52586 Federal Register / Vol. 71, No.

172 / Wednesday, September 6, 2006 / Notices

multi-year selection process of these 3. Kula Community Center, Commission has determined that the
sites and the potential environmental September 29, 2006, Friday, 6 p.m. to 10 reactor has a unique purpose. The
impacts of on-site construction, p.m. Commission’s stated purpose for these
installation, and operation of this Written comments may be submitted requirements was to reduce, to the
proposed new solar telescope. With its to Dr. Craig B. Foltz at the address maximum extent possible, the use of
unprecedented 4.2-m (165-inch) above. HEU fuel in order to reduce the risk of
aperture, advanced optical technology, Dated: August 23, 2006. theft and diversion of HEU fuel used in
and state-of-the-art instrumentation, the non-power reactors.
Craig B. Foltz,
proposed ATST would be an Paragraphs 50.64(b)(2)(i) and (ii)
ATST Program Officer. require that a licensee of a non-power
indispensable tool for exploring and
understanding physical processes on the [FR Doc. 06–7429 Filed 9–5–06; 8:45 am] reactor (1) not acquire more HEU fuel if
sun that ultimately affect Earth. The BILLING CODE 7555–01–M LEU fuel that is acceptable to the
DEIS addresses, among other things, the Commission for that reactor is available
potential direct, indirect, and when the licensee proposes to acquire
cumulative environmental impacts NUCLEAR REGULATORY HEU fuel and (2) replace all HEU fuel
associated with the proposed Advanced COMMISSION in its possession with available LEU fuel
Technology Solar Telescope project. acceptable to the Commission for that
[Docket No. 50–128; EA–06–211] reactor in accordance with a schedule
Written comments may be forwarded
to: determined pursuant to 10 CFR
In the Matter of Texas A&M University 50.64(c)(2).
ADDRESSES: Dr. Craig B. Foltz, Program (Nuclear Science Center TRIGA Paragraph 50.64(c)(2)(i) requires,
Manager, National Science Foundation, Research Reactor); Order Modifying among other things, that each licensee
Division of Astronomical Sciences, 4201 Amended Facility Operating License of a non-power reactor authorized to
Wilson Blvd., Room 1045, Washington No. R–83 possess and to use HEU fuel develop
DC 22230, telephone: (703) 292–4909, and submit to the Director of the Office
fax: (730) 292–9034, e-mail: I
of Nuclear Reactor Regulation (Director)
cfoltz@nsf.gov. The Texas A&M University (the by March 27, 1987, and at 12-month
licensee) is the holder of Amended intervals, thereafter, a written proposal
SUPPLEMENTARY INFORMATION:
Facility Operating License No. R–83 (the for meeting the requirements of the rule.
Proposed alternatives to be
license). The license was issued on The licensee shall include in its
considered include, but are not limited
December 7, 1961, by the U.S. Atomic proposal a certification that Federal
to the following:
Energy Commission and subsequently Government funding for conversion is
(1) Alternative 1 (Proposed Action): renewed on March 30, 1983, by the U.S.
Undeveloped site East of Mees available through the U.S. Department
Nuclear Regulatory Commission (the of Energy or other appropriate Federal
Observatory. NRC or the Commission). The license
(2) Alternative 2: Former radio agency and a schedule for conversion,
includes authorization to operate the based upon availability of replacement
telescope site known as Reber Circle. Nuclear Science Center TRIGA Research fuel acceptable to the Commission for
(3) Alternative 3: No-Action. The Reactor (the facility) at a power level up that reactor and upon consideration of
National Science Foundation will not to 1,000 kilowatts thermal (1,300 other factors such as the availability of
construct the Advanced Technology kilowatts thermal for purposes of testing shipping casks, implementation of
Solar Telescope on Maui. and calibration) and to receive, possess, arrangements for available financial
Publication of the DEIS does not and use special nuclear material support, and reactor usage.
foreclose consideration of any courses of associated with the operation. The Paragraph 50.64(c)(2)(iii) requires the
action or possible decisions addressed facility is on the campus of the Texas licensee to include in the proposal, to
by the National Science Foundation in A&M University, in the city of College the extent required to effect conversion,
its Final Environmental Impact Station, Brazos County, Texas. The all necessary changes to the license, to
Statement (FEIS). No final decisions mailing address is Nuclear Science the facility, and to licensee procedures.
will be made regarding construction of Center, Texas Engineering Experimental This paragraph also requires the
the ATST prior to completion and Station, Texas A&M University, 3575 licensee to submit supporting safety
signature of the Record of Decision for TAMU, College Station, Texas 77843– analyses in time to meet the conversion
the Proposed Action. 3575. schedule.
Public Comment Period: The NSF Paragraph 50.64(c)(2)(iii) also requires
welcomes and invites Federal, State, II
the Director to review the licensee
and local agencies, and the public to On February 25, 1986, the proposal, to confirm the status of
participate in the 45-day comment Commission promulgated a final rule, Federal Government funding, and to
period for the completion of this EIS. Title 10 of the Code of Federal determine a final schedule, if the
The 45-day public comment period Regulations (10 CFR) Section 50.64, licensee has submitted a schedule for
begins September 8, 2006, and ends on limiting the use of high-enriched conversion.
October 23, 2006. Public comment uranium (HEU) fuel in domestic non- Section 50.64(c)(3) requires the
meetings will take place on the island power reactors (research and test Director to review the supporting safety
of Maui, Hawai’i, with notification of reactors) (see 51 FR 6514). The analyses and to issue an appropriate
the times and locations published in the regulation, which became effective on enforcement order directing both the
local newspapers, as follows: March 27, 1986, requires that if Federal conversion and, to the extent consistent
1. Cameron Center Auditorium, Government funding for conversion- with protection of public health and
rwilkins on PROD1PC63 with NOTICES

September 27, 2006, Wednesday, 6 p.m. related costs is available, each licensee safety, any necessary changes to the
to 10 p.m. of a non-power reactor authorized to use license, the facility, and licensee
2. Hannibal Tavares Community HEU fuel shall replace it with low- procedures. In the Federal Register
Center, Multi-purpose Room, September enriched uranium (LEU) fuel acceptable notice of the final rule (51 FR 6514), the
28, 2006, Thursday, 6 p.m. to 10 p.m. to the Commission unless the Commission explained that in most, if

VerDate Aug<31>2005 18:44 Sep 05, 2006 Jkt 208001 PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 E:\FR\FM\06SEN1.SGM 06SEN1
Federal Register / Vol. 71, No. 172 / Wednesday, September 6, 2006 / Notices 52587

not all, cases, the enforcement order of the date of this Order. Any answer or with 10 CFR 51.22(c)(9). Thus, pursuant
would be an order to modify the license request for a hearing shall set forth the to either 10 CFR 51.10(d) or 51.22(c)(9),
under 10 CFR 2.204 (now 10 CFR matters of fact and law on which the no environmental assessment nor
2.202). licensee, or other person adversely environmental impact statement is
Section 2.309 states the requirements affected, relies and the reasons why the required.
for a person whose interest may be Order should not have been issued. Any For further information see the
affected by any proceeding to initiate a answer or request for a hearing shall be application from the licensee dated
hearing or to participate as a party. filed (1) by first class mail addressed to December 29, 2005 (Agencywide
the Office of the Secretary, U.S. Nuclear Documents Access and Management
III
Regulatory Commission, Washington, System (ADAMS) Accession No.
On December 29, 2005, as DC 20555–0001, Attention: Rulemaking ML062200390), as supplemented on
supplemented on July 17, and August 4 and Adjudications Staff; or (2) by July 17, and August 4 and 21, 2006
and 21, 2006, the NRC staff received the courier, express mail, and expedited (ADAMS Accession Nos. ML062220189,
licensee’s conversion proposal, delivery services to the Office of the ML062220278 and ML062410495), the
including its proposed modifications Secretary, Sixteenth Floor, One White staff’s request for additional information
and supporting safety analyses. HEU Flint North, 11555 Rockville Pike, dated June 1, 2006 (ADAMS Accession
fuel elements are to be replaced with Rockville, Maryland 20852, Attention: No. ML061500125), and the cover letter
LEU fuel elements. The reactor core Rulemaking and Adjudications Staff. to the licensee, attachments to the
contains fuel bundles, each fuel bundle Because of continuing disruptions in Order, and the staff’s safety evaluation
contains up to four fuel elements of the delivery of mail to the United States dated September 1, 2006 (ADAMS
TRIGA design, with the fuel consisting Government Offices, it is requested that Accession No. ML062410474), available
of uranium-zirconium hydride with 30 answers and/or requests for hearing be for public inspection at the
weight percent uranium. These fuel transmitted to the Secretary of the Commission’s Public Document Room
elements contain the uranium-235 Commission either by e-mail addressed (PDR), located at One White Flint North,
isotope at an enrichment of less than 20 to the Office of the Secretary, U.S. Public File Area O1 F21, 11555
percent. The NRC staff reviewed the Nuclear Regulatory Commission, Rockville Pike (first floor), Rockville,
licensee’s proposal and the hearingdocket@nrc.gov; or by facsimile Maryland. Publicly available records
requirements of 10 CFR 50.64 and has transmission addressed to the Office of will be accessible electronically from
determined that public health and safety the Secretary, U.S. Nuclear Regulatory the ADAMS Public Electronic Reading
and common defense and security Commission, Washington, DC, Room on the Internet at the NRC Web
require the licensee to convert the Attention: Rulemakings and site, http://www.nrc.gov/reading-rm/
facility from the use of HEU to LEU fuel Adjudications Staff at 301–415–1101 adams.html. Persons who do not have
in accordance with the attachments to (the verification number is 301–415– access to ADAMS or who have problems
this Order and the schedule included 1966). Copies of the request for hearing in accessing the documents in ADAMS
herein. The attachments to this Order must also be sent to the Director, Office should contact the NRC PDR reference
specify the changes to the License of Nuclear Reactor Regulation and to the staff by telephone at 1–800–397–4209 or
Conditions and Technical Specifications Assistant General Counsel for Materials 301–415–4737 or by e-mail to
that are needed to amend the facility Litigation and Enforcement, Office of pdr@nrc.gov.
license and contains an outline of a the General Counsel, with both copies Dated this 1st day of September 2006.
reactor startup report to be submitted to addressed to the U.S. Nuclear For the Nuclear Regulatory Commission.
NRC within six months following Regulatory Commission, Washington,
J.E. Dyer,
completion of LEU fuel loading. DC 20555–0001, and the NRC requests
that a copy also be transmitted either by Director, Office of Nuclear Reactor
IV facsimile transmission to 301–415–3725
Regulation.
Accordingly, pursuant to Sections 51, or by e-mail to OGCMailCenter@nrc.gov. [FR Doc. E6–14824 Filed 9–5–06; 8:45 am]
53, 57, 101, 104, 161b, 161i, and 161o If a person requests a hearing, he or BILLING CODE 7590–01–P

of the Atomic Energy Act of 1954, as she shall set forth in the request for a
amended, and to Commission hearing with particularity the manner in
regulations in 10 CFR 2.202 and 10 CFR which his or her interest is adversely NUCLEAR REGULATORY
50.64, it is hereby ordered that: affected by this Order and shall address COMMISSION
Amended Facility Operating License the criteria set forth in 10 CFR 2.309. [Docket No. 50–83; EA–06–210]
No. R–83 is modified by amending the If a hearing is requested by a person
License Conditions and Technical whose interest is adversely affected, the In the Matter of University of Florida
Specifications as stated in the Commission shall issue an Order (University of Florida Training
attachments to this Order. The Order designating the time and place of any Reactor); Order Modifying Amended
become effective on the later date of hearing. If a hearing is held, the issue to Facility Operating License No. R–56
either (1) the day the licensee receives be considered at such hearing shall be
whether this Order should be sustained. I
an adequate number and type of LEU
fuel elements to operate the facility as In accordance with 10 CFR 51.10(d) The University of Florida (the
specified in the licensee’s proposal, or this Order is not subject to Section licensee) is the holder of Amended
(2) 20 days after the date of publication 102(2) of the National Environmental Facility Operating License No. R–56 (the
of this Order in the Federal Register. Policy Act, as amended. The NRC staff license) issued on May 21, 1959, by the
notes, however, that with respect to U.S. Atomic Energy Commission, and
V environmental impacts associated with subsequently renewed on August 30,
rwilkins on PROD1PC63 with NOTICES

Pursuant to the Atomic Energy Act of the changes imposed by this Order as 1982, by the U.S. Nuclear Regulatory
1954, as amended any person adversely described in the safety evaluation, the Commission (the NRC or the
affected by this Order may submit an changes would, if imposed by other Commission). The license authorizes
answer to this Order, and may request than an Order, meet the definition of a operation of the University of Florida
a hearing on this Order, within 20 days categorical exclusion in accordance Training Reactor (the facility) at a power