu ftlsk.
Tail: 321 sx Class G, 1gps defoamer, 0.3% dispersant,15.8 ppg, 1.15 cu ftlsk.
Production
p.
After cementing but before commencing any test, the casing string shall stand cemented until
the cement has reached acompressive strength of at least 500 psi at the shoe, except that
in no case shall test be initiated until the cement has been in place at least 12 hours. WOC '/
time shall be recorded in the driller's log.
q.
The following reports shall be filed with the District Manager within 30 days after the work is
completed.
1.
Progress reports, Form 3160-5 (formerly 9-331) "Sundry Notices and Reports on
Wells", must include complete information concerning:
;-,
i
// iJ
I!I
""S
(/::1 .
J
Setting of each string of casing, showing the size, grade, weight of casing
set, hole size, setting depth, amounts and type of cement used, whether
cement circulated or the top of the cement behind the casing, depth of
cementing tools used, casing test method and results, and the date work
was done. Spud date will be shown on the first reports submitted.
rJ DC: r,~
/~ L.\
b.
r.
5.
2.
3.
Full opening safety valve - rated to the Ram Preventer working pressure.
MUD PROGRAM:
a.
Interval
MudTYE.e
Mud Wt.
Visco
FIL
PH
0-1,200'
Spud (Gel/Lime)
8.6-9.0
38-50
N/C
8.0-9.5
1,200'7,250'
LSND/Polymer
8.8-9.0
38-50
25-12
8.0-8.5
7,250'-12,000'
LSND/Polymer
8.8-9.0
38-50
12-8
8.0-8.5
I
,/
There will be sufficient mud material on location to maintain hydrostatic control of the formations
encountered at all times.
A mud test shall be performed every 24 hours after mudding up to determine, as applicable: denSity,
viscosity, gel strength, filtration, and pH.
...,/
(,
I
6.
Periodic checks will be made each tour of the mud system. The mud level will be
checked visually.
c.
The concentration of hazardous substances in the reserve pit at the time of pit backfilling
must not exceed the standards set forth il1 the Comprehensive Environmental Response,
Cornpensation, and Liability Act of 1980 (CERCLA).
d.
All oil and gas drilling related CERCLA hazardous wastes/substances removed from a
location and not reused at another drilling location must be disposed of at an EPA approved
hazardous waste facility.
EVALUATION PROGRAM:
The anticipated type and amount of testing, logging and coring are as follows:
a.
Drill stern tests will be run as needed. If drill stern tests are run, following will be adl1ered to:
Initial opening of drill stern test tools shall be restricted to daylight hours unless speci'fic
approval to start during other hours is obtained from the authorized officer. However, DST's
may be allowed to continue at night iI the test was initiated during daylight hours and the rate
of flow is stabilized and if adequate lighting is available (i.e. lighting which is adequate for
visibility and vapor-proof for safe operations). Packers can be released, but tripping shall not
begin before daylight, unless prior approval is obtained from the authorized officer. Closed
chamber DSTs may be accomplished day or night.
A DST that flows to the surface with evidence of hydrocarbons shall be either reversed out
of the testing string under controlled surface conditions, or displaced into the formation prior
to pulling the test tool. This would involve provided some means for reverse circulation.
Separation equipment required forthe anticipated recovery shall be properly installed before
atest starts.
All engines within 100 feet of the wellbore that are required to "run" during the test shall have
spark arresters or water cooled exhausts.
b.
The logging program will consist of a Triple Combo to be run from 1,200' SCP to TO.
c.
c. (; ,..-Y
Cores are anticipated between 8,200' to TO in the Guilmette Limestone formation, (possible ./U
50 rotary sidewall cores).
c:: r1 6 ( "
/4 -.
d.
fv 1'-' (,
/d
Open hole completion with packer, tubing and seating nipple(s). Possible acid stimulation.
In the event that water is encountered in the open hole interval, PXP may elect to run and
cement a 41/2" production liner that will require perforating.
7.
S.
The maximum anticipated bottorn hole pressure is estimated at approximately 6,000 psi
(calculated at 0,5 psi/foot for 12,000' planned TO) resulting in a calculated maximum
anticipated surface pressure (MASP) of approximately 3400 psi based upon a partially
evacuated hole at TO with an average fluid gradient of 0.22 psi/foot. (4.23 ppg EMW)
b.
No hydrogen sulfide gas is anticipated during drilling, however the logging unit will have an ./'
H2S detector for monitoring purposes.
b.
It is anticipated that the drilling of this well will take approximately 30 days.
c.
2.
3.
4,
r""
OBILUNG PROGRAM
Page 9
5.
How the pipe was cemented, including amount or cement, type, whether cement
circulated, location of the cementing tools, etc.
d.
6.
7.
Casing pressure tests after cementing, including test pressures and results.
Section 102 (b) (3) of the Federal Oil and Gas Royalty Management Act of 1982. as
implemented by the applicable provision of the operating regulations at Title 43 CFR
3162.4-1 @), requires that -not later than the 5th business day after any well begins
production on which royalty is due anywhere on the lease site or allocated to a lease site, or
resumes production in the case of a well which has been off production for more than 90
days, the operator shall notify the authorized officer by letter or sundry notice, Forms 3160-5
or orally to be followed by aletter or sundry notice, of the date on which such production has
begun or resumed:
The date on which production is commenced or resumed will be construed for oil wells as the
date on which liquid hydrocarbons are first sold or shipped from a temporary storage facility,
such as a test tank, and for which a run ticket is required to be generated or, the date on
which liquid hydrocarbons are IIrst produced into apermanent storage facility, whichever first
occurs; and, for gas sales as the date on which associated liquid hydrocarbons are first sold
or shipped from a temporary storage facility, such as a test tank, and for which a run tlcket
is required to be generated or, the date on which gas is first measured through permanent
metering facilities. whichever first occurs.
If the operator rails to comply with this requirements in the manner and time allowed, the
operator shall be liable ror a civil penalty of up to $10,000 per violation for each day such
violation continues, not to exceed a maximum of 20 days. See Section 109 @} {3} of the
Federal Oil and Gas Royalty Management Act of 1982 and the implementing regulations at
Title 43 CFR 3163.4-1 (b) (5) (ii).
e.
Revised 1-9-07
Notifications Requirements:
'1.
The BLM in Ely, Nevada (nS-289-1964 Michael Tyler Inspector) will be notified
verbally not more than 48 hours before the well is spudded, or on the next regular
work day.
2.
3.
For verbal plugging orders on drilling locations, the BLM will be notified 24 hours
prior to plugging.
The following standards apply to the abandonment of newly drilled dry or
non-productive wells in accordance with 43 CFR 3162.3-4. Approval shall be
obtained prior to the commencement of abandonment. All formations bearing
usable-quality water, oil, gas, or geothermal resources, and/or a prospectively
valuable deposit of minerals shall be protected. Approval may be given orally by
the authorized officer before abandonment operations are initiated. This oral
request and approval shall be followed by awritten notice of intent to abandon filed
not later than the fifth business day following oral approval. Failure to obtain
approval prior to commencement of abandonment operations shall result in
immediate assessment under 43 CFR 3153.1 (b)(3). The hole shall be in static
condition at the time any plugs are placed (this does not pertain to plugging lost
circulation zones). Within 30 days of completion of abandonment, a subsequent
report of abandonment shall be filed.
,)011}
;V /('~
BOPE Diagram
Minimum Requirements
()tf cic:kIY'
I / /c:)
/0
;1
Fillup Line
Flowline
13-5/8" 3M
Annular
To mud tanks
2"
.bJxi I
3-1/16
11
(ij
:;::l
Co
Possible Upgrade to
Flare line
2"
BOPE Diagram
Minimum Requirements
Fillup Line
Flowline
Annular
To mud tanks
2"
..l-nv'i
3-1/16"
(5
c:
:s.o
Flare line
2"
BOPE Diagram
Minimum Requirements
.
Fillup Line
'"
Flowline
13-5/8" 3M
Annular
"""""q,
..L-.-..".
To mud tanks
2"
3-1/16"
o
Flare line
2"
12,000'
Well Type:
Exploratory
7,460' Gl
Lease Number:
NVN-80835
BOP
Size
Inch
BOP Rated
Working Pressure
Ramsl Annular
BOP Test
Pressures
Ramsl Annular
Total Depth:
Elevation:
Casing
Conn.
Casing
Burst
Rating
psi
Wellhead
Flange
Rating
psi
Casing
Test
psi
PE
NA
NA
N/A
STC
2730
3,000
1500
133/8
5,000/3,000
3,0001 1,500
LTC
5750
5,000
1600
133/8
5,000/3,000
3,000/1,500
TBD
TBD
TBD
TBD
133/8
5,000/3,000
3,000/1,500
};::\
lUMBER
713579-6036]
CONTACT E.MAlqshopkins@plainsxp.com
~
"'
"
""
~
'-l
The onsite inspection for the subject well was conducted on Thursday, October 12, 2006 at approximately
8:30 a.m. Weather conditions were clear, cool and sunny. In attendance at the onsite inspection were the
following individuals:
Bill Wilson
Lisa Gilbert
Michael Tyler
Dave Jeppesen
Mark Lowry
John Longinetti
John Floyd
Steve Hopkins
Lisa Smith
Randy Smith
David Gibson
1.
Geologist
Archeologist Technician
Petroleum Engineering Tech
Visual and Rec Specialist
Range Specialist
Range Conservationist
Surveyor
Drilling and Operations Engineer
Permitting Agent
Permitting Agent
Dirt Contractor
EXISTING ROADS
a.
b.
c.
d.
Vehicles will travel only on deSignated travel ways shown on the map.
e.
Existing roads will be maintained and kept in good repair during all drilling and completion
operations associated with this well.
2.
All proposed access roads are within the lease boundary and a road right of way will not be
necessary.
There will be approximately 0.3 miles of existing access road to be upgraded and 0.3 miles
of new access to be constructed.
b.
The new access road will be constructed as a flat bladed road. Surfacing material will be
placed along the new access to a depth of approximately 4 inches. The running surface of
the road will be a minimum of 14 feet with a maximum disturbed width of 32 feet.
c.
Approximately 2 or 3turnouts will be constructed along the proposed route to allow traffic to
pass safely.
d.
Where the approach leaves Highway 50, it will be modified to meet NDOT standards. The
approach will meet the highway at a 90 degree angle. For the protection of the Old Lincoln
Highway (which parallels Highway 50 on the west side), the approach will be constructed by
placing a minimum of 4" of fill material over the Old Highway road bed. This will prevent
damage to the old road bed. In addition - approximately 6inches of gravel will be placed on
the fill material covering the Old Lincoln Highway. No topsoil will be removed from the old
road bed.
e.
Afterthe road crosses through the Highway fence line -the remainder of the road construction
will include salvaging the top 12" of topsoil in a windrow along the edge of the road and
immediately seeding it with the same interim seed mixture as used for the pad. Reclamation
will be similar to that for the location pad: regarding, ripping the road surface, recovering with
the salvaged topsoil, and final seeding.
1.
Gravel used for pad or access road construction may be placed only after the underlying
topsoil has been salvaged. It may be removed prior to regrading and ripping or left to be
incorporated in the reclamation procedures outlined above.
g.
Culverts, when deemed necessary by the location contractor, will be installed during
construction.
3.
4.
h.
The existing gate in the Highway fence line will be replaced with acattle guard to meet NDOT
standards. If requested by the BlM, agate will be constructed adjacent to the cattle guard.
i.
If production is established, the road to the tank battery site will be upgraded and graveled
as necessary to provide for all weather use.
j.
Surface disturbance and vehicular travel will be limited to the approved location, tank battery
site and approved access road. Any additional area needed will be approved in advance.
b.
c.
d.
If production is established, aproduction facility layout will be submitted via Sundry Notice at
that time. Anticipated production is not known at this time.
b.
All production facilities, including the pump, pump house, storage tanks, and treater will be
painted an earthtone color to blend with the environment.
c.
All flowlines from the well site to battery site will be buried below frost line depth
(approximately 48 il1ches).
d.
Adike will be constructed completely around the production facilities (Le. production tanks,
water tanks, and/or heater-treater). The dikes for the production facilities will be constructed
of compacted subsoil and hold the capacity of the largest tank.
5.
Page 4
e.
Produced hydrocarbons shall be put in test tanks on location during completion work.
f.
All site security guidelines identified in 43 CFR 3162.7 regulations will be adhered to.
Produced water for drilling purposes will be obtained from awater well to be drilled on the well
pad, at the south end of the reserve pit.
b.
c.
The well will be turned over to the Bureau of Land Management at the end of drilling
operations for their continued use for wildlife and stock grazing purposes.
d.
A water well may be accepted by the Ely District upon completion of operations. Please
submit the following information to the Ely District Office, Bureau of Land Management, HC
33, Box 33500, Ely, NV 89301-9408:
1.
2.
3.
4.
5.
6.
e.
6.
Operator requests that BLM allow operator to use water well for future well drilling,
completion, or rework activities in the area.
CONSTRUCTION MATERIALS
a.
If additional gravel is needed (other than that found in the access road or wellpad), then it will
be purchased from a permitted BLM gravel pit or local private source.
7.
8.
b.
No construction materials will be removed from Federal lands unless previously authorized.
c,
All gravel pit permits will be filed with the BlM by the dirt contractor.
b.
The mud tanks will be emptied into the reserve pit. The reserve pit and drilling fluids
contained in the pit will be allowed to dry before backfilling, or pits will be siphoned out and
dispOsed of in amanner approved by the authorized officer of the BlM before the reserve pit
is backfilled. Pit walls will not be breeched so as to drain fluids to the surrounding surface.
c.
All wastes that accumulate during the drilling operations will be contained in atrash cage or
dumpster. Wastes will be removed periodically from the location and taken to an approved
landfill.
d.
Immediately after removal of the drilling rig, all garbage (metal containers, etc.) and debris on
the site will be removed from the site. The reserve pit will not be utilized for trash disposal.
e.
1.
Chemical toilets with holding tanks will be utilized. All sewage will be disposed of in
accordance with county and state regulations. The permittee will comply with all state laws
and regulations pertaining to disposal of human waste.
g.
The produced fluids will be produced into a test tank until such time as construction of
production facilities is completed. Any spills of oil, gas salt water or other produced fluids will
be cleaned up and removed.
ANCILLARY FACILITIES
Atemporary camp may be located on site to house drilling and completion crews during operations.
However, due to the close proximity to Ely, crews will be housed in local motels.
9.
WELLSITE LAYOUT
a.
Prior to any removal of topsoil along the access road or on the wellpad, snow will be removed
and stockpiled adjacent to the road bed or well pad.
b.
Any large trees will be cut prior to construction. The remainder of the trees will be pushed off
and stockpiled adjacent to the wellpad. These trees will be saved for use in final reclamation.
c.
The operator will be responsible for taking steps to mitigate the spread or increased densities
of invasive weeds that result from implementation of the proposed action. The operator will
implement the Ely Field Office Noxious Weed Prevention Schedule and SOPs for weed
treatments, with special emphasis on the following actions. Prior to entering the site, all
construction, drilling equipment, and vehicles will be washed down and cleaned to prevent
the importation of noxious weed seeds from prior places of work. Vehicles will stay on roads
and avoid driving through any weed patched. All seeds used in reclamation will be certified
weed-free. The operator will assist in monitoring for noxious and invasive weeds during the
life of the project, until reclamation is complete.
d.
The top 12" of topsoil, where available, from pad construction will be salvaged, stockpiled
separately from any other material. The topsoil will be seeded immediately with the interim
seed mix in order to stabilize the soil and help prevent the establishment of invasive and non
native weeds. An additional interim seeding may be required.
e.
f.
Cuts and fills and cross sections are also shown on the location layout.
g.
The location of the reserve pit, with respect to the pad and other facilities is shown on the
location layout.
h.
A 12 mil plastic liner will be installed in the reserve pit to prevent loss of drilling fluids through
seepage.
i.
For the protection of livestock and wildlife, all pits containing toxic liquids will be fenced with
3-strands of barbed wire with one strand of smooth wire on the bottom. For the protection
of migrating waterfowl, the pits will be flagged overhead during migration periods. Any oil on
the surface of the pit will be burned off, or otherwise removed. In addition, white flagging will
be tied on the top wire of the reserve pit fencing.
10.
RECLAMATION OF SURFACE
a.
The rathole and mousehole will be filled in imrnediately after the rig is removed.
b.
Interim seeding will be done as soon as possible on any topsoil piles or windrow piles. A
seed mixture for interim reclamation will be provided by the BlM.
b.
Pad reclamation will consist of recontouring, ripping, re-spreading the topsoil, and reseeding
with the final seed mixture which should be planted between October 1 and March 15.
Performance standards for revegetation success are that the reclaimed area will have at least
100% oft the perennial canopy cover of the existing adjacent plant cover. The site will be
evaluated by the Ely BlM for vegetative progress after at least one full growing season. If not
successful, the BlM reclamation specialist will review the reclamation procedures with the
operator to decide on the best course of action to achieve success.
c.
The operator or his contractor will contact the Bureau of land Management in Ely, Nevada
(775) 289-1800, 48 hours prior to commence of site reclamation work and upon completion
of restoration measures.
d.
All disturbed areas will be recontoured to conform as near as possible to the natural contour.
This includes removing all berms and backfilling all cuts.
e.
All disturbed areas will be ripped in both directions (criss-cross) to break up the compacted
soils. The stockpiled topSOil will be evenly spread over the disturbed area.
f.
The operator will be responsible for complete control of any noxious weeds that become
established within the project area during the life of this project through final reclamation. This
would include the responsibility for control of noxious weeds along the access roads, pad
location, and any water and gravel sources.
g.
Noxious and invasive weeds, which may be introduced due to soil disturbance and
reclamation, will be treated by methods to be approved by the authorized officer. These
methods may include biological, mechanical, cultural or chemical. Should chemical methods
be approved, the lessee must submit a Pesticide Use Proposal to the authorized officer 60
days prior to the planned application date. All BlM and Ely Field Office SOPs for weed
treatments will be complied with. Copies of all Pesticide Application Reports will be provided
to the Ely Field Office Weed Coordinator and to the Nevada Department of Agriculture.
11.
12.
h.
i.
If the well is plugged and abandoned, the surface casing will be cut off three (3) feet below
reclaimed ground surface (with a metal plate affixed to the top. The metal plate will be
inscribed with the operator's name, well number, well location (1/4 1/4, Section, TownShip,
Range, etc.) and federal lease number.
j.
If the water well on location is taken over by the BlM, then the access road will not be
reclaimed and will be left in place for use by the grazing lessee.
SURFACE OWNERSHIP
Wellsite -
Roads -
OTHER INFORMATION
a.
AClass III archeological study has been conducted by Kautz Environmental. No significant
cultural resources (eligible for the NRHP) were found during the field inspection and
clearance for this project has been recommended. A copy of this report will be submitted
directly to the appropriate agencies by Kauthz Environmental..
b.
If sub-surface cultural materials are found during any work phase, the BlM must be notified
immediately. Construction will cease until the resource has been properly investigated and
mitigated.
c.
The BlM will be notified 48 hours in advance of any construction at the drilling or wellsite,
unless otherwise authorized.
13.
d.
"Sundry Notice and Report of Wells" (Form 3160-5) will be filed for approval for all changes
of plans and other operations in accordance with 32 CFR 3164.
e.
The dirt contractor will be provided with an approved copy of the surface use plan.
f.
Surface operations will follow the Surface Operating Standards and Guidelines for Oil and
Gas Exploration, Gold Book and the Conditions of Approval (COAs) contained in the Egan
Resource Management Plan, Oil and Gas Leasing Amendment and Record of Decision.
PERMITCO INC.
Lisa L. Smith
14421 County Road 10
Ft. Lupton, CO 80621
303/857-9999
CERTIFICATION
I hereby certify that I, or persons under my direct supervision, have inspected the proposed drill site
and access route; that I am familiar with the conditions which currently exist; that the statements
made in this plan are, to the best of my knowledge, true and correct; and that the work associated
with the operations proposed herein will be performed by Plains Exploration and Production
Company, its contractors and subcontractors in conformity with this plan and the terms and
conditions under which it is approved. This statement is subject to the provisions of 18 U.S.C. 1001
for the filing of a false statement.
November 91 2006
Date:
":f~lA. )J0l ~ )
LEGEND:
EXISTING ROAD
- - - - - - - - - - - PROPOSED ACCESS ROAD
II'
LEGEND:
PRODUCING WELLS
-+-
ABAt'liDONED WELLS
SHUT IN WELLS
TEMPORARILY ABANDONED
KIll
n
SCALE: 1"
50'
DATE: 10-02-06
:>
v"",
6!
I. 63.8'
C-1B.IJ
fm. pit)
~!
,h,>,
L..Jln
N
35'
::::::
~,!!:l'
!)S
'Q:l ~
Cl
:'-(;::
.ct
V}
!U~
s '- Cl.
11n
:r:
u
z
w
m
\\
RESERVE PITS
....
~G}
I!?
59.1'
~jC-(4'
Sto. .!..QQ.
(8' De8p)
.....
0..
o..J
If)
....
~~
125'
If)
I
.
\1_1 ~
' WI!!l!!!\~
~_ \
\
\ ~ ~M Tnneni/~
\ "111
. '
.
I. 67.0
\~c.:::5.2J) \
-~Bac~fi//\' I. 60.9'/ ~
C-19.3'
;SSpoilS Stockptle
-:I
C-l.3)
I. 51.0'
7356.8:
7355. 7
t- ;fjSto. 0+00
"0
N
X-Section
Scale
," = so'
DATE: 10-02-06
Revised: 10-18-06
3S'
- - -- -
12S'
Finished Grode
?:!!:J.::'<~:;:E2>~ :.,
STA. 3+20
--
80'
--
35'
125'
CUT
STA. 1+50
10'
80'
-- --
3S'
12S'
Slope= 1 1/2: 1
(7}p.)
CUT
- - - / ';!;~~~nstruction
STA. 1+00
-- - -- --- --
12S'
1--
NOTE:
Remaining Location
-- -- --
STA. 0+00
* NOTE:
APPROXIMATE YARDAGES
12S'
=
=
TOTAL CUT
FILL
EXCESS MATERIAL
EXCESS UNBALANCE
(After Rehabilitation)
Cu. Yds.
zoo
DATE: 10-02-06
Revised: 10-18-06
I.
c:
NOTE:
Flare Pit is to
be located a min.
of 100' from the
Well Head
'0
"
I-----l
III
::.::
-'
FLARE PIT
I-----l
III~I
35'I , +
PIPE RACKS
DOG HOUSE
r-J
125'
RIG
Vl
:.:
a::
:;;:
l-
RESERVE PIT~
:r
u
w
w
'0
::::I
::E
St~.
(8' Deep)
CD
.........
LO
"
HOD
1"OILET
W
Il..
HOPPER
...J
(f)
POWER
~O
TOOLS
L.......l--l
FUEL
TRASH
ARCHEOLOGY
A Class III Archeological Survey for the above mentioned location has been conducted by
Kautz Environmental. Noi significant cultural resources (eligible for the NRHP) were found and
clearance for the project has been recommend. A copy of this report will be submitted
directly to the appropriate agencies directly by Kautz Environmental..
PXP
Re:
Gentlemen:
This letter is to inform you that Permitco Inc. is authorized to act as Agent and to
sign documents on behalf of Plains Exploration & Production Company (PXP) when
necessary for filing county, state, and federal permits including Onshore Order No.1, Right
of Way applications, etc., for the referenced wells.
It should be understood that Permitco is acting as Agent only in those matters stated
above and is not responsible for drilling, completion, production, or compliance with
regulations.
Plains Exploration & Production Company (PXP) agrees to accept full responsibility
for operations conducted in order to drill, complete, and produce the above-mentioned
wells.
If you have any questions, please call me at (713) 579-6036.
StePhen R. Hopkins
Sr. Drilling Engineer
cc:
Wayne McBride
Randy Vines
Bud Simmons
Scott Cowand
1021 Main Street, Suite 2100 Houston IX 77002 7135796610 Fax:: 713-579-6611
14421 County Rd. 10 Ft. Lupton, Colorado 80621 (303) 857~9999 FAX (303) 857~0577 E-MAIL Permitco l@aolcom
RECEIVED
November 9, 2006
NOV 1 3 2006
~ivision
of Minerals
Dear Christy,
Enclosed please find three copies of the Application for Permit to Drill for the subject well along with
our check in the amount of $200.00 to cover the application fees. Also a copy of the Onshore Order No. 1
(Drilling and Surface Use Plan) which have been filed with the BlM offices in Reno and Ely.
If you should have any questions regarding the enclosed data, please feel free to contact me at the
number shown above. Thank you for your assistance.
Sincerely,
PERMITCO INC.
~a1~~~
Tabatha Parker
Consultant for
PLAINS EXPLORATION AND PRODUCTION COMPANY
Enc.
cc:
..
PERMITCO INC.
21188
111912006
Js
$"200.00
__________________________________________________
__ _______ __________________________ DOUARSW
Two Hundred and 001100..................... .... .......................................................
A
Ij
~44..p.~("/
........
1110 2 ~
~E.alll ~I: ~O
21168
PERMITCO INC.
11/9/2006
200.00
RECEIVED
NOV 1 3 2006
Division of Minerals
200.00
II!
~"
09/11/2006
10:27
7758616711
I '--V'I-III W ..........
PAul:.
114/110
~;uu
OF STAKING
OilWellW
Gas Well
NVN..a0835
6. If Inelian, Allottee or Tribe Name
N/A
2, Name of Operator
(303) 857-9999
5. Lease Number
SEP 052006
AM.
NlA
8, "Farm or Lease Name
1271
Wildcat
12,000'
Guilmette Limestone
13. State
Nevada
a. H2 S F30tential
None Anticipated
T18N R61E
Aeres
!gpo Map!
1,280.00
Robinson Summit
cc:
13. Signed
14:
JtR(JJIJl~
Consultant for:
Title Plains Exploration &Production ComE!ny Date
91112006
0'3/1112006
HI: 27
7758616711
LEGEND
Proposed Location
Lease Boundary
PAGE
135/135
BOPE Diagram
Minimum Requirements
Fillup Line
~jo'}
r
Flowline
'7 /V\
13-S/8" 3M
1",
Ct ",.} \' .
Annular
\II
To mud tanks
2"
o
.l--n......,'
3-1/16"
7ii
Possible Upgrade to
~
Flare line
2"
( ; I,'
/1
~,
. ( " a..
r/
d.
. ,,11-6-[1 & 0
.rJJ(1,
5.
How the pipe was cemented, including amount of cement, type, whether cement
circulated, location of the cementing tools, etc.
6.
7.
Casing pressure tests after cementing, including test pressures and results.
Section 102 (b) (3) of the Federal Oil and Gas Royalty Management Act of 1982, as
implemented by the applicable provision of the operating regulations at Title 43 CFR
3162.41 }, requires that "not later than the 5th business day after any well begins
production on which royalty is due anywhere on the lease site or allocated to a lease site, or
resumes production in the case of a well which has been off production for more than 90
days, the operator shall notify the authorized officer by letter or sundry notice, Forms 3160-5
or orally to be followed by a letter or sundry notice, of the date on which such production has
begun or resumed."
The date on which production is commenced or resumed will be construed for oil wells as the
date on which liquid hydrocarbons are first sold or shipped from atemporary storage facility,
such as a test tank, and for which a run ticket is required to be generated or, the date on
which liquid hydrocarbons are first produced into apermanent storage facility, whichever first
occurs; and, for gas sales as the date on which associated liquid hydrocarbons are first sold
or shipped from atemporary storage facility, such as a test tank, and for which a run ticket
is required to be generated or, the date on which gas is first measured through permanent
metering facilities, whichever first occurs.
If the operator fails to comply with this requirements in the manner and time allowed, the
operator shall be liable for a civil penalty of up to $10,000 per violation for each day such
violation continues, not to exceed a maximum of 20 days. See Section 109 } (3) of the
Federal Oil and Gas Royalty Management Act of 1982 and the implementing regulations at
Title 43 CFR 3163.4-1 (b) (5) (ii).
e.
f'~
Do IV-
j"'\ 0
Notifications Requirements:
1.
The BLM in Ely, Nevada (775/289-1800) will be notified verbally not more than 48
hours after the well is spudded, or on the next regular work day.
2.
h ~(p-n "01),-
14421 County Rd. 10 Ft. lupton. Colorado 80621 (303) 857-9999 FAX (303) 857-0577 E-MAil Permitco l@aol.com
RECEfVED
January 12, 2007
JAN I 8 2007
Division of Minerals
Dear John,
As per your recent telephone conversation with Steve Hopkins of Plains Exploration, attached please
find revised pages 2 (and 3 for Pluto #271 only) along with BOP Diagrams for each. Also attached is
supplemental information regarding casing burst pressures for each we" which have been prepared by Mr.
Hopkins.
I apologize for the confusion in getting this information to you. We are hopeful that the enclosed
information wilf allow you to approve our APD for the Pancake well next week.
If you have any questions regarding the enclosed material please don't hesitate to contact me.
Sincerely,
PERMITCO INC
..-y?~ _ A '\l
~U
;7& /
ruttiYJ1-/
Lisa Smith
ConSUltant for:
PLAINS EXPLORATION AND PRODUCTION COMPANY
Enc.
cc:
~j
3.
PC.r,~cJ/(.,u:J
pF
1/':>
':::JfV\,
Ram type preventers and associated equipment shall be tested to approved stack working pressure
if isolated by test plug or to 70 percent of internal yield pressure of casing if BOP stack is not isolated
from casing. Pressure shall be maintained for at least 10 minutes or until requirements of test are met,
whichever is longer. If a test plug is utilized no bleed-off pressure is acceptable. For a test not
utilizing atest plug, if adecline in pressure of more than 10 percent in 30 minutes occurs, the test shall '~
be considered to have failed. Valve on casing head below test plug shall be open during test of BOP
stack.
Annular type preventers (if used) shall be tested to 50 percent of rated working pressure. Pressure
shall be maintained at least 10 minutes or until provisions of test are met, whichever is longer.
As a minimum, the above test shall be performed:
a.
when initially installed;
b.
whenever any seal subject to test pressure is broken
c.
following related repairs; and
d.
at 30-day intervals
Valves shall be tested from working pressure side during BOPE tests with all down stream valves
open.
When testing the kill line valve(s) the check valve shall be held open or the ball removed.
Annular preventers shall be functionally operated at least weekly.
Pipe and blind rams shall be activated each trip, however, this function need not be performed more
than once a day.
A BOPE pit level drill shall be conducted weekly for each drilling crew.
Pressure tests shall apply to all related well control equipment.
All of the above described tests and/or drills shall be recorded in the drilling log.
3M
"oJ
.. I A '1
('.
v'
[{J. ;f;.! V
ONSHORE ORDER NO.1
Plains Exploration and Production Company
PXP Pluto #271
1865' FSL and 905' FEL
NE SE Sec. 27, T1 BN - R61 E
White Pine Coun!y, Nevada
lpf
JJr(
'//{)
}(/r
The choke manifold, BOP extension rods and hand wheels will be located outside the substructure.
The hydraulic BOP closing unit will be located at least 100 feet from the wellh.~~~ with the remote
control unit on the rig floor. The casing head and BOP will be flanged 5l QOO psi wl0 Kill line will be
2" Ld. with burst pressure rating of at least 3,000 psi. These items will be pressure tested concurrently
with BOP's. The BOP will be tested whentne stack is first installed on the well. It will also be tested
at each casing shoe and at least every 30 days. BOP and choke manifold sizes will be in accordance
with API-RP-53 as per the attached. See attached schematic of choke manifold.
4.
a.
The size and rating of the BOP stack is shown on the attached diagram.
b.
Achoke line and a kill line are to be properly installed. The kill line is not to be used as a
fill-up line.
c.
The accumulator system shall have apressure capacity to provide for repeated operation of
hydraulic preventers.
-./
d.
Drill string safety valve{s), to fit all drill string connections in use, are to be maintained on the
rig floor while drilling operations are in progress.
The proposed casing and cementing program shall be conducted as approved to protect
and/or isolate all usable water zones, potentially productive zones, lost circulation zones,
abnormally pressured zones, and any prospectively valuable deposits of minerals. Any
isolating medium other than cement shall receive approval prior to use. The casing setting
depth shall be calculated to pOSition the casing seat opposite a competent formation which
will contain the maximum pressure to which it will be exposed during normal drilling
operations. Determination of casing setting depth shall be based on all relevant factors,
including; presence/absence of hydrocarbons; fracture gradients; usable water zones;
formation pressures; lost circulation zones; other minerals; or other unusual characteristics.
All indications of usable water shall be reported.
b.
Casing design shall assume formation pressure gradients of 0.44 to 0.5 psi per foot for
exploratory wells (lacking better data).
c.
Casing design shall assume fracture gradients from 0.70 to 1.00 psi per foot for exploratory
wells (lacking better data).
-;,'
c;;
'i'
7
<;.
STATE OF NEVADA
COMMISSION ON MINERAL RESOURCES
DIVISION OF MINERALS
400 W. King Street, Suile 106
Carson City, Nevada R9703
(775) 684-7040 Fax (775) 684-7052
http://minerals,state,nv,us/
KF.'1'1Y C. G'JIr-ir-i
(iOI't!rltor
AI_AN R. COYNER
Administrator
December 8, 2006
Vanessa Langmacher
Permitco
RE: Plains Exploration and Production Company, Applications to Drill PXP Pancake Summit 21-1 and
PXP Pluto 27-1, White Pine County, NV
Ms. Langmacher:
TIlls office has received and reviewed the subject permit applications. We are in receipt of a letter from
the BLM Nevada State Office referencing a number of deficiencies in these applications. The Division
must advise you of additional correction to the applications which must me made:
Suiface Use Plan, WeI/site Layout, (i) Any oil on the suiface ofthe pit will be burned off, or otherwise
removed.
.C~-, /
-/.~
Christy L. Morris
Oil Gas and Geothermal Program Manager
Nevada Division of Minerals
cc:
P;ltrkl Fag..lll;
(/('Olhl'fluut Rt..',\"OUrrf'S
R'~l
OEC 0 1 2006
3160/N-80835
N-76524
(NV-920)
~f.~~0Il
.~~ {'
Re: Operator: Plains Exploration & Production Co, Lease Number: NVN- 80835, Well:
PXP Pluto No. 27-1, NE~ SE'4 Section 27, T. 18 N., R.61 E., White Pine County,
Nevada.
Operator: Plains Exploration & Production Co, Lease Number: NVN- 76524, Well:
PXP Pancake Summit No. 21-1, NE~ SE'4 Section 21, T. 18 N., R.56 E., White
Pine County, Nevada.
Dear Ms. Parker:
The above-referenced Applications for Permit to Drill (APD's) were received on November 13,
2006. According to the guidelines presented in Onshore Order No.1 and No.2:
_X_ APD is deficient in the following areas:
PXP Pluto 27-1 Al?Plication for Permit to Drill:
~ Drilling Program No. 8e Notification Requirements.
The BLM in Ely, Nevada phone number 775-289-1800 is incorrect. The number should
~ BOPE
On the same page it states the 13 5/8'" 3 M x 13 5/8 "5M combination spool & the 13
3/8" SOW 3M Braden Head. Should this be 5M?
~ Pursuant
2
);>
Existing Roads
Directions, states to turn right on to the proposed access road, should this be tum left on
to the proposed access road?
This states that the BLM Tonopah office will be contacted. This should be the Ely Field
office Bill Wilson 775-289- 1882
_X _APDs are being processed; final action pending receipt of further infonnation as noted
above.
A retained but deficient APD must be brought to a technically and administratively acceptable
level of completion within 45 days of the date of this notice or the application will be returned
unapproved.
Sincerely,
ATANDA cLARK
Atanda Clark
Deputy State Director
Minerals Management
cc:
Nevada Division of Minerals
400 W. King Street, Suite 106
Carson City, Nevada 89710
FM, Ely (NV-040)
NV-923
0-
~ rlnti~iUt~ii!11't1Mgi~
VISit our website at WWW.usps.com
.::t"
P08IIIge $
r-'I
Certified Fee
Postmalk
Here
I
F-Il-$ ------1
~ ~~----~~~~~~~~~~--~ww"__
R~;~:~T:~~:;~R!:.;~~~~J;~~. .~.!.~??.~.~~l
CJ
0-
g:
(Endorsement Required)
STATE OF NEVADA
COMMISSION ON MINERAL RESOURCES
DIVISION OF MINERALS
1702,41'(>-130
.IIM GIBBO'$
GI'.'l!rnor
Fa~
no:! J4Str-l.1-15
AL\, R. COYlIiER
Administrator
May 7, 2008
Company's Pluto 27-1. The confidential period for this well ended March 2, 2008.
'~
~~
-."
Administrative Assistant IV
Enclosures
Pro~/Ncltf!~
R,}JJ Pam:Ht. \
It
SUbmlf6yEmaifi
STATE OF NEVADA
COMMISSION ON MINERAL RESOURCES
DIVISION OF MINERALS
Company or Operator
Zip
Lease name
,,
.......
,. ....
,
, ,,.........
,,
.......-_ ..
.. --- ,,...... ...... -
,
,,
,, ,,
,
,,
,, ....,,
_.... .. .. _--:,..... _
.......... -. ....
.. ""r"' .....
:,
,,,
.. f
"--r"-'"
~---
, T. 18N
Wildcat
Field
_,
1848
The well is
TX
within the
If.
NE
SE
If.
888
M.D.B.M. Permit No.
White
Pine
County
16E
,R.
908
.-
Address
NVN-80835
,
,,
Lesseei!
_ , ........
State
the section. (Give location from section line, cross out wrong directions.)
If patented land. fee owner is
-
,
:, ,
,
...
........
. . --r .... ......,..
. .
,
,
~--
271
Well No.
27
~t--
.~-
Sec
Houston
City
713/5796045
Telephone
PXP Pluto
Address
Plugging Date
7/31/07
Section 27
1. Rib Hill
~ Ely
955
1855
1855
4110
3. Chainman
4]10
9643
4.__.....__________________________
BOTTOM
7.
~
5.
1.
2.
3.
4.
TOP
6.
8.
9.
10.
TOP 4524
TOP
TOP
TOP
BOTTOM
BOTTOM - - - -
BOTTOM _ _ _ __
BOTTOM _ _ _ __
Give data on rate of Inflow and elevation to which water rose in hole.
1.
2.
3.
4.
TOP N/A
TOP
TOP
TOP
BOTTOM
BOTTOM
BOTTOM
BOTTOM
CASING/LINER RECORD
Sizelwt.
Shoe depth
Perfs. from-to
PLUGGING RECORD
Top Depth
Bottom Depth
1
2
3
4
5
ppg.
TX;".;.....__
State ....
. 20,.:.0.::;..8_ _
(512412007 LV)
Size of casing
Yield Cement
ttjsxs
CMT. Density
Method used
Where set
()D
Shell
used
Size
Depth Treated
Explosive or
Quantity
Date
chemical used
From
To
Depth
cleaned out
I
w/A
2
3
I
-
Put on production
PIA/{ %167
PRODUCTION , 20
. Time:
Ja.m.) (p.m.)
Size of tubing
Make choke_ _ _ _ _ __
Size of choke
FOR PUMPING WELL:
Length of stroke used
inches
Number strokes per minute
Size of working barrel_~-_ _ _ _ _ _ _ _ __
FOR OIL WELL:
Production of first 24 hours was
barrels of fluid
Percent water
Percent sedime-n""'t--------------
Percent emulsion
Gas-oil ratio this w-e":':'I1-------------- (cu. ft. gas per barrel of oil)
FOR GAS WELL:
Cubic feet of gas first 24 hours
Gallons of gasoline per MCF g a - s - - - - - - - -
Type of Survey
Company
Date
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Attach to this record two (2) copies of all formational, electrical, radioactivity logs and deviation surveys,
I hereby certify that the information given herewith is a true, correct and complete record of this well and all work done
on it so far as can be determined from the available records.
Name
5iJe//a.
Position
2hf.1Li; sf
Company or Operator ______________
Form 5 - OG_WellCompleUonRpCFlv3.doc
k'e:2
S.
~I
tJ ()
20.~p..{oCI...-_
(512212007 LV)
STATE OF NEVADA
DIVISION OF MINERALS
a.n/i?nJu.ci.'()!t 0,.
f'Xp
~;;::s /0:1/ /J24Ut, 110" Ita. IX 77rh'l-
1?1a/lI.sEN/or-:f}t1J)
WELL LOCATION
lmL.J.--i... LuLJ.--l.J
027-/
in lYe
T. /11"
. R / ItE
M.D.B.&M.
County WI" 'f... A'13 e...
Well No.
i--+-...;..--t-..........-+--i-;--I
.w . . . , _................. ~...
Section caS 1
I Jfl9' ,c=s-.t.I!..,I~1()-I-';:.-..,.f,-I-,
Drilling Commenced
Drilling Contractor
= .5il/o 7
1/4 of
SE
PI~tD
Lease
1/4 of Sec.
,1.
~ ~
.' to,'!'&!. f
Permit Number
fKf
Completed
7
Field
A'4-6'rs .)nll.,"1 __
/11, G"'r e.e 4 So Rd., ?2'4 ,.1 fL I
0 lib
Address S/S
60 0 p
"-fa f,,, I T X 7 7 d ~
Total Depth of Well _...t..'l...!!ki:-4..:....;:3
______
Elevation above sea level in feet: Surface
'1~g57
KB _--';;".{.l..:3=--._ __
Method determination _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~
GEOLOGICAL FORMATIONS
NAME
6.
1155
.-~~~------~~------~BO~TT~O~M~'
/-10
TOP
BOTTOM
7.
8.
9.
10.
1.
2.
3.
4.
TOP
TOP
TOP
TOP
45.2
BOTTOM
BOTTOM
BOTTOM
BOTTOM
""'.5" /
--.-J
BOTTOM
BOTTOM - - - -
BOTTOM
BOTTOM - - - -
Give data on rate of inflow and elevation to which water rose in hole.
T.D._ _ _ _ __
1. TOP
BOTTOM
REMARKS _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
2. TOP
BOTTOM
REMARKS
___
3. TOP
BOTTOM
REMARKS
4. TOP
BOTTOM
REMARKS ___________________________
RECORD OF DRILL STEM TESTS AND SPECIAL TESTS
(Submit reports on separate sheet showing depths, dates, duration of tests, results. and attach hereto)
CASING RECORD
Perforated
Amount
Amount
Weight (Ib) per
Size
Shoe
Make
Purpose
Set
foot
Pulled
From
To
1
2
3
4
5
6
,
~
Fonn 6 OG_WeIlCompletlonRpcFlv3.doc
(OVER)
(512212007 LV)
~<fJ
~.D_ r~iitl
!!
I
cfiIGH'fJEFlN11!lON lNJJUCfffJNLOGJ!tf
'. . . CfJllPBNSA.f'ED Z..:DBNSllIlr: ''''i;',
'(]JJJ(PENSAf':EJ) NEIl1'JlfJN.iOG
'BAKER
HUGHES
~i'~aalias
f,I'ID;"~!I;:'
D~l'Ker'~
(FmB1/CombmedRuD.s)
PLAINS EXPLORATION &: PRODUCTION
PLUTO 27-1
WILDCAT
WHITE PINE
STATE NEVADA
API NO:
27-033-05318
COMPANY
WELL
FIELD
COUNTY
Ver. 3.87
LOCATION:
fiLE NO:
13933
OTHER SERVICES
SEC 27
PERMANENT DATUM
GL
KS
KS
! DATE
ZOL/CN
905' FEL
TWP 18 N
RGE 61 E
EU:VATION
21 FT
.:...;735=-:-7..;...FT..:..-_ _
ABOVE P.O.
19-Ma~,..2007
I RUN
i SERVICE ORDER
I DEPTH DRllliR
DEPTH lOGGER
BOTTOM LOGGED INTERVAL
TOP LOGGED INTERVAL
CASING DRILLER
CASING LOGGER
BIT SIZE
TYPE OF FLUID IN HOLE
Ulg"SrrL_
VISCOSITY
PH
I FLUID LOSS
SOURCE OF SAMPLE
RM AT MEAS. TEMP.
RMF AT "EAS. TEMP.
RMC AT MEAS, TEMP.
SOURCE Of RMf
RMC
RM AT BHT
i TIME SINCE CIRCULATION
MAX. RECORDED TEMP.
i EQUIP. NO.
! LOCATION
. RECORDED BY
__J
l1
TRIP
, 529453
[1629 FT
1582 FT
1582 FT
OFT
20 IN
133 FT
17.5 IN
0122 FT
WBM
8.6 LS~
NA
FlOWLINE
NA
NA.
o
o
NA
3
60.9 DEeF
I SISTRUNK
7m FT
7357 FT
13-JUN-2007
2
529113
4750 FT
4658 FT
4656 FT
1589 FT
13.375 IN
1589 FT
12.25 IN
11
.1590 FT
8.5 LS/G
130 S
9 . 0 1 3 0 C3
FU7tfLiNE
NA
0
NA.
0
NA
INA
It
HL671S
7:r18 FT
WBM
135
NA
MEASURED
va IGT/BARNElT
ELEVATIONS:
KB
OF
GL
I MEASURED
NA
NA
INA
0
14 HRS.
I ROCK
SPGS.
71 OEGF
HL-6685
IRK.SPRINGS
YARBOROUGH
r&iI
BAKER
HUGHI
EA TH IMAGE}
COMPANY
WELL
FIELD
COUNTY
LOCATION:
STATE
SEC
TWP
ELEVATIONS:
KB
DATE
\.,1
\.t_"-_"
,~,~,~ . ~,
r.JV
DF
Ece
~~_GL
..:-.::V:..;.'..;V:;;_.:...;:"':..;....
.:::..;_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
~sca
r~iill
BAKER
HUGHES
COMPANY
PLAINS EXPLORATION
WELL
FIELD
~PL=uro~~2~7-~1~
COUNTY
WHITE PINE
~PUTITI~~
___________________________
_______________________________
STATE
=NEV=.;. ;:;.;;;AD=A=--_________
LOCATION:
27
TWP lBN
KB
7378 FI'
DF
RGE . !:-'Sl=E'------_ __
ELEVATIONS:
DATE
22
MA~
2007
7377 FI'
ECC . ~. ~ . __
GL
7357 FI'
~K8
f52
N4
t:~VtU
r&iill
looaBAKER
t'
.. i.' . .
HUGHES
.ClJMPENSA.'PED N~li'hfJCf""
GlUlJIl1tJ. Ray ".-:';.
. .' Caliper
.... '"
,',
M:n\,,:rals
'
Baker Atlas
API NO:
27-033-05318
COMPANY
WELL
FIELD
COUNTY
Ver. 3.87
LOCATION:
FILE NO:
13933
..'
lOL/eO~ERVICES
SEC 27
PERMANENT DATUM
LOG MEASURED FROM
GL
KB
RGE 61 E
TWP 16 N
ELEVATION
KB
21 FT
7357 FT
ABOVE P.O.
..lo.' ')'
L
.'"'-'
....
UP."--
/":
""
..... ""
\Y
19-May-2007
DATE
RUN
I TRIP
1
U.
I SERVICE ORDER
529453
DEPTH DRILlER
1629 FT A
~
t DEPTH LOGGER
1582 FJ"'IIt." ' "
BOTTOM LOGGED INTERVAL
1~a2..:~
TOP LOGGED INTERVAL
o..r~~
0122 FT
I CASING DRILlER
~1IIV
CASING LOGGER
~r!
17.5 IN
I BIT SIZE
.....
TYPE OF FLUID IN HOLE "'-.),. " WBU
I DENSITY
J35 S
I VISCOst'F{ " " 8.6 LB/G
PH
NA
I FL.UJ~SS
INA.
FLOWLINE
SOURCE OF SAMPAt 1. ....
0
NA
RM AT MEAS.
0
RMF AT MEA~~'
NA
! RMC AT MEAS. TEtfp.
NA
i SOURCE OF RWF
MEASURED
I MEASURED
L RMC
@
i RIA AT BHT
NA.
I TIME SINCE CIRCULATION
3
MAX. RECORDED TEMP.
60.9 DEGF
I EQUIP. NO.
I LOCATION
HL6715
I ROCK SPGS.
, RECORDED BY
VOl GT/BARNm
SISTRUNK
I WITNESSED BY
.....
~~
:) ,
KB
DF
GL
ELEVATIONS:
7378 FT
7377 FT
7357 FT
13-JUN-2007
2
529113
4750 FT
4656 FT
4656 FT
1589 FT
13.375 IN
1589 FT
12.25 IN
WBU
8.5 LB/G
9.0
FLOWLINE
NA.
NA.
NA.
NA
NA.
14 HRS.
71 DEGF
HL-6685
01590 FT
130 S
130 C3
0
0
.
.
INA.
YARBOROUGH
PENA (VIA WELLINK)
1
1
~~
COMPANY
WEIL
PLUTO #27-1
FIELD
COUNTY
WHITE PINE
STATE
~mN~AD=A~
___________
LOCATION:
TWP
RGE
=..;~.=~'--_ __
ELEVATIONS:
KB 7382.6 IT DF
DATE
20-JUN-07
GL
r&ii1l
BAKER
2 5 Z007
Jivislon
HUGHES
Mmerais
COMPANY
PLAINS EXPIDRATION
WELL
PWI'O 27-1
FIELD
WILDCAT
COUNTY
WHITE PINE
LOCATION:
=NEV=AD=A~_ _ _ _ __
ELEVATIONS:
KB
DATE
STATE
7382.6
6 JilL 2007
TWP lBN
rr DF 0 IT
RGE
~61=E,--_ __
GL
7357 IT
ECC 7079.02
___________________
+",c',
STATE OF NEVADA
DIVISION OF MINERALS
.o-
---
----
--
----~--. ----~...
+--+--+--+--+:-+--+:--;
_..f...
__
__
u n h __
.on:'.__
::
i
--+- ---- .--
----1--- ____:.u_
11f'~' pst:. f
?!P
WELL LOCATION
r---:---.-----:--,----:-........,.~.-,
Company
Address
Well No.
T. /J'#
County
PI~t()
Lease
..<z....1
. R.
tv h,'/-c.
'
lYe
in
~E
M.D.B.&M.
A'tle....
=.5hIe
114 of
Field
SE
1/4 of Sec.
;< 7
., tv/Cd(!#.
Permit Number
fKf
0 h
Drilling Commenced
7
Completed
IJ
7
Drilling Contractor --<..:!1"""d-;.;..."=-.:::.ole'-'s""--'j)lC::'-t"'-'d'--"/...:...,\="1T-_ _ _ _ _~-~----
Address $ / 5
Method determination
"fa I 'Pet
-----------------------------------------NAME
TOP
BOTTOM
6.
7.
1.
2.
3.
4.
TOP
TOP
TOP
TOP
4s..2
8.
9.
10.
s,
BOTTOM _ _ __
BOTTOM _ _ _ __
BOTTOM _ _ _ __
BOTTOM
Give data on rate of inflow and elevation to which water rose in hole.
1.
2.
3.
4.
TOP
TOP
TOP
TOP
BOTTOM
BOTTOM
BOTTOM
BOTTOM
T.D._ _ _ _ __
REMARKS ____________________________
REMARKS _____________________________
REMARKS
REMARKS----------------------------
3
4
5
6
~'--
(OVER)
(512212007 LV,
Size of hole
Size of casing
Where set
No. sacks of
cement
'II!'"'"
Method used
Yield Cement
ft.lsxs
CMT. Density
/'0
bO
Shell
used
Size
Explosive or
chemical used
Quantity
Depth Treated
From
To
Date
Depth
cleaned out
A//A
1
2
Put on production
D (AI
r'int(
PRODUCTION
2167
'--
.
,20 _ _._. Time:
(a.m.) (p.m.)
Gas..oil ratio this w - e " l ' l ' U - - - - - - - - - - - - - (cu. ft. gas per barrel of 011)
FOR GAS WELL:
Cubic feet of gas first 24 hours
Gallons of gasoline per MCF g a - s - - - - - - - -
LOGS AND ADDITIONAL RECORDS
Type of Survey
Top
Bottom
Date
Company
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Attach to this record two (2) copies of a/l formational, electrical, radioactivity logs and deviation surveys.
I hereby certify that the information given herewith is a true, correct and complete record of this well and all work done
on it so far as can be determined from the available records.
5A
kI~4
Pr,Ju;'.I/01'!.. A-hLh,~-f
Name
e!,'a..
Position
Company or Operator
Form 5 - OG_WeIiCompletlonRpLFlv3.doc
..4'Jtt, it
Address /"';( I
City
Date
~.~
/'te:!,t.,!'j
:5..:::1/ ,
(J
Stater>{Z7(1o:J, 20..!:;~a.W_ _
(512212007 LV)