63294 Federal Register / Vol. 71, No.

209 / Monday, October 30, 2006 / Notices

DEPARTMENT OF ENERGY issuance of securities or assumptions of The new, high-deliverability storage


liability. facility would be located in Simpson
Federal Energy Regulatory Copies of the full text of the Director’s and Jefferson Davis Counties,
Commission Order are available from the Mississippi. The facility would have
Commission’s Public Reference Room, initial interconnections with two
[Docket Nos. ER06–1419–000, ER06–1419– 888 First Street, NE., Washington, DC interstate (Southern Natural Gas Co. and
001] 20426. The Order may also be viewed Gulf South Pipeline) and one intrastate
on the Commission’s Web site at http:// (CrossTex Energy) gas pipeline systems.
MeadWestvaco Virginia Corporation; Due to the sequential construction
Notice of Issuance of Order www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the process associated with the solution
October 19, 2006. last three digits in the docket number mining of the two proposed caverns, MS
MeadWestvaco Virginia Corporation filed to access the document. HUB requests that the Commission
(MeadWestvaco Virginia) filed an Comments, protests, and interventions authorize construction over a five-year
application for market-based rate may be filed electronically via the period.
authority, with an accompanying rate Internet in lieu of paper. See 18 CFR Questions concerning the application
schedule. The proposed market-based 385.2001(a)(1)(iii) and the instructions should be directed to by calling (281)
rate schedule provides for the sale of on the Commission’s Web site under the 242–2381 or J. Gordon Pennington,
energy and capacity at market-based ‘‘e-Filing’’ link. The Commission Attorney at Law, 2707 N. Kensington
strongly encourages electronic filings. St., Arlington, Virginia 22207 or at 703–
rates. MeadWestvaco Virginia also
533–7638 or pennington5@verizon.net.
requested waivers of various Magalie R. Salas, There are two ways to become
Commission regulations. In particular, involved in the Commission’s review of
Secretary.
MeadWestvaco Virginia requested that this project. First, any person wishing to
[FR Doc. E6–18111 Filed 10–27–06; 8:45 am]
the Commission grant blanket approval obtain legal status by becoming a party
BILLING CODE 6717–01–P
under 18 CFR part 34 of all future to the proceedings for this project
issuances of securities and assumptions should, on or before the comment date,
of liability by MeadWestvaco Virginia. file with the Federal Energy Regulatory
DEPARTMENT OF ENERGY
On October 18, 2006, pursuant to Commission, 888 First Street, NE.,
delegated authority, the Director, Federal Energy Regulatory Washington, DC 20426, a motion to
Division of Tariffs and Market Commission intervene in accordance with the
Development—West, granted the requirements of the Commission’s Rules
requests for blanket approval under part of Practice and Procedure (18 CFR
[Docket Nos. CP07–4–000; CP07–5–000;
34. The Director’s order also stated that CP07–6–000] 385.214 or 385.211) and the Regulations
the Commission would publish a under the NGA (18 CFR 157.10). A
separate notice in the Federal Register Mississippi Hub, L.L.C.; Notice of person obtaining party status will be
establishing a period of time for the Application placed on the service list maintained by
filing of protests. Accordingly, any the Secretary of the Commission and
person desiring to be heard or to protest October 20, 2006.
will receive copies of all documents
the blanket approvals of issuances of On October 10, 2006, in Docket Nos. filed by the applicant and by all other
securities or assumptions of liability by CP07–4–000, CP07–5–000 and CP07–6– parties. A party must submit 14 copies
MeadWestvaco Virginia should file a 000, Mississippi Hub, L.L.C. (MS HUB), of filings made with the Commission
motion to intervene or protest with the pursuant to section 7(c) of the Natural and must mail a copy to the applicant
Federal Energy Regulatory Commission, Gas Act, as amended, and part 157, and to every other party in the
888 First Street, NE., Washington, DC subparts A and F, and part 284, subpart proceeding. Only parties to the
20426, in accordance with Rules 211 G of the Federal Energy Regulatory proceeding can ask for court review of
and 214 of the Commission’s Rules of Commission’s (Commission) Commission orders in the proceeding.
Practice and Procedure. 18 CFR 385.211, regulations, filed requests for: However, a person does not have to
385.214 (2004). authorization to construct, own, and intervene in order to have comments
Notice is hereby given that the operate the MS HUB Storage Project; a considered.
deadline for filing motions to intervene Subpart F construction, operation and The second way to participate is by
or protest is November 17, 2006. abandonment blanket certificate (CP07– filing with the Secretary of the
Absent a request to be heard in 5–000); and, a Subpart G transportation Commission, as soon as possible, an
opposition by the deadline above, blanket certificate (CP07–6–000). MS original and two copies of comments in
MeadWestvaco Virginia is authorized to HUB also seeks: approval of its pro support of or in opposition to this
issue securities and assume obligations forma tariff; authorization to charge project. The Commission will consider
or liabilities as a guarantor, indorser, market-based rates for the proposed these comments in determining the
surety, or otherwise in respect of any storage services; and, waiver of certain appropriate action to be taken, but the
security of another person; provided Commission regulations. Further, MS filing of a comment alone will not serve
that such issuance or assumption is for HUB asks that the Commission issue to make the filer a party to the
some lawful object within the corporate requested authorizations by February proceeding. The Commission’s rules
purposes of MeadWestvaco Virginia, 15, 2007 so that: construction may start require that persons filing comments in
compatible with the public interest, and in spring 2007; initial storage injections opposition to the project provide copies
is reasonably necessary or appropriate can commence in spring and summer of of their protests only to the party or
for such purposes. 2008; and, withdrawals can begin by parties directly involved in the protest.
sroberts on PROD1PC70 with NOTICES

The Commission reserves the right to December 31, 2008. Start-up in this Comments, protests and interventions
require a further showing that neither timeframe also would coincide with may be filed electronically via the
public nor private interests will be proposed in-service dates of certain Gulf Internet in lieu of paper. See 18 CFR
adversely affected by continued Coast region liquefied natural gas 385.2001(a) (1) (iii) and the instructions
approvals of MeadWestvaco Virginia’s import terminals. on the Commission’s web site under the