Sie sind auf Seite 1von 1

49348 Federal Register / Vol. 71, No.

163 / Wednesday, August 23, 2006 / Rules and Regulations

DEPARTMENT OF DEFENSE SUMMARY: The Department of Defense is FOR FURTHER INFORMATION CONTACT: L.
removing several CFR parts from Bynum 703–696–4970.
Office of the Secretary Chapter I, Office of the Secretary of SUPPLEMENTARY INFORMATION: Each part
Defense. This administrative action has been removed to correspond with
32 CFR Parts 71, 105, and 243 removes obsolete information from the the cancellation of the DoD Directive for
Code of Federal Regulations and notifies which the part was based. The chart
Removal of Obsolete Regulations readers of the availability of the current below identifies the part number and
DoD documents that contain the it’s companion Directive. All three DoD
AGENCY: Department of Defense. information being removed. Directives were canceled by a Director
ACTION: Final rule. DATES: This rule is effective August 23, of Administration and Management
2006. memorandum dated August 8, 2006.

DoD
Part No. Title directive No.

71 ...................................................... Eligibility Requirements for Education of Minor Dependents in Overseas Areas ................... 1342.13
105 .................................................... Employment and Volunteer Work of Spouses of Military Personnel ...................................... 1400.33
243 .................................................... Intergovernmental Coordination of DoD Federal Development Programs and Activities ....... 4165.61

List of Subjects temporary final rule allows the bridge announced September 7, 2006
owner to extend the effective period expiration of the temporary final rule,
32 CFR Part 71
during which only one of the two and because any interruption of the
Elementary and secondary education; moveable spans need open for the arrangements permitted by the
Military personnel; Panama Canal. passage of vessel traffic. This rule is temporary final rule would be contrary
necessary to facilitate the completion of to the public interest. For the same
32 CFR Part 105
the ongoing bridge deck replacement. reason, the Coast Guard finds under 5
Military personnel. DATES: This temporary rule is effective U.S.C. 553(d) that good cause exists for
32 CFR Part 243 from September 8, 2006 through making this extension of the temporary
December 30, 2006. final rule effective less than 30 days
Intergovernmental relations. after publication. The deck replacement
ADDRESSES: Comments and material
received from the public, as well as for the New York City Highway Bridge
PARTS 71, 105, and 243—[REMOVED] is ongoing, vital, and necessary work
documents indicated in this preamble as
■ Accordingly, by the authority of 10 that must be performed without delay as
being available in the docket, are part of
U.S.C. 301, 32 CFR parts 71, 105, and a result of the deterioration of the
docket CGD01–06–006 and are available
existing bridge deck which could fail if
243 are removed. for inspection or copying at the First
not replaced with all due speed. Work
August 14, 2006. Coast Guard District, Bridge Branch
is behind schedule due to unforeseen
L.M. Bynum, Office, 408 Atlantic Avenue, Boston,
construction delays and bad weather. In
Massachusetts 02110, between 7 a.m.
Alternate OSD Federal Register Liaison order to assure the continued safe and
Officer, Department of Defense. and 3 p.m., Monday through Friday,
reliable operation of the bridge,
except Federal holidays.
[FR Doc. 06–7010 Filed 8–22–06; 8:45 am] construction should be allowed to
FOR FURTHER INFORMATION CONTACT: Ms. continue through December 30, 2006.
BILLING CODE 5001–06–M
Judy Leung-Yee, Project Officer, First
Coast Guard District, (212) 668–7195. Background and Purpose
SUPPLEMENTARY INFORMATION: The New York City Highway Bridge
DEPARTMENT OF HOMELAND
(Belt Parkway), has a vertical clearance
SECURITY Regulatory Information
of 34 feet at mean high water and 39 feet
Coast Guard On January 30, 2006, we published a at mean low water in the closed
notice of proposed rulemaking (NPRM) position. The existing regulations are
33 CFR Part 117 entitled ‘‘Drawbridge Operation listed at 33 CFR 117.795(b).
Regulations; Jamaica Bay and The owner of the bridge, New York
[CGD01–06–006] Connecting Waterways, New York City, City Department of Transportation
NY,’’ in the Federal Register (71 FR (NYCDOT), requested a temporary
RIN 1625–AA09 4852). We received no comments in change to the drawbridge operation
Drawbridge Operation Regulations; response to the NPRM. regulations in November 2005, to
Jamaica Bay and Connecting On March 13, 2006, we published a facilitate the replacement of the bridge
Waterways, New York City, NY temporary final rule (TFR) entitled roadway deck. During the prosecution
‘‘Drawbridge Operation Regulations; of that rehabilitation construction, the
AGENCY: Coast Guard, DHS. Jamaica Bay and Connecting Waterways, opening span that was undergoing deck
ACTION: Temporary final rule; extension New York City, NY,’’ in the Federal replacement could not open for vessel
of effective period. Register (71 FR 12621). traffic. As a result, the bridge owner
We did not publish an NPRM for this requested that only one of the two
SUMMARY: The Coast Guard has changed extension of the temporary final rule’s opening spans open for the passage of
sroberts on PROD1PC70 with RULES

the effective period for the temporary effective period. Under 5 U.S.C. vessel traffic from March 1, 2006
regulation governing the operation of 553(b)(B), the Coast Guard finds that through September 7, 2006.
the New York City Highway Bridge (Belt good cause exists for not publishing an The Coast Guard published a
Parkway), at mile 0.8, across Mill Basin, NPRM because it is impracticable to temporary final rule (71 FR 12621) on
at New York City, New York. This issue an NPRM prior to the previously March 13, 2006, effective from March 8,

VerDate Aug<31>2005 15:49 Aug 22, 2006 Jkt 208001 PO 00000 Frm 00040 Fmt 4700 Sfmt 4700 E:\FR\FM\23AUR1.SGM 23AUR1

Das könnte Ihnen auch gefallen