Federal Register / Vol. 71, No.

227 / Monday, November 27, 2006 / Notices 68605

Prepare your submission in the same formal issuances and submittals in must also serve a copy of the document
manner as you would if filing on paper specific dockets. This can reduce the on that resource agency.
and save it to a file on your hard drive. amount of time you spend researching h. Description of Projects: The project
Before you can file comments you will proceedings by automatically providing proposed by Mason Dam, LLC, using the
need to create an account by clicking on you with notification of these filings, Bureau of Reclamation’s Mason Dam
‘‘Login to File’’ and then ‘‘New User document summaries and direct links to and impoundment, would consist of: (1)
Account.’’ You will be asked to select the documents. Go to http:// A proposed intake structure (2) a
the type of filing you are making. This www.ferc.gov/esubscribenow.htm. proposed 115-foot-long, 54-inch-
filing is considered a ‘‘Comment on diameter steel penstock, (4) a proposed
Magalie R. Salas, powerhouse containing one generating
Filing.’’
Secretary. unit having an installed capacity of 2.7
Becoming an Intervenor [FR Doc. E6–19918 Filed 11–24–06; 8:45 am] MW, (5) a proposed 1-mile-long, 15–kV
In addition to involvement in the EA BILLING CODE 6717–01–P transmission line, and (6) appurtenant
scoping process, you may want to facilities. The project would have an
become an official party to the annual generation of 8 GWh, which
proceeding known as an ‘‘intervenor’’. DEPARTMENT OF ENERGY would be sold to a local utility.
Intervenors play a more formal role in The project proposed by Baker
the process. Among other things, Federal Energy Regulatory County, Oregon, using the Bureau of
intervenors have the right to receive Reclamation’s Mason Dam and
copies of case-related Commission Notice of Applications Accepted for impoundment, would consist of: (1) A
documents and filings by other Filing and Soliciting Comments, proposed intake structure and penstock,
intervenors. Likewise, each intervenor Motions To Intervene, and Protests (2) a proposed powerhouse with
must send one electronic copy (using November 16, 2006. generating unit(s) having a total
the Commission’s e-Filing system) or 14 Take notice that the following installed capacity of 3 megawatts, (3) an
paper copies of its filings to the hydroelectric applications have been existing transmission line and possible
Secretary of the Commission and must filed with the Commission and are additional new transmission line(s), and
end a copy of its filings to all other available for public inspection: (4) appurtenant facilities. The project
parties on the Commission’s service list a. Type of Applications: Preliminary would have an annual generation of 14
for this proceeding. If you want to Permit (Competing). GWh, which would be sold to a local
become an intervenor you must file a b. Applicants, Project Numbers, and utility.
motion to intervene according to Rule Dates Filed: i. Locations of Applications: Copies of
214 of the Commission’s Rules of Mason Dam, LLC filed the application the applications are available for
Practice and Procedure (18 CFR for Project No. 12675–000 on May 11, inspection and reproduction at the
385.214). Only intervenors have the 2006, at 3:29 PM. Commission in the Public Reference
right to seek rehearing of the Baker County, Oregon filed the Room, located at 888 First Street NE.,
Commission’s decision. application for Project No. 12686–000 Room 2A, Washington DC 20426, or by
Affected landowners and parties with on May 23, 2006, at 1:27 PM. calling (202) 502–8371. These filings
environmental concerns may be granted c. The name of the project is the may also be viewed on the
intervenor status upon showing good Mason Dam Hydroelectric Project. The Commission’s Web site at http://
cause by stating that they have a clear proposed project would be located on www.ferc.gov using the ‘‘eLibrary’’ link.
and direct interest in this proceeding the Powder River, in Baker County, Enter the docket numbers excluding the
which would not be adequately Oregon and would utilize the existing last three digits in the docket number
represented by any other parties. You do Bureau of Reclamation’s Mason Dam. field to access the document. For
not need intervenor status to have your d. Filed Pursuant to: Federal Power assistance, call toll-free 1–866–208–
environmental comments considered. Act, 16 U.S.C. 791a–825r. 3676 or e-mail
e. Applicants Contacts: For Mason FERCOnlineSupport@ferc.gov. For TTY,
Additional Information Dam, LLC: Mr. Brent L. Smith, call (202) 502–8659. Copies are also
Additional information about the President, Northwest Power Services, available for inspection and
project is available from the Inc., P. O. Box 535, Rigby, ID 83442, reproduction at the addresses in item e
Commission’s Office of External Affairs (208) 745–0834. For Baker County, above.
at 1–866–208–FERC (3372) or on the Oregon: Mr. Fred Warner, Jr. Chairman, j. Individuals desiring to be included
FERC Internet Web site (http:// Baker County Board of Commissioners, on the Commission’s mailing list should
www.ferc.gov). Using the ‘‘eLibrary’’ 1995 Third Street, Baker City, OR so indicate by writing to the Secretary
link, select ‘‘General Search’’ from the 97814, (541) 523–8200. of the Commission.
eLibrary menu, enter the selected date f. FERC Contact: Tom Papsidero, (202) k. Competing Preliminary Permit—
range and ‘‘Docket Number’’ (i.e., CP06– 502–6002. Anyone desiring to file a competing
465–000), and follow the instructions. g. Deadline for filing comments, application for preliminary permit for a
For assistance with access to eLibrary, protests, and motions to intervene: proposed project must submit the
the helpline can be reached at 1–866– January 23, 2007. competing application itself, or a notice
208–3676, TTY (202) 502–8659, or at The Commission’s Rules of Practice of intent to file such an application, to
FERCOnlineSupport@ferc.gov. The and Procedure require all intervenors the Commission on or before the
eLibrary link on the FERC Internet Web filing documents with the Commission specified comment date for the
site also provides access to the texts of to serve a copy of that document on particular application (see 18 CFR 4.36).
formal documents issued by the each person in the official service list Submission of a timely notice of intent
sroberts on PROD1PC70 with NOTICES

Commission, such as orders, notices, for the project. Further, if an intervenor allows an interested person to file the
and rule makings. files comments or documents with the competing preliminary permit
In addition, the Commission now Commission relating to the merits of an application no later than 30 days after
offers a free service called eSubscription issue that may affect the responsibilities the specified comment date for the
which allows you to keep track of all of a particular resource agency, they particular application. A competing

VerDate Aug<31>2005 16:58 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00077 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1
68606 Federal Register / Vol. 71, No. 227 / Monday, November 27, 2006 / Notices

preliminary permit application must filing’’ link. The Commission strongly f. Filed Pursuant to: Federal Power
conform with 18 CFR 4.30(b) and 4.36. encourages electronic filing. Act, 16 U.S.C. 791(a)–825(r).
l. Competing Development p. Filing and Service of Responsive g. Applicant contact: Mr. Richard P.
Application—Any qualified Documents—Any filings must bear in Schulze, 9590 Prototype Drive, Suite
development applicant desiring to file a all capital letters the title 400, Reno, Nevada 89521, (925) 634–
competing development application ‘‘COMMENTS’’, 1550.
must submit to the Commission, on or ‘‘RECOMMENDATIONS FOR TERMS h. FERC Contact: Tom Papsidero,
before a specified comment date for the AND CONDITIONS’’, ‘‘PROTEST’’, (202) 502–6002.
particular application, either a ‘‘COMPETING APPLICATION’’, or i. Deadline for filing comments,
competing development application or a ‘‘MOTION TO INTERVENE’’, as protests, and motions to intervene:
notice of intent to file such an applicable, and the Project Number of January 23, 2007.
application. Submission of a timely the particular application to which the All documents (original and eight
notice of intent to file a development filing refers. Any of the above-named copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
application allows an interested person documents must be filed by providing
Regulatory Commission, 888 First
to file the competing application no the original and the number of copies
Street, NE., Washington, DC 20426.
later than 120 days after the specified provided by the Commission’s
Comments, protests and interventions
comment date for the particular regulations to: The Secretary, Federal
may be filed electronically via the
application. A competing license Energy Regulatory Commission, 888
Internet in lieu of paper; see 18 CFR
application must conform with 18 CFR First Street, NE., Washington, DC 20426.
385.2001(a)(1)(iii) and the instructions
4.30(b) and 4.36. A copy of any motion to intervene must
on the Commission’s web site under the
m. Notice of Intent—A notice of intent also be served upon each representative
‘‘e-Filing’’ link. The Commission
must specify the exact name, business of the Applicant specified in the
strongly encourages electronic filings.
address, and telephone number of the particular application.
Please include the project number (P–
prospective applicant, and must include q. Agency Comments—Federal, state, 12709–000) on any comments or
an unequivocal statement of intent to and local agencies are invited to file motions filed.
submit, if such an application may be comments on the described application. The Commission’s Rules of Practice
filed, either a preliminary permit A copy of the application may be and Procedure require all intervenors
application or a development obtained by agencies directly from the filing documents with the Commission
application (specify which type of Applicant. If an agency does not file to serve a copy of that document on
application). A notice of intent must be comments within the time specified for each person in the official service list
served on the applicant(s) named in this filing comments, it will be presumed to for the project. Further, if an intervenor
public notice. have no comments. One copy of an files comments or documents with the
n. Proposed Scope of Studies under agency’s comments must also be sent to Commission relating to the merits of an
Permit—A preliminary permit, if issued, the Applicant’s representatives. issue that may affect the responsibilities
does not authorize construction. The of a particular resource agency, they
Magalie R. Salas,
term of the proposed preliminary permit must also serve a copy of the document
Secretary.
would be 36 months. The work on that resource agency.
proposed under the preliminary permit [FR Doc. E6–19921 Filed 11–24–06; 8:45 am]
j. Description of Existing Facilities
would include economic analysis, BILLING CODE 6717–01–P
and Proposed Project: The proposed
preparation of preliminary engineering pumped storage project would consist of
plans, and a study of environmental (1) an upper reservoir, an enlargement
impacts. Based on the results of these DEPARTMENT OF ENERGY
of the existing Pope Reservoir, with a
studies, the Applicant would decide Federal Energy Regulatory surface area of 550 acres and a storage
whether to proceed with the preparation Commission capacity of 60,000 acre-feet at a water
of a development application to surface elevation of 5,500 feet msl, (2)
construct and operate the project. Notice of Application Accepted for a 4,000-foot-long, 310-foot-high earthen
o. Comments, Protests, or Motions to Filing and Soliciting Comments, upper dam, (3) a 1,500-foot-long, 30-
Intervene—Anyone may submit Protests, and Motions To Intervene foot-diameter concrete low pressure
comments, a protest, or a motion to tunnel, (4) a 270-foot-deep, 30-foot-
intervene in accordance with the November 16, 2006. diameter concrete surge shaft, (5) an
requirements of Rules of Practice and Take notice that the following 1,100-foot-long, 30-foot diameter
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed vertical concrete power shaft, (6) a
In determining the appropriate action to with the Commission and is available 3,800-foot-long, 24-foot-diameter
take, the Commission will consider all for public inspection: concrete power tunnel, (7) a
protests or other comments filed, but a. Type of Application: Preliminary powerhouse containing four reversible
only those who file a motion to Permit. generating units with a total installed
intervene in accordance with the b. Project No.: 12709–000. capacity of 1,175 megawatts, (8) a lower
Commission’s Rules may become a c. Date filed: July 5, 2006. reservoir with a surface area of 1,480
party to the proceeding. Any comments, d. Applicant: United Power acres and a storage capacity of 110,000
protests, or motions to intervene must Corporation. acre-feet at a water surface elevation of
be received on or before the specified e. Name and Location of Project: The 4,220 feet msl, (9) a 21,500-foot-long,
comment date for the particular Bryant Mountain Hydroelectric Pumped 135-foot-high earthen lower dam, (10) a
application. Storage Project would use flows from 4-mile-long, 500-kilovolt transmission
sroberts on PROD1PC70 with NOTICES

Comments, protests and interventions the U.S. Bureau of Reclamation’s D and line, and (11) appurtenant facilities.
may be filed electronically via the J Canals and would be built on federal k. Location of Applications: A copy of
Internet in lieu of paper; See 18 CFR lands administered by the U.S. Bureau the application is available for
385.2001 (a)(1)(iii) and the instructions of Land Management in Klamath inspection and reproduction at the
on the Commission’s web site under ‘‘e- County, Oregon. Commission in the Public Reference