Sie sind auf Seite 1von 1

Federal Register / Vol. 71, No.

175 / Monday, September 11, 2006 / Notices 53439

are also available for review in the free at 1–866–208–3676, or for TTY, This notice announces the opening of
Commission’s Public Reference Room in 202–502–8659. the scoping period that will be used to
Washington, DC. You may also register online at gather environmental input from the
There is an eSubscription link on the http://www.ferc.gov/docs-filing/ public and interested agencies on the
Web site that enables subscribers to esubscription.asp to be notified via e- Project. Please note that the scoping
receive e-mail notification when a mail of new filings and issuances period will close on October 5, 2006.
document is added to a subscribed related to this or other pending projects. Details on how to submit comments are
docket(s). For assistance with any FERC For assistance, contact FERC Online provided in the Public Participation
Online service, please e-mail Support. section of this notice.
FERCOnlineSupport@ferc.gov. or call Any comments (an original and 8 This notice is being sent to potentially
(866) 208–3676 (toll free). For TTY, call copies) should be filed within 30 days affected landowners along the Project
(202) 502–8659. from the date of this notice and should route; Federal, State, and local
be addressed to Magalie R. Salas, government agencies; elected officials;
Magalie R. Salas, Secretary, Federal Energy Regulatory environmental and public interest
Secretary. Commission, 888 First Street, NE., groups; Native American tribes; and
[FR Doc. E6–14951 Filed 9–8–06; 8:45 am] Washington, DC 20426. Please affix local libraries and newspapers.
BILLING CODE 6717–01–P ‘‘Dorena Lake Dam Project No. 11945– With this notice, we 2 are asking
001’’ to all comments. Comments may Federal, State, and local agencies with
be filed electronically via the Internet in jurisdiction and/or special expertise
DEPARTMENT OF ENERGY lieu of paper. See 18 CFR with respect to environmental issues to
385.2001(a)(1)(iii) and the instructions cooperate with us in the preparation of
Federal Energy Regulatory on the Commission’s Web site at the EA. These agencies may choose to
Commission http://www.ferc.gov under the ‘‘e-filing’’ participate once they have evaluated the
link. The Commission strongly proposal relative to their
[Project No. 11945–001—Oregon] encourages electronic filings. responsibilities. Agencies which would
For further information, contact like to request cooperating status should
Dorena Lake Dam Hydroelectric Michael Henry by telephone at 503– follow the instructions for filing
Project; Notice of Availability of Draft 552–2762 or by e-mail at comments described later in this notice.
Environmental Assessment mike.henry@ferc.gov. We encourage government
representatives to notify their
September 1, 2006. Magalie R. Salas, constituents of this planned Project and
In accordance with the National Secretary. encourage them to comment on their
Environmental Policy Act of 1969 and [FR Doc. E6–14959 Filed 9–8–06; 8:45 am] areas of concern.
the Federal Energy Regulatory BILLING CODE 6717–01–P Some affected landowners may be
Commission’s (Commission’s) contacted by a Project representative
regulations, 18 CFR part 380 (Order No. about the acquisition of an easement to
486, 52 FR 47897), the Office of Energy DEPARTMENT OF ENERGY construct, operate, and maintain the
Projects has reviewed Symbiotics, LLC’s proposed pipeline. If so, the company
application for license for the proposed Federal Energy Regulatory should seek to negotiate a mutually
Dorena Lake Dam Project (or project), Commission acceptable agreement. In the event that
located on the Row River near the city [Docket No. CP05–357–003] the Project is certificated by the
of Cottage Grove, Lane County, Oregon, Commission, that approval conveys the
and has prepared a Draft Environmental Cheniere Creole Trail Pipeline, L.P.; right of eminent domain for securing
Assessment (Draft EA) for the project. Notice of Intent To Prepare an easements for the pipeline. Therefore, if
The proposed project would occupy less Environmental Assessment for the easement negotiations fail to produce an
than 0.13 acre (5,655 square feet) of Proposed Creole Trail Segment I agreement, the company could initiate
federal land administered by the U.S. Amendment Project and Request for condemnation proceedings in
Army Corps of Engineers and the U.S. Comments on Environmental Issues accordance with State law.
Bureau of Land Management. A fact sheet prepared by the FERC
The Draft EA contains the staff’s September 5, 2006. entitled ‘‘An Interstate Natural Gas
analysis of the potential future The staff of the Federal Energy Facility On My Land? What Do I Need
environmental effects of the project, and Regulatory Commission (FERC or To Know?’’ addresses a number of
staff has concluded that licensing the Commission) will prepare an typically asked questions, including the
project, with appropriate environmental environmental assessment (EA) that use of eminent domain and how to
protective measures, would not discusses the environmental impacts of participate in the Commission’s
constitute a major federal action that Cheniere Creole Trail Pipeline, L.P. proceedings. It is available for viewing
would significantly affect the quality of (Cheniere) proposed Creole Trail on the FERC Internet Web site (http://
the human environment. Segment I Amendment or Project) www.ferc.gov).
A copy of the Draft EA is available for which involves extension of Creole Trail A map illustrating the proposed
review at the Commission in the Public Pipeline by adding about 18.1 miles of Project is provided in Appendix 1.3
Reference Room or may be viewed on 42-inch-diameter Pipeline (Segment I) to
the Commission’s Web site at http:// be located in Cameron Parish, Terminal and Pipeline Project included a liquefied
Louisiana. The Creole Trail LNG and natural gas (LNG) terminal and associated LNG
www.ferc.gov using the ‘‘eLibrary’’ link. facilities, 116.8 miles of dual 42-inch-diameter
Enter the docket number excluding the Pipeline Project was authorized on June mainline pipeline, and associated pipeline
rwilkins on PROD1PC61 with NOTICES

last three digits in the docket number 15, 2006.1 facilities.


2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
field to access the document. For 1 On June 15, 2006, the Commission approved the environmental staff of the Office of Energy Projects.
assistance, contact FERC Online Creole Trail LNG and Pipeline Project in Docket 3 The appendices referenced in this notice are not
Support at Nos. CP05–360–000, CP05–357–000, CP05–358– being printed in the Federal Register. Copies are
FERCOnlineSupport@ferc.gov or toll- 000, and CP05–359–000. The Creole Trail LNG Continued

VerDate Aug<31>2005 18:03 Sep 08, 2006 Jkt 208001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\11SEN1.SGM 11SEN1

Das könnte Ihnen auch gefallen