40484 Federal Register / Vol. 71, No.

136 / Monday, July 17, 2006 / Notices

Practice and Procedure (18 CFR license term, to issue from year-to-year DEPARTMENT OF ENERGY
385.211). Protests to this filing will be an annual license to the then licensee
considered by the Commission in under the terms and conditions of the Federal Energy Regulatory
determining the appropriate action to be prior license until a new license is Commission
taken, but will not serve to make issued, or the project is otherwise
protestants parties to the proceeding. [Docket Nos. CP06–412–000 and CP06–416–
disposed of as provided in section 15 or
Such protests must be filed on or before 000]
any other applicable section of the FPA.
the date as indicated below. Anyone If the project’s prior license waived the Puget Sound Energy, Inc. and
filing a protest must serve a copy of that applicability of section 15 of the FPA, Northwest Pipeline Corporation; Notice
document on all the parties to the then, based on section 9(b) of the of Application
proceeding. Administrative Procedure Act, 5 U.S.C.
The Commission encourages July 10, 2006.
558(c), and as set forth at 18 CFR
electronic submission of protests in lieu Take notice that on June 30, 2006,
16.21(a), if the licensee of such project
of paper using the ‘‘eFiling’’ link at Puget Sound Energy, Inc. (Puget), 10885
http://www.ferc.gov. Persons unable to has filed an application for a subsequent
license, the licensee may continue to NE. 4th Street, Bellevue, Washington
file electronically should submit an 98009, filed an application in Docket
original and 14 copies of the protest to operate the project in accordance with
the terms and conditions of the license No. CP06–412–000, pursuant to sections
the Federal Energy Regulatory 7(c) and 7(b) of the Natural Gas Act
Commission, 888 First Street, NE., after the minor or minor part license
(NGA) and part 157 of the Commission’s
Washington, DC 20426. expires, until the Commission acts on
regulations, for a certificate of public
This filing is accessible online at its application. If the licensee of such a convenience and necessity and related
http://www.ferc.gov, using the project has not filed an application for abandonment authority for Puget, as
‘‘eLibrary’’ link and is available for a subsequent license, then it may be operator of the Jackson Prairie Storage
review in the Commission’s Public required, pursuant to 18 CFR 16.21(b), Project in Lewis County, Washington, to
Reference Room in Washington, DC. to continue project operations until the construct and operate new and
There is an ‘‘eSubscription’’ link on the Commission issues someone else a upgraded facilities necessary to increase
Web site that enables subscribers to license for the project or otherwise the Jackson Prairie maximum firm
receive e-mail notification when a orders disposition of the project. withdrawal deliverability from 850
document is added to a subscribed If the project is subject to section 15 MMcf/day to 1,150 MMcf/day on behalf
docket(s). For assistance with any FERC of three owners of Jackson Prairie,
of the FPA, notice is hereby given that
Online service, please e-mail Puget, Northwest Pipeline Corporation
an annual license for Project No. 2145
FERCOnlineSupport@ferc.gov, or call (Northwest), and Avista Corporation.
(866) 208–3676 (toll free). For TTY, call is issued to Public Utility District No. 1
of Chelan County for a period effective Also on June 30, 2006, Northwest, 295
(202) 502–8659. Chipeta Way, Salt Lake City, Utah
Comment Date: 5 p.m. Eastern Time July 1, 2006 through June 30, 2007, or
until the issuance of a new license for 84158, filed a companion application
on July 18, 2006. under section 7(c) of the NGA and part
the project or other disposition under
Magalie R. Salas, 157 of the Commission’s regulations, for
the FPA, whichever comes first. If
Secretary. a certificate of public convenience and
issuance of a new license (or other
[FR Doc. E6–11261 Filed 7–14–06; 8:45 am] necessity authorizing it to utilize a
disposition) does not take place on or portion of the expanded withdrawal
BILLING CODE 6717–01–P before June 30, 2007, notice is hereby deliverability from the Jackson Prairie
given that, pursuant to 18 CFR 16.18(c), Storage Project for new firm storage
an annual license under section 15(a)(1) services. Puget’s project would consist
DEPARTMENT OF ENERGY of the FPA is renewed automatically of up to ten new injection/withdrawal
Federal Energy Regulatory without further order or notice by the wells with appurtenant gathering
Commission Commission, unless the Commission facilities, about 0.8 miles of 24-inch-
orders otherwise. If the project is not diameter pipeline looping, and various
[Project No. 2145] subject to section 15 of the FPA, notice upgrades at the Jackson Prairie
Public Utility District No. 1 of Chelan is hereby given that Public Utility Compressor station and Jackson Prairie
County, WA; Notice of Authorization District No. 1 of Chelan County, is Meter Station. The total cost of facilities
for Continued Project Operation authorized to continue operation of the is estimated to be $43.8 million, all as
Rocky Reach Project until such time as more fully set forth in the applications
July 11, 2006. the Commission acts on its application which are on file with the Commission
On June 29, 2004, Public Utility for a subsequent license. and open to public inspection. The
District No. 1 of Chelan County, licensee filings may also be viewed on the Web
for the Rocky Reach Hydroelectric Magalie R. Salas, at http://www.ferc.gov using the
Project, filed an application for a new or Secretary. ‘‘eLibrary’’ link. Enter the docket
subsequent license pursuant to the [FR Doc. E6–11262 Filed 7–14–06; 8:45 am] number excluding the last three digits in
Federal Power Act (FPA) and the BILLING CODE 6717–01–P the docket number field to access the
Commission’s regulations. The Rocky document. For assistance, please contact
Reach Project is located on the FERC Online Support at
Columbia River in the Town of Entiat, FERCOnlineSupport@ferc.gov or toll
Chelan County, Washington. free at (866) 208–3676, or for TTY,
rwilkins on PROD1PC63 with NOTICES

The license for Project No. 2145 was contact (202) 502–8659.
issued for a period ending June 30, Any questions regarding these
2006. Section 15(a)(1) of the FPA, 16 applications may be directed to Garry
U.S.C. 808(a)(1), requires the Kotter, Manager, Certificates and Tariffs,
Commission, at the expiration of a at (801) 584–7117, Northwest Pipeline

VerDate Aug<31>2005 17:41 Jul 14, 2006 Jkt 208001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\17JYN1.SGM 17JYN1