Sie sind auf Seite 1von 3

54812 Federal Register / Vol. 71, No.

181 / Tuesday, September 19, 2006 / Notices

application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions f. Location: On the Catawba River, in
the specified comment date for the on the Commission’s web site under ‘‘e- Alexander, Burke, Caldwell, Catawba,
particular application. A competing filing’’ link. The Commission strongly Gaston, Iredell, Lincoln, McDowell, and
preliminary permit application must encourages electronic filing. Mecklenburg Counties, North Carolina,
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive and on the Catawba and Wateree Rivers
o. Competing Development Documents: Any filings must bear in all in the counties of Chester, Fairfield,
Application: Any qualified development capital letters the title ‘‘COMMENTS’’, Kershaw, Lancaster, and York, South
applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS Carolina.
development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’, OR g. Filed Pursuant to: Federal Power
the Commission, on or before a ‘‘MOTION TO INTERVENE’’, as Act 16 U.S.C. 791 (a)—825(r).
specified comment date for the applicable, and the Project Number of h. Applicant Contact: Jeffrey G.
particular application, either a the particular application to which the Lineberger, Catawba-Wateree Hydro
competing development application or a filing refers. Any of the above-named Relicensing Manager; and E. Mark
notice of intent to file such an documents must be filed by providing Oakley, Catawba-Wateree Relicensing
application. Submission of a timely the original and the number of copies Project Manager, Duke Energy, Mail
notice of intent to file a development provided by the Commission’s Code EC12Y, P.O. Box 1006, Charlotte,
application allows an interested person regulations to: The Secretary, Federal NC 28201–1006.
to file the competing application no Energy Regulatory Commission, 888 i. FERC Contact: Sean Murphy at 202–
later than 120 days after the specified First Street, NE., Washington, DC 20426. 502–6145; Sean.Murphy@ferc.gov.
comment date for the particular A copy of any motion to intervene must j. Cooperating Agencies: We are
application. A competing license also be served upon each representative asking Federal, State, and local and
application must conform with 18 CFR of the Applicant specified in the tribal agencies with jurisdiction and/or
4.30(b) and 4.36. particular application. special expertise with respect to
p. Notice of Intent: A notice of intent t. Agency Comments: Federal, state,
environmental issues to cooperate with
must specify the exact name, business and local agencies are invited to file
us in the preparation of the
address, and telephone number of the comments on the described application.
environmental document. Agencies who
prospective applicant, and must include A copy of the application may be
would like to request cooperating status
an unequivocal statement of intent to obtained by agencies directly from the
should follow the instructions for filing
submit, if such an application may be Applicant. If an agency does not file
comments described in item k below.
filed, either a preliminary permit comments within the time specified for
application or a development filing comments, it will be presumed to Cooperating agencies should note the
application (specify which type of have no comments. One copy of an Commission’s policy that agencies that
application). A notice of intent must be agency’s comments must also be sent to cooperate in the preparation of the
served on the applicant(s) named in this the Applicant’s representatives. environmental document cannot also
public notice. intervene. See, 94 FERC ¶ 61,076 (2001).
Magalie R. Salas, k. Pursuant to section 4.32(b)(7) of 18
q. Proposed Scope of Studies under
Permit: A preliminary permit, if issued, Secretary. CFR of the Commission’s regulations, if
does not authorize construction. The [FR Doc. E6–15523 Filed 9–18–06; 8:45 am] any resource agency, Indian Tribe, or
term of the proposed preliminary permit BILLING CODE 6717–01–P person believes that an additional
would be 36 months. The work scientific study should be conducted in
proposed under the preliminary permit order to form an adequate factual basis
would include economic analysis, DEPARTMENT OF ENERGY for a complete analysis of the
preparation of preliminary engineering application on its merit, the resource
Federal Energy Regulatory agency, Indian Tribe, or person must file
plans, and a study of environmental
Commission a request for a study with the
impacts. Based on the results of these
studies, the Applicant would decide [Project No. 2232–522] Commission not later than 60 days from
whether to proceed with the preparation the date of filing of the application, and
of a development application to Duke Power Company LLC; Notice of serve a copy of the request on the
construct and operate the project. Application and Settlement Agreement applicant.
r. Comments, Protests, or Motions to Tendered for Filing With the l. Deadline for filing comments on the
Intervene: Anyone may submit Commission, Soliciting Comments on settlement, additional study requests,
comments, a protest, or a motion to the Settlement, Additional Study and requests for cooperating agency
intervene in accordance with the Requests, Establishing Procedural status: 60 days from the date of filing of
requirements of Rules of Practice and Schedule for Relicensing and a the application. Reply comments on the
Procedure, 18 CFR 385.210, 385.211, Deadline for Submission of Final settlement are due: 75 days from the
385.214. In determining the appropriate Amendments date of filing of the application.
action to take, the Commission will September 13, 2006.
All documents (original and eight
consider all protests or other comments Take notice that the following copies) should be filed with: Magalie R.
filed, but only those who file a motion hydroelectric application has been filed Salas, Secretary, Federal Energy
to intervene in accordance with the with the Commission and is available Regulatory Commission, 888 First
Commission’s Rules may become a for public inspection. Street, NE., Washington, DC 20426.
party to the proceeding. Any comments, a. Type of Application: New Major Comments on the settlement,
protests, or motions to intervene must License. additional study requests, and requests
be received on or before the specified b. Project No.: 2232–522. for cooperating agency status may be
pwalker on PRODPC60 with NOTICES

comment date for the particular c. Date filed: August 29, 2006. filed electronically via the Internet in
application. d. Applicant: Duke Power Company lieu of paper. The Commission strongly
Comments, protests and interventions LLC—current licensee. encourages electronic filings. See 18
may be filed electronically via the e. Name of Project: Catawba-Wateree CFR 385.2001(a)(1)(iii) and the
Internet in lieu of paper; See 18 CFR Hydroelectric Project. instructions on the Commission’s Web

VerDate Aug<31>2005 16:49 Sep 18, 2006 Jkt 208001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\19SEN1.SGM 19SEN1
Federal Register / Vol. 71, No. 181 / Tuesday, September 19, 2006 / Notices 54813

site (http://www.ferc.gov) under the ‘‘e- connected to two generators, each rated (VII) The Wylie development consists
Filing’’ link. at 18,000 kW for a total installed of the following existing facilities: (1)
m. This application is not ready for capacity of 35.7 MW; and (5) other The Wylie dam consisting of: (a) A 234-
environmental analysis at this time. appurtenances. foot-long bulkhead; (b) a 790.92-foot-
n. The existing Catawba-Wateree (IV) The Lookout Shoals development long ogee spillway section that contains
Project comprises eleven developments: consists of the following existing 2 controlled sections with a total of
(I) The Bridgewater development facilities: (1) The Lookout Shoals dam eleven Stoney gates, each 45-feet-wide
consists of the following existing consisting of: (a) A 282.08-foot-long by 30-feet-high, separated by an
facilities: (1) The Catawba dam concrete gravity bulkhead section; (b) a uncontrolled section with no gates; (c)
consisting of: (a) a 1,650-foot-long, 125- 933-foot-long uncontrolled concrete a 400.92-foot-long bulkhead; and (d) a
foot-high earth embankment; (b) a 305- gravity ogee spillway; (c) a 65-foot-long 1,595-foot-long earth embankment; (2) a
foot-long, 120-foot-high concrete gravity gravity bulkhead section; and (d) a 12,177 acre reservoir with a normal
ogee spillway; and (c) a 850-foot-long, 1,287-foot-long, 88-foot-high earth water surface elevation of 569.4 feet
125-foot-high earth embankment; (2) the embankment; (2) a 1,155 acre reservoir above msl; (3) a powerhouse integral to
Paddy Creek dam consisting of: a 1,610- with a normal water surface elevation of the dam, situated between the bulkhead
foot-long, 165-foot-high earth 838.1 feet above msl; (3) a powerhouse and the spillway near the left bank,
embankment; (3) the Linville dam integral to the dam, situated between containing four vertical Francis-type
consisting of: A 1,325-foot-long, 160- the bulkhead on the left bank and the turbines directly connected to four
foot-high earth embankment; (4) a 430- ogee spillway, containing three main generators rated at 18,000 kW for a total
foot-long uncontrolled low overflow vertical Francis-type turbines and two installed capacity of 69 MW; and (4)
weir spillway situated between Paddy smaller vertical Francis-type turbines other appurtenances.
Creek Dam and Linville Dam; (5) a 6,754 directly connected to five generators, (VIII) The Fishing Creek development
acre reservoir formed by Catawba, the three main generators rated at 8,970 consists of the following existing
Paddy Creek, and Linville with a normal kW, and the two smaller rated at 450 facilities: (1) The Fishing Creek dam
water surface elevation of 1,200 feet kW for a total installed capacity of 25.7 consisting of: (a) A 114-foot-long, 97-
above msl; (6) a 900-foot-long concrete- MW; and (4) other appurtenances. foot-high uncontrolled concrete ogee
lined intake tunnel; (7) a powerhouse (V) The Cowans Ford development spillway; (b) a 1,210-foot-long concrete
containing two vertical Francis-type consists of the following existing gravity, ogee spillway with twenty-two
turbines directly connected to two facilities: (1) The Cowans Ford dam Stoney gates, each 45-feet-wide by 25-
generators, each rated at 10,000 kW, for consisting of: (a) A 3,535-foot-long feet-high; and (c) a 214-foot-long
a total installed capacity of 20.0 MW; embankment; (b) a 209.5-foot-long concrete gravity bulkhead structure; (2)
and (8) other appurtenances. gravity bulkhead; (c) a 465-foot-long a 3,431 acre reservoir with a normal
(II) The Rhodhiss development concrete ogee spillway with eleven water surface elevation of 417.2 feet
consists of the following existing Taintor gates, each 35-feet-wide by 25- above msl; (3) a powerhouse integral to
facilities: (1) The Rhodhiss dam feet-high; (d) a 276-foot-long bulkhead; the dam, situated between the gated
consisting of: (a) A 119.58-foot-long and (e) a 3,924-foot-long earth spillway and the bulkhead structure
concrete gravity bulkhead; (b) a 800- embankment; (2) a 3,134-foot-long near the right bank, containing five
foot-long, 72-foot-high concrete gravity saddle dam (Hicks Crossroads); (3) a vertical Francis-type turbines directly
ogee spillway; (c) a 122.08-foot-long 32,339 acre reservoir with a normal connected to five generators two rated at
concrete gravity bulkhead with an water surface elevation of 760 feet above 10,530 kW and three rated at 9,450 kW
additional 8-foot-high floodwall; and (d) msl; (4) a powerhouse integral to the for a total installed capacity of 48.1 MW;
a 283.92-foot-long rolled fill earth dam, situated between the spillway and and (4) other appurtenances.
embankment; (2) a 2,724 acre reservoir the bulkhead near the right (IX) The Great Falls-Dearborn
with a normal water surface elevation of embankment, containing four vertical development consists of the following
995.1 feet above msl; (4) a powerhouse Kaplan-type turbines directly connected existing facilities: (1) The Great Falls
integral to the dam, situated between to four generators rated at 83,125 kW for diversion dam consisting of a 1,559-
the bulkhead on the left bank and the a total installed capacity of 332.5 MW; foot-long concrete section; (2) the
ogee spillway section, containing three and (5) other appurtenances. Dearborn dam consisting of: (a) A 160-
vertical Francis-type turbines directly (VI) The Mountain Island foot-long, 103-foot-high, concrete
connected to three generators, two rated development consists of the following embankment; (b) a 150-foot-long, 103-
at 12,350 kW, one rated at 8,500 kW for existing facilities: (1) The Mountain foot-high intake and bulkhead section;
a total installed capacity of 28.4 MW; Island dam consisting of: (a) A 997-foot- and (c) a 75-foot-long, 103-foot-high
and (5) other appurtenances. long, 97-foot-high uncontrolled concrete bulkhead section; (3) the Great Falls
(III) The Oxford development consists gravity ogee spillway; (b) a 259-foot-long dam consisting of: (a) A 675-foot-long,
of the following existing facilities: (1) bulkhead on the left side of the 103-foot-high concrete embankment
The Oxford dam consisting of: (a) A powerhouse; (c) a 200-foot-long situated in front of the Great Falls
74.75-foot-long soil nail wall; (b) a 193- bulkhead on the right side of the Powerhouse (and joined to the Dearborn
foot-long emergency spillway; (c) a 550- powerhouse; (d) a 75-foot-long concrete dam embankment); and (b) a 250-foot-
foot-long gated concrete gravity core wall; and (e) a 670-foot-long, 140- long intake section (within the
spillway; (d) a 112-foot-long foot-high earth embankment; (2) a 3,117 embankment); (4) the Great Falls
embankment wall situated above the acre reservoir with a normal water bypassed spillway and headworks
powerhouse; and (e) a 429.25-foot-long surface elevation of 647.5 feet above section consisting of: (a) A 446.7-foot-
earth embankment; (2) a 4,072 acre msl; (3) a powerhouse integral to the long short concrete bypassed reach
reservoir with a normal water surface dam, situated between the two uncontrolled spillway with a gated
pwalker on PRODPC60 with NOTICES

elevation of 935 feet above msl; (4) a bulkheads, containing four vertical trashway (main spillway); (b) a 583.5-
powerhouse integral to the dam, Francis-type turbines directly connected foot-long concrete headworks
situated between the gated spillway and to four generators rated at 15,000 kW for uncontrolled spillway with 4-foot-high
the earth embankment, containing two a total installed capacity of 55.1 MW; flashboards (canal spillway); and (c) a
vertical Francis-type turbines directly and (4) other appurtenances. 262-foot-long concrete headworks

VerDate Aug<31>2005 16:49 Sep 18, 2006 Jkt 208001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\19SEN1.SGM 19SEN1
54814 Federal Register / Vol. 71, No. 181 / Tuesday, September 19, 2006 / Notices

section situated perpendicular to the installed capacity of 82.0 MW; and (4) ENVIRONMENTAL PROTECTION
main spillway and the canal spillway, other appurtenances. AGENCY
containing ten opening, each 16-feet- o. A copy of the application and [Regional Docket No. V–2005–1, FRL–8220–
wide; (5) a 353 acre reservoir with a settlement agreement is available for 9]
normal water surface elevation of 355.8 review at the Commission in the Public
feet above msl; (6) two powerhouses Clean Air Act Operating Permit
Reference Room or may be viewed on
separated by a retaining wall, consisting Program; Petition for Objection to
the Commission’s Web site at http://
of: (a) Great Falls powerhouse: State Operating Permit for Onyx
Containing eight horizontal Francis-type www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the Environmental Services
turbines directly connected to eight
generators rated at 3,000 kW for an last three digits in the docket number AGENCY: Environmental Protection
installed capacity of 24.0 MW, and (b) field to access the document. For Agency (EPA).
Dearborn powerhouse: containing three assistance, contact FERC Online ACTION: Notice of final amended order
vertical Francis-type turbines directly Support at on petition to object to a title V
connected to three generators rated at FERCOnlineSupport@ferc.gov or toll- operating permit.
15,000 kW for an installed capacity of free at 1–866–208–3676, or for TTY,
42.0 MW, for a total installed capacity (202) 502–8659. A copy is also available SUMMARY: This document announces
of 66.0 MW; and (7) other for inspection and reproduction at the that the EPA Administrator has
appurtenances. address in item h above. responded to a citizen petition asking
(X) The Rocky Creek-Cedar Creek EPA to object to a Clean Air Act (Act)
You may also register online at
development consists of the following title V operating permit proposed by the
http://www.ferc.gov/docs-filing/
existing facilities: (1) A U-shaped Illinois Environmental Protection
esubscription.asp to be notified via e- Agency (IEPA). Specifically, the
concrete gravity overflow spillway with mail of new filings and issuances
(a) A 130-foot-long section (on the east Administrator has partially granted and
related to this or other pending projects. partially denied the petition submitted
side) that forms a forebay canal to the For assistance, contact FERC Online
Cedar Creek powerhouse and contains by the Sierra Club and American Bottom
Support. Conservancy to object to the proposed
two Stoney gate, each 45-feet-wide by
25-feet-high; (b) a 1,025-foot-long, 69- p. With this notice, we are initiating operating permit for Onyx
foot-high concrete gravity overflow consultation with the North Carolina Environmental Services. EPA originally
spillway; and (c) a 213-foot-long section State Historic Preservation Officer responded to the petition in an order
(on the west side) that forms the upper (SHPO) and the South Carolina SHPO, dated February 1, 2006. However, EPA
end of the forebay canal for the Rocky as required by 106, National Historic has become aware of a factual error in
Creek powerhouse; (2) a 450-foot-long Preservation Act, and the regulations of the February 1, 2006, order. To correct
concrete gravity bulkhead section that the Advisory Council on Historic that error, on August 9, 2006, the
completes the lower end of the Rocky Preservation, 36, CFR, at 800.4. Administrator signed an order
Creek forebay canal; (3) a 748 acre amending the February 1, 2006, order by
q. Procedural schedule and final striking out the section entitled ‘‘VI.
reservoir with a normal water surface amendments: The application will be
elevation of 284.4 feet above msl; (4) Monitoring’’, and replacing it with the
processed according to the following language as described below. The
two powerhouses consisting of: (a)
Hydro Licensing Schedule. Revisions to remainder of the February 1, 2006, order
Cedar Creek powerhouse (on the east):
the schedule will be made as remains undisturbed and in effect.
containing three vertical Francis-type
appropriate. Pursuant to section 505(b)(2) of the
turbines directly connected to three
generators, one rated at 15,000 kW, and Issue Acceptance or Deficiency Letter: Act, a petitioner may seek in the United
two rated at 18,000 kW for an installed October 2006. States Court of Appeals for the
capacity of 43.0 MW; and (b) Rocky appropriate circuit judicial review of
Issue Scoping Document for
Creek powerhouse (on the west): those portions of the petition which
comments: January 2007. EPA denied. Any petition for review
Containing eight horizontal twin-runner
Francis-type turbines directly connected Notice of application is ready for shall be filed within 60 days from the
to eight generators, six rated at 3,000 kW environmental analysis: April 2007. date a notice appears in the Federal
and two rated at 4,500 kW for an Notice of the availability of the draft Register, pursuant to section 307 of the
installed capacity of 25.8 MW, for a total EIS: October 2007. Act.
installed capacity of 68.8 MW; and (5) ADDRESSES: You may review copies of
Notice of the availability of the final
other appurtenances. EIS: March 2008. the final amended order, the petitions,
(XI) The Wateree development and other supporting information at the
consists of the following existing Ready for Commission’s decision on EPA Region 5 Office, 77 West Jackson
facilities: (1) The Wateree dam the application: June 2008. Boulevard, Chicago, Illinois 60604. If
consisting of: (a) A 1,450 foot-long Final amendments to the application you wish to examine these documents,
uncontrolled concrete gravity ogee must be filed with the Commission no you should make an appointment at
spillway; and (b) a 1,370-foot-long earth later than 30 days from the issuance least 24 hours before visiting day.
embankment; (2) a 13,025 acre reservoir date of the notice of ready for Additionally, the final order for Onyx
with a normal water surface elevation of environmental analysis. Environmental Services is available
225.5 feet above msl; (3) a powerhouse electronically at: http://www.epa.gov/
integral to the dam, situated between Magalie R. Salas, region07/programs/artd/air/title5/
pwalker on PRODPC60 with NOTICES

the spillway and the earth embankment, Secretary. petitiondb/petitiondb2004.htm.


containing five vertical Francis-type [FR Doc. E6–15524 Filed 9–18–06; 8:45 am] FOR FURTHER INFORMATION CONTACT:
turbines directly connected to five BILLING CODE 6717–01–P Pamela Blakley, Chief, Air Permitting
generators, two rated at 17,100 kW and Section, Air Programs Branch, Air and
three rated at 18,050 kW for a total Radiation Division, EPA, Region 5, 77

VerDate Aug<31>2005 16:49 Sep 18, 2006 Jkt 208001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\19SEN1.SGM 19SEN1