Beruflich Dokumente
Kultur Dokumente
Edition 04/06/2006
Identification no. FTT-12
Sikafloor-156
Construction
Uses
Advantages
Low viscosity
Good penetration ability
High bond strength
Solvent free
Easy application
Short waiting times
Multi-purpose
For external use also
Product Data
Type
Appearance /Colours
Packaging
Part A:
Part B:
Part A+B:
Storage Conditions
Shelf Life
Technical Data
Density (at 23C)
(DIN EN ISO 2811-1)
Part A:
Part B:
Mixed Resin:
Mixing Ratio
~ 1.10 kg/lt
~ 1.02 kg/lt
~ 1.1 kg/lt
Sikafloor-156
1/6
Solid Content
Mechanical / Physical
Properties
Compressive Strength
(EN 196-1)
Resin: ~ 70 N/mm
Mortar: ~ 95 N/mm
Flexural Strength
(EN 196-1)
Resin: ~ 75 N/mm
Mortar: ~ 30 N/mm
Bond Strength
(EN 4624)
Shore D Hardness
(DIN 53505)
83
Thermal Resistance
Exposure*
Dry heat
Permanent
+50C
Short-term max. 7 d
+80C
Short-term max. 12 h
+100C
System Information
System Structure
Primer
Low/medium porosity concrete:
High porosity concrete:
1 x Sikafloor-156
2 x Sikafloor-156
Sikafloor-156
2/6
Application Details
Consumption / Dosage
Coating System
Product
Consumption
Priming
Sikafloor -156
1 pbw Sikafloor-156 +
0.5 pbw quartz sand (0.1-0.3 mm)
+ 0.015 pbw Extender T
1.4 kg/m/mm
1 pbw Sikafloor-156 +
1 pbw quartz sand (0.1 - 0.3 mm)
+0.015 pbw Extender T
1.6 kg/m/mm
Bonding Bridge
Sikafloor-156
2.2 kg/m/mm
Note: These figures are theoretical and do not include for any additional material
required due to surface porosity, surface profile, variations in level or wastage
etc.
Substrate Quality
Substrate Preparation
Application Conditions /
Limitations
Substrate Temperature
Ambient Temperature
Substrate Humidity
Dew Point
Be aware of condensation!
The substrate and uncured floor must be at least 3C above the dew point to
reduce the risk of condensation or blooming on the floor finish.
Application Instruction
Mixing
Mixing Time
Prior to mixing stir part A mechanically. When all of part B has been added to
part A continuously mix for 3 minutes until a uniform mix has been achieved.
When parts A and B have been mixed, the quartz sand and if required the
Extender T must be mixed with part A and B for a further 2 minutes until a
uniform mix has been achieved.
To ensure thorough mixing pour materials into another container and mix again
to achieve a consistent mix.
Over mixing must be avoided to minimize air entrainment.
Sikafloor-156
3/6
Mixing Tools
Cleaning of Tools
Clean all tools and application equipment with Sika Thinner C immediately after
use. Hardened/cured material can only be mechanically removed.
Pot life
Waiting Time /
Overcoatability
Temperature
Time
+10C
~ 60 minutes
+20C
~ 30 minutes
+30C
~ 15 minutes
Minimum
Maximum
+10C
24 hours
4 days
+20C
12 hours
2 days
+30C
6 hours
1 day
Minimum
Maximum
+10C
36 hours
6 days
+20C
24 hours
4 days
+30C
12 hours
2 days
Sikafloor-156
4/6
Limitations
Curing
Foot traffic
Light traffic
Full cure
+10C
~ 24 hours
~ 5 days
~ 10 days
+20C
~ 12 hours
~ 3 days
~ 7 days
+30C
~ 6 hours
~ 2 days
~ 5 days
All technical data stated in this Product Data Sheet are based on laboratory tests.
Actual measured data may vary due to circumstances beyond our control.
Local Restriction
Please note that as a result of specific local regulations the performance of this
product may vary from country to country. Please consult the local Product Data
Sheet for the exact description of the product uses.
For information and advice on the safe handling, storage and disposal of
chemical products, users should refer to the most recent Material Safety Data
Sheet containing physical, ecological, toxicological and other safety-related
data.
Sikafloor-156
5/6
EU Regulation
2004/42 VOC Decopaint Directive
Legal Notes
Construction
Sikafloor-156
6/6