Beruflich Dokumente
Kultur Dokumente
Dental autoclave
manual de opraciones
J1208
V02.00.01
Tabla de contenidos
1
Instalacin ...................................................................................................................... 6
1.1
Desempacado ................................................................................................................6
1.2
Instalacin ..................................................................................................................... 6
1.3
Inspeccin de Accesorios.............................................................................................. 10
2.1
2.2
Apertura/Cierre de la puerta........................................................................................... 12
Apertura de la puerta.................................................................................................... 12
3.1
4
4.1
Tecla de retorno............................................................................................................. 16
4.2
Tecla de OK.................................................................................................................... 16
4.3
4.4
4.5
Tecla abierto.................................................................................................................. 16
4.6
Cursor ............................................................................................................................ 16
7.1
7.2
7.3
Manual ......................................................................................................................... 24
7.4
Setear Contrasea......................................................................................................... 24
7.5
Testear Agua.................................................................................................................. 24
7.6
7.7
9.1
03/2013
J1208_V02.00.01
9.2
Preparation ...................................................................................................................28
11.2
11.3
Sterilization ...................................................................................................................29
11.4
11.5
11.6
12.2
Water discharging.........................................................................................................30
12.3
Cleaning ........................................................................................................................30
12.4
Requirements ................................................................................................................30
Annex 1:
J1208_V02.00.01
-3-
03/2013
Thank you for using the sterilizer manufactured by this Company. For the purpose of
bringing the performance of the sterilizer into full play, please carefully read the
Installation/Operation Manual before use, and install, use, operate and maintain it in strict
accordance with the Installation/Operation Manual, so as to ensure that the equipment
will serve you safely and reliably.
This manual is applicable to the installation of the equipment.
Instructions on Use
Please keep the Installation/Operation Manual in good conditions during
the service life of this equipment;
Notice
Make sure that all updated contents received can be stored in the
Installation/Operation Manual;
In case this equipment is transferred to another user or another using
place, please ensure that the Installation/Operation Manual is also
transferred or handed over together with the equipment;
In this Manual and the Operation Manual, the following signs are used to indicate the operations to
which attention must be paid or great importance must be attached:
Notice
This sign is used to indicate the instruction to which great importance must be
attached.
Warning
This sign is used to indicate the instruction which must be followed, otherwise
this equipment may get damaged.
Danger
This sign is used to indicate the instruction which must be strictly followed,
otherwise personal safety may be jeopardized.
Before operating or maintaining the equipment, please carefully read and fully understand the
contents of every section of this Manual and the Operation Manual, especially the contents marked
with any of the above signs.
The Installation/Operation Manual must be properly kept, so as to prevent it from getting lost or
damaged, even slightly damaged.
The operator is obliged to technically repair and make up the contents and sections in the
Installation/Operation Manual which are lost, damaged or inapplicable.
Under no event may any part of the Installation/Operation Manual be torn
off or taken out.
Notice
03/2013
In case of any situation which is not consistent with the instruction in the
Installation/Operation
Manual
or
is
not
covered
by
the
Installation/Operation Manual, please contact the manufacturer in time for
-4-
J1208_V02.00.01
upgrading or updating.
The Installation/Operation Manual shall be kept in a dry and
well-ventilated place, and be protected against moisture and intense heat.
Warning
This equipment may not be used to sterilize liquid articles. For the
sterilization of such liquid, please contact this Company, and we will
select the special sterilizer for you.
Danger
Notice
Warning
Chloride ion is the important factor which may cause corrosion and
damage of stainless steel. If this sterilizer is used to sterilize any article
which contains chloride ion, please use fresh water to wash the inner wall
of sterilizing chamber every day, so as to prevent the corrosion of internal
stainless steel caused by accumulated chloride ion and prolong the
service life of the equipment.
This sterilizer can only be used to sterilize the medical devices and
articles which can resist high temperature and high humidity, and may not
be used to sterilize oil and powder such as Vaseline!
Notice
This sign
is found on any portion of this equipment, please look up
the Installation/Operation Manual and other relevant documents, so as to
ascertain the nature of potential hazard and the countermeasures to be
taken.
Notice
This sign
found on any portion of this equipment means that the
temperature at such portion is relatively high and thus care shall be taken
for avoiding scalding.
J1208_V02.00.01
-5-
03/2013
1 Installation
1.1 Unpacking
1.1.1
Box Opening
First of all, cut off the fixing rope binding the equipment.
1.1.2
Unpacking
Open the package top of the equipment, and then respectively tear down the baffles on the
right, left, front and rear. After that, remove the plastic membrane.
1.1.3
1.1.3.1
After unpacking the equipment, firstly inspect whether the model and name stated on the
nameplate are identical with those on purchase order (The nameplate is on a side of this
equipment)
1.1.3.2
Check whether there exist any distinct traces of collision and whether the equipment is in good
condition. If any, make the records and contact our company or the transportation company.
1.2
Installation
1.2.1
The preparation for installation and the installation of this equipment shall be undertaken by
professional workers under the instruction of professional personnel. The name and model of this
equipment shall be properly recorded, so as to facilitate the consulting with us and the technical
service provided by us.
1.2.1.1
Check the installation conditions first: space dimensions, platform and temperature and humidity
conditions. Preparation and requirements before installation:
1.2.1.2
Installation space:
In consideration of the operation, maintenance and repair of this equipment, the height of the
space where this sterilizer is installed shall be no less than 1.5m; the distance between left/right
side of sterilizer and wall shall be no less than 0.5m; the depth in the loading/unloading direction of
this sterilizer shall be no less than 1.5 times of length of sterilizer, so as to facilitate the handling of
sterilization article. The distance between the rear end of this equipment and the wall shall also be
no less than 0.5m, so as to facilitate the operation and maintenance of equipment.
The drawing below shows the minimum space for installation.
J1208_V02.00.01
-6-
03/2013
991mm
500mm
730mm
500mm
1470mm
500mm
1.2.1.3
03/2013
-7-
J1208_V02.00.01
J1208_V02.00.01
-8-
03/2013
1.2.2
Leveling
Adjust the front and rear height of the device according to the drawing below after placing it on the
platform. Dont make the equipment store too much water (the water drainage vent and air exhaust
vent are on the front side).
5cm
1.2.3
1.2.3.1
1.2.3.2
Water source: The equipment is equipped with water tank, so that it is unnecessary to connect any
water source, and it is only necessary to add water in water tank of this equipment water tank.
Pure water must be used for the equipment, and the quality of water must meet the following
requirements:
a)
b)
c)
PH value: 5-7
d)
Hardness: 0.02mmol/l
Warning The water used for the equipment must be pure water.
The water need about 16L,in order to over the water line.
03/2013
-9-
J1208_V02.00.01
High Level and Low Level are the high water line and the low water level.
Notice
When it shows the water is dirty, the water can not meet the requirements.
Warning
1.2.4
1.3
1.3.1
Danger
Accessories inspection
Against the packing list of this equipment, carefully inspect whether all components of this
equipment are in good conditions. If any component is found damaged or lost, please make record
properly and contact this Company in time.
1.3.2
1.3.3
J1208_V02.00.01
- 10 -
03/2013
Water-discharging
port a
Water-discharging
port d of evaporator
Water-discharging ball
valve of evaporator
Start a program or initiate the preheating mode, so as to preheat up the evaporator to 30 kPa.
(If the pressure in evaporator is higher than 30 kPa, it is unnecessary to re-start the program,
because the water in evaporator cant be fully discharged when there is no pressure in evaporator.)
When the pressure in evaporator is relatively high, the opening angle of water-discharging ball valve
of evaporator may not be adjusted too large, so as to prevent the leakage of steam and scalding.
03/2013
- 11 -
J1208_V02.00.01
Opening/Closing of Door
Multi-point press-fit door structure equipped with door motor. When the motor is working and the door is
being opened or closed, the display screen will display: The door is being opened/closed.
3.1
Opening of Door
When it need open the door, you can press the open key or just turn the door handle, and open the
door after the motor stops. When the motor is working, it shows closing or opening.
No
Machine is
power on?
Yes
Hold the door handle and
turn it outward 30
12/09/14
10:06:35
Chember-P1 1 kPa
chamber-T1 20C
Chbr-out-T2 20C
Generator r -P21kPa
Door state opening
J1208_V02.00.01
- 12 -
03/2013
No
Power is
connected?
Yes
Hold the door handle and
turn it outward 30
If no power, do
connection according to
installation manual-2.1
No
Yes
12/09/14
10:06:35
Chember-P1 1 kPa
chamber-T1 20 C
Chbr-out-T2 20 C
Generator -P21kPa
Door state opening
03/2013
- 13 -
J1208_V02.00.01
Safety lock
J1208_V02.00.01
- 14 -
03/2013
Door handle
handle
Door lock axis
The door handle is connected with the safety lock through the door lock axis, and when
the door handle is turned, the lock axis is also simultaneously;
b)
When the door motor is working, it will drive the four door lock jaws to act, so as to
complete the opening/closing of door
c)
When the door is closed and the door handle is turned, the safety lock will press the door
lock touch point and then the motor works to drive the door closed.
d)
When the door handle is turned, the door lock touch point is released. The motor will
work, so as to complete the opening of door (It will take some time for motor to run).
Instructions on Key
Return Key
Open Key
OK Key
Up Key
Down Key
03/2013
- 15 -
J1208_V02.00.01
4.1
Return Key
OK Key
Press this key so as to select the icon where the cursor remains.
When setting the parameters, this key can be used to move the cursor
4.3
Up Key
When setting the parameters, this key can be used to increase the value.
4.4
Down Key
When setting the parameters, this key can be used to decrease the value.
4.5
Open Key
When the motor is jammed, please press the Open Key to open the door. Under normal conditions, just
turn the door handle, and then the door will be opened automatically.
4.6
Cursor
When the cursor is moved to the icon or parameter selected, the color of such icon or parameter will
change:
J1208_V02.00.01
- 16 -
03/2013
SN
1
Icon
Function
Remark
10
03/2013
- 17 -
J1208_V02.00.01
12/09/14
10:06:35
Chember--P 1 kPa
chamber--T1 20 C
Chbr-out--T2 20 C
Generator -P2 1kPa
Door state opening
Auxiliary program
Select parameter setting key to enter the password input
menuput in 149 to enter parameter setting menu by OK key
Program Select
Unwrapped
Wrapped
Rubber
N-class
Liquid
Quick
PARA
1# Unwrapped
Ster. time 4 min
Ster. time: 134 C
Dry. time 10 min
Puls. time 3
H.Plus 80 kPa
L.Plus -80 kPa
Purg. time 4.0 min
J1208_V02.00.01
****password*****
0100
Pro. No01
TypeUnwrapped
Para134C/240s
Door State Opened
HMIVer:******
PLCVer******
- 18 -
03/2013
No.
Program Type
Sterilization
Sterilization
Drying
Times of Vacuum
Temperature (C)
Time (s)
Time (s)
Pulsation
Unwrapped Program
134
240
360
Wrapped Program
134
360
600
Rubber
121
1200
600
N-class Program
134
360
600
Quick Program
134
240
300
B&D Testing
134
210
120
Helix
134
210
120
Leak Testing
300s for vacuuming, 300s for balancing and 600s for testing
Sterilization time (Ster. P): Operation time of sterilization phase, [0-999] min.
Sterilization temperature (Ster. Temp.):
Note:
Among the above sterilization programs, only the parameters of Programs 1-4 can be set, and the
parameters of other programs cant be set.
Instructions on program:
Under default state, this equipment is equipped with a total of 9 programs, among which the Programs 1,
2, 3, 4 and 6 are sterilization programs, and the Programs 7, 8 and 9 are testing programs. 10 is assistant
program for adjusting.
The default value of every technological parameter of this equipment is the default value set
through testing under the standard loading conditions as specified in the product standard. If the
load or the loading mode adopted by the user changes, the relevant value may be used only after
the relevant technological verification has been carried out (The user shall firstly make sure that the
article to be sterilized may be operated in the technological process corresponding to the program
selected).
03/2013
- 19 -
J1208_V02.00.01
Programs 1, 2, 3 and 6 are pulsation/vacuum based sterilization program, and their technological
process is the same, with the only difference that the value of relevant parameters is adjusted on
the basis of the characteristics of various loads.
Program 1 is mainly used to sterilize the exposed metal articles which are unwrapped and
can resist high temperature. The standard simulated load is solid metal screw.
Program 2 is mainly used to sterilize the wrapped articles which can resist high
temperature. The standard simulated load is metal screw wrapped with paper or plastics
and the fabric article wrapped with cloth.
Program 3 is mainly used to sterilize the rubber articles of which the heat resistance is
relatively low.
Program 6 is only used to sterilize single exposed device under emergency circumstance.
The device so sterilized shall be used within 4 hours after the completion of sterilization,
and shall be protected against secondary contamination caused by environmental factors
during the transportation to using place.
Program 4 is the steam-discharging program to be used under emergency circumstance when the
vacuum system of this equipment fails and the pulsation/vacuum based sterilization program cant
be used. This program does not involve vacuum pumping and drying, so that the drying effect cant
be ensured. In addition, before using this program, please make sure that the article to be sterilized
can be effectively sterilized under this technological condition. For example, this program may not
be used to sterilize the tube/cavity devices.
Program 7 is used to, in conjunction with special materials, test the discharging effect of cold air and
the penetration effect of steam for articles such as such as standard BD kit and disposable BD kit. As
for this program, the parameters shall be set on the basis of the value as required by manufacturer
of most widely used BD testing paper (sterilization for 3.5 minutes at 134). If different from the
material or testing paper adopted by hospital, the specific parameters shall be changed by
reference to the requirements of the material or testing paper adopted by hospital.
Program 8 is used to, in conjunction with special tube/cavity PCD, test the discharging effect of cold
air and the penetration effect of steam for tube/cavity devices of certain length. As for this program,
the parameters shall be set on the basis of the value as required by manufacturer of most widely
used PCD device (sterilization for 3.5 minutes at 134). If different from the material or testing
paper adopted by hospital, the specific parameters shall be changed by reference to the
requirements of the material or testing paper adopted by hospital.
Program 9 is used to test the sealing performance of pipe or device connected to chamber under
the negative pressure state. In the course of adjustment or routine inspection/testing of this
equipment, especially after long-distance transportation, it is very likely that some pipes are
loosened (or when the B-D testing is disqualified). In such case, you may select this program to
carry out testing. It is mainly used to inspect the vacuum leakage of this sterilizer, so as to inspect
the sealing performance of pipe. This testing shall be carried out under the precondition that the
sterilizing chamber is unloaded. After the operation enters into the testing phase, if the change in
pressure during 600 seconds does not exceed 1.3kPa, the vacuum leakage testing shall be deemed
as qualified. If the testing fails, then inspection and repair shall be carried out. Please inspect the
sealing of door and the connection between pipe system and chamber, identify and eliminate the
leakage point, and carry out the testing again until the testing is qualified.
This program is only used for testing rather than verifying whether the sterilization is qualified
and reliable.
J1208_V02.00.01
- 20 -
03/2013
12/09/14
10:06:35
Select
parameter
setting in
initiation
menu
Chember-P1 1 kPa
chamber-T1 20 C
Chbr-out-T2 20 C
Generator -P21KPa
Door state opening
Enter
system
parameter
setting
Select
Atmo pres
With OK, UP
and DOWN keys
to choose the
content for
modification
Choose
Preheat
Use OK to
choose the
content for
modification,
UP and DOWN
for MODE and
PARAMETER
modification
Pressure point
Atmo pres100kPa
Boil Temp100 C
Preheat
ON
Print mode
Choose
Print mode
On
Time/Date
Date2012-01-01
Time00:00:00
Choose
Time /Date
USB State
>Please Insert Udisk
Choose
USB State
03/2013
>Flash Storage
>Udisk Wrote
- 21 -
J1208_V02.00.01
1) Pressure poin: The atmospheric pressure shall be adjusted on the basis of actual value of local
atmospheric pressure, and the boiling point of water will be automatically adjusted on the
basis of the relationship between boiling point of water and pressure.
2) Preheat:
The preheating mode is switched on, so that the evaporator and chamber wall will be
preheated up automatically when this equipment is in standby state.
3) Printing mode: Used to select whether the printing will be carried out or not.
4) Time/Date:
5) USB State:
J1208_V02.00.01
- 22 -
03/2013
System maintenance
Password 149 should be put in for parameter modification
Maintance
Epuip info
Deviation
Manual
Pssword Set
USB Set
Water Test
Resume PARA
12/09/14
10:06:35
Select system
mainten in
initiation
menu
Enter
system
mainten
setting
Chember-P1 1 kPa
chamber-T1 20 C
Chbr-out-T2 20 C
Generator -P21kPa
Door state opening
Epuip info
DeviceID20131234
Volume 0000
Cycels 000000
LCDPARA178
Choose
Equip infor
ENTR
With OK, UP
and DOWN
keys to choose
the content for
modification
OK
Use OK to
choose the
content for
modification,
UP and DOWN
for
modification
Choose
ENTR(if it has
ENTR to
choose) to
confirm and
then use
RETURN to
back.
BACK
Choose
Deviation
Manual operation
F2ON B1ON
F3ON B2ON
F4ON H1ON
F5ON H2ON
F6ON LK: ON
P11Kpa T120
P21 Kpa T220
Choose
Manual
Choose
Set
USB
USB Set
USB ConnectON
USB AlarmOFF
USB Clear FORCE
ENTR
Password Set
Password****
New password****
Confirm****
ENTR
BACK
Water Test
Test value 0000
Upper value****
Lower value****
Choose Water
Test
ENTR
Choose
Resume
PARA
03/2013
BACK
BACK
- 23 -
J1208_V02.00.01
Manual
You can manual the output device
7.4
Password Set
Change the password: input the original password and input new password, confirm the password
at last.
7.5
Water Test
View the Test value of water and set the upper and lower value. When the Test value greater than
the upper value, it will shows water is dirty.
7.7
F2
For steam feed into the chamber after the door is closed
F3
Vacuum valve
F4
F5
Release valve
F6
reserved
B1
Circulation pump
H1
Main heater
Evaporator heating
H2
LK
Solenoid lock
J1208_V02.00.01
- 24 -
03/2013
Program start
P11 kPa T120 C
P21 kPa T220 C
Cycles 0000
Serial No000000
12/09/14
10:06:35
Choose
program kind
icon
in
initiation
menu
Enter
program kind
selection
menu
With OK, UP
and DOWN
keys to enter
program
selection
menu
With UP and
DOWN keys
to choose
the program
and with OK
to confirm to
enter
program
start
Chember-P1 1 kPa
chamber-T1 20 C
Chbr-out-T2 20 C
Generator -P21 kPa
Door State opening
Sterilize Program
Test Program
Program Select
Unwrapped
Wrapped
Rubber
N- class
Quick
Choose the
related
program
P11 kPa T1 20 C
P21 KPa T2 20 C
Choose the
program to
be started
Pro. No01
TypeUnwrapped
Para134 C/240 s
Door State: Opened
Choose
program
parameter
setting icon
Choose
program
parameter
view icon
Choose
program
start icon
03/2013
- 25 -
J1208_V02.00.01
Program Process
1# Unwrapped
P11 kPa T120 C
Program
process menu
Parameter setting
1# Unwrapped
Steri time
4 min
Steri tepm: 134 C
Dry time
10 min
Pulses
3
H. Puls
80 kPa
L. Puls
-80 kPa
Purg time: 4.0 min
Prepare
Running time00:01
Door state
Closed
With UP and
DOWN keys
to choose the
program icon
and with OK
to confirm
With OK, UP
and DOWN
keys to enter
program
selection
With UP and
DOWN keys to
choose the
program and
with OK to
confirm to
enter program
start
Choose
output
information
view icon
Choose alarm
message view
icon
Phase information
Pur0:00 Ste0:00
Pv10:00 Max0.0
Pv10:00 Min: 0.0
Pv20:00
Pp20:00
Pv20:00
Pp20:00
Pv30:00
Pp30:00
Choose
program
process data
view icon
Choose
program exit
and do the
exit with OK
key
J1208_V02.00.01
Press OK to Stop
- 26 -
03/2013
9.1
Pv1:
Actual running time from pulse upper limit to low limit during the first pulse vacuum
P p1: Actual running time from pulse low limit to upper limit during the first pulse vacuum
Pv2:
Actual running time from pulse upper limit to low limit during the second pulse
vacuum
P p2: Actual running time from pulse low limit to upper limit during the second pulse
vacuum
Pv3:
Actual running time from pulse upper limit to low limit during the third pulse
vacuum
P p4: Actual running time from pulse low limit to upper limit during the third pulse
vacuum
Ste:
Sterilization time
No.
Warning Code
Description
E00
Interrupted
E01
E02
E03
E04
Temp. Low
E05
Vacuum Overtime
E06
Heat Overtime
E07
E08
Motor Jamming
10
E09
11
E10
12
E11
Generat.P2 high
13
E12
ChamberT1 Error
14
E13
Ch-out-T2 Error
15
E14
Genera.P2 Error
03/2013
- 27 -
Remarks
J1208_V02.00.01
No.
Warning Code
Description
16
E15
ChamberP1 Error
17
E16
18
E18
19
E20
Door Unlocked
20
E21
21
E50
Communic. Error
Remarks
Communication
Error
10
c)
Preparation:
Mark the B-D testing paper with the name or code of operator and date, place it into the sterilizer,
start the B-D testing program, and monitor whether this equipment leaks and whether this
equipment works normally. Set in order the parcel to be sterilized, make sure that it is not bound
too tightly, paste the chemical indicator tape on it, and place the chemical indicator card in the
chamber.
d) Placement of article:
After the B-D testing is successfully carried out, open the front door, place the article to be sterilized
into the sterilizing chamber, and make sure that there is clearance between every two articles and
no article contacts with inner wall or door plate.
Close the door and turn the door handle, so as to make latch hook on door handle connecting rod
J1208_V02.00.01
- 28 -
03/2013
pressed against the latch, and then the motor will automatically run so as to close the sealing face
(The message door is closing will be displayed on screen). If pressing the door with hand when
the motor is running, the closing of door will become smoother. After the door is properly closed,
the message door closed will be displayed on screen.
Turn the door handle
11 Operation of Sterilization
11.1 Selection of program
Select the sterilization program or testing program on the basis of the article to be sterilized, and inspect
whether the sterilization parameters are appropriate, refer to Program Start 2.5.
11.2 Starting of program
If any parameter is found inappropriate after the program parameters are set, set such parameter by
reference to the relevant section of this Manual, and then select the start icon and press the OK Key, so
as to start the program. Refer to Program Start 2.5.
11.3 Sterilization
In the course of sterilization, the operator may not get far away from this equipment, but shall closely
observe the operation of equipment. If any abnormal situation is found, please handle it in time, so as to
prevent the occurrence of any accident.
Refer to Program Start 2.6.
03/2013
J1208_V02.00.01
Water discharging
Discharge the residual water in steam generator (or fully discharge the accumulated water in
evaporator once a week).
12.2
12.3
Cleaning
Clear away the residual dirt in sterilizing chamber, and clean up the sterilizing chamber strainer, so as to
prevent the strainer from being blocked up by dirt (As for the cleaning method, please refer to the
Service Manual).
12.4 Requirements
Maintain this equipment on a regular basis in accordance with the maintenance requirements given as
follows.
Notice:
a) No article which has been sterilized may be placed together with those articles which have not
been sterilized.
b) The articles which have been successfully sterilized shall be marked with sterilization date and
qualified sign.
J1208_V02.00.01
- 30 -
03/2013
No.
Component
Maintenance Interval
Maintenance Requirements
Remarks
Chamber
Once a day
Chamber strainer
Once a day
Tray
Once a day
Once a week
Once a week
Once a week
Cleaning of evaporator
10
11
Motor gear
Once a month
12
Door handle
Once a month
Note: The above maintenance interval shall be adjusted flexibly in light of the actual use of this equipment
by the user, so as to ensure that the performance of this equipment will be brought into full play and your
needs will be met better.
Note: Pure water must be used for the equipment, and the quality of water must meet the following
requirements:
a) Electrical conductivity:
15 S/cm
5-7
d) Hardness:
0.02 mmol/l
03/2013
- 31 -
J1208_V02.00.01
2.
3.
4.
Add softened water or pure water into clean water tank and circulating water tank in accordance
with the requirements, and connect the power supply for this equipment.
Connect the control-purpose power supply, turn the power switch of sterilizer to 1 side, and make
proper preparation for operation of the program.
Mark the B-D testing paper with the name or code of operator and date, place it into the sterilizer,
start the B-D testing program, and monitor whether this equipment leaks and whether this
equipment works normally.
Set in order the parcel to be sterilized, make sure that it is not bound too tightly, paste the chemical
indicator tape on it, and place the chemical indicator card in the chamber.
Operation of Sterilization:
After the B-D testing is successfully carried out, open the front door, place the article to be sterilized
into the sterilizing chamber, and make sure that there is clearance between every two parcels and
no parcel contacts with inner wall or door plate.
Close the door, select the appropriate sterilization program in light of the article to be sterilized,
inspect whether the sterilization parameters are correct, and start the program.
In the course of sterilization, the operator may not get far away from this equipment, but shall
closely observe the operation of equipment. If any abnormal situation is found, please handle it in
time, so as to prevent the occurrence of any accident.
Monitor the sterilization effect and properly make and retain the record, so as to ensure the
traceability.
After the sterilization is completed and the pressure in sterilizing chamber returns to zero, open the
rear door and take out the article.
After taking out the sterilized article from the sterilizer, put it in an appropriate place, so as to
prevent recontamination.
Open the door, turn the power switch to side, and cut off the control-purpose power supply and
main power supply.
Discharge the residual water in water tank, or discharge the water in accordance with the required
interval.
Discharge the residual water in steam generator (or fully discharge the water accumulated in
evaporator in accordance with the required interval).
After the works are completed every day, please keep the inside and outside of sterilizer clean, clear
away all dirt from the chamber, carry out simply maintenance once a week, and carried out
thorough maintenance once a month.
Notices:
No article which has been sterilized may be placed together with unsterilized articles.
The articles which have been successfully sterilized shall be marked with sterilization date and
qualified sign.
Name of User:
J1208_V02.00.01
Date:
- 32 -
03/2013