Sie sind auf Seite 1von 1

63036 Federal Register / Vol. 71, No.

208 / Friday, October 27, 2006 / Notices

notification disclosing all changes in DEPARTMENT OF JUSTICE would consist of construction and
membership or planned activities. operation of a medium-security Federal
Federal Bureau of Prisons Correctional Institution, a satellite work
Patricia A. Brink, camp to house minimum-security
Deputy Director of Operations, Antitrust Notice of the Availability of the Record inmates, staff training facilities, along
Division. of Decision for Proposed Federal with ancillary facilities. The principal
[FR Doc. 06–8913 Filed 10–26–06; 8:45 am] Correctional Institution—Berlin, NH function of the correctional facility
BILLING CODE 4410–11–M AGENCY: U.S. Department of Justice, would be to provide a safe, secure and
Federal Bureau of Prisons. humane environment for the care and
custody of federal inmates, primarily
ACTION: Notice of a Record of Decision.
DEPARTMENT OF JUSTICE from the Northeast region of the
SUMMARY: The U.S. Department of country. Upon activation, the facility
Antitrust Division Justice, Federal Bureau of Prisons (BOP) would have a staff of approximately 300
announces the availability of the Record to 350 full-time employees who would
Notice Pursuant to the National provide 24-hour supervision.
of Decision (ROD) concerning the
Cooperative Research and Production Development of the proposed facility
Environmental Impact Statement (EIS)
Act of 1993—SwRI Biodiesel Fuel/ for the proposed development of a will necessitate the acquisition of
Water Separation Cooperative R&D Federal Correctional Institution to be approximately 700 acres of land by the
Program located in Berlin, Coos County, New BOP exclusive of lands which may be
Hampshire. acquired for mitigation purposes.
Notice is hereby given that on The BOP evaluated alternatives as
Background Information: Pursuant to
September 27, 2006, pursuant to Section part of the EIS including the No Action
Section 102(2)(c) of the National
6(a) of the National Cooperative Alternative, development of the
Environmental Policy Act of 1969 and
Research and Production Act of 1993, proposed project at alternative locations
the Council of Environmental Quality
15 U.S.C. 4301 et seq. (‘‘the Act’’), SwRI nationwide, development of the
Regulations (40 CFR Parts 1500–1508),
Biodiesel Fuel/Water Separation proposed project at alternative locations
BOP has prepared Draft and Final EISs
Cooperative R&D Program (‘‘SwRI’’) has within the Northeast United States, and
for the development of a medium-
filed written notifications development of the proposed project at
security Federal Correctional Institution one of four alternative sites located in
simultaneously with the Attorney to house approximately 1,230 adult Berlin, New Hampshire. Each of the four
General and the Federal Trade male inmates, a satellite work camp to alternative sites located in Berlin, New
Commission disclosing changes in its house approximately 128 minimum- Hampshire, is examined in detail in the
membership. The notifications were security inmates, staff training facilities, Draft and Final EISs with development
filed for the purpose of extending the and ancillary facilities in Berlin, New of the proposed project at Site A1
Act’s provisions limiting the recovery of Hampshire. located northeast of downtown Berlin
antitrust plaintiffs to actual damages Project Information: The BOP is identified by the Draft and Final EISs as
under specified circumstances. responsible for carrying out judgements the Preferred Alternative.
Specifically, John Deere Product of the Federal courts whenever a period The BOP issued a Draft EIS in March
Engineering Center, Waterloo, IA has of confinement is ordered. 2006 with publication of the Notice of
been added as a party to this venture. Subsequently, the mission of the BOP is Availability (NOA) in the Federal
to protect society by confining offenders Register on March 24, 2006. The NOA
No other changes have been made in in the controlled environments of
either the membership or planned provided for a 45-day public comment
prisons and community-based facilities period which began on March 24, 2006,
activity of the group research project. that are safe, humane, cost-efficient, and and ended on May 8, 2006. During the
Membership in this group research appropriately secure, and that provide public comment period, the BOP held a
project remains open, and SwRI intends work and other self-improvement public hearing concerning the proposed
to file additional written notification opportunities to assist offenders in action and the Draft EIS on April 19,
disclosing all changes in membership. becoming law-abiding citizens. 2006. Approximately 200 individuals
On December 6, 2005, SwRI filed its Approximately 162,200 inmates are attended the public hearing which was
original notification pursuant to Section currently housed within the 114 federal held in Berlin, New Hampshire.
6(a) of the Act. the Department of Justice correctional institutions that have levels The Final EIS addressed comments
published a notice in the Federal of security ranging from minimum to received on the Draft EIS and
Register pursuant to Section 6(b) of the maximum; a number exceeding the publication of the NOA in the Federal
Act on December 22, 2005 (70 FR combined rated capacities of all federal Register concerning the Final EIS
76080). correctional facilities. Measures being occurred on August 11, 2006. The 30-
taken to manage the growth of the day review period for receipt of public
The last notification was filed with federal inmate population include comments concerning the Final EIS
the Department on February 7, 2006. A construction of new institutions, ended on September 11, 2006.
notice was published in the Federal acquisition and adaptation of facilities Approximately 500 comment letters,
Register pursuant to Section 6(b) of the originally intended for other purposes, post cards, and other forms of
Act on May 10, 2006 (71 FR 27280). expansion and improvement of existing communication were received by the
correctional facilities, and expanded use BOP during the Final EIS public review
Patricia A. Brink,
of contract beds. Adding capacity period. The comment letters received on
Deputy Director of Operations, Antitrust through these various means allows the the Final EIS are similar to comments
jlentini on PROD1PC65 with NOTICES

Division.
BOP to work toward the long-term goal received by the BOP on the Draft EIS
[FR Doc. 06–8914 Filed 10–26–06; 8:45 am] of reduced system-wide crowding. and were considered in the decision
BILLING CODE 4410–11–M The proposed action in Berlin, New presented in the ROD.
Hampshire, is part of the BOP’s BOP provided written notices of the
comprehensive expansion effort and availability of the Draft EIS and Final

VerDate Aug<31>2005 16:53 Oct 26, 2006 Jkt 211001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\27OCN1.SGM 27OCN1

Das könnte Ihnen auch gefallen