Federal Register / Vol. 71, No.

135 / Friday, July 14, 2006 / Notices 40095

technical person listed under FOR Busway/Bus Rapid Transit Facility, potential site that may require inclusion
FURTHER INFORMATION CONTACT. 11 miles between downtown in the general conformity applicability
Dated: July 10, 2006. Minneapolis and downtown St. Paul, analysis. Rating EC2.
Minnesota, Twin Cities Metropolitan
Deborah Y. Dietrich, Final EISs
Area, MN.
Director, Office of Emergency Management. EIS No. 20060133, ERP No. F–NRC–
[FR Doc. E6–11106 Filed 7–13–06; 8:45 am]
Summary: EPA expressed
environmental concerns about traffic E06024–MS, Grand Gulf Early Site
BILLING CODE 6560–50–P
impacts, hazardous waste, noise Permit (ESP) Site, Construction and
impacts, possible geologic, water, and Operation, Issuance of an Early Site
air issues, and alternative selection Permit (ESP), NUREG–1817,
ENVIRONMENTAL PROTECTION Claiborne County, MS.
AGENCY criteria. Rating EC2.
Summary: EPA continues to express
EIS No. 20060173, ERP No. D–UAF– concerns about the uncertainty of
[ER–FRL–6677–3] K11021–GU, Andersen Air Force Base regulatory limits for offsite releases of
(AFB), Establish and Operate an radionuclides for the current candidate
Environmental Impact Statements and Intelligence, Surveillance,
Regulations; Availability of EPA repository site. EPA recommends that
Reconnaissance, and Strike (ISR/ emergency preparedness issues be
Comments Strike) Capability, Guam. evaluated regarding potential
Availability of EPA comments Summary: EPA expressed implications of a release to plant
prepared pursuant to the Environmental environmental concerns about the personnel or the public in the event of
Review Process (ERP), under section disposal of wastewater from the project, a major unintended release. EPA also
309 of the Clean Air Act and Section and recommended the Air Force work recommends continued coordination
102(2)(c) of the National Environmental with Guam Waterworks Authority with Environmental Justice
Policy Act as amended. Requests for towards upgrading the wastewater communities in the area to ensure that
copies of EPA comments can be directed treatment plant. Other concerns include their concerns are addressed as the
to the Office of Federal Activities at noise impacts, and impacts to project progresses.
202–564–7167. endangered species. EPA requested EIS No. 20060179, ERP No. F–AFS–
An explanation of the ratings assigned additional information regarding J65456–WY, Moose-Gypsum Project,
to draft environmental impact cumulative impacts, resource use/ Proposes to Authorize Vegetation
statements (EISs) was published in FR impacts from 1,800 migrant laborers, Treatments, Watershed
dated April 7, 2006 (71 FR 17845). and solid waste disposal and impacts to Improvements, and Travel Plan and
the Sole Source Aquifer.Rating EC2. Recreation Updates, Pinedale Ranger
Draft EISs
EIS No. 20060187, ERP No. D–AFS– District, Bridger-Teton National
EIS No. 20060141, ERP No. D–AFS– F65065–WI, Long Rail Vegetation and Forest, Sublette County, WY
F65064–WI, Boulder Project, Timber Transportation Management Project, Summary: Quantified estimates of
Harvesting, Vegetation and Road Implementation, Eagle River-Florence sediment impacts from modeling
Management, U.S. Army COE Section Ranger District, Chequamegon-Nicolet addressed EPA concerns about erosion.
404 Permit, Chequamegon-Nicolet National Forest, Florence and Forest However, EPA continues to have
National Forest, Lakewood-Laona Counties, WI concerns about the adaptive
Ranger District, Oconto and Langlade Summary: EPA expressed management program because there are
Counties, WI. environmental concern about whether no quantitative measures, thresholds, or
Summary: EPA expressed the preferred alternative would support required actions if physical and
environmental concerns about the Draft adequate habitat to support the regional biological objectives are not met.
EIS’s discussion of habitat requirements species of concern. The Final EIS EIS No. 20060189, ERP No. F–NRC–
and population trends for key species, should include more information about F06027–OH, American Centrifuge
notably the northern goshawk and red- impacts from timber harvest to riparian Plant, Gas Centrifuge Uranium
shouldered hawk; the Final EIS should areas and adequate levels of Enrichment Facility, Construction,
present a more complete cumulative successional habitat for population Operation, and Decommission,
impact analysis, covering the geographic viability. Rating EC2. License Issuance, Piketon, OH
range of targeted species, regardless of EIS No. 20060211, ERP No. D–DOE– Summary: EPA’s concerns on the
land ownership. Rating EC2. G03030–00, Strategic Petroleum management of various materials,
EIS No. 20060146, ERP No. D–UAF– Reserve Expansion, Site Selection of facility decontamination and
K11115–HI, Hickam Air Force Base Five New Sites: Chacahoula and decommissioning, groundwater
and Bellows Air Force Station, 15th Clovelly, in Lafourche Parish, LA; contamination, and the relationship of
Airlift Wing, Housing Privatization Burinsburg, Claiborne County, MS; the project to other facilities and
Phase II, To Transfer the Remaining Richton, Perry County, MS; and contaminated sites at the Portsmouth
Housing Units, and Associated Stratton Ridge, Brazoria County, TX Reservation have been resolved.
Infrastructure to Selected Offeror, and Existing Site Bayou Choctaw, However, EPA continues to have
O’ahu, HI. Iberville Parish, LA, West Hackberry, concerns about radionuclide air
Summary: EPA expressed concerns Cameron and Calcasieu Parishes, LA; emissions standards compliance, waste
about a lack of federal commitment to and Big Hill, Jefferson County, TX processing capacity, construction air
sustainable building, and requested Summary: EPA expressed emissions, and cumulative impacts to
additional information and mitigation environmental concerns and requested surface water.
jlentini on PROD1PC65 with NOTICES

measures for air quality, stormwater additional information about air quality, EIS No. 20060199, ERP No. F–AFS–
pollution, and wetlands. Rating EC2. water quality, and wetlands. EPA is F65050–MI, Huron-Manistee National
EIS No. 20060147, ERP No. D–FTA– particularly interested in information Forests, Land and Resource
F40434–MN, Central Corridor Project, pertaining to emissions from backup Management Plan, Implementation,
Develop a Light Rail Facility or a generators and other activities for each Several Counties, MI

VerDate Aug<31>2005 17:44 Jul 13, 2006 Jkt 208001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\14JYN1.SGM 14JYN1
40096 Federal Register / Vol. 71, No. 135 / Friday, July 14, 2006 / Notices

Summary: EPA’s concerns about CA, Wait Period Ends: 08/14/2006, EIS No. 20060289, Final EIS, AFS, WA,
potential impacts to soil and water Contact: Sky Murphy 831–630–5039. School Fire Salvage Recovery Project,
quality and from invasive species have EIS No. 20060283, Draft EIS, FHW, UT, Salvage Harvest Fire-Killed (dead)
been addressed, therefore, we do not Riverdale Road Project (UT–26), and Fire-Damaged (dying) Trees,
object to the proposed action. Improvement Mobility and Safety Implementation, Pomeroy Ranger
EIS No. 20060261, ERP No. F–NPS– between 1900 West in Roy, UT and District, Umatilla National Forest,
J61106–UT, Burr Trail Modification U.S. Highway 89 (Washington Columbia and Garfield Counties, WA,
Project, Proposed Road Modification Boulevard) in Odgen, UT, Cities of Wait Period Ends: 08/14/2006,
within Capitol Reef National Park, Roy, Riverdale, South Ogden and Contact: Dean Millett 509–843–1891.
Garfield County, UT Ogden, Weber County, UT, Comment EIS No. 20060290, Draft Supplement,
Summary: No formal comment letter Period Ends: 08/28/2006, Contact: NRC, VA, Early Site Permit (ESP) at
was sent to the preparing agency. Greg Punske 801–963–0182. the North Anna Power Station ESP
EIS No. 20060284, Draft EIS, FHW, KY, Site (TAC No. MC1128), New and
EIS No. 20060104, ERP No. FR–BLM–
I–66 Somerset to London Project, Updated Information, Construction
A65174–00, PROGRAMMATIC—
Construction from the Vicinity of the and Operation, NUREG–1811, Louisa
Proposed Revision to Grazing
Northern Bypass (I–66) in Somerset, County, VA, Comment Period Ends:
Regulations for the Public Lands, 42
KY to I–75 between London and 08/28/2006, Contact: Jacking Cushing
CFR Part 4100, in the Western Portion
Corbin Cities, Pulaski, U.S. Army COE 301–415–1424.
of the United States EIS No. 20060291, Final EIS, NOA, 00,
Section 404 Permit, Rockcastle and
Summary: No formal comment letter Consolidated Atlantic Highly
Laurel Counties, KY, Comment Period
was sent to the preparing agency. Migratory Species Fishery
Ends: 08/28/2006, Contact: Jose
Dated: July 11, 2006. Sepulveda 502–223–6740. Management Plan for Atlantic Tunas,
Ken Mittelholtz, EIS No. 20060285, Draft Supplement, Swordfish, and Shark and the Atlantic
Environmental Protection Specialist, Office FHW, ME, Aroostook County Billfish Fishery Management Plan,
of Federal Activities. Transport Study, New and Updated Implementation, Atlantic Coast,
[FR Doc. E6–11129 Filed 7–13–06; 8:45 am] Information, To Identify Caribbean and Gulf of Mexico, Wait
BILLING CODE 6560–50–P Transportation Corridors that will Period Ends: 08/14/2006, Contact:
Improve Mobility and Efficiency Karyle Brewster-Geisz 301–713–2347.
within Northeastern Aroostook Amended Notices
ENVIRONMENTAL PROTECTION County and other portions of the U.S.
AGENCY EIS No. 20060260, Final EIS, BLM, AK,
and Canada, U.S. Army COE Section
East Alaska Draft Resource
[ER–FRL–6677–2] 404 Permit, Endangered Species Act,
Management Plan (RMP), Provide a
NPDES and Section 10 River and
Single Comprehensive Land Use Plan,
Environmental Impacts Statements; Harbors Act, Aroostook, ME,
Implementation, Glennallen Field
Notice of Availability Comment Period Ends: 08/31/2006,
Office District, AK, Wait Period Ends:
Contact: Mark Hasselman 207–622–
Responsible Agency: Office of Federal 08/02/2006, Contact: Bruce Rogers
8350.
Activities, General Information (202) 907–822–3217.
EIS No. 20060286, Draft EIS, BLM, ID,
564–7167 or http://www.epa.gov/ Eastside Township Fuels and Revision to Federal Register Notice
compliance/nepa/. Vegetation Project, Address the Forest Published 07/03/2006: Correction to
Weekly receipt of Environmental Impact Health, Fuels, Safety, and Watershed Wait Period from 07/31/2006 to 08/02/
Statements Filed 07/03/2006 Through Issues, Elk City, Idaho County, ID, 2006.
07/07/2006. Comment Period Ends: , 09/11/2006, EIS No. 20060261, Final EIS, NPS, UT,
Pursuant to 40 CFR 1506.9. Contact: Robbin B. Boyce 208–962– Burr Trail Modification Project,
THIS NOTICE SUPERSEDES 3594. Proposed Road Modification within
‘‘SPECIAL NOTICE DATED: 07/07/ EIS No. 20060287, Draft EIS, AFS, MT, Capitol Reef National Park, Garfield
2006’’ EIS’S FILED JUNE 19 THRU Little Belt-Castle-North Half Crazy County, UT, Wait Period Ends: 08/02/
JUNE 23, 2006 SCHEDULED TO Mountains Travel Management Plan, 2006, Contact: Chris Turk 303–969–
APPEAR IN THE Federal Register ON To Change the Management of 2832.
JUN 30, 2006, BUT WERE PUBLISHED Motorized and Non-motorized Travel Revision to Federal Register Notice
ON MONDAY JULY 3, 2006. on the Road, Trails, and Areas within, Published 07/03/2006: Correction to
CALCULATED FROM JULY 3, 2006 Belt Creek, Judith, Musselshell, and Wait Period from 07/31/2006 to 08/02/
Federal Register THE DRAFT EIS’S White Sulphur Springs Ranger 2006.
COMMENT PERIODS WILL END ON Districts, Lewis and Clark National EIS No. 20060263, Final EIS, BIA, MI,
AUGUST 17, 2006 AND FINAL EIS’S Forest, Cascade, Judith Basin, Nottawaseppi Huron Band of
WAIT PERIODS WILL END ON Meagher, Wheatland, Sweetgrass and Potawatomi Indians (the Tribe),
AUGUST 2, 2006. Park Counties, MT, Comment Period Proposes Fee-to-Trust Transfer and
EIS No. 20060281, Final EIS, NPS, CA, Ends: 09/15/2006, Contact: Dick Casino Project, Calhoun County, MI,
Furnace Creek Water Collection Schwecke 406–791–7700. Wait Period Ends: 08/02/2006,
System, Reconstruction, Death Valley EIS No. 20060288, Final EIS, FTA, CA, Contact: Terrance Virden 612–725–
National Park, Implementation, Inyo Warm Springs Extension, Proposing 4510.
County, CA, Wait Period Ends: 08/14/ 5.4 mile Extension of the BART Revision to Federal Register Notice
2006, Contact: Linda Greene 760– System in the City of Fremont, Published 07/03/2006: Correction to
jlentini on PROD1PC65 with NOTICES

786–3253. Funding, San Francisco Bay Area Wait Period from 07/31/2006 to 08/02/
EIS No. 20060282, Final EIS, BLM, CA, Rapid Transit District, Alameda 2006.
Southern Diablo Mountain Range and County, CA, Wait Period Ends: 08/14/ EIS No. 20060264, Draft EIS, AFS, WY,
Central Coast of California Resource 2006, Contact: Lorraine Lerman 415– Lower Valley Energy (LVE) Natural
Management Plan, Several Counties, 744–2735. Gas Pipeline Project, Construction