Sie sind auf Seite 1von 1

52340 Federal Register / Vol. 71, No.

171 / Tuesday, September 5, 2006 / Notices

Public Review and Comments consider all comments received during (208) 677–6699 or e-mail:
The Service has made a preliminary the comment period. Scott_Barker@blm.gov.
determination that the proposed The Service provides this notice SUPPLEMENTARY INFORMATION: Windland,
Agreement and permit application are pursuant to section 10(c) of the Act and Inc. proposes to construct, operate, and
eligible for categorical exclusion under pursuant to implementing regulations maintain a wind-powered electric
the National Environmental Policy Act for NEPA (40 CFR 1506.6). generation facility on the ridgeline of
of 1969 (NEPA). We explain the basis Susan Moore, Cotterel Mountain, near the towns of
for this determination in an Acting Field Supervisor, Sacramento Fish and Albion, Malta, and Burley in south
Environmental Action Statement, which Wildlife Office, Sacramento, California. central Idaho. Windland, Inc. has a
is also available for public review. [FR Doc. E6–14630 Filed 9–1–06; 8:45 am] development agreement with Shell
Individuals wishing copies of the BILLING CODE 4310–55–P
Wind Energy, Inc. for this project.
permit application, copies of our Four alternatives were analyzed in a
preliminary Environmental Action four-year collaborative process to arrive
Statement, and/or copies of the full text DEPARTMENT OF THE INTERIOR at the decisions contained in the ROD.
of the Agreement, including a map of The approved Cassia Resource
the proposed permit area, references, Bureau of Land Management Management Plan Amendment permits
and legal descriptions of the proposed the development of a single wind energy
permit area, should contact the office [ID 220 5101 ER D025] project as described in Alternative C of
and personnel listed in the ADDRESSES the Final Environmental Impact
section above. Notice of Availability of the Record of Statement, published in March 2006,
If you wish to comment on the permit Decision for the Cotterel Wind Power and in the Plan of Development (POD)
application or the Agreement, you may Project and Cassia Resource and environmental protection measures,
submit your comments to the address Management Plan Amendment/ which are attached to and made a part
listed in the ADDRESSES section of this Environmental Impact Statement of the ROD.
document. Comments and materials BLM received eight protests to the
AGENCY: Lead Agency—Bureau of Land
received, including names and proposed plan amendment, all of which
Management, Interior; Cooperating have been resolved. The Governor
addresses of respondents, will be Agencies—U.S. Fish and Wildlife
available for public review, by determined this project EIS and plan
Service, Interior; Bureau of Reclamation, amendment are both consistent with
appointment, during normal business Interior; Bonneville Power
hours at the address in the ADDRESSES State policy by letter dated May 30,
Administration, Energy; Idaho 2006.
section above and will become part of Department of Lands; Cassia County
the public record, pursuant to section Commissioners; Participating Agency— Dated: July 31, 2006.
10(c) of the Act. Individual respondents Idaho Department of Fish and Game. Kenneth E. Miller,
may request that we withhold their Burley Field Office Manager, Bureau of Land
ACTION: Notice of availability of a
home address from the record, which Management.
we will honor to the extent allowable by Record of Decision (ROD).
[FR Doc. E6–14647 Filed 9–1–06; 8:45 am]
law. There also may be circumstances in SUMMARY: In accordance with the BILLING CODE 4310–GG–P
which we would withhold from the Federal Land Policy and Management
record a respondent’s identity, as Act of 1976 and the National
allowable by law. If you wish us to Environmental Policy Act of 1969, the DEPARTMENT OF THE INTERIOR
withhold your name and/or address, Bureau of Land Management announces
you must state this prominently at the the availability of the ROD for the Cassia Bureau of Land Management
beginning of your comment. Resource Management Plan [MT–066–1220–AL]
Anonymous comments will not be Amendment/Environmental Impact
considered. All submissions from Statement (EIS) for the Cotterel Wind Notice of Relocation/Change of
organizations or businesses, and from Power Project, located in south central Address/Office Closure; Montana
individuals identifying themselves as Idaho. The decision contained in the
representatives or officials of AGENCY: Bureau of Land Management;
ROD is two-fold. It approves both the Interior.
organizations or businesses, are amendment to the Cassia Resource
available for public inspection in their ACTION: Notice.
Management Plan and the issuance of a
entirety. right-of-way grant pursuant to Title V of
We will evaluate this permit EFFECTIVE DATE: September 15, 2006.
the Federal Land Policy and
application, associated documents, and FOR FURTHER INFORMATION CONTACT: June
Management Act of 1976.
comments submitted thereon to Bailey, Lewistown Field Manager, 406/
ADDRESSES: Copies of the Cotterel Wind 538–1900, BLM Lewistown Field Office,
determine whether the permit
application meets the requirements of Power Project ROD are available upon 920 NE Main Street, Lewistown,
section 10(a) of the Act and NEPA request from the Field Office Manager, Montana 59457.
regulations. If we determine that the Burley Field Office, Bureau of Land SUPPLEMENTARY INFORMATION: On
requirements are met, we will sign the Management, 15 East 200 South, Burley, September 15, 2006, the Bureau of Land
proposed Agreement and issue an ID 83318. The document may also be Management’s Fort Benton River
enhancement of survival permit under viewed on the following Web site: Management Station, the Fort Benton
section 10(a)(1)(A) of the Act to the http://www.id.blm.gov/offices/burley/ Visitor Contact Station and the Fort
Applicants for take of the CRLF and index.htm. Benton Law Enforcement Ranger will
sroberts on PROD1PC70 with NOTICES

CTS incidental to otherwise lawful FOR FURTHER INFORMATION CONTACT: move/relocate their offices to the Upper
activities in accordance with the terms Scott Barker, Project Manager, Burley Missouri River Breaks National
of the Agreement. We will not make our Field Office, Bureau of Land Monument Interpretive Center, at 701
final decision until after the end of the Management, 15 East 200 South, Burley, 7th Street in Fort Benton, Montana
30-day comment period and will fully ID 83318, phone (208) 677–6678, fax 59442. The following business practices

VerDate Aug<31>2005 17:24 Sep 01, 2006 Jkt 208001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\05SEN1.SGM 05SEN1

Das könnte Ihnen auch gefallen