Sie sind auf Seite 1von 6

Federal Register / Vol. 71, No.

188 / Thursday, September 28, 2006 / Notices 56977

EPA’s response to any comments ADDRESSES: Direct all comments to commence on March 7, 2007 (Auction
received will be available for public David Rostker, Office of Management No. 70). This document also seeks
inspection at the U.S. Environmental and Budget, Office of Information and comments on minimum opening bids
Protection Agency, 75 Hawthorne Regulatory Affairs, NEOB, Room 10202, and other procedures for Auction No.
Street, San Francisco, CA 94105. Washington, DC 20503 (202) 395–3897. 70.
DATES: Comments must be submitted on SUPPLEMENTARY INFORMATION: DATES: Comments are due on or before
or before October 30, 2006. October 5, 2006, and reply comments
Availability: The proposed settlement Titles and Form Numbers
are due on or before October 13, 2006.
is available for public inspection at the EIB 92–31 Notification by Insured of ADDRESSES: Comments and reply
U.S. Environmental Protection Agency, Amounts Payable Under Multi-Buyer comments must be identified by AU
75 Hawthorne Street, San Francisco, CA Export Credit Insurance Policy. Docket No. 06–170; DA 06–1810. The
94105. A copy of the proposed EIB 92–32 Notification by Insured of Bureaus request that a copy of all
settlement may be obtained from Amounts Payable Under Single-Buyer comments and reply comments be
Bethany Dreyfus, Assistant Regional Export Credit Insurance Policy. submitted electronically to the
Counsel (ORC–3), Office of Regional EIB 92–53 Small Business Multi-Buyer following address: auction70@fcc.gov.
Counsel, U.S. EPA Region IX, 75 Export Credit Insurance Policy (ENB/
Hawthorne Street, San Francisco, CA In addition, comment and reply
ENV) Enhanced Assignment of Policy comments may be submitted by any of
94105. Comments should reference Proceeds.
‘‘Environmental Education Center, the following methods:
EIB 99–17 Single Buyer Export Credit • Federal eRulemaking Portal: http://
South Bay Asbestos Area Superfund Insurance Policy (ESS/ESSP) www.regulations.gov. Follow the
Site,’’ and ‘‘Docket No. R9–2006–14’’. Enhanced Assignment of Policy instructions for submitting comments.
FOR FURTHER INFORMATION CONTACT: Proceeds. • Federal Communications
Bethany Dreyfus, Assistant Regional Commission’s Web site: http://
OMB Numbers: None.
Counsel (ORC–3), Office of Regional www.fcc.gov/cgb/ecfs/. Follow the
Type of Review: Regular.
Counsel, U.S. EPA Region IX, 75 instructions for submitting comments.
Hawthorne Street, San Francisco, CA Need and Use: The information
requested allows for the assignment of • People with Disabilities: Contact
94105; e-mail: the FCC to request reasonable
dreyfus.bethany@epa.gov; phone: (415) the proceeds of an insurance policy to
a financial institution. accommodations (accessible format
972–3886. documents, sign language interpreters,
Affected Public: The form affects
Dated: September 5, 2006. entities involved in the export of U.S. CART, etc.) by e-mail: FCC504@fcc.gov
E. Adams, goods and services. or phone: 202–418–0530 or TTY: 202–
Acting Director, Superfund Division, U.S. Estimated Annual Respondents: 170 418–0432.
EPA, Region IX. (new estimate). • Paper Filers: Parties who choose to
[FR Doc. E6–15977 Filed 9–27–06; 8:45 am] Estimated Responses: 680 (4 originals file by paper must file an original and
BILLING CODE 6560–50–P per respondent). four copies of each filing. Filings can be
Estimated time per Respondent: 10 sent by hand or messenger delivery, by
minutes. commercial overnight courier, or by
EXPORT-IMPORT BANK Estimate Annual Burden: 113.33 first-class or overnight U.S. Postal
hours (new estimate). Service mail (although the Bureaus
[Public Notice 91] continues to experience delays in
Frequency of Reporting or Use:
annually for an enhanced assignment receiving U.S. Postal Service mail). All
Agency Information Collection
and once for the life of a policy for the filings must be addressed to the
Activities: Submission for OMB
standard assignment. Commission’s Secretary, Attn: WTB/
Review; Comment Request
ASAD, Office of the Secretary, Federal
Dated: September 22, 2006. Communications Commission.
AGENCY: Export-Import Bank of the U.S.
ACTION: Notice and Request for
Solomon Bush, • The Commission’s contractor will
Comments. Agency Clearance Officer. receive hand-delivered or messenger-
[FR Doc. 06–8325 Filed 9–27–06; 8:45 am] delivered paper filings for the
SUMMARY: The Export-Import Bank, as a BILLING CODE 6690–01–M Commission’s Secretary at 236
part of its continuing effort to reduce Massachusetts Avenue, NE., Suite 110,
paperwork and respondent burden, Washington, DC 20002. The filing hours
invites the general public and other at this location are 8 a.m. to 7 p.m.
FEDERAL COMMUNICATIONS
Federal Agencies to comment on the eastern time (ET). All hand deliveries
COMMISSION
proposed information collection, as must be held together with rubber bands
required by the Paperwork Reduction [Report No. AUC–06–70–A (Auction No. 70); or fasteners. Commercial overnight mail
Act of 1995. Our customers will be able AU Docket No. 06–170; DA 06–1810] (other than U.S. Postal Service Express
to submit this form electronically. The Mail and Priority Mail) must be sent to
proposed forms may be viewed on our Auction of FM Broadcast Construction 9300 East Hampton Drive, Capitol
Web site at http://www.exim.gov/pub/ Permits Scheduled for March 7, 2007; Heights, MD 20743.
ins/pdf/eib92-31_prop.pdf, http:// Comments Sought on Competitive • U.S. Postal Service first-class,
www.exim.gov/pub/ins/pdf/eib92- Bidding Procedures for Auction No. 70 Express, and Priority mail should be
32_prop.pdf, http://www.exim.gov/pub/ AGENCY: Federal Communications addressed to 445 12th Street, SW.,
ins/pdf/eib92-53_prop.pdf, http:// Commission. Washington, DC 20554.
sroberts on PROD1PC70 with NOTICES

www.exim.gov/pub/ins/pdf/eib99- FOR FURTHER INFORMATION CONTACT:


ACTION: Notice.
17_prop.pdf. Media Bureau, Audio Division, for rules
DATES: Written comments should be SUMMARY: This document announces the service questions: Lisa Scanlan or Tom
received on or before October 30, 2006 auction of certain FM broadcast Nessinger at (202) 418–2700 Wireless
to be assured of consideration. construction permits scheduled to Telecommunications Bureau, Auctions

VerDate Aug<31>2005 20:16 Sep 27, 2006 Jkt 208001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1
56978 Federal Register / Vol. 71, No. 188 / Thursday, September 28, 2006 / Notices

and Spectrum Access Division, for II. Bureaus Seek Comment on Auction closes simultaneously on all
auctions legal questions: Lynne Milne at Procedures construction permits. More specifically,
(202) 418–0660. For general auction 3. Consistent with the provisions of bidding will close simultaneously on all
questions: Jeff Crooks at (202) 418–0660 section 309(j)(3) of the Communications construction permits after the first
or Linda Sanderson at (717) 338–2888. Act of 1934, as amended, and to ensure round in which no bidder submits any
that potential bidders have adequate new bids, applies a proactive waiver, or,
SUPPLEMENTARY INFORMATION: This is a if applicable, withdraws any
summary of the Commission’s Auction time to familiarize themselves with the
specific rules that will govern the day- provisionally winning bids. Thus,
No. 70 Comment Public Notice released unless circumstances dictate otherwise,
on September 21, 2006. The complete to-day conduct of an auction, the
Bureaus seek comment on the following bidding will remain open on all
text of the Auction No. 70 Comment construction permits until bidding stops
Public Notice, including attachments issues relating to Auction No. 70.
on every construction permit.
and related Commission documents, is A. Auction Structure 9. The Bureaus propose to retain the
available for public inspection and discretion to exercise any of the
copying from 8 a.m. to 4:30 p.m. ET i. Simultaneous Multiple Round
following options during Auction No.
Auction Design 70: (a) Use a modified version of the
Monday through Thursday or from 8
a.m. to 11:30 a.m. ET on Fridays in the 4. The Bureaus propose to award all simultaneous stopping rule, based on
FCC Reference Information Center, construction permits included in the failure to submit during a prior
Portals II, 445 12th Street, SW., Room Auction No. 70 in a simultaneous round of a waiver or a new bid by a
CY–A257, Washington, DC 20554. The multiple-round (SMR) auction. This bidder who is not a provisionally
Auction No. 70 Comment Public Notice, type of auction offers every construction winning bidder for that construction
including attachments and related permit for bid at the same time and permit, as described in the Auction No.
Commission documents also may be consists of successive bidding rounds in 70 Comment Public Notice; (b) keep the
purchased from the Commission’s which eligible bidders may place bids auction open even if no bidder submits
duplicating contractor, Best Copy and on individual construction permits. A any new bids or applies a waiver; and
Printing, Inc. (BCPI), Portals II, 445 12th bidder may bid on, and potentially win, (c) declare that the auction will end
Street, SW., Room CY–B402, any number of construction permits. after a specified number of additional
Washington, DC 20554, telephone 202– Typically, bidding remains open on all rounds (special stopping rule).
construction permits until bidding stops 10. The Bureaus propose to exercise
488–5300, facsimile 202–488–5563, or
on every construction permit, unless a these options only in certain
you may contact BCPI at its Web site:
modified stopping rule is invoked. The circumstances, for example, where the
http://www.BCPIWEB.com. When
Bureaus seek comment on this proposal. auction is proceeding very slowly, there
ordering documents from BCPI, please is minimal overall bidding activity, or it
provide the appropriate FCC document ii. Round Structure appears likely that the auction will not
number for example, DA 06–1810. The 5. The Commission will conduct close within a reasonable period of time.
Auction No. 70 Comment Public Notice Auction No. 70 over the Internet. Before exercising these options, the
and related documents also are available Alternatively, telephonic bidding also Bureaus are likely to attempt to increase
on the Internet at the Commission’s Web will be available. the pace of the auction by, for example,
site: http://wireless.fcc.gov/ 6. The initial bidding schedule will be increasing the number of bidding
auctions/70/. announced in a public notice to be rounds per day, and/or changing the
I. Constuction Permits to be Offered in released at least one week before the minimum acceptable bids. The Bureaus
Auction No. 70 start of the auction. The SMR format seek comment on these proposals.
will consist of sequential bidding
iv. Information Relating to Auction
1. The Media and Wireless rounds, each followed by the release of
Delay, Suspension, or Cancellation
Telecommunications Bureaus (Bureaus) round results.
announce that Auction No. 70 will offer 7. The Bureaus have the discretion to 11. For Auction No. 70, the Bureaus
124 construction permits in the FM change the bidding schedule in order to propose that, by public notice or by
broadcast service as listed in foster an auction pace that reasonably announcement during the auction, the
balances speed with the bidders’ need to Bureaus may delay, suspend, or cancel
Attachment A of the Auction No. 70
study round results and adjust their the auction in the event of natural
Comment Public Notice.
bidding strategies. The Bureaus may disaster, technical obstacle, evidence of
2. Attachment A of the Auction No. 70 increase or decrease the amount of time an auction security breach, unlawful
Comment Public Notice lists vacant FM for the bidding rounds and review bidding activity, administrative or
allotments, reflecting FM channels periods, or the number of rounds per weather necessity, or for any other
assigned to the Table of FM Allotments, day, depending upon the bidding reason that affects the fair and efficient
47 CFR 73.202(b), pursuant to the activity level and other factors. The conduct of competitive bidding. In such
Commission’s established rulemaking Bureaus seek comment on this proposal. cases, the Bureaus, in their sole
procedures, designated for use in the discretion, may elect to resume the
indicated community. Pursuant to the iii. Stopping Rule auction starting from the beginning of
policies established in the Broadcast 8. The Bureaus have discretion to the current round, resume the auction
First Report and Order, 64 FR 24523, establish stopping rules before or during starting from some previous round, or
May 7, 1999, applicants may apply for multiple round auctions in order to cancel the auction in its entirety.
any vacant FM allotment, as specified in terminate the auction within a Network interruption may cause the
Attachment A. Applications specifying reasonable time. For Auction No. 70, the Bureaus to delay or suspend the
sroberts on PROD1PC70 with NOTICES

the same FM allotment will be Bureaus propose to employ a auction. The Bureaus emphasize that
considered mutually exclusive and, simultaneous stopping rule approach. A exercise of this authority is solely
thus, the construction permit for the FM simultaneous stopping rule means that within the discretion of the Bureaus,
allotment will be awarded by all construction permits remain and its use is not intended to be a
competitive bidding procedures. available for bidding until bidding substitute for situations in which

VerDate Aug<31>2005 20:16 Sep 27, 2006 Jkt 208001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1
Federal Register / Vol. 71, No. 188 / Thursday, September 28, 2006 / Notices 56979

bidders may wish to apply their activity total number of bidding units. The maintain its current bidding eligibility
rule waivers. The Bureaus seek Bureaus seek comment on this proposal. is required to be active on 95 percent of
comment on this proposal. its current bidding eligibility. Failure to
ii. Activity Rule
maintain the requisite activity level will
B. Bidding Procedures 14. In order to ensure that an auction result in a reduction in the bidder’s
i. Upfront Payments and Bidding closes within a reasonable period of bidding eligibility in the next round of
Eligibility time, an activity rule requires bidders to bidding (unless an activity rule waiver
bid actively throughout the auction, is used). During Stage Two, a bidder’s
12. The Bureaus have delegated rather than wait until late in the auction reduced eligibility for the next round
authority and discretion to determine an before participating. A bidder’s activity will be calculated by multiplying the
appropriate upfront payment for each in a round will be the sum of the bidder’s current round activity by
FM construction permit being bidding units associated with any twenty-nineteenths (20⁄19).
auctioned, taking into account such construction permits upon which it 17. The Bureaus seek comment on
factors as the efficiency of the auction places bids during the current round this proposal. Commenters that believe
process and the potential value of and the bidding units associated with this activity rule should be modified
similar spectrum. The upfront payment any construction permits for which it should explain their reasoning and
is a refundable deposit made by each holds provisionally winning bids. comment on the desirability of an
bidder to establish eligibility to bid on Bidders are required to be active on a alternative approach. The Bureaus also
construction permits. Upfront payments specific percentage of their current invite comment on, in the alternative,
related to the specific spectrum subject bidding eligibility during each round of conducting the auction with a single
to auction protect against frivolous or the auction. Failure to maintain the stage that would use an activity
insincere bidding and provide the requisite activity level will result in the requirement of 100 percent.
Commission with a source of funds from use of an activity rule waiver, if any Commenters are advised to support
which to collect payments owed at the remain, or a reduction in the bidder’s their claims with analyses and
close of the auction. With these eligibility, possibly curtailing or suggested alternative activity rules.
guidelines in mind, the Bureaus propose eliminating the bidder’s ability to place
bids in the auction. iii. Activity Rule Waivers and Reducing
the schedule of upfront payments for Eligibility
each construction permit as set forth in 15. The Bureaus propose to divide the
Attachment A of the Auction No. 70 auction into two stages, each 18. Use of an activity rule waiver
Comment Public Notice. The Bureaus characterized by a different activity preserves the bidder’s eligibility despite
seek comment on this proposal. requirement. The auction will start in the bidder’s activity in the current
Stage One. It proposes that the auction round being below the required
13. The Bureaus further propose that generally will advance from Stage One minimum level. An activity rule waiver
the amount of the upfront payment to Stage Two when the auction activity applies to an entire round of bidding
submitted by a bidder will determine level, as measured by the percentage of and not to a particular construction
the maximum number of bidding units bidding units receiving new permit. Activity rule waivers can be
on which a bidder may place bids. This provisionally winning bids, is either proactive or automatic and are
limit is a bidder’s initial bidding approximately twenty percent or below principally a mechanism for auction
eligibility. Each FM construction permit for three consecutive rounds of bidding. participants to avoid the loss of bidding
is assigned a specific number of bidding However, the Bureaus further propose eligibility in the event that exigent
units equal to the upfront payment that it retain the discretion to change circumstances prevent them from
listed in Attachment A of the Auction stages unilaterally by announcement placing a bid in a particular round.
No. 70 Comment Public Notice, on a during the auction. In exercising this 19. The Commission’s Integrated
bidding unit per dollar basis. Bidding discretion, the Bureaus will consider a Spectrum Auction System (‘‘ISAS’’ or
units for a given construction permit do variety of measures of bidder activity, ‘‘FCC Auction System’’) assumes that a
not change as prices rise during the including, but not limited to, the bidder that does not meet the activity
auction. A bidder’s upfront payment is auction activity level, the percentage of requirement would prefer to apply an
not attributed to specific construction construction permits (as measured in activity rule waiver (if available) rather
permits. Rather, a bidder may place bids bidding units) on which there are new than lose bidding eligibility. Therefore,
on any combination of construction bids, and the number of new bids. the system will automatically apply a
permits that it selected in its short form 16. For Auction No. 70, the Bureaus waiver at the end of any bidding round
application (FCC Form 175), as long as propose the following activity where a bidder’s activity level is below
the total number of bidding units requirements: Stage One: In each round the minimum required unless: (1) The
associated with those construction of the first stage of the auction, a bidder bidder has no activity rule waivers
permits does not exceed the bidder’s desiring to maintain its current bidding available; or (2) the bidder overrides the
current eligibility. In order to bid on a eligibility is required to be active on automatic application of a waiver by
construction permit, qualified bidders construction permits representing at reducing eligibility, thereby meeting the
must have an eligibility level that meets least 75 percent of its current bidding minimum requirement. If a bidder has
or exceeds the number of bidding units eligibility. Failure to maintain the no waivers remaining and does not
assigned to that construction permit. requisite activity level will result in a satisfy the required activity level, its
Eligibility cannot be increased during reduction in the bidder’s bidding eligibility will be permanently reduced,
the auction; it can only remain the same eligibility in the next round of bidding possibly curtailing or eliminating the
or decrease. Thus, in calculating its (unless an activity rule waiver is used). bidder’s ability to place additional bids
upfront payment amount, an applicant During Stage One, a bidder’s reduced in the auction.
sroberts on PROD1PC70 with NOTICES

must determine the maximum number eligibility for the next round will be 20. A bidder with insufficient activity
of bidding units it may wish to bid on calculated by multiplying the bidder’s may wish to reduce its bidding
(or hold provisionally winning bids on) current round activity by four-thirds eligibility rather than use an activity
in any single round, and submit an (4⁄3). Stage Two: In each round of the rule waiver. If so, the bidder must
upfront payment amount covering that second stage, a bidder desiring to affirmatively override the automatic

VerDate Aug<31>2005 20:16 Sep 27, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1
56980 Federal Register / Vol. 71, No. 188 / Thursday, September 28, 2006 / Notices

waiver mechanism during the bidding effective bidding tool for accelerating provisionally winning bid for a
round by using the reduce eligibility the competitive bidding process. The construction permit, the minimum
function in the FCC Auction System. In Bureaus do not propose a separate acceptable bid amount will be
this case, the bidder’s eligibility is reserve price for the construction calculated by multiplying the
permanently reduced to bring the bidder permits to be made available in Auction provisionally winning bid amount times
into compliance with the activity rules No. 70. one plus the minimum acceptable bid
as described above. Reducing eligibility 25. For Auction No. 70, the proposed percentage. If, for example, the
is an irreversible action. Once eligibility minimum opening bids were minimum acceptable bid percentage is
has been reduced, a bidder will not be determined by taking into account 10 percent, the minimum acceptable bid
permitted to regain its lost bidding various factors related to the efficiency amount will equal (provisionally
eligibility, even if the round has not yet of the auction and the potential value of winning bid amount) * (1.10), rounded.
closed. the spectrum, including the type of 29. The eight additional bid amounts
21. A bidder may apply an activity service and class of facility offered, are calculated using the minimum
rule waiver proactively as a means to market size, population covered by the acceptable bid amount and a bid
keep the auction open without placing proposed FM broadcast facility, increment percentage, which need not
a bid. If a bidder proactively applies an industry cash flow data and recent be the same as the percentage used to
activity rule waiver (using the apply broadcast transactions. The specific calculate the minimum acceptable bid
waiver function in the FCC Auction minimum opening bid for each amount. The first additional acceptable
System) during a bidding round in construction permit available in bid amount equals the minimum
which no bids or withdrawals (if Auction No. 70 is set forth in acceptable bid amount times one plus
permitted) are submitted, the auction Attachment A of the Auction No. 70 the bid increment percentage, rounded.
will remain open and the bidder’s Comment Public Notice. The Bureaus If, for example, the bid increment
eligibility will be preserved. An seek comment on this proposal. percentage is 10 percent, the calculation
automatic waiver applied by the FCC 26. If commenters believe that these is (minimum acceptable bid amount) *
Auction System in a round in which minimum opening bid amounts will (1 + 0.10), rounded, or (minimum
there are no new bids or withdrawals (if result in unsold construction permits, or acceptable bid amount) * 1.10, rounded;
permitted) will not keep the auction are not reasonable amounts, they should the second additional acceptable bid
open. A bidder cannot submit a explain why this is so, and comment on amount equals the minimum acceptable
proactive waiver after submitting a bid the desirability of an alternative bid amount times one plus two times
in a round, and submitting a proactive approach. Commenters are advised to the bid increment percentage, rounded,
waiver will preclude a bidder from support their claims with valuation or (minimum acceptable bid amount) *
placing any bids in that round. analyses and suggested reserve prices or 1.20, rounded; the third additional
Applying a waiver is irreversible; once minimum opening bid amount levels or acceptable bid amount equals the
a proactive waiver is submitted, that formulas. In establishing the minimum minimum acceptable bid amount times
waiver cannot be unsubmitted, even if opening bid amounts, the Bureaus one plus three times the bid increment
the round has not yet closed. particularly seek comment on such percentage, rounded, or (minimum
22. The Bureaus propose that each factors as the potential value of the acceptable bid amount) * 1.30, rounded;
bidder in Auction No. 70 be provided spectrum being auctioned, including the etc. The Bureaus will round the result
with three activity rule waivers that may type of service and class of facility using our standard rounding
be used at the bidder’s discretion during offered, market size, population covered procedures.
the course of the auction. The Bureaus by the proposed FM broadcast facility 30. For Auction No. 70, the Bureaus
seek comment on this proposal. and other relevant factors that could propose to use a minimum acceptable
reasonably have an impact on valuation bid percentage of 10 percent. This
iv. Reserve Price or Minimum Opening
of the broadcast spectrum. The Bureaus means that the minimum acceptable bid
Bid
also seek comment on whether, amount for a construction permit will be
23. The Bureaus seek comment on the consistent with section 309(j), the approximately 10 percent greater than
use of a minimum opening bid amount public interest would be served by the provisionally winning bid amount
and/or a reserve price in Auction No. having no minimum opening bid for the construction permit. The
70. Normally, a reserve price is an amount or reserve price. Bureaus also propose to use a bid
absolute minimum price below which increment percentage of 10 percent to
an item will not be sold in a given v. Bid Amounts
calculate the eight additional acceptable
auction. Reserve prices can be either 27. The Bureaus propose that, in each bid amounts.
published or unpublished. A minimum round, eligible bidders be able to place 31. The Bureaus retain the discretion
opening bid amount, on the other hand, bids on a given construction permit in to change the minimum acceptable bid
is the minimum bid price set at the any of nine different amounts, if a amounts, the minimum acceptable bid
beginning of the auction below which bidder has sufficient eligibility to place percentage, and the bid increment
no bids are accepted. It is generally used a bid on that construction permit. Under percentage if they determine that
to accelerate the competitive bidding this proposal, the FCC Auction System circumstances so dictate. The Bureaus
process. The auctioneer has the interface will list the nine acceptable will do so by announcement in the FCC
discretion to lower minimum opening bid amounts for each construction Auction System during the auction. The
bid amounts during the course of the permit. Bureaus seek comment on these
auction. It is also possible for the 28. The first of the nine acceptable bid proposals.
minimum opening bid amount and the amounts is called the minimum
reserve price to be the same amount. acceptable bid amount. The minimum vi. Provisionally Winning Bids
sroberts on PROD1PC70 with NOTICES

24. The Bureaus propose to establish acceptable bid amount for a 32. Provisionally winning bids are
minimum opening bid amounts for construction permit will be equal to its bids that would become final winning
Auction No. 70. The Bureaus believe a minimum opening bid amount until bids if the auction were to close in that
minimum opening bid amount, which there is a provisionally winning bid for given round. At the end of a bidding
has been used in other auctions, is an the construction permit. After there is a round, a provisionally winning bid

VerDate Aug<31>2005 20:16 Sep 27, 2006 Jkt 208001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1
Federal Register / Vol. 71, No. 188 / Thursday, September 28, 2006 / Notices 56981

amount for each construction permit fewer incentives to aggregate permits FM channel(s) on which they plan to
will be determined based on the highest through the auction process (as bid. Reports and Orders adopted in FM
bid amount received for the compared with bidders in many allotment rulemaking proceedings often
construction permit. In the event of auctions of wireless licenses). The include anomalies such as site
identical high bid amounts being Bureaus also remain mindful that restrictions or expense reimbursement
submitted on a construction permit in a withdrawals, particularly those made in requirements. Additionally, potential
given round (i.e., tied bids), the Bureaus late stages of an auction, could result in bidders should perform technical
will use a random number generator to delays in licensing new FM stations and analyses sufficient to assure them that,
select a single provisionally winning bid attendant delays in the offering of new should they prevail in competitive
from among the tied bids. (Each bid is broadcast service to the public. bidding for a given FM construction
assigned a random number, and the tied 37. As an alternative, the Bureaus permit, they will be able to build and
bid with the highest random number seek comment on whether to permit operate facilities that will fully comply
wins the tiebreaker.) The remaining each bidder to withdraw provisionally with the Commission’s technical and
bidders, as well as the provisionally winning bids in no more than one round legal requirements. Applicants are
winning bidder, can submit higher bids during the course of the auction. To strongly encouraged to inspect any
in subsequent rounds. However, if the permit a bidder to withdraw bids in prospective transmitter sites located in,
auction were to end with no other bids more than one round may encourage or near, the service area for which they
being placed, the winning bidder would insincere bidding or the use of plan to bid, and also to familiarize
be the one that placed the selected withdrawals for anti-competitive themselves with the Commission’s rules
provisionally winning bid. If any bids purposes. The round in which a regarding the National Environmental
are received on the construction permit withdrawal may be used would be at the Policy Act.
in a subsequent round, the provisionally bidder’s discretion; bid withdrawal 40. Potential bidders are strongly
winning bid again will be determined otherwise must be in accordance with encouraged to conduct their own
by the highest bid amount received for the Commission’s rules. Should this research prior to Auction No. 70 in
the construction permit. approach be adopted, there would no order to determine the existence of
33. A provisionally winning bid will limit on the number of provisionally pending proceedings, including pending
remain the provisionally winning bid winning bids that may be withdrawn in rulemaking proceedings that might
until there is a higher bid on the same the round in which a withdrawal is affect their decisions regarding
construction permit at the close of a used. Any withdrawal would remain participation in the auction. Participants
subsequent round. Bidders are subject to the bid withdrawal payment in Auction No. 70 are strongly
reminded that provisionally winning provisions specified in the encouraged to continue such research
bids count toward activity for purposes Commission’s rules. during the auction.
of the activity rule. 38. If permitted, a bidder would have
the option to withdraw its provisionally D. Post-Auction Procedures
vii. Bid Removal and Bid Withdrawal winning bids using the ‘‘withdraw bids’’ i. Establishing the Interim Withdrawal
34. For Auction No. 70, the Bureaus function in the FCC Auction System. A Payment Percentage
propose the following bid removal bidder that withdraws its provisionally
procedures. Before the close of a winning bid(s) would be subject to the 41. As noted above, the Bureaus
bidding round, a bidder has the option bid withdrawal payment provisions of propose not to permit bids to be
of removing any bid placed in that the Commission rules. withdrawn in Auction No. 70. However,
round. By removing selected bids in the in the event that Bureaus choose to
FCC Auction System, a bidder may C. Due Diligence permit bidders to withdraw bids in
effectively unsubmit any bid placed 39. Potential bidders are solely Auction No. 70, we seek comment on
within that round. In contrast to the bid responsible for investigating and the appropriate percentage of a
withdrawal provisions described below, evaluating all technical and market withdrawn bid that should be assessed
a bidder removing a bid placed in the place factors that may have a bearing on as an interim withdrawal payment,
same round is not subject to any the value of the broadcast facilities in which is an amount that is assessed in
penalties. Once a round closes, a bidder this auction. The FCC makes no the event that a final withdrawal
may no longer remove a bid. representations or warranties about the payment cannot be determined at the
35. The Bureaus also seek comment use of this spectrum for particular close of the auction. In general, the
on bid withdrawal procedures to be services. Applicants should be aware Commission’s rules provide that a
used for Auction No. 70. Where that an FCC auction represents an bidder that withdraws a bid during an
permitted, bid withdrawals provide a opportunity to become an FCC auction is subject to a withdrawal
bidder with the option of withdrawing permittee in the broadcast service, payment equal to the difference between
bids placed in prior rounds that have subject to certain conditions and the amount of the withdrawn bid and
become provisionally winning bids. A regulations. An FCC auction does not the amount of the winning bid in the
bidder that withdraws any of its constitute an endorsement by the FCC of same or subsequent auction(s).
provisionally winning bids is subject to any particular service, technology, or However, if a permit for which there has
the bid withdrawal payment provisions product, nor does an FCC construction been a withdrawn bid is neither subject
of the Commission rules. permit or license constitute a guarantee to a subsequent higher bid nor won in
36. For Auction No. 70, the Bureaus of business success. Applicants should the same auction, the final withdrawal
propose to prohibit bidders from perform their individual due diligence payment cannot be calculated until a
withdrawing any bids after the round in before proceeding as they would with corresponding permit is subject to a
which bids were placed has closed. The any new business venture. In particular, higher bid or won in a subsequent
sroberts on PROD1PC70 with NOTICES

Bureaus proposal is made in recognition potential bidders are strongly auction. When that final payment
of the site-specific nature and wide encouraged to review all underlying cannot yet be calculated, the bidder
geographic dispersion of the permits Commission orders, such as the specific responsible for the withdrawn bid is
available in this auction, which suggests Report and Order amending the FM assessed an interim bid withdrawal
that FM broadcast interests may have Table of Allotments and allotting the payment, which will be applied toward

VerDate Aug<31>2005 20:16 Sep 27, 2006 Jkt 208001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1
56982 Federal Register / Vol. 71, No. 188 / Thursday, September 28, 2006 / Notices

any final bid withdrawal payment that bidder’s bid and the amount of the and written ex parte presentations in
is ultimately assessed. The winning bid the next time a permit-but-disclose proceedings are set
Commission’s recently adopted rules construction permit covering the same forth in 47 CFR 1.1206(b).
provide that in advance of the auction, spectrum is won in an auction, plus an Federal Communications Commission.
the Commission shall establish the additional payment equal to a Gary D. Michaels,
percentage of the withdrawn bid to be percentage of the defaulter’s bid or of
Deputy Chief, Auctions and Spectrum Access
assessed as an interim bid withdrawal the subsequent winning bid, whichever
Division, WTB.
payment between three percent and is less. Until recently, this additional
[FR Doc. 06–8366 Filed 9–27–06; 8:45 am]
twenty percent. payment for most auctions has been set
42. When it adopted the new rule, the at three percent of the defaulter’s bid or BILLING CODE 6712–01–P

Commission indicated that the level of of the subsequent winning bid,


the interim withdrawal payment in a whichever is less.
particular auction will be based on the 45. On January 24, 2006, the
nature of the service and the inventory Commission released the Commercial FEDERAL ELECTION COMMISSION
of the authorizations being offered. The Spectrum Enhancement Act Report and
Sunshine Act Meeting Notice
Commission noted that it may impose a Order (CSEA/Part 1 Report and Order),
higher interim withdrawal payment 71 FR 6214, February 7, 2006, in which PREVIOUSLY SCHEDULED DATE AND TIME:
percentage to deter the anti-competitive it modified § 1.2104(g)(2) by increasing Thursday, September 28, 2006, Meeting
use of withdrawals when, for example, the three percent limit on the additional Open to the Public. This meeting was
bidders likely will not need to aggregate default payment for non-combinatorial cancelled.
permits offered, such as when few auctions to twenty percent. Under the
DATE AND TIME: Tuesday, October 3, 2006
permits are offered that are not on modified rule, the Commission will, in
adjacent frequencies or in adjacent advance of each auction, establish an at 10 a.m.
areas, or there are few synergies to be additional default payment for that PLACE: 999 E Street, NW., Washington,
captured by combining permits. auction of three percent up to a DC.
43. The Commission has observed maximum of twenty percent. The level STATUS: This meeting will be closed to
that it may be appropriate to impose a of this payment in each case will be the public.
higher interim withdrawal payment based on the nature of the service and ITEMS TO BE DISCUSSED:
percentage to deter the anti-competitive the inventory of the construction Compliance matters pursuant to 2
use of withdrawals in auctions where it permits being offered. U.S.C. 437g.
is much less likely that bidders will 46. For Auction No. 70, the Bureaus
Audits conducted pursuant to 2
need to assemble complete sets of propose to establish additional default
U.S.C. 437g, 438(b), and Title 26, U.S.C.
licenses. With respect to the permits payment of twenty percent. As noted in
Matters concerning participation in
being offered in Auction No. 70, the the CSEA/Part 1 Report and Order,
civil actions or proceedings or
Bureaus have little evidence that defaults weaken the integrity of the
arbitration.
bidders have a significant need to use auctions process and may impede the
withdrawals to avoid incomplete deployment of service to the public, and Internal personnel rules and
combinations of licenses. Citing an additional default payment of more procedures or matters affecting a
experience with FM Auction No. 37, than the previous three percent will be particular employee.
among others, the Commission has more effective in deterring defaults. In DATE AND TIME: Wednesday, October 4,
‘‘observed a disproportionate number of light of its proposal for the interim bid 2006 at 10 a.m.
withdrawals late in our auctions, withdrawal payment amount as PLACE: 999 E Street, NW., Washington,
indicating that some bidders have been discussed above, the Bureaus are DC (Ninth Floor).
placing and then withdrawing bids concerned that setting an additional STATUS: This meeting will be open to the
primarily to discourage potential or default payment of less than the twenty public.
existing market competitors from percent maximum amount may
ITEMS TO BE DISCUSSED:
seeking to acquire licenses.’’ Consistent encourage post-auction defaults, which
with its interest in deterring strategic further undermine the integrity of the Correction and Approval of Minutes.
withdrawals, the Bureaus propose to auction process. In light of these Advisory Opinion 2006–20: Unity 08
establish the percentage of the considerations for Auction No. 70, the by counsel, John J. Duffy.
withdrawn bid to be assessed as an Bureaus propose an additional default Advisory Opinion 2006–24: National
interim bid withdrawal payment at the payment of twenty percent of the Republican Senatorial Committee by
maximum twenty percent permitted relevant bid. The Bureaus seek comment General Counsel William J. McGinley;
under the Commission’s rules. The on this proposal. Democratic Senatorial Campaign
Bureaus seek comment on this proposal. Committee by counsel, Marc Elias;
III. Conclusion Republican State Committee of
ii. Establishing the Additional Default 47. This proceeding has been Pennsylvania by General Counsel
Payment Percentage designated as a permit-but-disclose Lawrence J. Tabas.
44. Any winning bidder that defaults proceeding in accordance with the Report of the Audit Division on
or is disqualified after the close of an Commission’s ex parte rules. Persons Daniel Mongiardo for U.S. Senate.
auction (i.e., fails to remit the required making oral ex parte presentations are Management and Administrative
down payment within the prescribed reminded that memoranda summarizing Matters.
period of time, fails to submit a timely the presentations must contain PERSON TO CONTACT FOR INFORMATION:
long-form application, fails to make full summaries of the substance of the
sroberts on PROD1PC70 with NOTICES

Mr. Robert Biersack, Press Officer.


payment, or is otherwise disqualified) is presentations and not merely a listing of
liable for a default payment under 47 the subjects discussed. More than a one Mary W. Dove,
CFR 1.2104(g)(2). This payment consists or two sentence description of the views Secretary of the Commission.
of a deficiency payment, equal to the and arguments presented is generally [FR Doc. 06–8376 Filed 9–26–06; 2:51 pm]
difference between the amount of the required. Other rules pertaining to oral BILLING CODE 6715–01–M

VerDate Aug<31>2005 20:16 Sep 27, 2006 Jkt 208001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\28SEN1.SGM 28SEN1

Das könnte Ihnen auch gefallen