FICHTNER

Fichtner's fields of activity in Energy Sector:


Conventional Power Plants
Steam, gas turbine and combined-cycle power plants, combined seawater desalination and power plants,
hard coal- and lignite-fired power plants, industrial power plants, waste-to-energy plants, diesel power
and IC cogeneration plants
Renewable Energies
Hydropower, solar thermal, photovoltaics, onshore and offshore wind power, biomass, geothermal energy.
Energy Transport and Distribution
Electrical networks, switchgear, SCADA systems, electrical system studies, network studies, district
heating and cooling networks
Smart Grids
Smart grid strategies and roadmaps, Grid development, Information and communications technology
(ICT)
Electric Mobility
Energy Management
Optimization of power plant deployment, energy data management, load forecasts
Energy Economy
Techno-economic analyses, market studies, tariff studies, master plans, energy efficiency consultancy,
political incentive tools
Oil and Gas
Pipeline systems, LNG and LPG facilities, gas treatment and storage, compressor stations & pumps

Range of engineering and consulting services


In all phases of your project, we provide you with expert independent advice and support.
Analysis and conceptual design
Feasibility studies, environmental impact assessments, siting studies, economic and technical analyses,
master plans, integrated infrastructure concepts, conceptual studies of plants, preliminary planning and
conceptual engineering, operation management concepts, IT concepts
Engineering and contract award
General planning, basic engineering, permit planning, detail engineering, plant specification/functional
specifications, tendering, bid evaluation, contract award recommendation and negotiations, preparation of
contracts
Implementation
Checking of drawings, factory acceptance, specialist site management and supervision, coordination of
commissioning, acceptance at completion, documentation, trial operation and warranty support
Interface coordination, project steering, general project supervision, health and safety coordination,
training and instruction
Operation
Process optimization, management of risks and environmental hazards, quality assurance, maintenance
scheduling, optimization of deployment, operation, management and environmental information systems
Business Consultancy
Market analyses, tariff studies, project development, strategy and organization consulting, financial
modeling, project financing, project management, lender's engineering, due diligence, mergers &
acquisitions, IT consulting, industry-specific IT solutions

References for Steam, gas turbine and combined cycle power plants:
Planning of a 440 MW combined-cycle power plant, Germany
In order to strengthen its involvement in the power sector, the Luxembourg public utility Enovos planned
to construct a combined-cycle power plant in Germany with a capacity of around 440 MW. After initial
siting studies, Fichtner prepared the conceptual study which will also identify the tie points to the gas and
high-voltage networks in addition to preparing proposals on line routing and connection. Fichtner has also

been contracted to carry out the basic engineering and permitting studies as well as procurement planning
for contract award to a general contractor.

General planning for an 800 MW combined cycle project, Germany


Trianel Power Kraftwerk Hamm-Uentrop GmbH & Co. KG (TPH) is constructing in Hamm-Uentrop,
Westphalia, a combined cycle power plant with an electrical rating of 800 MW. For this two-unit plant,
technology for attaining the highest possible efficiency at least 57.5% finds application. Fichtner was
retained as technical consultant at an early stage of the project to handle conceptual and basic
engineering, tendering for contract award to a general contractor and permit engineering. Additionally,
preparations were made for award of a contract to a service provider for plant operation. After the
decision to go ahead with construction Fichtner was entrusted with follow-on planning, supervision of the
general contractor and construction management.

Concept study for rehabilitation of a combined cycle CHP plant, Germany


Pfaffenwald Combined Heat and Power Plant of the University of Stuttgart supplies the research and
teaching facilities as well as student residences with electricity, heat and cold. Fichtner was awarded a
contract for a concept study, resulting in a recommendation for measures for modernizing the plant, and in
particular the 2 x 5 MWe gas turbines, 2 x 8.6 t/h HRSGs (37 bar / 440C) and 3.9 MWe extractioncondensing steam turbine. Additionally, Fichtner is advising the University Building Services Department
in assessing leasing concepts for the new facilities.

Technical consultancy and owner's engineering for a 4000 MW combined cycle power plant, Saudi
Arabia
Saudi Electric Corporation (SEC) is initiating several power plant projects on a privately financed basis.
With a total rating of 4000 MW, twelve gas turbines, twelve HRSGs and six steam turbines, the Qurrayah
IPP Project is currently the world's biggest combined cycle power plant. We provided support to SEC as
strategy and technical consultant during tendering, up to contract signing and financial close. For the
construction phase, we were contracted by the project company to provide owner's engineering services,
including checking of contractor's drawings.

Construction of a new 500 MW thermal power plant, Sudan


To extend electrification in the Sudan, the National Electricity Corporation (NEC) is constructing a
thermal 4 x 125-MW power plant some 300 km south of Khartoum. The natural circulation boilers are
fired with crude oil and service water is extracted from the White Nile 12 km away. Flue gases pass
through a recuperative heat exchanger to preheat the combustion air before they are cleaned in an
electrostatic precipitator. As Owners Engineer, Fichtner is assisting NEC with review and completion of

the technical and commercial contract documents, including drawing up the environmental impact study,
support during contract negotiations, as well as reviewing preliminary planning and detail engineering,
with a check of drawings, of the Indian general contractor. Subsequently, Fichtner will undertake site
supervision, project management and quality control, training of operating staff, monitoring trial
operation and commissioning, with support of local staff during the warranty phase.

Project management for Ca Mau 2 x 750 MW Combined Cycle Power Plant, Vietnam
The client Lilama Vietnam Machinery Erection Corporation was nominated by the Vietnamese
Government as general contractor for this power plant. Fichtner was awarded a contract as EPC engineer
for engineering the proposal for the complete plant and, during Phase 2, with project management, design
review and site supervision, including commissioning and performance trials, approval of working
drawings from all subcontractors, compiling project documentation for submission to and approval by the
client, interface coordination, project steering and training of clients staff. All services were completed
on schedule. Since 2008 and 2009 respectively, Ca Mau I and II have been on stream in unfaulted
operation and delivering their full rated power.

Feasibility study for extending a combined cycle power plant, Pakistan


In the city of Kot Addu, Muzzaffargarh District in Punjab Province, Kot Addu Power Company Limited is
planning to extend the 1600 MW combined cycle power plant they operate by up to 500 MW, and supply
the electricity to the national 220 kV grid. Fichtner was awarded a contract to prepare a bankable
feasibility study. This included technical and economic comparison of options, with combined cycle
configurations on the basis of residual oil-fired gas turbines, calculation of capital costs, financing model,
detailed technical description of the preferred option, environmental impact study, geological
investigations and a grid study, as well as review of contracts under technical, economic and financial
aspects.

Technical specifications for Campanario 400 MW Combined Cycle Power Plant, Chile

Fichtner was entrusted by Campanario Generacin S. A. with drawing up technical specifications and
tender documents for appointing an EPC contractor to erect this 400 MW gas-fired combined cycle power
plant in Central Chile.

CONTACT:
Power Plants, Solar Thermal & Desalination
Hermann Bayerlein
Managing Director
Phone: +49 711 8995-347
E-mail: Hermann.Bayerlein(at)fichtner.de

Electrical Systems & Networks


Ralf Epping
Managing Director
Phone: +49 711 8995-612
E-mail: Ralf.Epping(at)fichtner.de