Sie sind auf Seite 1von 2

29146 Federal Register / Vol. 71, No.

97 / Friday, May 19, 2006 / Notices

2000 (65 FR 55331), and promulgated search data sources; complete and 3501 et seq.), this document announces
on December 4, 2002 (67 FR 72341). review the collection of information; that an Information Collection Request
These standards apply to each existing, and transmit or otherwise disclose the (ICR) has been forwarded to the Office
new, or reconstructed paper and other information. of Management and Budget (OMB) for
web coating (POWC). Respondents/Affected Entities: Paper review and approval. This is a request
Owners or operators of the affected and other web coating facility. to renew an existing approved
facilities must make the following Estimated Number of Respondents: collection. The ICR which is abstracted
notification: (1) Initial notification; (2) 215. below describes the nature of the
notification of performance test; and (3) Frequency of Response: On occasion, collection and the estimated burden and
notification of compliance status. initially, semiannually, and monthly. cost.
Affected sources must submit Estimated Total Annual Hour Burden: DATES: Additional comments may be
performance test reports, and a startup, 11,312. submitted on or before June 19, 2006.
shutdown, malfunction (SSM) report. Estimated Total Annual Costs:
ADDRESSES: Submit your comments,
Owners or operators are also required to $1,765,220, which includes $233,000
annualized capital/startup costs, referencing docket ID number EPA–HQ–
maintain records on a monthly basis. OECA–2005–0021, to (1) EPA online
They are: (1) Continuous emission $619,000 O&M costs and $913,229 in
labor costs. using http://www.regulations.gov (our
monitor data; (2) control device and preferred method), or by e-mail to
capture system operating parameter Changes in the Estimates: There is a
decrease of 30,150 hours in the total docket.oeca@epa.gov, or by mail to: EPA
data; (3) organic HAP content data; (4) Docket Center (EPA/DC), Environmental
volatile matter and coating solids estimated burden currently identified in
the OMB Inventory of Approved ICR Protection Agency, Enforcement and
content data; (5) overall control Compliance Docket and Information
efficiency determination using capture Burdens. The decrease in burden from
the most recently approved ICR is due Center, mail code 2201T, 1200
efficiency and control device; (6) Pennsylvania Avenue, NW.,
material usage, organic HAP usage, to the requirements of the rule that
states all existing sources must be in Washington, DC 20460, and (2) OMB at:
volatile matter usage, and coating solids Office of Information and Regulatory
usage; and (7) liquid-liquid material compliance within three years of
promulgation date, thus, less burden is Affairs, Office of Management and
balances. Semiannual compliance Budget (OMB), Attention: Desk Officer
reports are also required. imposed on existing sources.
Also, in the previous ICR, 226 for EPA, 725 17th Street, NW.,
Any owner or operator subject to the Washington, DC 20503.
provisions of this subpart must maintain respondents read the rule and
determined that they were not subject, FOR FURTHER INFORMATION CONTACT:
a file of these measurements, and retain
since this is a one-time-only activity, the Learia Williams, Compliance
the file for at least five years following
number of respondents is 226 less than Assessment and Media Programs
the collection of such measurements,
in the previous ICR. Division (CAMPD), Office of
maintenance reports, and records. All
There was a decrease in the capital/ Compliance, (Mail Code 2223A),
reports are sent to the delegated state or
startup and operations and maintenance Environmental Protection Agency, 1200
local authority. In the event that there
(O&M) costs from the previous ICR. The Pennsylvania Avenue, NW.,
is no such delegated authority, the
reason for this decrease is because we Washington, DC 20460; telephone
reports are sent directly to the EPA
are accounting only for the number of number: (202) 564–4113; fax number:
regional office.
An agency may not conduct or respondents associated with the O&M (202) 564–0050; e-mail address:
sponsor, and a person is not required to costs, not for the number of annual williams.learia@epa.gov.
respond to, a collection of information reports used in the previous ICR. Also, SUPPLEMENTARY INFORMATION: EPA has
unless it displays a currently valid OMB there are only 6 new sources per year submitted the following ICR to OMB for
Control Number. The OMB Control versus 18 in the previous ICR. review and approval according to the
Numbers for EPA’s regulations are listed Dated: May 12, 2006. procedures prescribed in 5 CFR 1320.12.
in 40 CFR part 9 and 48 CFR chapter 15, Oscar Morales, On May 6, 2005 (70 FR 24020), EPA
and are identified on the form and/or Director, Collection Strategies Division.
sought comments on this ICR pursuant
instrument, if applicable. to 5 CFR 1320.8(d). EPA received no
[FR Doc. E6–7651 Filed 5–18–06; 8:45 am]
Burden Statement: The annual public comments. Any additional comments on
BILLING CODE 6560–50–P
reporting and recordkeeping burden for this ICR should be submitted to EPA
this collection of information is and OMB within 30 days of this notice.
estimated to average 23 hours per EPA has established a public docket
ENVIRONMENTAL PROTECTION
response. Burden means the total time, for this ICR under docket ID number
AGENCY
effort, or financial resources expended HQ–EPA–OECA–2005–0021, which is
by persons to generate, maintain, retain, [EPA–HQ–[OECA–2005–0021; FRL–8172–1] available for public viewing online at
or disclose or provide information to or http://www.regulations.gov, or in person
for a Federal agency. This includes the Agency Information Collection viewing at the Enforcement and
time needed to review instructions; Activities; Submission to OMB for Compliance Docket in the EPA Docket
develop, acquire, install, and utilize Review and Approval; Comment Center (EPA/DC), EPA West, Room
technology and systems for the purposes Request; NESHAP for Brick and B102, 1301 Constitution Avenue, NW.,
of collecting, validating, and verifying Structural Clay Manufacturing Washington, DC. The EPA Docket
information, processing and (Renewal), EPA ICR Number 2022.03, Center Public Reading Room is open
maintaining information, and disclosing OMB Control Number 2060–0508 from 8:30 a.m. to 4:30 p.m., Monday
and providing information; adjust the AGENCY: Environmental Protection through Friday, excluding legal
wwhite on PROD1PC61 with NOTICES

existing ways to comply with any Agency (EPA). holidays. The telephone number for the
previously applicable instructions and ACTION: Notice. Reading Room is (202) 566–1744, and
requirements which have subsequently the telephone number for the
changed; train personnel to be able to SUMMARY: In compliance with the Enforcement and Compliance Docket is
respond to a collection of information; Paperwork Reduction Act (44 U.S.C. (202) 566–1752.

VerDate Aug<31>2005 17:37 May 18, 2006 Jkt 208001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\19MYN1.SGM 19MYN1
Federal Register / Vol. 71, No. 97 / Friday, May 19, 2006 / Notices 29147

Use EPA’s electronic docket and duration of any startup, shutdown, or full compliance three years after
comment system at http:// malfunction. promulgation, which would be the
www.regulations.gov, to submit or view Any owner or operator subject to the fourth year or the first year of this
public comments, access the index provisions of this subpart must maintain renewal ICR. All existing sources, along
listing of the contents of the docket, and a file of these measurements, and retain with the additional new source would
to access those documents in the docket the file for at least five years following be fulfilling the applicable standards
that are available electronically. Once in the collection of such measurements, thus, justifying the decrease in
the system, select ‘‘docket search,’’ then maintenance reports, and records. All respondent’s burden as compared to the
key in the docket ID number identified reports are sent to the delegated state or active ICR.
above. Please note that EPA’s policy is local authority. In the event that there There is a decrease in the capital/
that public comments, whether is no such delegated authority, the startup and operations and maintenance
submitted electronically or in paper, reports are sent directly to the EPA (O&M) costs from the previous ICR. The
will be made available for public regional office. reason for this decrease is also due to
viewing at http://www.regulations.gov, An agency may not conduct or the fact that all existing facilities are
as EPA receives them and without sponsor, and a person is not required to required to be in full compliance during
change, unless the comment contains respond to, a collection of information the fourth year, thus reflecting the
copyrighted material, Confidential unless it displays a currently valid OMB decrease incurred in this renewal ICR.
Business Information (CBI), or other Control Number. The OMB Control
Dated: May 8, 2006.
information whose public disclosure is Numbers for EPA’s regulations are listed
in 40 CFR part 9 and 48 CFR chapter 15, Oscar Morales,
restricted by statute. For further
and are identified on the form and/or Director, Collection Strategies Division.
information about the electronic docket,
instrument, if applicable. [FR Doc. E6–7652 Filed 5–18–06; 8:45 am]
go to http://www.regulations.gov.
Title: NESHAP for Brick and Burden Statement: The annual public BILLING CODE 6560–50–P

Structural Clay Manufacturing reporting and recordkeeping burden for


(Renewal). this collection of information is
estimated to average 85 hours per ENVIRONMENTAL PROTECTION
ICR Numbers: EPA ICR Number AGENCY
2022.03, OMB Control Number 2060– response. Burden means the total time,
0508. effort, or financial resources expended [ER–FRL–6675–4]
ICR Status: This ICR is scheduled to by persons to generate, maintain, retain,
expire on May 31, 2006. Under OMB or disclose or provide information to or Environmental Impact Statements and
regulations, the Agency may continue to for a Federal agency. This includes the Regulations; Availability of EPA
conduct or sponsor the collection of time needed to review instructions; Comments
information while this submission is develop, acquire, install, and utilize
technology and systems for the purposes Availability of EPA comments
pending at OMB. An Agency may not prepared pursuant to the Environmental
conduct or sponsor, and a person is not of collecting, validating, and verifying
information, processing and Review Process (ERP), under section
required to respond to, a collection of 309 of the Clean Air Act and section
information unless it displays a maintaining information, and disclosing
and providing information; adjust the 102(2)(c) of the National Environmental
currently valid OMB control number. Policy Act as amended. Requests for
The OMB control numbers for EPA’s existing ways to comply with any
previously applicable instructions and copies of EPA comments can be directed
regulations in title 40 of the CFR, after to the Office of Federal Activities at
appearing in the Federal Register when requirements which have subsequently
changed; train personnel to be able to 202–564–7167. An explanation of the
approved, are listed in 40 CFR part 9, ratings assigned to draft environmental
and displayed either by publication in respond to a collection of information;
search data sources; complete and impact statements (EISs) was published
the Federal Register or by other in FR dated April 7, 2006 (71 FR 17845).
appropriate means, such as on the review the collection of information;
related collection instrument or form, if and transmit or otherwise disclose the Draft EISs
applicable. The display of OMB control information.
Respondents/Affected Entities: Brick EIS No. 20060083, ERP No. D–AFS–
numbers in certain EPA regulations is K65301–AZ, Jacob Ryan Vegetation
and structural clay manufacturing
consolidated in 40 CFR part 9. Management Project, Implementation,
facilities.
Abstract: The National Emission Estimated Number of Respondents: Kaibab National Forest, North Kaibab
Standards for Hazardous Air Pollutants 72. Ranger District, Coconino County, AZ.
(NESHAP) for brick and structural clay Frequency of Response: On occasion, Summary: EPA expressed
products (BSCP) manufacturing, were semiannually and initially. environmental concerns about potential
proposed on July 22, 2002 (67 FR Estimated Total Annual Hour Burden: effects to regional air quality, water
47894), promulgated on May 16, 2003 14,086. quality, and old growth forest; and
(68 FR 26690). These standards apply to Estimated Total Annual Cost: recommended that the final EIS include
each existing, new or reconstructed $1,125,915, which includes $10,000 a more detailed air quality effects
BSCP manufacturing facility. annualized capital, start up costs, analysis, implementation plan for
Owners or operators of the affected $5,000 annualized O&M costs, and BMPs, and management strategy to
facilities must make the following $1,110,915 O&M costs. maintain old growth forest. Rating EC2.
notification: (1) Initial notification, (2) Changes in the Estimates: There is a
notification of initial performance test, decrease of 3,385 hours in the total Final EISs
(3) notification of compliance status. estimated burden currently identified in EIS No. 20060139, ERP No. F1–AFS–
wwhite on PROD1PC61 with NOTICES

Affected sources must submit a the OMB Inventory of Approved ICR K65269–CA, Southern California
compliance report, and a startup, Burdens. The decrease in burden from National Forests Land Management
shutdown, and malfunction (SSM) plan. the most recently approved ICR is due Plans, Revision of the Angeles,
Respondents are also required to to the requirements of the standard that Cleveland, Los Padres, and San
maintain records of the occurrence and states all existing facilities must be in Bernardino National Forests Land

VerDate Aug<31>2005 17:37 May 18, 2006 Jkt 208001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\19MYN1.SGM 19MYN1

Das könnte Ihnen auch gefallen