Sie sind auf Seite 1von 2

63314 Federal Register / Vol. 71, No.

209 / Monday, October 30, 2006 / Notices

Web site at http://www.ferc.gov using preparation of preliminary engineering agency’s comments must also be sent to
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental the Applicant’s representatives.
number excluding the last three digits in impacts. Based on the results of these
Magalie R. Salas,
the docket number field to access the studies, the Applicant would decide
document. For assistance, call toll-free Secretary.
whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to [FR Doc. E6–18108 Filed 10–27–06; 8:45 am]
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. BILLING CODE 6717–01–P
call (202) 502–8659. A copy is also
s. Comments, Protests, or Motions to
available for inspection and
Intervene—Anyone may submit DEPARTMENT OF ENERGY
reproduction at the address in item h
above. comments, a protest, or a motion to
n. Individuals desiring to be included intervene in accordance with the Federal Energy Regulatory
on the Commission’s mailing list should requirements of Rules of Practice and Commission
so indicate by writing to the Secretary Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to Notice of Application and Soliciting
of the Commission. Comments, Motions To Intervene, and
o. Competing Preliminary Permit— take, the Commission will consider all
protests or other comments filed, but Protests
Anyone desiring to file a competing
application for preliminary permit for a only those who file a motion to October 19, 2006.
proposed project must submit the intervene in accordance with the a. Type of Application: Request for
competing application itself, or a notice Commission’s Rules may become a Non-project Use of Project Lands and
of intent to file such an application, to party to the proceeding. Any comments, Waters.
the Commission on or before the protests, or motions to intervene must b. Project Number: Project No. 459–
specified comment date for the be received on or before the specified 163.
particular application (see 18 CFR 4.36). comment date for the particular c. Date Filed: July 14, 2006.
Submission of a timely notice of intent application. d. Applicant: AmerenUE.
allows an interested person to file the e. Name of Project: Osage
t. Filing and Service of Responsive
competing preliminary permit Hydroelectric Project (FERC No. 459).
Documents—Any filings must bear in
application no later than 30 days after f. Location: The project is located on
all capital letters the title the Osage River in Camden and Miller
the specified comment date for the
particular application. A competing ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Counties, Missouri.
preliminary permit application must TO FILE COMPETING APPLICATION’’, g. Filed Pursuant to: Federal Power
conform with 18 CFR 4.30(b) and 4.36. ‘‘COMPETING APPLICATION’’, Act, 16 U.S.C. 791 (a) 825(r) and 799
p. Competing Development ‘‘PROTEST’’, or ‘‘MOTION TO and 801.
Application—Any qualified INTERVENE’’, as applicable, and the h. Applicant Contact: Reginald
development applicant desiring to file a Project Number of the particular Franklin, Ameren Services, PO Box 993,
competing development application application to which the filing refers. Lake Ozark, MO 65049. Phone: (573)-
must submit to the Commission, on or Any of the above-named documents 365–9216.
before a specified comment date for the must be filed by providing the original i. FERC Contact: Any questions on
particular application, either a and the number of copies provided by this notice should be addressed to Chris
competing development application or a the Commission’s regulations to: The Yeakel at (202) 502–8132, or e-mail
notice of intent to file such an Secretary, Federal Energy Regulatory address: christopher.yeakel@ferc.gov.
application. Submission of a timely Commission, 888 First Street, NE., j. Deadline for filing comments and or
notice of intent to file a development Washington, DC 20426. An additional motions: November 20, 2006.
application allows an interested person copy must be sent to Director, Division k. Description of Application: The
to file the competing application no of Hydropower Administration and applicant seeks approval to allow the
later than 120 days after the specified Compliance, Federal Energy Regulatory use of approximately 160 square-feet of
comment date for the particular Commission, at the above-mentioned project lands for a deck associated with
application. A competing license address. A copy of any notice of intent, a residence located outside the project
application must conform with 18 CFR competing application or motion to boundary in the Pebble Creek
4.30(b) and 4.36. intervene must also be served upon each Subdivision.
q. Notice of Intent—A notice of intent representative of the Applicant l. Locations of the Application: A
must specify the exact name, business specified in the particular application. copy of the application is available for
address, and telephone number of the inspection and reproduction at the
Comments, protests and interventions
prospective applicant, and must include Commission’s Public Reference Room,
may be filed electronically via the
an unequivocal statement of intent to located at 888 First Street, NE., Room
Internet in lieu of paper; see 18 CFR 2A, Washington, DC 20426, or by calling
submit, if such an application may be
385.2001(a)(1)(iii) and the instructions (202) 502–8371. This filing may also be
filed, either a preliminary permit
on the Commission’s Web site under the viewed on the Commission’s Web site at
application or a development
‘‘e-Filing’’ link. The Commission http://www.ferc.gov using the
application (specify which type of
strongly encourages electronic filings. ‘‘eLibrary’’ link. Enter the docket
application). A notice of intent must be
served on the applicant(s) named in this u. Agency Comments—Federal, state, number excluding the last three digits in
public notice. and local agencies are invited to file the docket number field (p-459) to
r. Proposed Scope of Studies under comments on the described application. access the document. You may also
Permit—A preliminary permit, if issued, A copy of the application may be register online at http://www.ferc.gov/
sroberts on PROD1PC70 with NOTICES

does not authorize construction. The obtained by agencies directly from the docs-filing/esubscription.asp to be
term of the proposed preliminary permit Applicant. If an agency does not file notified via e-mail of new filings and
would be 36 months. The work comments within the time specified for issuances related to this or other
proposed under the preliminary permit filing comments, it will be presumed to pending projects. For assistance, call 1–
would include economic analysis, have no comments. One copy of an 866–208–3676 or e-mail

VerDate Aug<31>2005 02:16 Oct 28, 2006 Jkt 211001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\30OCN1.SGM 30OCN1
Federal Register / Vol. 71, No. 209 / Monday, October 30, 2006 / Notices 63315

FERCOnlineSupport@ferc.gov, for TTY, DEPARTMENT OF ENERGY Subdivision. The proposed marina is


call (202) 502–8659. A copy is also located on Lake James in McDowell and
available for inspection and Federal Energy Regulatory Burke Counties, North Carolina and
reproduction at the address in item (h) Commission would consist of 12 lease areas
above. containing a total of 14 cluster docks
Notice of Application for Non-Project with one hundred and thirty-nine (139)
m. Individuals desiring to be included Use of Project Lands and Waters and
on the Commission’s mailing list should boat slips, including one slip to be used
Soliciting Comments, Motions To as a pump-out facility. No dredging or
so indicate by writing to the Secretary Intervene, and Protests
of the Commission. shoreline stabilization is associated with
October 20, 2006. the proposed marina.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit Take notice that the following l. Location of the Application: This
comments, a protest, or a motion to application has been filed with the filing is available for review at the
intervene in accordance with the Commission and is available for public Commission or may be viewed on the
requirements of Rules of Practice and inspection: Commission’s Web site at http://
Procedure, 18 CFR 385.210, .211, .214. a. Application Type: Non-Project Use www.ferc.gov, using the ‘‘eLibrary’’ link.
In determining the appropriate action to Of Project Lands And Waters. Enter the docket number excluding the
take, the Commission will consider all b. Project No: 2232–527. last three digits in the docket number
c. Date Filed: October 10, 2006. field to access the document. For
protests or other comments filed, but
d. Applicant: Duke Power, a division assistance, contact FERC Online
only those who file a motion to
of Duke Energy Corporation. Support at
intervene in accordance with the
e. Name of Project: Catawba-Wateree FERCOnlineSupport@ferc.gov or toll-
Commission’s Rules may become a
Project. free at (866) 208–3676, or for TTY,
party to the proceeding. Any comments, f. Location: This project is located on
protests, or motions to intervene must contact (202) 502–8659.
the Catawba and Wateree Rivers, in nine
be received on or before the specified counties in North Carolina (Burke, m. Individuals desiring to be included
comment date for the particular Alexander, McDowell, Iredell, Caldwell, on the Commission’s mailing list should
application. Lincoln, Catawba, Gaston, and so indicate by writing to the Secretary
o. Filing and Service of Responsive Mecklenburg Counties) and five of the Commission.
Documents: Any filings must bear in all counties in South Carolina (York, n. Comments, Protests, or Motions to
capital letters the title ‘‘COMMENTS’’, Chester, Lancaster, Fairfield and Intervene—Anyone may submit
‘‘RECOMMENDATIONS FOR TERMS Kershaw Counties). This project does comments, a protest, or a motion to
AND CONDITIONS’’, ‘‘PROTEST’’, OR not occupy any Tribal or federal lands. intervene in accordance with the
‘‘MOTION TO INTERVENE’’, as g. Filed Pursuant to: Federal Power requirements of Rules of Practice and
applicable, and the Project Number of Act, 16 U.S.C. 791 (a) 825(r) and 799 Procedure, 18 CFR 385.210, .211, .214.
the particular application to which the and 801. In determining the appropriate action to
filing refers (p-459–163). All documents h. Applicant Contact: Mr. Kelvin take, the Commission will consider all
(original and eight copies) should be Reagan, Senior Lake Services protests or other comments filed, but
filed with: Magalie R. Salas, Secretary, Representative; Duke Energy only those who file a motion to
Federal Energy Regulatory Commission, Corporation; P.O. Box 1006; Charlotte, intervene in accordance with the
888 First Street, NE., Washington DC NC; 28201–1006; 704–382–9386. Commission’s Rules may become a
20426. A copy of any motion to i. FERC Contact: Any questions on party to the proceeding. Any comments,
intervene must also be served upon each this notice should be addressed to Jon protests, or motions to intervene must
representative of the Applicant Cofrancesco at (202) 502–8951 or by e- be received on or before the specified
specified in the particular application. mail: Jon.Cofrancesco@ferc.gov. comment date for the particular
j. Deadline for filing comments and or application.
p. Agency Comments: Federal, State,
motions: November 20, 2006.
and local agencies are invited to file o. Filing and Service of Responsive
All documents (original and eight
comments on the described application. Documents—Any filings must bear in
copies) should be filed with: Ms.
A copy of the application may be all capital letters the title ‘‘Comments’’,
Magalie R. Salas, Secretary, Federal
obtained by agencies directly from the ‘‘Recommendations for Terms and
Energy Regulatory Commission, 888
Applicant. If an agency does not file Conditions’’, ‘‘Protest’’, for ‘‘Motion to
First Street, NE., Washington DC 20426.
comments within the time specified for Intervene’’, as applicable, and the
Please include the project number (P–
filing comments, it will be presumed to Project Number of the particular
2232–527) on any comments or motions
have no comments. One copy of an application to which the filing refers. A
filed. Comments, protests, and
agency’s comments must also be sent to copy of any motion to intervene must
interventions may be filed electronically
the Applicant’s representatives. via the Internet in lieu of paper. See, 18 also be served upon each representative
q. Comments, protests and CFR 385.2001(a)(1)(iii) and the of the Applicant specified in the
interventions may be filed electronically instructions on the Commission’s Web particular application.
via the Internet in lieu of paper. See, 18 site under the ‘‘e-Filing’’ link. The p. Agency Comments—Federal, state,
CFR 385.2001(a)(1)(iii) and the Commission strongly encourages and local agencies are invited to file
instructions on the Commission’s Web e-filings. comments on the described
site at http://www.ferc.gov under the ‘‘e- k. Description of Request: Duke applications. A copy of the applications
Filing’’ link. Power, licensee for the Catawba-Wateree may be obtained by agencies directly
sroberts on PROD1PC70 with NOTICES

Hydroelectric Project, has requested from the Applicant. If an agency does


Magalie R. Salas,
Commission authorization to lease to not file comments within the time
Secretary. 1780, LLC 5.66 acres of project lands for specified for filing comments, it will be
[FR Doc. E6–18109 Filed 10–27–06; 8:45 am] a residential marina to serve the presumed to have no comments. One
BILLING CODE 6717–01–P residents of the adjacent 1780, LLC copy of an agency’s comments must also

VerDate Aug<31>2005 02:16 Oct 28, 2006 Jkt 211001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\30OCN1.SGM 30OCN1

Das könnte Ihnen auch gefallen