Federal Register / Vol. 71, No.

136 / Monday, July 17, 2006 / Notices 40499

notice of intent to file such an filing refers. Any of the above-named The Commission’s Rules of Practice
application. Submission of a timely documents must be filed by providing and Procedure require all intervenors
notice of intent to file a development the original and the number of copies filing documents with the Commission
application allows an interested person provided by the Commission’s to serve a copy of that document on
to file the competing application no regulations to: The Secretary, Federal each person in the official service list
later than 120 days after the specified Energy Regulatory Commission, 888 for the project. Further, if an intervenor
comment date for the particular First Street, NE., Washington, DC 20426. files comments or documents with the
application. A competing license A copy of any motion to intervene must Commission relating to the merits of an
application must conform with 18 CFR also be served upon each representative issue that may affect the responsibilities
4.30(b) and 4.36. of the Applicant specified in the of a particular resource agency, they
p. Notice of Intent: A notice of intent particular application. must also serve a copy of the document
must specify the exact name, business t. Agency Comments: Federal, State, on that resource agency.
address, and telephone number of the and local agencies are invited to file k. Description of Project: The
prospective applicant, and must include comments on the described application. proposed project would consist of: (1)
an unequivocal statement of intent to A copy of the application may be 25 to 50 Tidal In Stream Energy
submit, if such an application may be obtained by agencies directly from the Conversion (TISEC) devices consisting
filed, either a preliminary permit Applicant. If an agency does not file of rotating propeller blades, (2)
application or a development comments within the time specified for integrated generators with a capacity of
application (specify which type of filing comments, it will be presumed to 0.5 to 2.0 MW each, (3) anchoring
application). A notice of intent must be have no comments. One copy of an systems, (4) mooring lines, (5)
served on the applicant(s) named in this agency’s comments must also be sent to interconnection transmission lines, and
public notice. the Applicant’s representatives. (6) appurtenant facilities. The project is
q. Proposed Scope of Studies under estimated to have an annual generation
Permit: A preliminary permit, if issued, Magalie R. Salas, of 8.76 gigawatt-hours per-unit per-year,
does not authorize construction. The Secretary. which would be sold to a local utility.
term of the proposed preliminary permit [FR Doc. E6–11197 Filed 7–14–06; 8:45 am] l. Locations of Applications: A copy of
would be 36 months. The work BILLING CODE 6717–01–P the application is available for
proposed under the preliminary permit inspection and reproduction at the
would include economic analysis, Commission in the Public Reference
preparation of preliminary engineering DEPARTMENT OF ENERGY Room, located at 888 First Street, NE.,
plans, and a study of environmental Room 2A, Washington, DC 20426, or by
impacts. Based on the results of these Federal Energy Regulatory calling (202) 502–8371. This filing may
studies, the Applicant would decide Commission also be viewed on the Commission’s
whether to proceed with the preparation Web site at http://www.ferc.gov using
of a development application to Notice of Application Accepted for the ‘‘eLibrary’’ link. Enter the docket
construct and operate the project. Filing and Soliciting Motions To number excluding the last three digits in
r. Comments, Protests, or Motions to Intervene, Protests, and Comments the docket number field to access the
Intervene: Anyone may submit July 10, 2006. document. For assistance, call toll-free
comments, a protest, or a motion to Take notice that the following 1–866–208–3676 or e-mail
intervene in accordance with the hydroelectric application has been filed FERCOnlineSupport@ferc.gov. For TTY,
requirements of Rules of Practice and with the Commission and is available call (202) 502–8659. A copy is also
Procedure, 18 CFR 385.210, .211, .214. for public inspection: available for inspection and
In determining the appropriate action to a. Type of Application: Preliminary reproduction at the address in item h
take, the Commission will consider all Permit. above.
protests or other comments filed, but b. Project No.: 12697–000. m. Individuals desiring to be included
only those who file a motion to c. Date filed: June 19, 2006. on the Commission’s mailing list should
intervene in accordance with the d. Applicant: Alaska Tidal Energy so indicate by writing to the Secretary
Commission’s Rules may become a Company. of the Commission.
party to the proceeding. Any comments, e. Name of Project: Wrangell Narrows n. Competing Preliminary Permit—
protests, or motions to intervene must Tidal Energy Project. Anyone desiring to file a competing
be received on or before the specified f. Location: The project would be application for preliminary permit for a
comment date for the particular located on the Wrangell Narrows in proposed project must submit the
application. Wrangell-Petersburg, Alaska. competing application itself, or a notice
Comments, protests and interventions g. Filed Pursuant to: Federal Power of intent to file such an application, to
may be filed electronically via the Act, 16 U.S.C. 791(a)–825(r). the Commission on or before the
Internet in lieu of paper; See 18 CFR h. Applicant Contacts: Joseph A. specified comment date for the
385.2001(a)(1)(iii) and the instructions Cannon, Pillsbury Winthrop Shaw particular application (see 18 CFR 4.36).
on the Commission’s Web site under ‘‘e- Pittman LLP, 2300 N Street, NW., Submission of a timely notice of intent
filing’’ link. The Commission strongly Washington, DC 20037, phone: (202) allows an interested person to file the
encourages electronic filing. 663–8000, and Charles B. Cooper, TRC competing preliminary permit
s. Filing and Service of Responsive Environmental, Boott Mills South, 116 application no later than 30 days after
Documents: Any filings must bear in all John St., Lowell, MA 01852, phone: the specified comment date for the
capital letters the title ‘‘COMMENTS’’, (978) 656–3567. particular application. A competing
‘‘RECOMMENDATIONS FOR TERMS i. FERC Contact: Robert Bell, (202) preliminary permit application must
rwilkins on PROD1PC63 with NOTICES

AND CONDITIONS’’, ‘‘PROTEST’’, 502–6062. conform with 18 CFR 4.30(b) and 4.36.
‘‘COMPETING APPLICATION’’ OR j. Deadline for filing comments, o. Competing Development
‘‘MOTION TO INTERVENE’’, as protests, and motions to intervene: 60 Application—Any qualified
applicable, and the Project Number of days from the issuance date of this development applicant desiring to file a
the particular application to which the notice. competing development application

VerDate Aug<31>2005 17:41 Jul 14, 2006 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\17JYN1.SGM 17JYN1
40500 Federal Register / Vol. 71, No. 136 / Monday, July 17, 2006 / Notices

must submit to the Commission, on or AND CONDITIONS’’, ‘‘PROTEST’’, i. FERC Contact: Robert Bell, (202)
before a specified comment date for the ‘‘COMPETING APPLICATION’’ OR 502–6062.
particular application, either a ‘‘MOTION TO INTERVENE’’, as j. Deadline for filing comments,
competing development application or a applicable, and the Project Number of protests, and motions to intervene: 60
notice of intent to file such an the particular application to which the days from the issuance date of this
application. Submission of a timely filing refers. Any of the above-named notice.
notice of intent to file a development documents must be filed by providing The Commission’s Rules of Practice
application allows an interested person the original and the number of copies and Procedure require all intervenors
to file the competing application no provided by the Commission’s filing documents with the Commission
later than 120 days after the specified regulations to: The Secretary, Federal to serve a copy of that document on
comment date for the particular Energy Regulatory Commission, 888 each person in the official service list
application. A competing license First Street, NE., Washington, DC 20426. for the project. Further, if an intervenor
application must conform with 18 CFR A copy of any motion to intervene must files comments or documents with the
4.30(b) and 4.36. also be served upon each representative Commission relating to the merits of an
p. Notice of Intent—A notice of intent of the Applicant specified in the issue that may affect the responsibilities
must specify the exact name, business particular application. of a particular resource agency, they
address, and telephone number of the t. Agency Comments—Federal, State, must also serve a copy of the document
prospective applicant, and must include and local agencies are invited to file on that resource agency.
an unequivocal statement of intent to comments on the described application. k. Description of Project: The
submit, if such an application may be A copy of the application may be proposed project would consist of: (1)
filed, either a preliminary permit obtained by agencies directly from the 50 to 500 Tidal In Stream Energy
application or a development Applicant. If an agency does not file Conversion (TISEC) devices consisting
application (specify which type of of rotating propeller blades, (2)
comments within the time specified for
application). A notice of intent must be integrated generators with a capacity of
filing comments, it will be presumed to
served on the applicant(s) named in this 0.5 to 2.0 MW each, (3) anchoring
have no comments. One copy of an
public notice. systems, (4) mooring lines, (5)
agency’s comments must also be sent to
q. Proposed Scope of Studies under interconnection transmission lines, and
the Applicant’s representatives.
Permit—A preliminary permit, if issued, (6) appurtenant facilities. The project is
does not authorize construction. The Magalie R. Salas, estimated to have an annual generation
term of the proposed preliminary permit Secretary. of 8.76 gigawatt-hours per-unit per-year,
would be 36 months. The work [FR Doc. E6–11198 Filed 7–14–06; 8:45 am] which would be sold to a local utility.
proposed under the preliminary permit BILLING CODE 6717–01–P
l. Locations of Applications: A copy of
would include economic analysis, the application is available for
preparation of preliminary engineering inspection and reproduction at the
plans, and a study of environmental DEPARTMENT OF ENERGY Commission in the Public Reference
impacts. Based on the results of these Room, located at 888 First Street, NE.,
studies, the Applicant would decide Federal Energy Regulatory Room 2A, Washington, DC 20426, or by
whether to proceed with the preparation Commission calling (202) 502–8371. This filing may
of a development application to also be viewed on the Commission’s
construct and operate the project. Notice of Application Accepted for Web site at http://www.ferc.gov using
r. Comments, Protests, or Motions to Filing and Soliciting Motions To the ‘‘eLibrary’’ link. Enter the docket
Intervene—Anyone may submit Intervene, Protests, and Comments number excluding the last three digits in
comments, a protest, or a motion to the docket number field to access the
July 10, 2006.
intervene in accordance with the document. For assistance, call toll-free
requirements of Rules of Practice and Take notice that the following 1–866–208–3676 or e-mail
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed FERCOnlineSupport@ferc.gov. For TTY,
In determining the appropriate action to with the Commission and is available call (202) 502–8659. A copy is also
take, the Commission will consider all for public inspection: available for inspection and
protests or other comments filed, but a. Type of Application: Preliminary reproduction at the address in item h
only those who file a motion to Permit. above.
intervene in accordance with the b. Project No.: 12705–000. m. Individuals desiring to be included
Commission’s Rules may become a c. Date filed: June 28, 2006. on the Commission’s mailing list should
party to the proceeding. Any comments, d. Applicant: Alaska Tidal Energy so indicate by writing to the Secretary
protests, or motions to intervene must Company. of the Commission.
be received on or before the specified e. Name of Project: Central Cook Inlet n. Competing Preliminary Permit—
comment date for the particular Tidal Energy Project. Anyone desiring to file a competing
application. f. Location: The project would be application for preliminary permit for a
Comments, protests and interventions located on the central part of Cook Inlet proposed project must submit the
may be filed electronically via the in Kenai Peninsula, Alaska. competing application itself, or a notice
Internet in lieu of paper; See 18 CFR g. Filed Pursuant to: Federal Power of intent to file such an application, to
385.2001(a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)–825(r). the Commission on or before the
on the Commission’s Web site under ‘‘e- h. Applicant Contacts: Joseph A. specified comment date for the
filing’’ link. The Commission strongly Cannon, Pillsbury Winthrop Shaw particular application (see 18 CFR 4.36).
encourages electronic filing. Pittman LLP, 2300 N Street, NW., Submission of a timely notice of intent
rwilkins on PROD1PC63 with NOTICES

s. Filing and Service of Responsive Washington, DC 20037, phone: (202) allows an interested person to file the
Documents—Any filings must bear in 663–8000, and Charles B. Cooper, TRC competing preliminary permit
all capital letters the title Environmental, Boott Mills South, 116 application no later than 30 days after
‘‘COMMENTS’’, John St., Lowell, MA 01852, phone: the specified comment date for the
‘‘RECOMMENDATIONS FOR TERMS (978) 656–3567. particular application. A competing

VerDate Aug<31>2005 17:41 Jul 14, 2006 Jkt 208001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\17JYN1.SGM 17JYN1