30128 Federal Register / Vol. 71, No.

101 / Thursday, May 25, 2006 / Notices

taken, but will not serve to make June 14, 2006 and in Salem, MA on June action. In addition, FERC staff
protestants parties to the proceeding. 15, 2006. Both hearings will be from 6 recommends that:
Such protests must be filed in p.m. to 8 p.m. (EST) and will be Prior to construction, Algonquin file
accordance with the provisions of preceded by an informational open documentation with the Secretary of the
Section 154.210 of the Commission’s house from 4:30 p.m. to 6 p.m. The Commission that confirms USCG staff’s
regulations (18 CFR 154.210). Anyone public meeting in Gloucester will be review and approval of the project’s air
filing a protest must serve a copy of that held at the Gloucester High School quality analysis and identifies all
document on all the parties to the Auditorium, 32 Leslie O. Johnson Road, mitigation requirements required to
proceeding. Gloucester, MA, telephone: 617–635– demonstrate conformity with Title 40
The Commission encourages 4100. The public meeting in Salem will CFR 51.858.
electronic submission of protests in lieu be at the Salem State College Library, 3. Algonquin should not begin
of paper using the ‘‘eFiling’’ link at Charlotte Forten Hall, 360 Lafayette construction of the project until it files
http://www.ferc.gov. Persons unable to Street, Salem, MA, telephone: 978–542– with the Secretary of the Commission a
file electronically should submit an 7192. copy of the determination of
original and 14 copies of the protest to The U.S. Coast Guard has mailed consistency with the Coastal Zone
the Federal Energy Regulatory copies of the DEIS to Federal, state, and Management Plan issued by the
Commission, 888 First Street, NE., local government agencies; elected Massachusetts Office of Coastal Zone
Washington, DC 20426. officials; Native American tribes; local Management.
This filing is accessible on-line at libraries and newspapers; intervenors in 4. Algonquin should prepare as-built
http://www.ferc.gov, using the the FERC’s proceeding; individuals who construction plans for the Pipeline
‘‘eLibrary’’ link and is available for provided scoping comments; and Lateral that include the details of where
review in the Commission’s Public affected landowners and individuals. A the pipeline would be laid on the ocean
Reference Room in Washington, DC. copy of this DEIS, the application, and floor and protected with concrete mats.
There is an ‘‘eSubscription’’ link on the associated documentation are currently To minimize the potential for the
Web site that enables subscribers to available for viewing at the DOT’s pipeline to become an obstacle for
receive e-mail notification when a Docket Management System Web site: ground fishing gear, these plans should
document is added to a subscribed http://dms.dot.gov under docket number be made available to the USCG and
docket(s). For assistance with any FERC 22219. other jurisdictional agencies for
Online service, please e-mail During preparation of the DEIS, the dissemination to the commercial fishing
FERCOnlineSupport@ferc.gov, or call following FERC staff recommendations industry.
(866) 208–3676 (toll free). For TTY, call were inadvertently left out of section 5. Algonquin should file with the
(202) 502–8659. 4.12 of the DEIS: Secretary of the Commission, prior to
1. Algonquin should not begin construction, a detailed program to
Magalie R. Salas,
construction activities until: monitor the burial and backfilling of the
Secretary. Pipeline Lateral. Include documentation
a. FERC staff receives comments from
[FR Doc. E6–8015 Filed 5–24–06; 8:45 am] of all consultation with jurisdictional
the National Marine Fisheries Service
BILLING CODE 6717–01–P
(NMFS) regarding the proposed action; resource management agencies to
b. the staff completes formal determine the appropriate depth and
consultation with the NMFS, if cover criteria as well as any measures to
DEPARTMENT OF ENERGY minimize impacts to migrating lobsters
required; and
c. Algonquin has received written from pipeline trenching and backfilling
Federal Energy Regulatory
notification from the Director of the activities.
Commission
Office of Energy Projects (OEP) that Magalie R. Salas,
[Docket No. CP05–383–000] construction or use of mitigation may Secretary.
Algonquin Gas Transmission, LLC; begin. [FR Doc. E6–8032 Filed 5–24–06; 8:45 am]
Notice of Availability of the Draft 2. Prior to construction, Northeast
BILLING CODE 6717–01–P
Environmental Impact Statement for Gateway (NEG) should provide to the
the Proposed Northeast Gateway U.S. Coast Guard (USCG) staff for
Project and Notice of Public Comment review and approval a full air quality DEPARTMENT OF ENERGY
Meetings analysis identifying all mitigation
requirements required to demonstrate Federal Energy Regulatory
May 19, 2006. conformity and submit detailed Commission
The staff of the Federal Energy information documenting how the
[Docket No. CP05–420–000]
Regulatory Commission (Commission or project would demonstrate conformance
FERC) has cooperated in the preparation with the applicable SIP in accordance Bayou Casotte Energy, LLC; Notice of
of the Draft Environmental Impact with Title 40 CFR 51.858. The Availability of the Draft Environmental
Statement (EIS) on the liquefied natural documentation should address each Impact Statement for the Casotte
gas (LNG) facilities proposed by regulatory criteria listed in part 51.858; Landing LNG Project
Algonquin Gas Transmission, LLC in provide a detailed explanation as to
the above-referenced docket. The whether or not the project would meet May 19, 2006.
Maritime Administration (MARAD) and each requirement; and for each criteria The staff of the Federal Energy
the U. S. Coast Guard, as the lead being satisfied, provide all supporting Regulatory Commission (FERC or
Federal agencies, have issued a Notice information on how the project would Commission) has prepared this draft
cchase on PROD1PC60 with NOTICES

in the Federal Register indicating the comply. Should any element of the Environmental Impact Statement (EIS)
availability of the DEIS and requesting project change substantially, NEG for the construction and operation of the
comments by July 3, 2006. should resubmit the aforementioned liquefied natural gas (LNG) import
The U.S. Coast Guard will also hold information so that USCG staff may terminal and natural gas pipeline
public hearings in Gloucester, MA on determine the Conformity of the revised facilities, referred to as the Casotte

VerDate Aug<31>2005 16:42 May 24, 2006 Jkt 208001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\25MYN1.SGM 25MYN1
Federal Register / Vol. 71, No. 101 / Thursday, May 25, 2006 / Notices 30129

Landing LNG Project, as proposed by on ‘‘Sign-up’’ under ‘‘New User.’’ You specified above.1 You do not need
Bayou Casotte Energy, LLC in the above- will be asked to select the type of intervenor status to have your
referenced docket. submission you are making. This type of comments considered.
This draft EIS was prepared to satisfy submission is considered a ‘‘Comment The draft EIS has been placed in the
the requirements of the National on Filing.’’ Comments submitted public files of the FERC and is available
Environmental Policy Act. The staff electronically must be submitted by July
concludes that approval of the Casotte for distribution and public inspection
10, 2006.
Landing LNG Project, with appropriate If you wish to mail comments on the at: Federal Energy Regulatory
mitigating measures as recommended, draft EIS, please mail your comments so Commission, Public Reference and Files
would have limited adverse that they will be received in Maintenance Branch, 888 First Street,
environmental impact. The draft EIS Washington, DC on or before July 10, NE., Room 2A, Washington, DC 20426.
evaluates alternatives to the proposal, 2006 and carefully follow these (202) 502–8371.
including system alternatives, instructions: A limited number of copies of the
alternative sites for the LNG import Send an original and two copies of draft EIS are available from the Public
terminal, and pipeline alternatives. The your comments to: Reference and Files Maintenance
draft EIS also contains our Essential • Magalie R. Salas, Secretary, Federal Branch identified above. In addition, CD
Fish Habitat Assessment. Energy Regulatory Commission, 888 copies of the draft EIS have been mailed
The general purpose of the Casotte First Street, NE., Room 1A, Washington, to Federal, state, and local agencies;
Landing LNG Project is to provide up to DC 20426.
• Reference Docket Nos. CP05–420– elected officials; public interest groups;
1.6 billion cubic feet per day of natural individuals and affected landowners;
gas to markets in the United States. 000 on the original and both copies;
• Label one copy of your comments libraries; newspapers; and parties to
The draft EIS addresses the potential
environmental effects of construction for the attention of Gas Branch 2, PJ11.2; these proceedings.
and operation of the following facilities and Additional information about the
near the City of Pascagoula in Jackson • Mail your comments so that they project is available from the
County, Mississippi: will be received in Washington, DC on Commission’s Office of External Affairs,
• A ship unloading facility with a or before July 10, 2006. at 1–866–208–FERC or on the FERC
single berth capable of receiving LNG In lieu of or in addition to sending Internet website (http://www.ferc.gov)
ships with cargo capacities of up to written comments, we invite you to using the eLibrary link. Click on the
200,000 cubic meters (m3); attend the public comment meeting the
eLibrary link, click on ‘‘General Search’’
• Three 160,000 m3 (net capacity) full FERC will conduct in the project area to
and enter the docket number excluding
containment LNG storage tanks; receive comments on the draft EIS. The
the last three digits in the Docket
• A closed-loop intermediate fluid public comment meeting will be
Number field. Be sure you have selected
vaporizer system utilizing cooling water conducted jointly to also receive
comments on the draft EIS prepared for an appropriate date range. For
from the adjacent Chevron Pascagoula
the Clean Energy LNG Project. The assistance, please contact FERC Online
Refinery as a heat source, sized for a
normal sendout of 1.3 Bcfd; meeting is scheduled as follows: Support at:
• Various ancillary buildings and Thursday, June 22, 2006, 7 p.m. (CDT), FERCOnlineSupport@ferc.gov or toll
facilities; Pascagoula High School cafeteria, 1716 free at 1–866–208–3676, or for TTY at
• Five pipeline interconnects Tucker Avenue, Pascagoula, MS 39567. (202) 502–8659. The eLibrary link on
originating from a 1.5-mile-long, 36- Telephone: (228) 938–6451. the FERC Internet website also provides
inch-diameter spur; The public comment meeting will be access to the texts of formal documents
• Associated pipeline support posted on the FERC’s calendar located issued by the Commission, such as
facilities, including two meter stations at http://www.ferc.gov/EventCalendar/ orders, notices, and rulemakings.
at interconnects with the existing EventsList.aspx. Interested groups and In addition, the Commission now
pipeline systems; and individuals are encouraged to attend offers a free service called eSubscription
• Integrally related nonjurisdictional and present oral comments on the draft
that allows you to keep track of all
facilities would include a natural gas EIS. A transcript of the meeting will be
formal issuances and submittals in
liquid (NGL) extraction system and prepared.
pipeline, electric transmission lines, an After the written comments and specific dockets. This can reduce the
electric substation, a waste heat water comments from the public meeting are amount of time you spend researching
circulation system, and the relocation of reviewed, any significant new issues are proceedings by automatically providing
two of the Chevron Pascagoula Refinery investigated, and modifications are you with notification of these filings,
crude oil tanker berths. made to the draft EIS, a final EIS will document summaries, and direct links
be published and distributed by the to the documents. To register for this
Comment Procedures and Public staff. The final EIS will contain the service, go to the eSubscription link on
Meetings staff’s responses to timely comments the FERC Internet Web site.
Any person wishing to comment on received on the draft EIS.
Magalie R. Salas,
the draft EIS may do so. To expedite the Comments will be considered by the
FERC’s receipt and consideration of Commission but will not serve to make Secretary.
your comments, electronic submission the commentor a party to the [FR Doc. E6–8016 Filed 5–24–06; 8:45 am]
of comments is strongly encouraged. See proceeding. Any person seeking to BILLING CODE 6717–01–P
18 Code of Federal Regulations (CFR) become a party to the proceeding must
385.2001(a)(1)(iii) and the instructions file a motion to intervene pursuant to
cchase on PROD1PC60 with NOTICES

on the FERC’s Internet Web site (http:// Rule 214 of the Commission’s Rules of
www.ferc.gov) under the eFiling link Practice and Procedures (18 CFR
and the link to the User’s Guide. Before 385.214). Anyone may intervene in this 1 Interventions may also be filed electronically via

you can submit comments, you will proceeding based on this draft EIS. You the Internet in lieu of paper. See the previous
need to create a free account by clicking must file your request to intervene as discussion on filing comments electronically.

VerDate Aug<31>2005 16:42 May 24, 2006 Jkt 208001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\25MYN1.SGM 25MYN1

Das könnte Ihnen auch gefallen