Copyright 2007 - JGM van der Lubbe and Adrianus van Haandel
System configuration consists of an aeration tank, final settler, sludge thickener and anaerobic digester
It is assumed that nitrification does not develop
Section 1: Input data
1. General data for the activated sludge system
Y=
fcv =
f=
fn =
fp =
0.45
1.5
0.2
0.1
0.025
b=
fv =
eta =
0.24
0.7
1.2
k=
vo =
DSVI =
0.46
144
120
12000
77515
Sti =
fns =
fnp =
650
0.1
0.08
Nti =
Pti =
50
15
175
300
400
350
3500
i=
n=
0.06
20
Cel =
Csd =
Ch =
fac =
fi =
0.15
200
0.35
1.6
1.35
Sfd =
Sfth =
Hd =
Hth =
2
1.5
4
3
T min =
T max =
T dig =
20
24
20
p=
o=
m=
n=
3.0
1.0
2.0
0.3
2. Influent composition
Qi =
P.E. =
3. Financial data
Cr =
Cd =
Cth =
Cdi =
Cae =
COD removal is substantially complete at lower values of Rs: higher value is required to obtain a sludge that settles well
A - Optimisation of the System Consisting of the Aeration Tank and the Final Settler
(a1) Calculate the sludge mass that will develop
mXa =
mXe =
mXi =
mXv =
mXt =
Cr =
0.64
0.09
0.16
0.90
1.28
0.78
MXa =
MXe =
MXi =
MXv =
MXt =
5020 Xa
723
1248
6991 Xv
9987 fat
1.21
1.68
0.50
Xt
Vr
Vd
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
3.0
3.2
3.4
3.6
3.8
4.0
4.2
4.4
4.6
4.8
5.0
5.2
5.4
5.6
5.8
6.0
6.2
6.4
6.6
6.8
7.0
9,987
8,323
7,134
6,242
5,548
4,994
4,540
4,161
3,841
3,567
3,329
3,121
2,937
2,774
2,628
2,497
2,378
2,270
2,171
2,081
1,997
1,921
1,849
1,783
1,722
1,665
1,611
1,560
1,513
1,469
1,427
1,056
1,158
1,269
1,392
1,526
1,673
1,834
2,011
2,205
2,417
2,650
2,905
3,185
3,492
3,829
4,198
4,602
5,046
5,532
6,065
6,649
7,290
7,993
8,763
9,607
10,533
11,548
12,661
13,881
15,219
16,685
total construction
construction costs in million dollars
costs
aeration tank
final settler
total
2,064,568
1,803,806
1,629,212
1,509,859
1,428,721
1,375,735
1,344,653
1,331,472
1,333,585
1,349,303
1,377,565
1,417,761
1,469,624
1,533,150
1,608,556
1,696,246
1,796,792
1,910,924
2,039,522
2,183,616
2,344,387
2,523,175
2,721,483
2,940,990
3,183,560
3,451,261
3,746,374
4,071,419
4,429,169
4,822,678
5,255,303
1,331,472
2.40
4,161
2,011
288
1.104
0.35
1.75
1.46
1.25
1.09
0.97
0.87
0.79
0.73
0.67
0.62
0.58
0.55
0.51
0.49
0.46
0.44
0.42
0.40
0.38
0.36
0.35
0.34
0.32
0.31
0.30
0.29
0.28
0.27
0.26
0.26
0.25
0.32
0.35
0.38
0.42
0.46
0.50
0.55
0.60
0.66
0.73
0.79
0.87
0.96
1.05
1.15
1.26
1.38
1.51
1.66
1.82
1.99
2.19
2.40
2.63
2.88
3.16
3.46
3.80
4.16
4.57
5.01
2.06
1.80
1.63
1.51
1.43
1.38
1.34
1.33
1.33
1.35
1.38
1.42
1.47
1.53
1.61
1.70
1.80
1.91
2.04
2.18
2.34
2.52
2.72
2.94
3.18
3.45
3.75
4.07
4.43
4.82
5.26
k = 0,46 l.g-1
TSS
v 0 = 144 m.d-1
2.00
Total
costs
1.50
Settler
1.00
0.50
Reactor
0.00
1.0
1.5
2.0
2.5
!! Enter in the cell to the left the value of Xt for which the construction costs are mimimum !!
Rhdmax =
Rdh =
Xr
3.0 for s = sc
2.0 for s = 1
4.8 for s = 1
3.0
Xt (kg TSS.m-3)
3.5
4.0
4.5
5.0
q=
MEt =
MEv =
1387
3329
2330
Xthr
Xthl
Fl
qth
Vth
Vdi
12.0
12.5
13
13.5
14
14.5
15
15.5
16
16.5
17
17.5
18
18.5
19
19.5
20
20.5
21
21.5
22
9.1
9.7
10.2
10.8
11.3
11.8
12.4
12.9
13.4
13.9
14.4
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.6
82.4
72.0
62.5
54.1
46.6
40.1
34.3
29.3
25.0
21.2
18.0
15.2
12.9
10.8
9.1
7.7
6.4
5.4
4.5
3.8
3.1
277.4
266.3
256.1
246.6
237.8
229.6
221.9
214.8
208.1
201.8
195.8
190.2
184.9
179.9
175.2
170.7
166.5
162.4
158.5
154.8
151.3
182
208
240
277
321
374
436
511
600
706
832
983
1,164
1,381
1,641
1,953
2,329
2,780
3,324
3,979
4,768
6,936
6,658
6,402
6,165
5,945
5,740
5,548
5,369
5,202
5,044
4,896
4,756
4,624
4,499
4,380
4,268
4,161
4,060
3,963
3,871
3,783
17
832
4896
!! Enter in the cell to the left the value of Xthr for which the construction costs are mimimum !!
Rhth =
14.4
qth =
196
Rdi =
25.0
q - qth =
1191
0.07
0.08
0.10
0.11
0.13
0.15
0.17
0.20
0.24
0.28
0.33
0.39
0.47
0.55
0.66
0.78
0.93
1.11
1.33
1.59
1.91
2.43
2.33
2.24
2.16
2.08
2.01
1.94
1.88
1.82
1.77
1.71
1.66
1.62
1.57
1.53
1.49
1.46
1.42
1.39
1.35
1.32
2.50
2.41
2.34
2.27
2.21
2.16
2.12
2.08
2.06
2.05
2.05
2.06
2.08
2.13
2.19
2.28
2.39
2.53
2.72
2.95
3.23
3.00
2.50
Total costs
2.00
Digester
1.50
1.00
Thickener
0.50
0.00
12.0
14.0
Xrth
16.0(kg TSS.m-3)
18.0
20.0
22.0
MNl =
MNp =
Nl =
Pl =
Nte =
Pte =
MSti =
MOc =
OUR =
Pb,avg =
Pb,max =
Pdiss =
233.0
58.3
19.4
4.85
30.6
10.1
fav =
MEv =
Rdp =
Rdn =
MSd =
MSxve =
MEve =
MEte =
Xte =
fve =
conversion effic.
Mch4 =
Pch4 =
0.72
2330
0.494
0.138
1376
2120
1413
2412
12.3
0.59
0.35
344
70
(-)
kg CZV/d
Nitrogen
(-)
mg N/l
0.10
0.45
0.18
0.27
1.00
780
3524
1376
2120
7800
Nti =
Nl =
Nle =
Nld =
Nte,max =
Nte,min =
Bn =
1.00
0.39
0.24
0.15
0.76
0.61
1.00
50.0
19.4
11.8
7.6
38.2
30.6
50.0
Phosphorus
Pti =
Pl =
Ple =
Pld =
Pte,max =
Pte,min =
Bp =
(-)
mg P/l
0.32
0.20
0.13
0.80
0.68
1.00
15
4.9
2.9
1.9
12.1
10.1
15.0
D - Financial Analysis
i=
n=
0.06
20
a_i,n =
anual =
11.5
0.087
Construction costs
Volume
Costs
Aeration Tank
Final Settler
Thickener
Digester
Aeration Equipment
4,161
2,011
832
4,896
184
730,000
600,000
330,000
1,710,000
640,000
8%
7%
4%
20%
7%
11,900
3,250,000
4,010,000
1,400,000
5,410,000
8,660,000
46%
16%
62%
38%
Per yer
US$ ct per m3
760,000
160,000
180,000
260,000
90,000
170,000
30,000
0
890,000
1,650,000
17.4
3.7
4.1
5.9
2.1
3.9
0.7
0.0
20.3
37.7
Fraction
46%
10%
11%
16%
5%
10%
2%
0%
54%
100%
Symbol list
Symbol
Description
a_i,n =
annualization factor
b=
decay rate
Bn =
mass balance recovery factor for nitrogen
Bo =
mass balance recovery factor for COD
Bp =
mass balance recovery factor for phosphorus
Cae =
construction cost of aeration system
Cd =
construction cost of the final settler
Cdi =
construction cost of the anaerobic digester
Cel =
cost of electricity
Ch =
cost of heating (gas)
conversion effic.efficiency of gas motor
Cr =
construction cost of the aeration tank
Cr =
specific active sludge production per unit mass daily applied biodegradable COD
Csd =
cost of sludge disposal
Cth =
construction cost of the thickener
DSVI =
diluted sludge volume index
eta =
oxygen transfer efficiency
f=
endogenous residue
fac =
fraction of construction costs for additional units
fat =
active sludge fraction
fav =
active fraction of volatile sludge
fcv =
proportionality constant between bacterial mass and mass of COD
fi =
additional investment costs (non construction)
Fl =
limiting solids flux
fn =
nitrogen fraction in biomass
fnp =
non biodegradable, particulate influent COD fraction
fns =
non biodegradable, soluble influent COD fraction
fp =
phosphorus fraction in biomass
fv =
ratio between volatile and total sludge concentration
fve =
volatile sludge fraction in stabilized sludge
Unit of measure
(-)
1/d
(-)
(-)
(-)
US$/kW
US$/m3
US$/m3
US$/kWh
US$/m3 natural gas
%
US$/m3
mg VSS/(mg COD/d)
US$/ton sludge
US$/m3
ml/g TSS
kg O2/kWh
mg VSS/mg VSS
(-)
mg VSS/mg TSS
mg VSS/mg VSS
mg COD/mg VSS
(-)
kg TSS/(m2*d)
mg N/mg VSS
mg COD/mg COD
mg COD/mg COD
mg P/mg VSS
mg VSS/mg TSS
mg VSS/mg TSS
Symbol
Description
Unit of measure
Hd =
Hth =
i=
I=
k=
m=
Mch4 =
MEt =
MEte =
MEv =
MEve =
MNl =
MNp =
MOc =
mSd =
MSd =
mSo =
mSte =
MSti =
MSxve =
mSXve =
mXa =
MXa =
mXe =
MXe =
mXi =
MXi =
mXt =
MXt=
mXv =
MXv =
n=
n=
m
m
%
US$
l/g TSS
% of I per year
kg CH4/d
kg TSS/m3
kg TSS/d
kg VSS/m3
kg VSS/d
kg N/d
kg P/d
kg O2/d
(-)
kg COD/d
(-)
(-)
kg COD/d
kg COD/d
(-)
mg VSS/(mg COD/d)
kg VSS
mg VSS/(mg COD/d)
kg VSS
mg VSS/(mg COD/d)
kg VSS
mg TSS/(mg COD/d)
kg TSS
mg VSS/(mg COD/d)
kg VSS
% of I per year
years
Symbol
Description
Unit of measure
Nl =
Nld =
Nle =
Nte =
Nte,max =
Nte,min =
Nti =
o=
OUR =
p=
P.E. =
Pb,avg =
Pb,max =
Pch4 =
Pdiss =
Pl =
Pl =
Pld =
Ple =
Pte =
Pte,max =
Pte,min =
Pti =
q=
qth =
Rdi =
Rdn =
mg N/l
mg N/l
mg N/l
mg N/l
mg N/l
mg N/l
mg N/l
% of I per year
mg O2/(l.h)
% of I per year
--kW
kW
kW
W/m3
mg P/l
mg P/l
mg P/l
mg P/l
mg P/l
mg P/l
mg P/l
mg P/l
m3/d
m3/d
days
(-)
Symbol
Description
Unit of measure
Rdp =
Rs =
Rth =
sc =
Sfd =
Sfth =
Sti =
T dig =
T max =
T min =
Vd =
Vdi =
vo =
Vt =
Vth =
Xa =
Xr =
Xt =
Xte =
Xthl =
Xthr =
Xv =
Y=
(-)
days
hours
(-)
(-)
(-)
mg COD/l
deg C
deg C
deg C
m3
m3
m/d
m3
m3
kg VSS/m3
kg TSS/m3
kg TSS/m3
kg TSS/m3
kg TSS/m3
kg TSS/m3
kg VSS/m3
mg VSS/mg COD