Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat Road

DIAMOND HARBOUR HIGHWAY DIVISION, PW(R) D, WB

Check list for prepration of Detailed project Report to be submitted for


loans under Rural Infrastructure Development Fund
Road / Bridge project

Name of project

ii
iii

District covered
Project outlay (Rs. Crore)

:
:

S.No
1
i
ii
iii
2
i
ii
iii
iv
v
3
i
a
b
c
d
e
ii
a

b
c
iii

Strengthening of Joynagar(Burorghat)Moydah-Jibonmondalhat-Mahishmarihat
Road(0KMP TO 18.53KMP) under Diamond
Harbour Highway Division in the district of
South 24 Paraganas, under the loan
assistance from NABARD, RIDF XIX
South 24 Paraganas
13.6629

Item
General
Whether the project is prioritized by the State Govt.
Whether the project submited through the Nodal Dept.
Whether the project included in the State Plan.
Clearances from ( wherever applicable )
Ministry of Enviroment & Forests
Ministry of Railways
Administrative Approval
Technical Sanction
Land Acquisition - Extent status and time frame .
Technical Aspects
General
Whether master plan prepared by state Govt. and
proposed project are as per Master plan.
Whether proposed project are new or Strengthening of
existing roads.
Whether proposed project have been designed as per
IRC standards . Reasons for deviation , if any should be
spelt out.
Type of road project - Village Roads, Other District
Road, Major Rural Road .
Whether fair weather connectivity is proposed reasons
for same to be elucidated.
Road Project
Depth of roadway , Damage way , pavment making of
formation, sub-base , base courses, black toping,
culvert and small bridges in existing and proposed
conditions to be furnished in relevant Annexures .
Extent of cement Concrete sections, wherever provided
to be detailed .
Justifications for widening / strengthening should be
supported by relevant data along with year of
construction.
Bridge project

Remarks
Yes
Yes
Yes
Does not arise
Does not arise
To be done aftter NABARD sanction
To be done aftter NABARD sanction
Not Required

As per department/district Plan


Strengthening of existing Road

Yes
MDR (Major District Road)
No

Reffered later
No
Inadequate Pavement thickness,
Improvement of Riding Quality

IMPROVEMENT AND STRENGTHENING OF ROAD FROM 0.000KMP TO 18.530KMP

(Yes /
No)

Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat Road

DIAMOND HARBOUR HIGHWAY DIVISION, PW(R) D, WB

Check list for prepration of Detailed project Report to be submitted for


loans under Rural Infrastructure Development Fund
Road / Bridge project

Name of project

ii
iii

District covered
Project outlay (Rs. Crore)

:
:

S.No
a
b
4
i
ii
iii.
a
b
c
d
e
f
g

Strengthening of Joynagar(Burorghat)Moydah-Jibonmondalhat-Mahishmarihat
Road(0KMP TO 18.53KMP) under Diamond
Harbour Highway Division in the district of
South 24 Paraganas, under the loan
assistance from NABARD, RIDF XIX
South 24 Paraganas
13.6629

Item

Hydraulic data, geo-technical details of foundations,


Does not arise as this is entirely Road
design details and drawings to be furnished.
Scheme
Bridge project with detailed investigations should only
be proposed.
Financial Aspects
Schedule of rates adopted (where updated to current Yes/Year 2008-2009 as applicable on
costs)
upto 7th corrigendum
If not, Whether cost proposed will be sufficient to creat 01.09.2011
Does not arise
the assets
Cost Estimate
Item wise cost of project
Item wise expenditure incurred
Item wise cost of balance works
Item wise RIDF loan
Item wise State Govt. contribution
Year wise phasing of RIDF loan and State and Govt.
Contribution (2 year Phasing allowed, reasons for 3
years phasing , wherever required)
Specific justification for high cost of development.
Benefits
and
justification
Overall impact of the project need to assessed and
detailed

Reffered later
Do
Does not arise
80%
20%
To be done after sanction

To be done after sanction


Potential (road in km and bridge
in

span) Reduction in distance

(km) population
Marketing

(Yes /
No)

Remarks

benefited. Access to
tourist

/ pilgrimage

conters ( numbers to be finished )


PCU data with likely savings in VOC
etc Non

recurring

employment

and recurring

generation

income 'Without' and 'With' project


and cash statement to be furnished

IMPROVEMENT AND STRENGTHENING OF ROAD FROM 0.000KMP TO 18.530KMP

Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat Road

DIAMOND HARBOUR HIGHWAY DIVISION, PW(R) D, WB

Check list for prepration of Detailed project Report to be submitted for


loans under Rural Infrastructure Development Fund
Road / Bridge project

Name of project

ii
iii

District covered
Project outlay (Rs. Crore)

:
:

S.No
6

7
i.
ii.
iii.
iv.
v.

8
i.
ii.
iii.
iv.
v.
9

Strengthening of Joynagar(Burorghat)Moydah-Jibonmondalhat-Mahishmarihat
Road(0KMP TO 18.53KMP) under Diamond
Harbour Highway Division in the district of
South 24 Paraganas, under the loan
assistance from NABARD, RIDF XIX
South 24 Paraganas
13.6629

Item
Operation and Maintenance
Arrange for O/M of projects after completions.
Infrastructure Facilities
Organizational structure of the implementing Dept.
Capacity and preparedness of the implementing
Dept. and status of implementation of earlier
sanctioned and mechanism.
Quality control infrastructure and mechanism
Availability of labour
Budget provision
a. For contribution of State Share
b. For subsequent O & M
c. For repayment of loans - Principal and interest.
Project Risks
Land acquisition
Forest clearance
Railway / road crossings
Construction hazards
Any other risks
Convergence with any other programme

(Yes /
No)

Remarks
Through
Provision

Departmental

Budgetary

EE/AE/SAE's office to look after

Adequate
Adequate
Adequate
Adequate Yearwise allocation is made

Not Required.
Not Required.
Does not arise
Nil
Nil
No.

IMPROVEMENT AND STRENGTHENING OF ROAD FROM 0.000KMP TO 18.530KMP

under the loan assistance from NABARD, RIDF XIX


Shoulders width (m)

CBR value %

0.75

3%

CBR value %

3%

Pavement
Thickness (m)
No of CD works

Nature of Surface

0
Bituminous

Proposed

0.275

Carriage way width


(m)

Hard Shoulders
width (m)

0.6

Pavement
Thickness (m)

0.61

Road way width (m)

Carriage way width


(m)

5.5

Existing

Road Land width


(m)

15

Shoulders Unstabilized,Inadequate
Status of damage
Pavement Thickness

Pavement
Thickness (m)

Carriage way width


(m)

5.5

Length (km) 18.530

0.335

Road way width (m)

Category

Department

District

MDR

PW(Roads) Directorate

South 24 Paraganas

Strengthening of
Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat
Road(0KMP TO 18.53KMP) under Name of Project
Diamond Harbour Highway Division
in the district of South 24
Paraganas,

RURAL ROAD PROJECTS -TECHNICAL DETAILS- RIDF XIX

State : West Bengal


Increase

Strengthening of Joynagar(Burorghat)-Moydah-Jibonmondal-Mahismarihat Road(0KMP TO 18.53KMP) under Diamond Harbour Highway Division in the district of South 24 Paraganas,

under the loan assistance from NABARD, RIDF XIX


Grand Total

Department

Date of Effect

P.W(ROADS).D
05.01.09 of 2008-09

Project preparation @
0.5%

6,53,732.00

Others

13,66,29,991.00

Contingency @ 3%

km

39,22,392.00

Cess @ 1%

Others

569108.00

18.53

Rates are inclusive of Cess

Drains

0.00

Length:

Protective Work

West Bengal Block: JOYNAGAR-I&II

3085111.00

CD

WBM III

0.00

0.00

WBM II

789883.00

BT

WMM

52669530.00

22515930.00

Sub-base

6585138.00

BM

Picking up existing road


surface

293154.00

41929456.00

Earthwork

3616557.00

District

State :

South 24 Paraganas

Strengthening of
Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat
Road(0KMP TO 18.53KMP) under Name of Project
Diamond Harbour Highway
Division in the district of South 24
Paraganas,

RURAL ROAD PROJECTS -TECHNICAL DETAILS- RIDF XIX


(in Rs.)

SoR

Strengthening of Joynagar(Burorghat)-Moydah-Jibonmondal-Mahismarihat Road(0KMP TO 18.53KMP) under Diamond Harbour Highway Division in the district of South 24 Paraganas,

under the loan assistance from NABARD, RIDF XIX

76

75

79

294

322

15

Improvement & Strengthening of Joynagar(Burorghat)-Moydah-Jibonmondal-Mahismarihat Road(0KMP TO 18.53KMP) under Diamond Harbour Highway Division in the district of South 24 Paraganas,
Contribution to GDP (per HA)

Wastage saving

Better price realisation

Market Surplus

Traffic details(Average Daily Traffic)*

Value of produce per Ha

Area benefitted

Truck - Trailor/ Tractor Trailer

Bus/ Truck

Tractor/ LCV

Car/Pickup Van/ Auto rickshaw

Motor cycle/ Scooter

Bullock cart

Horse vehicle

Hand cart

Cycle rickshaw

Length: 18.530km

469

Cycle

Distance* reduction (in km)

Rec. emp. Generation ( no. of


jobs)

Non- rec emp. Generation (in lakh


man days)

No. of Marketing centres

Population benefitted

Joynagar I & II

521

1,20,000

No. of farmers benefitted

No. of villegers benefitted

Block:

80,000

80,000

Total Cost

GCA (in Ha)

Potential

District

Name of Scheme

State :West Bengal

13,66,29,991.00

High

South 24 Pgs

Strengthening of Road

Serial Nos.

Annexure

DETAILS OF CALCULATION OF ECONOMIC ANALYSIS


(Amount Rs. in lakh )

DIAMOND HARBOUR HIGHWAY DIVISION , P.W(ROADS) DIRECTORATE


LAKSHMIKANTAPUR HIGHWAY SUB-DIVISION
(RIDF Scheme with Loan Assistance from "NABARD")

REPORT
1 NAME OF WORK
Strengthening of "Joynagar(started from Burorghat)-Moydah-Jibonmondalhat-Mahishmarihat
Road"(from 0km-18.530km) under Diamond Harbour Highway Division in the district of South 24
paraganas.

2 INTRODUCTION
2.1

Project Background
The RURAL INFRASTRUCTURE DEVELOPMENT FUND (RIDF) is a Scheme Dedicated for
infrastructural development in rural areas with a objective of providing better comunication facilities
in rural areas and ensuring reduction of poverty in rural areas. As per assignment of the RIDF
Scheme, the National Bank for Agriculture and Rural Development has envisaged development of
infrastructure in rural area (i.e. Improvement or Upgradation of rural roads) in the state of West
Bengal.

2.2

Location
South 24 Parganas , a coastal district in the south of the State of West Bengal is bounded by
Kolkata and North 24 Parganas on North, Hoogly river on West, Bangladesh on East and Bay of
Bengal on South.
This district is having a geographical area of 8165.05 sq comprising vast rural area, Sundarban
forest area and also urban city area (part of Kolkata Metropolises).
Large road network spread over the district is still deficient in respect of requirement .With growth
of traffic in terms of volume and load many of the existing road which are built on poor road bed of
lower Gangetic alluvial soil are suffering from capacity constraint and structural inadequacy
resulting in deterioration of road pavement mainly due to financial stringency timely improvement
of the roads. A large number of rivers and channels including irrigation and canals provide gaps
blocking thorough movement along many of the road.
While expanding road network particularly in the sector of district has become a necessity, stress
has been given to complete the incomplete roads, strengthening of high density sections of
important traffic corridors which already have been taken up and completion of bridge projects
approved for implementation.
In view of the above, Public Works Department, Government of West Bengal takes a plan for
strengthening of existing carriage way to standard intermediate lane carriage way to meet the
requirement of present and future traffic.

Sub-Division
Block
Mouza
2.3

Joynagar I , Joynagar II, Kultoli


Hatpara,Shahjadapur,Chandipur,Maydah,Naypukuria,Mayakholi,Khoimara,Dara,Ta
ranagar,Kripakhali

Classification of Road and its Status


The proposed road is a Major District Road.The road serves as the prime connectivity between
Joynagar Station with the habitations of the above mentioned mouzas.The road is 18.53 km with
average crust thickness of 335 mm and an average wearing coarse of 25mm (bituminous) with
earthen shoulders.

DIAMOND HARBOUR HIGHWAY DIVISION , P.W(ROADS) DIRECTORATE


LAKSHMIKANTAPUR HIGHWAY SUB-DIVISION
(RIDF Scheme with Loan Assistance from "NABARD")
2.4

Length of the Road


Length of the road = 18.530km
Starting Point = The propsed road originates at Burorghat (T junction), 1.8 km from Joynagar on
the
PWD
road
connecting
Joynagar
and
Kultoli.
o
o
Co-ordinates are 22 09'56.35'' N , 88 25'41.44''E
o

Termination point = Mahismarihat. Co-ordinates are 22 11'17.03'' N, 88 34'19.77''


2.5

Nature of Locality and Inhabitants


The road Terrain is classified as plain terrain.The climatic condition of this region is tropical humid.
Winter starts early in November and ends in the middle of February. Summer lasts till the middle
of June. Soon after this the rainy season commences and continues till the end of August. January
is the coldest month in this region. The mean minimum temperature in the month of January
0
0
0
varies from 10 C to 15 C. The highest temperature is often registered in May (Near about 42 C),
which is the hottest month. The average rainfall in this region is above 1500mm.There are two
harvesting seasons in area, one from middle of March to end of May(75 days) and other is from
start of October to middle of December (75 days)

2.6

History
The propsed road originates at Burorghat (T junction), 1.8 km from Joynagar on the PWD road
connecting Joynagar and Kultoli and terminates at Mahishmari Hat. The road passes through
areas mostly inhabitated by farmers and fisherman. The region around Joynagar, Kutoli was a rich
province and carries historical heritages and importance.

3 NECESSITY & BENEFIT


The proposed road contributes immensly to the the connectivity of the Joynagar and Baruipur.This
road runs parallel to the rail route connecting rail stations namely Dakshin Barasat , Baharu,and
Joynagar. This region is thickly populated with population around 1.2 lakhs considering all the
Blocks and mouzas that it connects on the way. Thus this road serves the population from 10
Mouzas. This road runs through agricultural areas,a good number of farm houses,brick fields (21
number approx),schools ,colleges, banks hospitalsand connects 6 number of markets namely
Chandipur,Maydah Kalibari, Jibon Mondal Haat, Pitambarer More, Dara, Mahish Mari Haat. So
quite a considerable number of commercial vehicle ply everyday. Besides this since the region is
known to be one of the major producers of vegetable which was daily required to be brought to the
urban area to meet its daily need.Thus this road has a tremendous socio-economic impact on the
rural population.
Social Aspects:
Health Center/Hospital :

2 Nos.

Bank and Panchyet :

Sub-Hospital :

1 No.

Other Offices :

12 Nos.
5 Nos.

Markets and Economic activities :


Major Produces are Paddy,Flower,Fruits,Vegetables,Sweet Water Fisheries and Breeding Units.
Markets at Chandipur,Maydah Kalibari, Jibon Mondal Haat, Pitambarer More, Dara, Mahish Mari
Haat and 21 number brick-fields.
Traffic Status:
Fast Moving Vehicles :

846

Nos.

Slow Moving Vehicles :

1005

Nos.

DIAMOND HARBOUR HIGHWAY DIVISION , P.W(ROADS) DIRECTORATE


LAKSHMIKANTAPUR HIGHWAY SUB-DIVISION
(RIDF Scheme with Loan Assistance from "NABARD")

4 PRESENT STATUS OF THE ROAD


a) The proposed road is under Major District Road category of intermediate lane with poor BT.
b) Total length is

18.530 Kilometer

c)

18.530 Kilometer

Project length is

d) Carriageway width of existing bituminous road is 5.5m(Average) for a total length


e) Average height of the Finished surface level 1.0m & is 0.6m over the normal HFL of the area .
f)

Average crust thickness of 335 mm with an average wearing coarse of 25mm (bituminous).

g) The roadway width is 6.5 m to 7.0 m average with Road land width 15.0 m to 30.0 m.
h) Existing alignment does not suffer from any major deficiency in road geometry .
i)

Present surface condition is undulated , broken Crust, inadequate flanks width and eroded at
many stretches.

5 TOPOGRAPHICAL SURVEYS
Topographic survey true to ground realties have been done using precision instruments like Total
Stations and Auto levels, and bringing out data in digital form (x,y,z format) for developing DTM .
Traverse has been done by total station having angular measurement accuracy of 1 sec. All
leveling for establishing Benchmark are to be carried out as per method adopted by Survey of
India. All leveling are to be carried out with Auto Level having accuracy 2.5 mm/ km. In absence
of GTS benchmark in the nearby location of the road, arbitrary level (R.L) has been assumed and
fixed on TBM pillars accordingly.All data from topographic survey recorded by Auto Level were
takenup and final alignment, plan, profile were prepared and presented in AutoCAD Format.

6 SOIL AND MATERIAL SURVEY


Soil survey has been done by collecting samples of local soils from the embankment / sub-grade
of the proposed road in accordance to the guidelines of IRC :SP: 20-2002. The important tests
carried out on the soil intended for use for subgrade are as under

i). Sieve Analysis


ii). Atterbergs Limits
iii). Standard ProctorTest
iv). Soaked & Unsoaked CBR test
From the test results it is clear that the soil type is Silty Clay with fine sand and the designed CBR
for the soil along the proposed road is 3%. for the total length.

7 TRAFFIC CENSUS
7.1 Classified Traffic Volume Counts
The classified traffic count (7 days in both ways) survey was conducted on the same road . The
count was conducted for 24 hours (0.00 Hour to 24.00Hour) of the day.

DIAMOND HARBOUR HIGHWAY DIVISION , P.W(ROADS) DIRECTORATE


LAKSHMIKANTAPUR HIGHWAY SUB-DIVISION
(RIDF Scheme with Loan Assistance from "NABARD")
7.2

Traffic Forecast
The present day traffic has to be projected for the end of design life at growth rates as per IRC 372001. The design traffic in terms of the cumulative number of standard axle to be carried out
according to Cl. 3.3.6 of IRC 37-2001 , page 14. The traffic in the year of completion of the road
project has been estimated as per equation 3.3.6.1 of the above page 15 of IRC 37 : 2001
mentioned clause.

8 TECNNICAL SPECIFICATION
8.1

Preparation of Ground before Construction of Embankment


Widening of the embankment layers shall be done with earthen layers of thickness not exceeding
200mm in compacted thickness. The soil used in the embankment shall conform to the technical
specifications. At the time of placing the Earth work, layers not more than 300mm thick (loosened
earth) shall be placed only after checking the in-situ moisture content.It is compacted by power
Roller / vibratory Roller to attain the desired MDD at OMC compared to 100% standard proctor
density (i.e. degree of compaction of soil) in slope of embankment including breaking all clods
required quantity of watering as per OMC, filling depression making sufficient number benches on
existing embankment, crest width to proper profile with 2.5% cambering at sub-grade level in
accordance with the procedure of earth work.Clods or hard lumps of earth shall be broken to have
maximum size of 75 mm. when being placed in the embankments and a maximum size of 50 mm.
when being placed in the sub-grade.
600mm wide hard shoulder is proposed on both sides through out the length of the road except for
areas of concrete surfaces as in case of cross drainage structures. Shouldering is done with single
layer of 75mm compacted thickness of brick-bats over which a single layer of 75mm thick jhamametal is to be laid to attain an over-all compacted thickness of 150mm .

8.2

Wet Mix Macadam


Laying ,spreading & compacting approved stone aggregates to Wet Mix Macadam specification
including screening of aggregates and granular materials, mixing the materials in proper grading
using mechanical mixer, adding water to achieve required OMC, laying the mixed materials in
uniform thickness of 75 mm each layer over prepared surface, rolling with 8-10t roller in stages to
proper grade, camber, until the desired density is achieved, as per direction of Engineer-inCharge complete, including cost of quality control. WMM is laid in three layers to attain a desired
thickness of 225 mm.

Patching of pot holes


Existing potholes and cracks shall be repaired and sealed following the conventional methods or
as directed by the Engineer-in-Charge.
8.3

Construction of Bituminous course


Prime Coat
Where the existing surface is granular, all loose materials shall be removed and the surface lightly
watered where the profile corrective course to be provided as a separate layer. Where the profile
corrective course of bituminous material is to be laid over the existing granular surface, the latter
shall, after removal of all loose materials, be primed with as per the stipulations of prime coat over
granular base
This work shall consist of application of single coat of low viscosity liquid bituminous material to a
porous granular surface preparatory to any superimposition of bituminous treatment or mix. Single
coat of Prime coat with low viscosity should be applied over the granular surface MOST gives
guidelines for requirements of viscosity and quantity of bituminous material for priming purpose.
Since the surface is granular the kinematics viscosity of the primer at 60 0 should be in the range of
30-60 centistokes and quantity bitumen should be 0.75 kg per sq.m.
The sequence of laying of the primer should be as detailed in the IRC specification.

DIAMOND HARBOUR HIGHWAY DIVISION , P.W(ROADS) DIRECTORATE


LAKSHMIKANTAPUR HIGHWAY SUB-DIVISION
(RIDF Scheme with Loan Assistance from "NABARD")
8.4

Bituminous Macadam
This work shall consist of construction, in a single course, of 50 mm compacted thickness of
compacted crushed aggregates premixed with a bituminous binder, laid immediately after mixing,
on a base prepared previously in accordance with the requirements of the specifications, and in
conformity with the lines, grades and cross-sections shown on the drawings or directed by the
Engineer-in-Charge.
Tack coat shall be applied in all bituminious layers starting from BM,Premix and Mastic asphalt. In
case of application of tack coat mechanical means adopted for BM and Premixed carpet where as
for mastic asphalt it is to be laid manually.Tack coat in the form of Bituminous emulsion shall be
applied as 0.30 kg/sq.m.
The bitumen shall be paving bitumen of suitable penetration grade within the range S 35 to S 90 or
A 35 to A 90 (30/40 to 80/100) The aggregates shall consist of crushed stone, crushed gravel
(shingle) or other stones retained on 2.36 mm sieve. They shall be clean, strong, durable of fairly
cubical shape and free of disintegrated piece, organic and other deleterious matter, and adherent
coatings. The aggregates shall preferably be hydrophobic and of low porosity. Where crushed
gravel is used as aggregates, not less than 90% by weight of crushed materials retained on 4.75
mm sieve shall have at least two fractured faces. The aggregates shall be proportioned and
blended to produce a uniform mixture complying to the specifications. The binder content shall be
within a tolerance of 0.3 % by weight of total mixture.A tack coat shall be applied as required by
the Contract documents, or as directed by the Engineer-in-Charge.

8.5

Premixed Carpet and Seal Coat


This work shall consist of laying and compacting an open graded carpet of 20 mm thickness in a
single course composed of suitable small sized aggregates premixed with a bituminous binder on
a previously prepared base, in accordance with the requirements of these specifications to serve
as a wearing course. The underlying base on which the bituminous carpet is to be laid shall be
prepared shaped and conditioned to the specified lines, grade and cross section as directed by the
Engineer-in-Charge. A tack coat shall be applied as required by the Contract documents, or as
directed by the Engineer-in-Charge.
The binder shall be bitumen of a suitable grade appropriate to the region, traffic, rainfall and other
environmental conditions as directed by the Engineer-in-Charge, and satisfying the requirements
of IS: 73.

8.6

Mastic Asphalt
25mm thick mastic asphat wearing coarse will be applied on the treated BM top layer. Approved
quality coarse aggregate,fine aggregate,filter material,binder and bitumen in specified proportions as
reffered to in the IRC specification.
After thorough investigation of the road with Engineer-in-charge provision of mastic asphalt have
been made in water-logged areas,market places . The total length for mastic asphalt is 945m.

9 CROSS DRAINAGE WORKS


The existing CD structures are in good condition and are present in sufficient numbers. The list of
existing CD structures are presented alongwith.

10 PROTECTIVE WORKS AND ROAD FURNITURE


Protective works are carried out to stabilise the shoulders and embankment particularly in areas
where water bodies are located adjacent to the embankment. It is carried out using Eucalyptus
Ballah of 100mm and 150mm dia as required upon depending on the depth of the water body. The
list for protective works to be carried out ,chainage wise have been attached alongwith.
Road furnitures in the form of Ordinary km stone, 5th km stone and 200m RC post, guard post
and other regulatory traffic sign have been installed.

DIAMOND HARBOUR HIGHWAY DIVISION , P.W(ROADS) DIRECTORATE


LAKSHMIKANTAPUR HIGHWAY SUB-DIVISION
(RIDF Scheme with Loan Assistance from "NABARD")

11 PAVEMENT COMPOSITION
Existing Pavement Composition :

185 mm

Jhama Metal+ Brick Bats

150 mm

WBM Grade II

225 mm

Wet Mix Macadam

Proposed Pavement Composition


Considering strengthening :
(General)

(Mastic Asphalt 945m)

Total

50 mm

BM

20 mm

Premix Carpet & Seal Coat

225 mm

Wet Mix Macadam

50 mm

BM

25 mm

Mastic Asphalt

610 mm

12 ANALYSIS OF RATES
12.1 Rate Analysis
Rates have been adopted for various items of work from the schedule of Rates for Road works,
culverts & Carriage PW(Roads)D Schedule 2008 -2009 Effective from 05.01.09

Pradip Kumar Pal

Malay Ghosh

Arup Ratan Mukhopadhyay

Assistant Engineer

Superintending Engineer

Executive Engineer

Lakshmikantapur Highway Sub-Division

State Highway Circle No.1

Diamond Harbour Highway Division

P.W.(Roads) Directorate

P.W.(Roads) Directorate

P.W.(Roads) Directorate

Govt. Of West Bengal

Govt. Of West Bengal

Govt. Of West Bengal

DIAMOND HARBOUR HIGHWAY DIVISION


RIDF XIX th Scheme with Loan assistance from "NABARD"
EXISTING CROSS-DRAINAGE STRUCTURES
Road Name : Joynagar to Mahismarihat
Length of
18.530KM
the road = Block : Joynagar I & II, Kultoli
SL No. Chainage
(KM)
1
1+430
2
1+920
3
2+870
4
3+520
5
3+680
6
4+080
7
4+250
8
4+400
9
4+750
10
4+850
11
5+020
12
5+098
13
5+880
14
6+620
15
7+610
16
8+090
17
8+580
18
8+950
19
9+145
20
9+350
21
9+570
22
9+850
23
10+150
24
10+670
25
10+950
26
12+360
26
12+630
26
12+790
26
13+205
26
13+350
26
13+450
26
14+110
26
15+050
26
15+360
26
15+860
26
16+350
26
16+880
26
17+150
26
17+260
26
17+750
26
17+960
26
18+110
26
18+250

Type
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
BOX CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
BRIDGE
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
HUME PIPE
PIPE CULVERT
PIPE CULVERT
HUME PIPE
HUME PIPE
BOX CULVERT
BOX CULVERT
HUME PIPE
HUME PIPE
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
BOX CULVERT
PIPE CULVERT
PIPE CULVERT

No. Dia./Width Length


(m)
(m)
1
0.900
10.275
1
0.900
10.275
1
0.900
10.500
1
0.900
10.500
1
0.900
10.500
1
0.900
10.500
1
0.900
10.500
1
0.900
10.500
1
0.900
10.000
1
3.500
8.250
1
0.900
10.000
1
0.900
10.500
1
0.900
10.750
1
0.900
11.000
1
0.900
11.000
1
0.900
11.000
1
0.900
11.000
1
47.000
10.000
1
0.900
12.500
1
0.900
10.500
1
0.900
10.000
1
0.900
9.500
2
0.900
10.500
1
0.900
10.500
2
0.900
10.500
1
0.900
9.750
1
0.900
9.750
1
0.900
10.500
1
0.900
8.250
1
0.900
9.750
1
1.500
9.750
1
3.500
7.750
1
0.900
10.000
1
0.900
10.000
1
0.900
10.000
2
0.900
10.250
2
0.900
10.750
1
0.900
10.500
1
0.900
10.500
1
0.900
10.500
1
5.500
7.750
1
0.900
10.000
2
0.900
10.000

District : - South 24 - Parganas


Condition

Necessary
Action

Functioning
Functioning
No Action, Temporary
Functioning
Maintenance
Functioning
only,Removal of
Functioning
unwanted vegetative
Functioning
growth
Functioning
Functioning
Clogged
Cleaning
Good
No Action
Functioning
Functioning
Functioning No Action, Temporary
Functioning Maintenance
Functioning only,Removal of
Functioning unwanted vegetative
Functioning growth
Good Condt. No Action
Clogged
Cleaning
Clogged
Cleaning
Clogged
Cleaning
Functioning
Functioning
Functioning
No Action, Temporary
Functioning
Maintenance
Functioning
only,Removal of
Functioning
unwanted vegetative
Functioning
growth
Functioning
Functioning
Functioning
Good Condt. No Action
Functioning No Action, Temporary
Functioning Maintenance
only,Removal
of
Clogged
Cleaning
Functioning No Action, Temporary
Functioning Maintenance
Functioning only,Removal of
Functioning unwanted vegetative
Functioning growth
Good Condt. No Action
Functioning No Action, Temporary
Functioning Maintenance
only,Removal of

9000
C L of Proposed Carriageway
1750

2750

2750

Earthen
Shoulder
2.5 %

1750
Earthen
Shoulder

3.5 %

3.5 %

2.5 %

1
600 (TYP)
Existing Embankment
75MM JHAMA
75MM BRICK-BATS
20MM Premix Carpet

225MM WMM

50MM BM

PROPOSED CROSS SECTION IN STRAIGHT SECTION FOR FLEXIBLE PAVEMENT

8000
C L of Proposed Carriageway
1250

2750

2750

1250

Subgrade

25MM Wearing Course

150mm WMM (2 Layers)


85mm Brick Bats

100 mm Jhama-metal

EXISTING CROSS SECTION IN STRAIGHT SECTION FOR FLEXIBLE PAVEMENT

Calculation Of Quantity.
Length Of the Road =

18530.00 M

Width =

5.5 m

Length with concrete surface =

78.25 M
18451.75 M

WMM =
BM =

0.225 m
0.05 m

ITem No -1
Picking up of Existing Bituminous layer
1X

18451.8 X

5.50

101485.00 M

2
2

2030.00 M
2
103515.00 M

Add 2.00% as curve and Bellmouth

ITem No -2
Repairing Pot holes
( Assuming 6.5% of surface area are potholes and average loose net thickness is 100mm)
1X

18451.75 X

5.50 X

2
101485.00 M
2
2030.00 M

Add 2.00% as curve and Bellmouth

2
103515.00 M

Volume of potholes =

103515.00

6.50% X

0.1

673.000 M

ITem No -3
Hard shouldering
Width =
600 mm
Thickness =
150 mm
75 mm thick single-layer brick-bat used for shoudering

Add 2.00% as curve and Bellmouth

1660.6575 M
3
33.00 M
1693.6575 M

ITem No -4
75 mm thick single-layer Jhama-metal used for shoudering

2
22142.1 M
2
443.00 M

Add 2.00% as curve and Bellmouth

2
22585.1 M

ITem No -5
Wet Mix Macadam 150mm thick
In Jibanmondalhat Bazar

1X

18451.75 X

5.50 X

0.225

1X

145.00 X

3.80 X

0.15

Add 2.00% as curve and Bellmouth

3
22834.00 M
3
83.00 M
22917.00
3
458.00 M
3
23375.00 M

ITem No -6
Priming coat

In Jibanmondalhat Bazar

18530.00 X

5.50

2
101915.00 M

145.00 X

3.80

2
551.00 M
2
102466.00 M

2
2049.00 M

Add 2.00% as curve and Bellmouth

2
104515.00 M

ITem No -7
50mm th Bituminous Macadam
1X
In Jibanmondalhat Bazar

18530.00 X

5.50

101915.00 M

145.00 X

3.80

551.00 M
2
102466.00 M

2
2049.00 M

Add 2.00% as curve and Bellmouth

2
104515.00 M

ITem No -8
20mm thick premixed carpet
Area Of 50mm thick B.M.

2
104515.00 M
2
5302.00 M
2
99213.00 M

Less area of Mastic Asphalt

ITem No -9
25mm thick Mastic Asphalt
1X

945 X

5.50

5198.00 M

2
2

104.00 M
2
5302.00 M

Add 2.00% as curve and Bellmouth


ITem No -10
Seal Coat type "B"
Area same as Premixd carpet

2
99213.00 M

ITem No -11
Eucallyptuc Bullah Pilling

1425.00 M

ITem No -12
Placing of Cement Bag filled with Earth
Using 22 nos of bag per meter length along with bullah pilling
1425.00 X

Total Earthwork as per C/S drawings =


Deduction due to earthcrust
=
Deduction due to hard Shoulder =

22.00

31350.00
31350.00

73903.06
28466.44
3387.54
3

42049.08 M
Less :Built-up areas, homestead areas and markets ,side drain, earthen bundh, river,
ponds and water bodies, and other allied activities =

35 %

Therefore deduction in earthwork =

3
14717.18 M

Net earth-work volume =

27331.90 M

ITem No -13
Borrow Pit Earth Work =

40% of

27331.90 m3

3
10932.76 M

60% of

27331.90 m3

3
16399.14 M

ITem No -14
Carried Earth Work =

Diamond Harbour Highway


Division PW(R)D,West Bengal

Joynagar (Burorghat) to Mahishmarihat


(0.00kmp to 18.53kmp)

SUMMARY OF TRAFFIC FOR SEVEN DAYS COUNT (BOTH WAYS)

Un
laden
8

12.04.13

00.00

12.04.13

24.00

206

347

27

27

45

53

10

27

16

510

431

13.04.13

00.00

13.04.13

24.00

327

347

32

34

56

65

16

29

16

621

625

14.04.13

00.00

14.04.13

24.00

315

311

35

32

62

48

20

28

19

549

503

15.04.13

00.00

15.04.13

24.00

311

336

39

42

60

44

21

21

19

509

435

16.04.13

00.00

16.04.13

24.00

312

297

42

42

56

68

18

27

11

488

429

17.04.13

00.00

17.04.13

24.00

297

291

43

42

57

65

19

24

13

483

399

18.04.13

00.00

18.04.13

24.00

291

324

46

40

71

45

24

12

13

487

462

Total for 7 days

2059

2253

264

259

407

388

128

168

107

3647

3284

Average For One Day


Rounding

294.14
294

321.86
322

0.00
0

0.00
0

37.71
38

37.00
37

58.14
58

55.43
55

18.29
18

24.00
24

15.29
15

521.00
521

469.14
469

Passanger's Car Unit

294

161

114

111

261

248

81

108

120

261

938

HOUR

TO DATE

HOUR

CARS,JEE
PS, VANS
Wt <3MT

Average Daily Traffic

Agri-Tractors with
trailers

Truck

Un laden

Laden

Un laden

Laden

Un laden

Laden

ANIMAL
DRAWN
VEHICLES

CYCLES

OTHER
(SPECIFY)
VAN
RICHSHAW

TWO
WHEELERS

Other motorised
commercial
vehicles

Laden

FROM
DATE

BUSES

10

11

12

1851

Total PCU =

(CPVD)

Commercial Vehicle Per Day


Laden
Tractor with trailer
BUS
TRUCK

Un laden
55

58
0
38

0
37

Total =
96
(CVPD) at the time of Census(No. of vehicle weight > 3MT) =

92

133

Pradip Kumar Pal

Arup Ratan Mukhopadhyay

Assistant Engineer

Executive Engineer

Lakshmikantapur Highway Sub-Division

Diamond Harbour Highway Division

P.W (Roads) Directorate


Govt. Of West Bengal

P.W (Roads) Directorate


Govt. Of West Bengal

2696

Diamond Harbour Highway


Division PW(R)D,West Bengal

Joynagar (Burorghat) to Mahishmarihat


(0.00kmp to 18.53kmp)

Computation of traffic in terms of msa as per IRC 37:2001

A
A
P
r
n

=
=
=
=

Therefore,

No. of commercial vehicles per day at the end of "n" years during project
No. of commercial vehicles per day at last count
Annual growth rate
7.5 %
Nos. of years
2 yrs

A =

Ns =

365 x A x ((1+r)^t-1) x F x L / r

A =

No. of commercial vehicles per day at the end of project

r =
t =
F =
L =
Ns =

Annual growth rate


Design life in yrs
Vehicle damage Factor
Lane Distribution Factor

P x (1 + r ) ^ n

133 x (1 + 7.5/100)^2

153.6981

7.5 %
10 yrs
3.5
0.75

365 x 153.698 x ((1+7.5/100)^10-1) x 3.5 x 0.75 x (7.5/100)

2083329
2.08E+06

Therefore , Ns =
CBR =

2 msa
3%

PAVEMENT DESIGN
Now Since, Designed CBR is
Designed msa is

3%
2

Hence, From IRC 37:2001 we, get pavement thickness


Plate 1, Page 22

CBR(%)
Cumulative
Traffic
(msa)
2

3
Total
Pavement
Thickness
(mm)
610

Pavement Composition
Bituminous Coarse Granular Granular
Wearing Binder Base
Sub-base
Coarse
Coarse Coarse
Coarse
(mm)
(mm)
(mm)
(mm)
25

50

225

As per provision the crust is as follow


Strengthening of Existing Pavement
Existing Crust
Strengthening

WMM
BM
Total =

335

20 mm wearing coat

335 (185mm Brick Bats & Jhama Metal


+150mm WMM )
225 mm
50 mm
610 mm
Hence safe.

IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)- MOIDAHJIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 KMP)
UNDER DIAMOND HARBOUR HIGHWAY DIVISION
IN THE DISTRICT OF SOUTH 24 PGS.

Road From: JOYNAGAR TO MAHISHMARIGHAT


Length of the Road: 18.530 KM
Name of the District: South 24 Parganas
Sl. No. Description of Items

Cost in Rupees

1 Cost of Earth Work

3616557.00

2 Cost of Sub-Base

7668175.00

3 Cost of Base Course

52669530.00

4 Cost of Bituminous Work

64445386.00

5 Cost of Road Furniture & Traffic Safety Measures

569108.00

6 Cost of Protective Work


a Cost of UC Bullah Piling
b Cost of Dumping Earth Filled Gunny bags
7 Cost of Cross Drainage Works
Total (Including Cess)
Total (excluding cess @ 1%)
Add 3.00% as contingency
Add 0.50% as cost towards Outsource of DPR
Add L.W. Cess @ 1%

Say
Say

1425 metre 2781956.00


31350 nos. 303155.00
3085111.00
0.00
Rs.
132053867.00
Rs.
130746403.00
Rs.
Rs.
Rs.
Rs.
Rs. In Lakhs

3922392.00
653732.00

1307464.00
136629991.00
1366.29991

Arup Ratan Mukhopadhyay

Malay Ghosh

Executive Engineer

Superintending Engineer

Diamond Harbour Highway Division

State Highway Circle No. - I

PW(Roads) Directorate

PW(Roads) Directorate

Govt. of West Bengal

Govt. of West Bengal

Sankar Roy Choedhury


Chief Engineer
PW(Roads) Directorate
Govt. of West Bengal

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

Description

Unit

Quantity

Sqm

82812

Cum

Cum

V.P.265 It-2 ab (i)

Rate
(Rs)

Amount
(Rs)

Picking up and removing old bituminous layer or sand sealing coat


from old black topped surface and cleaning the exposed surface
by scraping and stacking the material as directed.
(b) By mechanical means :

3.54

293154.00

362.300

2180.19

789883.00

1693.6575

1252.30

2120967.00

( V.p.264,It-16)

Patching of potholes by draining water, cutting the pothole area to


rectangular shape with vertical edges, removing all loose
materials, screening and stacking the same for reuse with new
materials as per requirement, filling the pothole area with
additional volume of crushed stone materials / laterite / Jhama /
broken shingles / coated stones of Pakur variety etc. and
screenings as applicable, and compacting the same with static
roller as per Water Bound Macadam Specification, including cost
of all materials and machineries but including the cost of coarse
aggregates and screening.

(V.P.191 It-1)

Supplying, spreading and consolidation of brick bats (size 45 mm


and down) and medium sand including premixing the material in
suitable mixer conforming the combined material to the Grading I
of Granular Sub-base Materials and in proportion of 60 : 40 and
rolling at O.M.C. to achieve at least 97% of maximum dry density,
maintaining proper gradient and camber, watering as necessary
and lighting, guarding, barricading and making adequate earthen
bundh on both sides where necessary to protect the edges and
curing with water including all incidental charges for the work and
cost of rolling complete.

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

Description

Rate
(Rs)

Amount
(Rs)

Unit

Quantity

Sqm

22585.100

197.66

4464171.00

Cum

23375.02

2253.24

52669530.00

(V.P.259 It-7b))

Labour for spreading and consolidating 1st class brick bats/


Jhama metal/Laterite chelly or metal / shingles of specific size
in hard crust to requisite thickness (measured after compaction) in
layers including screening of bats/metals etc. as necessary, hand
packing, sweeping, watering and rolling in stages with power roller
to proper line, grade and camber, lighting, guarding & barricading
and making necessary earthen bundh of one metre width on each
side where necessary to protect edges and preparing the bed by
necessary cutting or filling and rolling all complete including the
cost of all materials and hire and labour charges of all man and
machineries and as per specification and direction of Engineer-inchargeincluding the cost of bats/chelly.
(b) Using Brick bats / Jhama metal / Laterite metal of size 63
mm 45 mm for compacted thickness 75mm.

( V.p.262,It-9)

Labour for spreading & compacting approved stone aggregates to


Wet Mix Macadam specification including screening of
aggregates and granular materials, mixing the materials in proper
grading using mechanical mixer, adding water to achieve required
OMC, carrying the mix to work-site using tipper trucks within a
lead of 10 km , laying the mixed materials in uniform thickness
over prepared surface, rolling with 8-10t roller in stages to proper
grade, camber, until the desired density is achieved, including
supply of all materials, machinery, fuel & lubricants, including
incidental costs for lighting, guarding, barricading, making of
earthen bundfh to protect the edges, controlling traffic, etc. as per
direction of Engineer-in-Charge complete, including cost of quality
control.

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

Description

Rate
(Rs)

Amount
(Rs)

Unit

Quantity

Sqm

104515.32

36.87

3853480.00

Sqm

104515.32

364.31

38075976.00

( V.p.266,It-4,a)
Providing and applying bituminous Primer Coat for priming of
base course with Cationic bituminous emulsion of approved grade
and requisite quantity including preparation of the surface to be
primed, through cleaning and sweeping, uprooting weeds, grass
etc. dampening the surface beforehand spraying the primer using
sprayer mounted on distributor truck or with hand sprayer using
mechanical pump including cost and carriage of bitumen emulsion
and all other incidental costs of work.
(a) For surfaces with low porosity
(@ 7.5 kg / 10 m2).

(Section 4.7, It-34(B)(b)(ii))

Laying Bituminous Macadam of specified grade using Hot Mix


Plant (HMP) and using approved aggregates conforming to
specified grading and bitumen over prepared surface, including
carrying the hot premixed materials by means of tipper truck,
spreading, the mixed material at specified laying temperature over
the prepared surface by means of a suitable paver finisher,
tamping and finishing the mix to specified grade, line and camber,
thorough rolling with suitable power rollers for break down, intermediate and finished rolling as per specification, hand packing and
pinning to give an even surface including cost and carriage of
stone materials & bitumen, and hire charges of HMP and all other
machines and equipments, cost of fuels and lubricants and wages
of operational staff, quality control as per IRC Specification all
complete including cost of applying tack coat.
(B) In Base / Binder Course using 3.4 % binder content by
weight of total mix.
(b) 50mm compacted thickness
(iii) Using Drum Mix type HMP of minimum capacity 60-90 TPH.

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

Description

Rate
(Rs)

Amount
(Rs)

Unit

Quantity

Sqm

99213.870

148.30

14713417.00

Sqm

99213.870

50.12

4972599.00

(Section 4.7, It-38(ii))


Providing & Laying 20 mm thick open graded Premixed Carpet
by Hot Mix Plant using 13.2 mm (@ 0.18 m 3 /m 2 ) and 11.2 mm
(@ 0.09 m 3 /m 2 ) size stone aggregates, including thorough
cleaning of the surface, applying tack coat, screening cleaning and
pre-heating stone chips and fully pre-coating the same with hot
matrix @ 54 kg/m3 of aggregate mix, carrying the mixture by tipper
trucks or by any other suitable arrangements, laying the mixture
uniformly over the surface with paver finisher , including manual
operations as and when required for proper level, grade and
camber, thoroughly rolling by power roller, including the cost and
carriage of stone chips and matrix, heating the matrix, preheating
the aggregates to required temperature and including the hire
charges of Hot Mix Plant and other machineries, pay of operators,
cost of fuel and lubricants etc. all complete including cost of
applying tack coat.
(c) Using Drum Mix type HMP of minimum capacity 60-90 TPH.

( V.p.276,It-18b))

Laying Premixed Seal Coat (Type B) with approved quality


sand/grit @ 0.6 m3/ 100 m2 and hot bitumen binder on
thoroughly cleaned black top surface coated with tack coat,
including heating and mixing cleaned sand/grit (100 % passing
through 2.36 mm sieve and retained on 180m sieve) uniformly with
hot binder (@ 113.5 kg per m3 of grit or sand in suitable pan /
Mobile Hot Mix Plant (Light duty), laying and spreading the mix at
an uniform rate using suitable means, brushing the surface, if
necessary, to ensure uniformity, followed by rolling with power
roller including the cost and carriage of binder and aggregates,
cost of heating the binder and aggregates and all other incidental
charges, cost of fuel and lubricants, including hire charges of
machineries, tools & plants required for construction and quality
control complete including cost of applying tack coat.
(b)Using Mobile Hot Mix Plant (Light duty)

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

10

Rate
(Rs)

Amount
(Rs)

Description

Unit

Quantity

Laying a single layer, 25mm thick Mastic Asphalt wearing course


in road pavement using approved coarse aggregate, fine
aggregate, filler material and bitumen, including cost and carriage
of all ingredients, cost of heating aggregates and binder, mixing in
specified proportions ... ... .... .. IRC, including the hire charges of
all tool, plants & machineries, pay of operators, cost of fuel and
lubricants and all other incidental charges and quality control
complete.

Sqm

5301.450

533.80

2829914.00

Cum

10932.760

57.56

629290.00

Cum

16399.140

182.16

2987267.00

(V.P. 281 Item No 24)

(V.p. 183 Item No 8a))

11

Earthwork in road embankment in ordinary soil to correct profile


as per designed formation level with earth obtained from land
owned /arranged by the Department, depositing in layers of 250
mm thickness including breaking clods ,dressing and compacting
by power roller (not at OMC) etc. complete as per specification,
drawing and direction of Engineer-in-charge from borrow-pits.
(Payment shall be made in m3 on finished work on the basis of
pre-work and post-work level section measurements.
(a) In ordinary soil.

(V.p. 183 Item No 8a))

12

Earthwork in road embankment in ordinary soil to correct profile


as per designed formation level with earth obtained from land
owned /arranged by the Department, depositing in layers of 250
mm thickness including breaking clods ,dressing and compacting
by power roller (not at OMC) etc. complete as per specification,
drawing and direction of Engineer-in-charge by carried earth with a
lead upto 1 km
(Payment shall be made in m3 on finished work on the basis of
pre-work and post-work level section measurements.
(a) In ordinary soil.

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

Description

Unit

Quantity

Rate
(Rs)

13

Drum sheet walling with eucalyptus Bullah 1.8m (av) high on


piling 150 mm dia and 4.50m long driven 2.70m (av) below G.L.
and 500 mm centre to centre including fitting fixing 3 nos. of half
bullah pieces (from 10 cm dia) and drum (empty bitumen) sheet
(approved condition) of height 1.90m , cutting and straightening
drum sheet (each joint must have lap length of min.50mm)
including cost of necessary nails, bolts, nuts etc and providing 2 to
3m long half bullah ties of 10cm dia @ 2.25 m centre to centre
fixed with 10 cm dia bullah posts driven 1.5m below G.L. including
cost of all materials and two coat of coal tarring to all bullah etc
complete as per direction

1425.00

1952.25

2781956.00

Nos.

31350

9.67

303155.00

Each

64

953.44

61020.00

14

Supplying empty cement bags in good condition & filling empty


cement bags with earth and placing them in position including tying
or sewing mouth (cost of thread included) and all incidental
charges complete with Departmental earth carried upto 1 km

Amount
(Rs)

(V.p. 287 Item No 1)

15

Supplying fitting and fixing R.C. guard post 1.37m long with
c.c.1:2:4 with graded stone chips of 13.2mm down casting , curing
complete including cost of providing 4nos.of 12mm dia. rod of
length 1.54m as main reinforcement and 6 nos. of round shaped
8mm dia rods used as binders; the placing of the first binder
should be at 75mm below the top finished surface and the other 5
nos of binders should be placed at 245mm c/c ; the guard post is
of octagonal section with inscribed circle of dia 24cm at the base
tappering to corresponding dimensions of 16cm at the top
including two coats of painting with best quality synthetic enamel
paint of approved make and grade to form 6 nos. horizontal
alternate bands in white/tanery yellow and black to 90 cm length
standing up above ground after mending good damages if any
during striking off shuttering, making hole in ground of 47cm
depth and 30cm minimum dia, fixing the guard posts in the
same holes and repacking the earth properly so as to keep the
guard posts standing properly erect in correct position true to line
and length including carriage of R. C. Guard Post with due care to
the site including loading into the truck and unloading at site
complete in all respect.

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

16

Description

Amount
(Rs)

Quantity

Each

74

402.99

29821.00

Each

2616.91

7851.00

(V.p. 288 Item No 2)


Supplying, fitting and fixing rectangular R.C. 200 m post of
size 65cm x 15cm x 10cm with cement concrete 1:2:4 with graded
stone chips of 13.2mm down including cost of providing 2 nos. of
inverted U-shaped 6mm dia M.S. rods of length 1.40m and 5 nos.
of 6mm dia M.S. binders spaced at 100mm C/C and of length
37.5cm each in correct position true to line and level and providing
sunk inscription with 30cm embedment into the ground after
making hole into the ground of section 10cm more on all side of
post and repacking the hole with 1:4:8 cement concrete with stone
chips with two coat of painting on the exposed portion of the post
with best quality synthetic enamel paint of approved make and
brand of different shades as directed complete in all respect
including carriage of the post to the site with loading & unloading
and printing of letters and numbers.

Rate
(Rs)

Unit

(V.p. 289 Item No 3a))

17

Supplying, fitting and fixing 5th KM post / KM post as per


standard drawing enumerated in IRC: 8-1980 (for type designs for
Highway Kilometre stone) with cement concrete 1:2:4 with chips of
size 26.5mm down in correct position true to line and level with
60cm embedment into the ground after making hole into the
ground of section 15cm more on all sides of the post and
repacking the with 1:4:8 cement concrete with stone chips with
two coats of painting on the exposed portion of the post with best
quality synthetic enamel paint of approved make and brand of
different shades as directed complete in all respect including
carriage of the post to the site with loading & unloading and
printing of letters and numbers.
(a) 5th Kilometer Post:

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

18

Description

Unit

Quantity

Each

15

(V.p. 289 Item No 3b))

Rate
(Rs)

Amount
(Rs)

Supplying, fitting and fixing 5th KM post / KM post as per


standard drawing enumerated in IRC: 8-1980 (for type designs for
Highway Kilometre stone) with cement concrete 1:2:4 with chips of
size 26.5mm down in correct position true to line and level with
60cm embedment into the ground after making hole into the
ground of section 15cm more on all sides of the post and
repacking the with 1:4:8 cement concrete with stone chips with
two coats of painting on the exposed portion of the post with best
quality synthetic enamel paint of approved make and brand of
different shades as directed complete in all respect including
carriage of the post to the site with loading & unloading and
printing of letters and numbers.
(b) Ordinary Kilometer Post:

2074.54

31118.00

(V.p. 148 Item No 4) of Schedule of Rates of Public Works (Roads) Department , National Highway Wing

19

Retro Reflective Traffic Signs


Providing and Fixing of Retro-reflectorised cautionary, mandatory
and informatory sign as per IRC:67 made of high intensity grade
sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm
thick supported on a mild steel angle iron post 75 mm X 75mm x 6
mm firmly fixed to the ground by means of properly designed
foundation with M15 grade cement concrete 45 cm x 45 cm X 60
cm, 60 cm below ground level as per approved drawing

(Reference to MORT&H's specification 801)


19.1 (ii) 60 cm equilateral triangle

Each

20

3047.05

60941.00

19.2 (iii) 60 cm circular

Each

86

4154.69

357303.00

19.3 (iii) 60 cm X 60 cm square

Each

4826.29

0.00

ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.

Description

Unit

Quantity

Rate
(Rs)

Amount
(Rs)

(V.p. 149 Item No 5) of Schedule of Rates of Public Works (Roads) Department , National Highway Wing

Direction and Place Identification Signs upto 0.9 sqm Size Board

20

Providing and ercting direction and place identification retroreflectorised sign as per IRC:67 made of high intensity grade
sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm
thick with area not exceeding 0.9 sqm supported on a mild steel
single angle iron post 75 X 75 X 6 mm firmly fixed to the ground
by means of properly designed foundation with M-15 grade cement
concrete 45 X 45 X 60 cm, 60 cm below ground level as per
approved drawing
(Reference to MORT&H's specification 801)

Each

10526.87

Total (Including Cess)


Total (excluding cess @ 1%)

21054.00
132053867.00
130746403.00

Arup Ratan Mukhopadhyay


Executive Engineer
Diamond Harbour Highway Division
PW (Roads) Directorate

Pradip Kumar Pal


Assistant Engineer
Lakshmikantapur Highway Sub-Division
PW (Roads) Directorate

Malay Ghosh
Superintending Engineer
State Highway Circle No. - I
PW (Roads) Directorate

IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)- MOIDAHJIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 KMP)
UNDER DIAMOND HARBOUR HIGHWAY DIVISION
IN THE DISTRICT OF SOUTH 24 PGS.

S.No.

Description of Item

Unit

Amount

Coarse Sand
1 (Grading Zone - I as per IS:383-1970)
Stacked at Site

cum

820.00

Medium Sand
2 (Grading Zone - I as per IS:383-1970)
Stacked at Site

cum

650.00

cum

500.00

cum

350.00

Fine Sand
3 (Grading Zone - I as per IS:383-1970)
Stacked at Site
Silver Sand
4
Stacked at Site
# Ref. PWD (Roads)Directorates S/R 2008-09,
Annex -II Page 319
BRICK, BATS
1

a).First Class Bricks (Kiln Burnt)

nos/1000

8000.00

b). Picked Jhama Bricks (Kiln Burnt)

nos/1000

8000.00

c). Jhama Metal (Kiln Burnt)

cum

1650.00

d). First Class Brick Bats (Kiln Burnt )

cum

1150.00

# Ref. PWD (Roads)Directorates S/R 2008-09,


Annex -II Page 319

COST OF STONE METAL


Pakur

Average lead (km) of Pakur Material from Ballygunj Jn. to


Project CG (By road) considered in the analysis:

48.00

Cost at Ballygunge

cum

906.00 1069.00 1089.00 1109.00 1109.00 1160.00

Loading, Un loading &


stacking
(p-302,
It
3c.d) (For General
work)

cum

62.00

62.00

62.00

62.00

Rate for general work

cum

1441.00

1604.00

1624.00

1644.00

Loading & Unloading


(p-302, It 3c.d) (For
Plant work)

cum

46.50

46.50

46.50

46.50

46.50

cum

473.00

473.00

473.00

473.00

473.00

cum

1425.50

1588.50

1608.50

1628.50

62.00

62.00

Stone Screening

1174.00

1195.00 1067.00

Type A

Stone Dust

5.6 mm

11.2 mm

13.2 mm

Machine Made Chips

22.4 mm

26.5 mm

37.5 mm

Boulder
30/45 kg

Grade III (53 22.4)

Unit

Grade I (90-45)

Item

Grade II (63-45)

Size of Aggregates
Hand Broken Aggregates

Type B

Source of Material:

833.00

727.00

909.00

729.00

62.00

62.00

62.00

62.00

58.00

62.00

58.00

1709.00

1730.00

1602.00

1368.00

1258.00

1444.00

1260.00

46.50

46.50

46.50

46.50

46.50

43.50

46.50

43.50

473.00

473.00

473.00

473.00

473.00

473.00

473.00

473.00

1628.50 1679.50

1693.50

1714.50

1586.50

1352.50

1243.50

1428.50

1245.50

1644.00 1695.00

Carriage for

48.00 Km
Rate for Plant work

(Vide P-325 I- 4g)

Carriage
Ballygunge to D. Barasaat
D. Barasaat to Moida
Moida to Site Middle

Say

38.00 Km
3.50 Km
6.27 Km
47.77 Km
48.00 Km

Carriage From
0.00
To
5.00
To
10.00
To
20.00
To

5.00
10.00
20.00
48.00

=
=
=
=

5.00
5.00
10.00
28.00

Km @Rs
Km @Rs
Km @Rs
Km @Rs

79.00
10.00
9.20
9.00

Rs.
Rs.
Rs.
Rs.

79.00
50.00
92.00
252.00

Rs.

473.00

(Format for anlysis of rates of bitumen / bituminous emulsion / CRMB supplied by Contractor)

Source of Material:

Haldia

Kolkata

Average lead (km) considered in the analysis:

170.00

52.00

Unit
Sl No.

Item
Source

(A)

(V.P.-316 It -4)

MT

Bitumen
Bitumen
Emulsion
(Bulk): VG(Packed):
30 (60/70)
MS Type

Bitumen
(Packed):
VG- 30
(10/20)

Haldia

Kolkata

Haldia

41423.00

41,903.00

37,400.00

43.50

43.50

330.70

897.50

4,190.30

3,740.00

1,000.00

1,000.00

45,467.50

41,081.00

Cost of Bitumen including all taxes at the nearest source of


the manufacturer

(B)

(V.P.-302 It -3a)

MT

Loading in to trucks at the lifting point, unloading at


destination, stacking properly in go downs or yard etc. as
directed including carriage by head load up to a lead of 30 m
at each of the two points.
a) Tar or asphalt in drums for plant works
(75% of Rs. 58.00)

(Vide P-308 I- 11A)

769.00

Carriage of Bitumen in bulk in insulated tanks from refinery


to work site including loading, unloading the same at hot mix
plant / Bitumen storage tanks / empty bitumen dums / tar
boiler as per direction of the Engineer in Charge at
specified temperature including necessary heating
arrangements during transfer & transit with all incidental
charges.

(Vide P-308 I- 2A)


Carriage of tar or asphalt in drums and similar miscelleneous
materials over pucca roads

(C)
(D)

(E)

Add Contractor's Profit (@ 10% of (A))

MT

4,142.30

(vide Note - 3, Table I-2, page- 316)


Deduct cost of container
(in case of packed bitumen, CRMB or bituminous emulsion
is considered to be used)

MT

Rate at Site

MT

46,334.30

For rates Refer Table I - 2 at page 316 & Format - B at page 317 of Government of
West Bengal , Public Works (Roads) Directorate Schedule of Rates for Road &
Bridge Works 2008 - 2009 & 7th Corrigenda, Addenda & Errata of SOR of SOR of
P.W. (Roads) Directorate 2008-2009- April, 2012

FORMAT B:

FORMAT B:

(Vide P-308 I- 11A):

Carriage
(Vide P-325 I- 4g)
Haldia to New Alipur
New Alipur D. Barasaat
D. Barasaat to Moida
Moida to Site Middle
Say

(Format for anlysis of rates of bitumen / bituminous emulsion / CRMB supplied by Contractor)

Carriage From
118.00
42.00
3.50
6.27
169.77
170.00

Km
Km
Km
Km
Km
Km

0.00
100.00

To
To

100.00
170.00

=
=

100.00
70.00

Km @Rs
Km @Rs

468.00
4.30

Rs.
Rs.

468.00
301.00

Rs.

769.00

Rs.
Rs.
Rs.
Rs.
Rs.

68.00
29.50
58.00
165.00
10.20

Rs.

330.70

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

68.00
29.50
58.00
165.00
255.00
322.00

Rs.

897.50

(Vide P-308 I- 2A):

Carriage

Carriage From
Kolkata to D. Barasaat
D. Barasaat to Moida
Moida to Site Middle

Say

42.00 Km
3.50 Km
6.27 Km
51.77 Km
52.00 Km

Say

To
To
To
To
To

5.00
10.00
20.00
50.00

52.00

=
=
=
=
=

5.00
5.00
10.00
30.00
2.00

Km @Rs
Km @Rs
Km @Rs
Km @Rs
Km @Rs

68.00
5.90
5.80
5.50
5.10

(Vide P-308 I- 11A):

Carriage
(Vide P-325 I- 4g)
Haldia to New Alipur
New Alipur D. Barasaat
D. Barasaat to Moida
Moida to Site Middle

0.00
5.00
10.00
20.00
50.00

Carriage From
118.00
42.00
3.50
6.27
169.77

Km
Km
Km
Km
Km

170.00 Km

0.00
5.00
10.00
20.00
50.00
100.00

To
To
To
To
To
To

5.00
10.00
20.00
50.00

100.00
170.00

=
=
=
=
=
=

5.00
5.00
10.00
30.00
50.00
70.00

Km @Rs
Km @Rs
Km @Rs
Km @Rs
Km @Rs
Km @Rs

68.00
5.90
5.80
5.50
5.10
4.60

RATE ANALYSIS
Sl
No.

Description

Unit

Quantity

Sqm

1.00

1.00

Cum

Rate
(Rs)

Amount
(Rs)

(V.P.265 It-2 b (i))


1

Picking up and removing old bituminous layer or sand


sealing coat from old black topped surface and cleaning
the exposed surface by scraping and stacking the material
as directed.
(b) By mechanical means :
(i) From 25 mm to 50 mm thick.
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)

3.50

3.50
3.50
0.04
3.54

1.00

270.00

270.00

Cum
Cum

1.000
0.210

1624.00
1260.00

1624.00
264.60
2158.60
21.59
2180.19

Cum

1.000

173.70

173.70

Cum
Cum

0.900
0.048

1150.00
650.00

1035.00
31.20
1239.90
12.40
1252.30

( V.p.264,It-16)

Patching of potholes by draining water, cutting the pothole


area to rectangular shape with vertical edges, removing all
loose materials, screening and stacking the same for
reuse with new materials as per requirement, filling the
pothole area with additional volume of crushed stone
materials / laterite / Jhama / broken shingles / coated
stones of Pakur variety etc. and screenings as applicable,
and compacting the same with static roller as per Water
Bound Macadam Specification, including cost of all
materials and machineries but excluding the cost of coarse
aggregates and screening.
Labour Cost
Add: Cost of Material per cum
Cost of Gr-II Aggregate
Cost of Type "B" screening
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Cum= A)+B)

(V.P.191 It-1)

Supplying, spreading and consolidation of brick bats (size


45 mm and down) and medium sand including premixing
the material in suitable mixer conforming the combined
material to the Grading I of Granular Sub-base Materials
and in proportion of 60 : 40 and rolling at O.M.C. to
achieve at least 97% of maximum dry density, maintaining
proper gradient and camber, watering as necessary and
lighting, guarding, barricading and making adequate
earthen bundh on both sides where necessary to protect
the edges and curing with water including all incidental
charges for the work and cost of rolling complete.
Add: Cost of Material per cum
Cost of Brick Bats
Cost of Medium sand
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Cum= A)+B)

RATE ANALYSIS
Sl
No.

Description

Rate
(Rs)

Amount
(Rs)

Unit

Quantity

Sqm

1.000

14.20

14.20

Cum

0.110

1650.00

181.50
195.70
1.96
197.66

Cum

1.00

273.90

273.90

Cum
Cum
Cum
Cum

0.396
0.264
0.356
0.304

1628.50
1714.50
1352.50
1243.50

644.89
452.63
481.49
378.02
2230.93
22.31
2253.24

(V.P.259 It-7b))

Labour for spreading and consolidating 1st class brick


bats/ Jhama metal/Laterite chelly or metal / shingles of
specific size in hard crust to requisite thickness (measured
after compaction) in layers including screening of
bats/metals etc. as necessary, hand packing, sweeping,
watering and rolling in stages with power roller to proper
line, grade and camber, lighting, guarding & barricading
and making necessary earthen bundh of one metre width
on each side where necessary to protect edges and
preparing the bed by necessary cutting or filling and rolling
all complete including the cost of all materials and hire and
labour charges of all man and machineries and as per
specification and direction of Engineer-in-charge but
excluding the cost of bats/chelly.
(b) Using Brick bats / Jhama metal / Laterite metal of
size 63 mm 45 mm for compacted thickness 75mm.
Add: Cost of Material per sqm
Cost of Jhama Metal
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)

( V.p.262,It-9)

Labour for spreading & compacting approved stone


aggregates to Wet Mix Macadam specification including
screening of aggregates and granular materials, mixing the
materials in proper grading using mechanical mixer,
adding water to achieve required OMC, carrying the mix to
work-site using tipper trucks within a lead of 10 km , laying
the mixed materials in uniform thickness over prepared
surface, rolling with 8-10t roller in stages to proper grade,
camber, until the desired density is achieved, including
supply of all materials, machinery, fuel & lubricants,
including incidental costs for lighting, guarding,
barricading, making of earthen bundfh to protect the
edges, controlling traffic, etc. as per direction of Engineerin-Charge complete, including cost of quality control.
Labour Cost
Add: Cost of Material per cum
Cost of stonemetal 37.50 mm size
Cost of stone chips 13.20 mm size
Cost of stone chips 5.60 mm size
Cost of Stone dust
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Cum= A)+B)

RATE ANALYSIS
Sl
No.

Description

Rate
(Rs)

Amount
(Rs)

Unit

Quantity

Sqm

1.00

2.40

2.40

kg

0.75

45.47

34.10

( V.p.266,It-4,a)

Providing and applying bituminous Primer Coat for


priming of base course with Cationic bituminous emulsion
of approved grade and requisite quantity including
preparation of the surface to be primed, through cleaning
and sweeping, uprooting weeds, grass etc. dampening the
surface beforehand spraying the primer using sprayer
mounted on distributor truck or with hand sprayer using
mechanical pump including cost and carriage of bitumen
emulsion and all other incidental costs of work.
(a) For surfaces with low porosity
(@ 7.5 kg / 10 m2).
Add: Cost of Material per sqm
Cost of C.B. Emulsion for low porosity stone
@ 0.75 Kg / m2

36.50
0.37
36.87

A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)

(Section 4.7, It-34(B)(b)(ii))

Laying Bituminous Macadam of specified grade using


Hot Mix Plant (HMP) and using approved aggregates
conforming to specified grading and bitumen over
prepared surface, including carrying the hot premixed
materials by means of tipper truck, spreading, the mixed
material at specified laying temperature over the prepared
surface by means of a suitable paver finisher, tamping and
finishing the mix to specified grade, line and camber,
thorough rolling with suitable power rollers for break down,
inter-mediate and finished rolling as per specification, hand
packing and pinning to give an even surface including cost
and carriage of stone materials & bitumen, and hire
charges of HMP and all other machines and equipments,
cost of fuels and lubricants and wages of operational staff,
quality control as per IRC Specification all complete
excluding cost of applying tack coat.
(B) In Base / Binder Course using 3.4 % binder content
by weight of total mix.
(b) 50mm compacted thickness
(iii) Using Drum Mix type HMP of minimum capacity 60-90
TPH.
Add: Cost of Material per sqm
Cost of stonechips 22.4 mm size
Cost of stone chips 11.2 mm size
Cost of stone chips 5.6 mm size
Cost of stonedust
Cost of 60/70 Bitumen for mixing

Sqm

1.00

67.40

67.40

Cum
Cum
Cum
Cum
Kg

0.0177
0.0177
0.0248
0.0106
3.74

1693.50
1586.50
1352.50
1243.50
46.33

29.97
28.08
33.54
13.18
173.29

RATE ANALYSIS
Sl
No.

Description

Rate
(Rs)

Amount
(Rs)

Unit

Quantity

Sqm

1.00

1.60

Kg

0.30

45.47

Sqm

1.00

18.80

18.80

Cum
Cum
Kg

0.018
0.009
1.46

1714.50
1586.50
46.33

30.86
14.28
67.65

Sqm

1.00

1.60

1.60

Kg

0.30

45.47

13.64

Add: (V.P.265,It-3b)-ii)
Providing and applying tack coat using Cationic bituminous
emulsion of approved grade conforming to IS : 8887-1978,
over prepared surface including cleaning of surface with
mechanical broom, moistening the surface, applying tack
coat including cost and carriage of emulsion, hire charges
of machineries and labour, cost of fuel and lubricants all
complete as per specification and direction of the Engineerin-charge.
(b) Over black topped surface @ 3.0 kg per 10 m2 :
(ii) By mechanical means.
Add: Cost of Material per sqm
Cost of C.B. Emulsion for tack coat
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)

1.60
13.64
360.70
3.61
364.31

(Section 4.7, It-38(ii))

Providing & Laying 20 mm thick open graded Premixed


Carpet by Hot Mix Plant using 13.2 mm (@ 0.18 m 3 /m 2 )
and 11.2 mm (@ 0.09 m 3 /m 2 ) size stone aggregates,
including thorough cleaning of the surface, applying tack
coat, screening cleaning and pre-heating stone chips and
fully pre-coating the same with hot matrix @ 54 kg/m3 of
aggregate mix, carrying the mixture by tipper trucks or by
any other suitable arrangements, laying the mixture
uniformly over the surface with paver finisher , including
manual operations as and when required for proper level,
grade and camber, thoroughly rolling by power roller,
including the cost and carriage of stone chips and matrix,
heating the matrix, preheating the aggregates to required
temperature and including the hire charges of Hot Mix
Plant and other machineries, pay of operators, cost of fuel
and lubricants etc. all complete excluding cost of applying
tack coat.
(iii) Using Drum Mix type HMP of minimum capacity 60-90
TPH.
Add: Cost of Material per sqm
Cost of Stonechips 13.2 mm size
Cost of Stonechips 11.2 mm size
Cost of 60/70 Bitumen for mixing
Add: (V.P.265,It-3b)-ii)
Providing and applying tack coat using Cationic bituminous
emulsion of approved grade conforming to IS : 8887-1978,
over prepared surface including cleaning of surface with
mechanical broom, moistening the surface, applying tack
coat including cost and carriage of emulsion, hire charges
of machineries and labour, cost of fuel and lubricants all
complete as per specification and direction of the Engineerin-charge.
(b) Over black topped surface @ 3.0 kg per 10 m2 :
(ii) By mechanical means.
Add: Cost of Material per sqm
Cost of C.B. Emulsion for tack coat

RATE ANALYSIS
Sl
No.

Description

Unit

Quantity

Rate
(Rs)

Amount
(Rs)
146.83
1.47
148.30

A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)

( V.p.276,It-18b))

Laying Premixed Seal Coat (Type B) with approved


quality sand/grit @ 0.6 m3/ 100 m2 and hot bitumen
binder on thoroughly cleaned black top surface coated
with tack coat, including heating and mixing cleaned
sand/grit (100 % passing through 2.36 mm sieve and
retained on 180m sieve) uniformly with hot binder (@
113.5 kg per m3 of grit or sand in suitable pan / Mobile Hot
Mix Plant (Light duty), laying and spreading the mix at an
uniform rate using suitable means, brushing the surface, if
necessary, to ensure uniformity, followed by rolling with
power roller including the cost and carriage of binder and
aggregates, cost of heating the binder and aggregates and
all other incidental charges, cost of fuel and lubricants,
including hire charges of machineries, tools & plants
required for construction and quality control complete
excluding cost of applying tack coat.
(b)Using Mobile Hot Mix Plant (Light duty)
Add: Cost of Material per sqm
Cost of stone aggregates 5.6 mm
Cost of 60/70 Bitumen for mixing
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)

Sqm
Cum
Kg

1.00
0.006
0.680

9.90

9.90

1368.00
46.33

8.21
31.51
49.62
0.50
50.12

(V.P. 281 Item No 24)


Laying a single layer, 25mm thick Mastic Asphalt wearing
course in road pavement using approved coarse
aggregate, fine aggregate, filler material and bitumen,
including cost and carriage of all ingredients, cost of
10 heating aggregates and binder, mixing in specified
proportions ... ... .... .. IRC, including the hire charges of all
tool, plants & machineries, pay of operators, cost of fuel
and lubricants and all other incidental charges and quality
control complete.
Add: Cost of materials
Cost of 5.6 mm Coarse Aggregates
Cost of 11.2 mm Coarse Aggregates
Cost of 13.2 mm Coarse Aggregates
Cost of Bitumen (10/20)
Cost of Bitumen (60/70)
Cost of Lime Stone Powder
Cost of Stone Dust

Sqm

1.00

181.80

181.80

Cum
Cum
Cum
Kg
Kg
Kg
Cum

0.0078
0.0078
0.0005
5.5000
0.0150
10.3000
0.0110

1352.50
1586.50
1714.50
41.08
46.33
6.32
1243.50

10.55
12.37
0.86
225.95
0.70
65.10
13.68

RATE ANALYSIS
Sl
No.

Description

Unit

Add: (V.P.265,It-3b)-ii)
Providing and applying tack coat using Cationic bituminous
emulsion of approved grade conforming to IS : 8887-1978,
over prepared surface including cleaning of surface with
mechanical broom, moistening the surface, applying tack
coat including cost and carriage of emulsion, hire charges
of machineries and labour, cost of fuel and lubricants all
complete as per specification and direction of the Engineerin-charge.
(b) Over black topped surface @ 3.0 kg per 10 m2 :
(ii) By manual means.
Sqm
Add: Cost of Material per sqm
Cost of S.R. Bitumen (applied hot)
Kg
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)

Quantity

Rate
(Rs)

1.00

3.60

0.30

46.33

(V.p. 183 Item No 8a))

Earthwork in road embankment in ordinary soil to


correct profile as per designed formation level with earth
obtained from land owned /arranged by the Department,
11 depositing in layers of 250 mm thickness including
breaking clods ,dressing and compacting by power roller
(not at OMC) etc. complete as per specification, drawing
and direction of Engineer-in-charge.
(Payment shall be made in m3 on finished work on the
basis of pre-work and post-work level section
measurements.
(a) In ordinary soil.
Add: (V.p.181,It-1a))
Earthwork in excavation from borrow pits (land
owned/arranged by the Department) and depositing in
layers of 250 mm. Including breaking clods and to fill up
back of abutments depressions and ruts with an initial lead
up to 50 m and initial lift up to 1.5 m making bunds at top
as directed dressing complete. (For petty emergent
works).
(a) In ordinary soil.
Rates to be evaluated considering 100 m3 of borrow pit
earth = 115 m 3 of embankment earth = 92 m 3 of compacted earth.
i.e. Cost of 1 m3 equivalent earth is 100/92= 1.09 m3 of
earth
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Cum= A)+B)

(V.p. 183 Item No 8a))


Earthwork in road embankment in ordinary soil to
correct profile as per designed formation level with earth
obtained from land owned /arranged by the Department,
12 depositing in layers of 250 mm thickness including
breaking clods ,dressing and compacting by power roller
(not at OMC) etc. complete as per specification, drawing
and direction of Engineer-in-charge by carried earth

Amount
(Rs)

3.60
13.90
528.51
5.29
533.80

Cum

1.00

17.10

17.10

Cum

1.087

36.70

39.89
56.99
0.57
57.56

RATE ANALYSIS
Sl
No.

Description
(Payment shall be made in m3 on finished work on the
basis of pre-work and post-work level section
measurements.
(a) In ordinary soil.
Add: Land owned/ arranged by the Contractor
Add: (V.p.181,It-1a))
Earthwork in excavation from borrow pits (land
owned/arranged by the Department) and depositing in
layers of 250 mm. Including breaking clods and to fill up
back of abutments depressions and ruts with an initial lead
up to 50 m and initial lift up to 1.5 m making bunds at top
as directed dressing complete. (For petty emergent
works).
(a) In ordinary soil.

Rate
(Rs)

Amount
(Rs)

Unit

Quantity

Cum
Cum

1.00
1.087

17.10
20.00

17.10
21.74

Cum

1.087

36.70

39.89

Cum

1.25

61.00

76.25

Cum

1.25

20.30

25.38

Rates to be evaluated considering 100 m3 of borrow pit


earth = 115 m 3 of embankment earth = 92 m 3 of compacted earth.
i.e. Cost of 1 m3 equivalent earth is 100/92= 1.09 m3 of
earth
Add: (V.p.308,It-1A.)
Carriage of Earth over pucca road upto 1 km
Rates to be evaluated considering 115 m 3 of embankment
earth = 92 m 3 of compacted earth.
i.e. Carriage Cost of 1 m3 equivalent earth is 115/92=
1.25 m3 of earth
Add: (V.p.302,It-3c))
Loading in to trucks at the lifting point, unloading at
destination, stacking properly in go downs or yard etc. as
directed including carriage by head load up to a lead of 30
m at each of the two points.
(c) Sand, Cinder, Lime, Moorum and similar materials.
Rates to be evaluated considering 115 m 3 of embankment
earth = 92 m 3 of compacted earth.
i.e. only Unloading Cost of 1 m3 equivalent earth is
115/92= 1.25 m3 of earth
Rates to be evaluated considering only Unloading i.e. 35%
of Rs. 58.00
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Cum= A)+B)
Drum sheet walling with eucalyptus Bullah 1.8m (av) high
on piling 150 mm dia and 4.50m long driven 2.70m (av)
below G.L. and 500 mm centre to centre including fitting
fixing 3 nos. of half bullah pieces (from 10 cm dia) and
drum (empty bitumen) sheet (approved condition) of height
1.90m , cutting and straightening drum sheet (each joint
13
must have lap length of min.50mm) including cost of
necessary nails, bolts, nuts etc and providing 2 to 3m long
half bullah ties of 10cm dia @ 2.25 m centre to centre
fixed with 10 cm dia bullah posts driven 1.5m below G.L.
including cost of all materials and one coat of coal tarring
to all bullah etc complete as per direction

180.36
1.80
182.16

RATE ANALYSIS
Sl
No.

Description
Taking Output = 50 m
Add: (V.p.229,It-37c))
Supplying Eucalyptus-bullah piles at work
including dressing and making one end pointed.

Unit

Quantity

Rate
(Rs)

Amount
(Rs)

454.50

124.00

56358.00

136.00

56.00

7616.00

272.70

46.00

12544.20

31.50

31.00

976.50

Sqm

277.00

7.90

2188.30

site,

(c) 15 cm. diameter pile.


Total no of bullah reqd. = 101 Nos.
Total Length = 101 * 4.5 m = 454.50 m
Add: (V.p.229,It-37a))
Supplying Eucalyptus-bullah piles at work site,
including dressing and making one end pointed.
(b) 10 cm. diameter pile.
For Runner
50 X 3 / 2 = 75.00 m
For Post
Total No of bullah reqd. = 50 / 2.5 + 1 = 21 Nos.
Total Length = 21 * 1.65 m = 34.65 m
For Tie
21 X 2.5 / 2 = 26.25.00 m
Total Length reqd. = 135.9 m i.e. 136 m (approx)
Add: (V.p.245,It-67))
Labour for driving Sal-bullah / Eucalyptus bullah piles
by monkey in sorts of soil including hoisting and placing
piles in position, protecting the pile head with iron ring and
cutting and shaping heads before and after driving and
including hire and labour for necessary driving appliances
and all tackles
b) When work under considerable (i.e. above 1 m.)
standing water is involved.
iii) 150mm. diameter
Total Length = 101 * 2.7 m = 272.70 m
i) 100mm diameter (It- 67a)
Total Length = 21 * 1.5 m = 31.50 m
Add: (V.p.248,It-80))
Coal tarring on wooden surfaces including cost of
materials. (It- 80a)
a) Double coat.
15 cm bullah
454.50 X X0.15 = 214.21 m2
Post
34.65 X X0.10 = 10.89 m2
Runner
75 X X0.10 = 23.57 m2
3 X 50 X0.10 = 15.00 m2
Tie
26.25 X X0.10 = 8.25 m2
2 X 26.25 X0.10 = 5.25 m2
Total Area = 277.17 m i.e. 277.00 m2 (approx)

RATE ANALYSIS
Sl
No.

Description
Add: (V.p.246,It-70))
Labour for fitting and fixing 10 cm. to 13 cm. diameter
sal-bullah as ties and runners including necessary nails,
bolts and nuts.
Runner = 75 m
Tie = 26.25 m
Total Length reqd. = 101.25 m
Supply of drum sheet

Rate
(Rs)

Amount
(Rs)

Unit

Quantity

101.25

10.50

1063.13

No.
Sqm

71.00
85.00

200.00
20.00

14200.00
1700.00
96646.13
1932.92
1932.92
19.33
1952.25

Nos.

100

385.00

385.00

Nos.

100

190.00

190.00

50m x 1.70m = 85.00 m


85/1.20 =70.83No Say= 17 No.
Fitting of Drum Sheet
Total
Rate per Metre of Piling
A) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per m= A)+B)
Supplying empty cement bags in good condition & filling
empty cement bags with earth and placing them in position
14 including tying or sewing mouth (cost of thread included)
and all incidental charges complete but excluding cost of
sand and gunny bags
Add: (V.p.250,It-97)
Supplying empty cement bags in good condition.
Add: (V.p.250,It-96)
Labour for filling empty cement bags with sand and placing
them in position including tying or sewing mouth (cost of
thread included) and all incidental charges complete but
excluding cost of sand and gunny bags.
A) Rate per number of bag
Add: (V.p.181,It-1a))
Earthwork in excavation from borrow pits (land
owned/arranged by the Department) and depositing in
layers of 250 mm. Including breaking clods and to fill up
back of abutments depressions and ruts with an initial lead
up to 50 m and initial lift up to 1.5 m making bunds at top
as directed dressing complete. (For petty emergent
works).
(a) In ordinary soil.
Rates to be evaluated considering 100 m3 of borrow pit
earth = 115 m 3 of embankment earth
i.e. Cost of 1 m3 equivalent earth is 100/115= 0.87 m3 of
earth
Add: (V.p.308,It-1A.)
Carriage of Earth over pucca road above upto 1 km
Add: (V.p.302,It-3c))
Loading in to trucks at the lifting point, unloading at
destination, stacking properly in go downs or yard etc. as
directed including carriage by head load up to a lead of 30
m at each of the two points.

5.75

Cum

0.870

36.70

31.91

Cum

1.00

61.00

61.00

RATE ANALYSIS
Sl
No.

Description
(c) Sand, Cinder, Lime, Moorum and similar materials.
Rates to be evaluated considering only Loading and
Unloading i.e. 75% of Rs. 58.00
Rate per cum
B) Cost of earth per bag
C) Sub- Total = A) + B)
D) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per number= C)+D)

Unit

Quantity

Cum

1.00

Rate
(Rs)

43.50

Cum

0.028

136.41

Each

1.000

944.00

Amount
(Rs)

43.50
136.41
3.82
9.57
0.10
9.67

(V.p. 287 Item No 1)


Supplying fitting and fixing R.C. guard post 1.37m long
with c.c.1:2:4 with graded stone chips of 13.2mm down
casting , curing complete including cost of providing
4nos.of 12mm dia. rod of length 1.54m as main
reinforcement and 6 nos. of round shaped 8mm dia rods
used as binders; the placing of the first binder should be at
75mm below the top finished surface and the other 5 nos
of binders should be placed at 245mm c/c ; the guard post
is of octagonal section with inscribed circle of dia 24cm at
the base tappering to corresponding dimensions of 16cm
at the top including two coats of painting with best quality
15
synthetic enamel paint of approved make and grade to
form 6 nos. horizontal alternate bands in white/tanery
yellow and black to 90 cm length standing up above
ground after mending good damages if any during striking
off shuttering, making hole in ground of 47cm depth
and 30cm minimum dia, fixing the guard posts in the
same holes and repacking the earth properly so as to keep
the guard posts standing properly erect in correct position
true to line and length including carriage of R. C. Guard
Post with due care to the site including loading into the
truck and unloading at site complete in all respect.
A) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per number= A)+B)

944.00
944.00
9.44
953.44

RATE ANALYSIS
Sl
No.

Description

Unit

Quantity

Rate
(Rs)

Amount
(Rs)

1.000

399.00

399.00
399.00
3.99
402.99

1.000

2591.00

2591.00
2591.00
25.91
2616.91

(V.p. 289 Item No 3a))


Supplying, fitting and fixing rectangular R.C. 200 m
post of size 65cm x 15cm x 10cm with cement concrete
1:2:4 with graded stone chips of 13.2mm down including
cost of providing 2 nos. of inverted U-shaped 6mm dia
M.S. rods of length 1.40m and 5 nos. of 6mm dia M.S.
binders spaced at 100mm C/C and of length 37.5cm each
in correct position true to line and level and providing sunk
16 inscription with 30cm embedment into the ground after
making hole into the ground of section 10cm more on all
side of post and repacking the hole with 1:4:8 cement
concrete with stone chips with two coat of painting on the
exposed portion of the post with best quality synthetic
enamel paint of approved make and brand of different
shades as directed complete in all respect including
carriage of the post to the site with loading & unloading
Each
and printing of letters and numbers.
A) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per number= A)+B)

(V.p. 289 Item No 3a))


Supplying, fitting and fixing 5th KM post / KM post as
per standard drawing enumerated in IRC: 8-1980 (for type
designs for Highway Kilometre stone) with cement
concrete 1:2:4 with chips of size 26.5mm down in correct
position true to line and level with 60cm embedment into
the ground after making hole into the ground of section
17 15cm more on all sides of the post and repacking the with
1:4:8 cement concrete with stone chips with two coats of
painting on the exposed portion of the post with best
quality synthetic enamel paint of approved make and
brand of different shades as directed complete in all
respect including carriage of the post to the site with
loading & unloading and printing of letters and numbers.
(a) 5th Kilometer Post:
A) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per number= A)+B)

Each

RATE ANALYSIS
Sl
No.

Description

Unit

Quantity

Rate
(Rs)

Each

1.000

2054.00

Amount
(Rs)

(V.p. 289 Item No 3b))


Supplying, fitting and fixing 5th KM post / KM post as
per standard drawing enumerated in IRC: 8-1980 (for type
designs for Highway Kilometre stone) with cement
concrete 1:2:4 with chips of size 26.5mm down in correct
position true to line and level with 60cm embedment into
the ground after making hole into the ground of section
18 15cm more on all sides of the post and repacking the with
1:4:8 cement concrete with stone chips with two coats of
painting on the exposed portion of the post with best
quality synthetic enamel paint of approved make and
brand of different shades as directed complete in all
respect including carriage of the post to the site with
loading & unloading and printing of letters and numbers.
(b) Ordinary Kilometer Post:
A) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per number= A)+B)

2054.00
2054.00
20.54
2074.54

(V.p. 148 Item No 4) of Schedule of Rates of Public Works (Roads) Department , National Highway Wing

Retro Reflective Traffic Signs


Providing and Fixing of Retro-reflectorised cautionary,
mandatory and informatory sign as per IRC:67 made of
high intensity grade sheeting vide clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported on a mild
19
steel angle iron post 75 mm X 75mm x 6 mm firmly fixed
to the ground by means of properly designed foundation
with M15 grade cement concrete 45 cm x 45 cm X 60 cm,
60 cm below ground level as per approved drawing
(Reference to MORT&H's specification 801)
Each
19.1 (ii) 60 cm equilateral triangle
Add: Cost of Material per number as per chapter A Sl. No. 8.4
Add: Overhead Charges @ 10%
%
A) Sub- Total
Add: Contractor's Profit @ 10%
%
B) Sub- Total
Cost of 1:2:4 cement concrete (Refer Sub-analysis)
Cum
C) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996 on
cost of 1:2:4 cement concrete and Cost of 60 cm
equilateral Triangle
Rate per number= A)+B)
Each
19.2 (iii) 60 cm circular
Add: Cost of Material per number as per chapter A Sl. No. 8.4
Add: Overhead Charges @ 10%
%
A) Sub- Total
Add: Contractor's Profit @ 10%
%
B) Sub- Total
Cost of 1:2:4 cement concrete (Refer Sub-analysis)
Cum
C) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996 on
cost of 1:2:4 cement concrete and Cost of 60 cm Circular
Rate per number= A)+B)

1.000

2033.70

10
10
0.12

4669.39

2033.70
203.37
2237.07
223.71
2460.78
560.33
3021.11
25.94

1.000

2941.60

10
10
0.12

4669.39

3047.05
2941.60
294.16
3235.76
323.58
3559.34
560.33
4119.67
35.02
4154.69

RATE ANALYSIS
Sl
No.

Description

Unit

Each
19.3 (iii) 60 cm X 60 cm square
Add: Cost of Material per number as per chapter A Sl. No. 8.4
Add: Overhead Charges @ 10%
%
A) Sub- Total
Add: Contractor's Profit @ 10%
%
B) Sub- Total
Cost of 1:2:4 cement concrete (Refer Sub-analysis)
Cum
C) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996 on
cost of 1:2:4 cement concrete and Cost of 60 cm X 60 cm
square
Rate per number= A)+B)
Sub-Analysis:

Quantity

Rate
(Rs)

1.000

3492.10

10
10
0.12

4669.39

Amount
(Rs)
3492.10
349.21
3841.31
384.13
4225.44
560.33
4785.77
40.52
4826.29

(V.p. 222 Item No 32)


Providing and laying Design Mix concrete for reinforced
concrete work in any part of bridge (excluding bottom
plugging) with coarse aggregates of appropriate nominal
size and grading, fine aggregate (sand) conforming to
proper grading zone, both of approved quality and cement,
as necessary, including labour, cost and carriage of all
materials and including preparation of design mix,
approval of the same by the Engineer-in-Charge and cost
for quality control, sampling, testing etc. all complete but
excluding cost of labour and materials for formwork &
reinforcement works.
(a) 1:2:4 concrete using concrete mixer.
Add: Cost of Material per cum
Cost of 22.4 mm Coarse Aggregates (@ 60% of 0.88m 3 )
Cost of 11.2 mm Coarse Aggregates (@ 40% of 0.88 m3)
Extra Cost of cement
A) Sub- Total

Cum

3213.00

Cum
Cum

0.528
0.352

1693.50
1586.50

3213.00
894.17
558.45
3.77
4669.39

(V.p. 149 Item No 5) of Schedule of Rates of Public Works (Roads) Department , National Highway Wing

Direction and Place Identification Signs upto 0.9 sqm Size Board
Providing and ercting direction and place identification
retro-reflectorised sign as per IRC:67 made of high
intensity grade sheeting vide clause 801.3, fixed over
aluminium sheeting, 2 mm thick with area not exceeding
0.9 sqm supported on a mild steel single angle iron post
75 X 75 X 6 mm firmly fixed to the ground by means of
properly designed foundation with M-15 grade cement
concrete 45 X 45 X 60 cm, 60 cm below ground level as
per approved drawing
20 (iii) 60 cm X 60 cm square
Each
1.000
Add: Cost of Material per number as per chapter A Sl. No. 8.4
Add: Overhead Charges @ 10%
%
10
A) Sub- Total
Add: Contractor's Profit @ 10%
%
10
B) Sub- Total
Cost of 1:2:4 cement concrete (Refer Sub-analysis)
Cum
0.12
C) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996 on
cost of 1:2:4 cement concrete and Cost of 60 cm X 60 cm
square
Rate per number= A)+B)

8164.70

4669.39

8164.70
816.47
8981.17
898.12
9879.29
560.33
10439.62
87.25
10526.87