Name of project
ii
iii
District covered
Project outlay (Rs. Crore)
:
:
S.No
1
i
ii
iii
2
i
ii
iii
iv
v
3
i
a
b
c
d
e
ii
a
b
c
iii
Strengthening of Joynagar(Burorghat)Moydah-Jibonmondalhat-Mahishmarihat
Road(0KMP TO 18.53KMP) under Diamond
Harbour Highway Division in the district of
South 24 Paraganas, under the loan
assistance from NABARD, RIDF XIX
South 24 Paraganas
13.6629
Item
General
Whether the project is prioritized by the State Govt.
Whether the project submited through the Nodal Dept.
Whether the project included in the State Plan.
Clearances from ( wherever applicable )
Ministry of Enviroment & Forests
Ministry of Railways
Administrative Approval
Technical Sanction
Land Acquisition - Extent status and time frame .
Technical Aspects
General
Whether master plan prepared by state Govt. and
proposed project are as per Master plan.
Whether proposed project are new or Strengthening of
existing roads.
Whether proposed project have been designed as per
IRC standards . Reasons for deviation , if any should be
spelt out.
Type of road project - Village Roads, Other District
Road, Major Rural Road .
Whether fair weather connectivity is proposed reasons
for same to be elucidated.
Road Project
Depth of roadway , Damage way , pavment making of
formation, sub-base , base courses, black toping,
culvert and small bridges in existing and proposed
conditions to be furnished in relevant Annexures .
Extent of cement Concrete sections, wherever provided
to be detailed .
Justifications for widening / strengthening should be
supported by relevant data along with year of
construction.
Bridge project
Remarks
Yes
Yes
Yes
Does not arise
Does not arise
To be done aftter NABARD sanction
To be done aftter NABARD sanction
Not Required
Yes
MDR (Major District Road)
No
Reffered later
No
Inadequate Pavement thickness,
Improvement of Riding Quality
(Yes /
No)
Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat Road
Name of project
ii
iii
District covered
Project outlay (Rs. Crore)
:
:
S.No
a
b
4
i
ii
iii.
a
b
c
d
e
f
g
Strengthening of Joynagar(Burorghat)Moydah-Jibonmondalhat-Mahishmarihat
Road(0KMP TO 18.53KMP) under Diamond
Harbour Highway Division in the district of
South 24 Paraganas, under the loan
assistance from NABARD, RIDF XIX
South 24 Paraganas
13.6629
Item
Reffered later
Do
Does not arise
80%
20%
To be done after sanction
(km) population
Marketing
(Yes /
No)
Remarks
benefited. Access to
tourist
/ pilgrimage
recurring
employment
and recurring
generation
Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat Road
Name of project
ii
iii
District covered
Project outlay (Rs. Crore)
:
:
S.No
6
7
i.
ii.
iii.
iv.
v.
8
i.
ii.
iii.
iv.
v.
9
Strengthening of Joynagar(Burorghat)Moydah-Jibonmondalhat-Mahishmarihat
Road(0KMP TO 18.53KMP) under Diamond
Harbour Highway Division in the district of
South 24 Paraganas, under the loan
assistance from NABARD, RIDF XIX
South 24 Paraganas
13.6629
Item
Operation and Maintenance
Arrange for O/M of projects after completions.
Infrastructure Facilities
Organizational structure of the implementing Dept.
Capacity and preparedness of the implementing
Dept. and status of implementation of earlier
sanctioned and mechanism.
Quality control infrastructure and mechanism
Availability of labour
Budget provision
a. For contribution of State Share
b. For subsequent O & M
c. For repayment of loans - Principal and interest.
Project Risks
Land acquisition
Forest clearance
Railway / road crossings
Construction hazards
Any other risks
Convergence with any other programme
(Yes /
No)
Remarks
Through
Provision
Departmental
Budgetary
Adequate
Adequate
Adequate
Adequate Yearwise allocation is made
Not Required.
Not Required.
Does not arise
Nil
Nil
No.
CBR value %
0.75
3%
CBR value %
3%
Pavement
Thickness (m)
No of CD works
Nature of Surface
0
Bituminous
Proposed
0.275
Hard Shoulders
width (m)
0.6
Pavement
Thickness (m)
0.61
5.5
Existing
15
Shoulders Unstabilized,Inadequate
Status of damage
Pavement Thickness
Pavement
Thickness (m)
5.5
0.335
Category
Department
District
MDR
PW(Roads) Directorate
South 24 Paraganas
Strengthening of
Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat
Road(0KMP TO 18.53KMP) under Name of Project
Diamond Harbour Highway Division
in the district of South 24
Paraganas,
Strengthening of Joynagar(Burorghat)-Moydah-Jibonmondal-Mahismarihat Road(0KMP TO 18.53KMP) under Diamond Harbour Highway Division in the district of South 24 Paraganas,
Department
Date of Effect
P.W(ROADS).D
05.01.09 of 2008-09
Project preparation @
0.5%
6,53,732.00
Others
13,66,29,991.00
Contingency @ 3%
km
39,22,392.00
Cess @ 1%
Others
569108.00
18.53
Drains
0.00
Length:
Protective Work
3085111.00
CD
WBM III
0.00
0.00
WBM II
789883.00
BT
WMM
52669530.00
22515930.00
Sub-base
6585138.00
BM
293154.00
41929456.00
Earthwork
3616557.00
District
State :
South 24 Paraganas
Strengthening of
Joynagar(Burorghat)-MoydahJibonmondal-Mahismarihat
Road(0KMP TO 18.53KMP) under Name of Project
Diamond Harbour Highway
Division in the district of South 24
Paraganas,
SoR
Strengthening of Joynagar(Burorghat)-Moydah-Jibonmondal-Mahismarihat Road(0KMP TO 18.53KMP) under Diamond Harbour Highway Division in the district of South 24 Paraganas,
76
75
79
294
322
15
Improvement & Strengthening of Joynagar(Burorghat)-Moydah-Jibonmondal-Mahismarihat Road(0KMP TO 18.53KMP) under Diamond Harbour Highway Division in the district of South 24 Paraganas,
Contribution to GDP (per HA)
Wastage saving
Market Surplus
Area benefitted
Bus/ Truck
Tractor/ LCV
Bullock cart
Horse vehicle
Hand cart
Cycle rickshaw
Length: 18.530km
469
Cycle
Population benefitted
Joynagar I & II
521
1,20,000
Block:
80,000
80,000
Total Cost
Potential
District
Name of Scheme
13,66,29,991.00
High
South 24 Pgs
Strengthening of Road
Serial Nos.
Annexure
REPORT
1 NAME OF WORK
Strengthening of "Joynagar(started from Burorghat)-Moydah-Jibonmondalhat-Mahishmarihat
Road"(from 0km-18.530km) under Diamond Harbour Highway Division in the district of South 24
paraganas.
2 INTRODUCTION
2.1
Project Background
The RURAL INFRASTRUCTURE DEVELOPMENT FUND (RIDF) is a Scheme Dedicated for
infrastructural development in rural areas with a objective of providing better comunication facilities
in rural areas and ensuring reduction of poverty in rural areas. As per assignment of the RIDF
Scheme, the National Bank for Agriculture and Rural Development has envisaged development of
infrastructure in rural area (i.e. Improvement or Upgradation of rural roads) in the state of West
Bengal.
2.2
Location
South 24 Parganas , a coastal district in the south of the State of West Bengal is bounded by
Kolkata and North 24 Parganas on North, Hoogly river on West, Bangladesh on East and Bay of
Bengal on South.
This district is having a geographical area of 8165.05 sq comprising vast rural area, Sundarban
forest area and also urban city area (part of Kolkata Metropolises).
Large road network spread over the district is still deficient in respect of requirement .With growth
of traffic in terms of volume and load many of the existing road which are built on poor road bed of
lower Gangetic alluvial soil are suffering from capacity constraint and structural inadequacy
resulting in deterioration of road pavement mainly due to financial stringency timely improvement
of the roads. A large number of rivers and channels including irrigation and canals provide gaps
blocking thorough movement along many of the road.
While expanding road network particularly in the sector of district has become a necessity, stress
has been given to complete the incomplete roads, strengthening of high density sections of
important traffic corridors which already have been taken up and completion of bridge projects
approved for implementation.
In view of the above, Public Works Department, Government of West Bengal takes a plan for
strengthening of existing carriage way to standard intermediate lane carriage way to meet the
requirement of present and future traffic.
Sub-Division
Block
Mouza
2.3
2.6
History
The propsed road originates at Burorghat (T junction), 1.8 km from Joynagar on the PWD road
connecting Joynagar and Kultoli and terminates at Mahishmari Hat. The road passes through
areas mostly inhabitated by farmers and fisherman. The region around Joynagar, Kutoli was a rich
province and carries historical heritages and importance.
2 Nos.
Sub-Hospital :
1 No.
Other Offices :
12 Nos.
5 Nos.
846
Nos.
1005
Nos.
18.530 Kilometer
c)
18.530 Kilometer
Project length is
Average crust thickness of 335 mm with an average wearing coarse of 25mm (bituminous).
g) The roadway width is 6.5 m to 7.0 m average with Road land width 15.0 m to 30.0 m.
h) Existing alignment does not suffer from any major deficiency in road geometry .
i)
Present surface condition is undulated , broken Crust, inadequate flanks width and eroded at
many stretches.
5 TOPOGRAPHICAL SURVEYS
Topographic survey true to ground realties have been done using precision instruments like Total
Stations and Auto levels, and bringing out data in digital form (x,y,z format) for developing DTM .
Traverse has been done by total station having angular measurement accuracy of 1 sec. All
leveling for establishing Benchmark are to be carried out as per method adopted by Survey of
India. All leveling are to be carried out with Auto Level having accuracy 2.5 mm/ km. In absence
of GTS benchmark in the nearby location of the road, arbitrary level (R.L) has been assumed and
fixed on TBM pillars accordingly.All data from topographic survey recorded by Auto Level were
takenup and final alignment, plan, profile were prepared and presented in AutoCAD Format.
7 TRAFFIC CENSUS
7.1 Classified Traffic Volume Counts
The classified traffic count (7 days in both ways) survey was conducted on the same road . The
count was conducted for 24 hours (0.00 Hour to 24.00Hour) of the day.
Traffic Forecast
The present day traffic has to be projected for the end of design life at growth rates as per IRC 372001. The design traffic in terms of the cumulative number of standard axle to be carried out
according to Cl. 3.3.6 of IRC 37-2001 , page 14. The traffic in the year of completion of the road
project has been estimated as per equation 3.3.6.1 of the above page 15 of IRC 37 : 2001
mentioned clause.
8 TECNNICAL SPECIFICATION
8.1
8.2
Bituminous Macadam
This work shall consist of construction, in a single course, of 50 mm compacted thickness of
compacted crushed aggregates premixed with a bituminous binder, laid immediately after mixing,
on a base prepared previously in accordance with the requirements of the specifications, and in
conformity with the lines, grades and cross-sections shown on the drawings or directed by the
Engineer-in-Charge.
Tack coat shall be applied in all bituminious layers starting from BM,Premix and Mastic asphalt. In
case of application of tack coat mechanical means adopted for BM and Premixed carpet where as
for mastic asphalt it is to be laid manually.Tack coat in the form of Bituminous emulsion shall be
applied as 0.30 kg/sq.m.
The bitumen shall be paving bitumen of suitable penetration grade within the range S 35 to S 90 or
A 35 to A 90 (30/40 to 80/100) The aggregates shall consist of crushed stone, crushed gravel
(shingle) or other stones retained on 2.36 mm sieve. They shall be clean, strong, durable of fairly
cubical shape and free of disintegrated piece, organic and other deleterious matter, and adherent
coatings. The aggregates shall preferably be hydrophobic and of low porosity. Where crushed
gravel is used as aggregates, not less than 90% by weight of crushed materials retained on 4.75
mm sieve shall have at least two fractured faces. The aggregates shall be proportioned and
blended to produce a uniform mixture complying to the specifications. The binder content shall be
within a tolerance of 0.3 % by weight of total mixture.A tack coat shall be applied as required by
the Contract documents, or as directed by the Engineer-in-Charge.
8.5
8.6
Mastic Asphalt
25mm thick mastic asphat wearing coarse will be applied on the treated BM top layer. Approved
quality coarse aggregate,fine aggregate,filter material,binder and bitumen in specified proportions as
reffered to in the IRC specification.
After thorough investigation of the road with Engineer-in-charge provision of mastic asphalt have
been made in water-logged areas,market places . The total length for mastic asphalt is 945m.
11 PAVEMENT COMPOSITION
Existing Pavement Composition :
185 mm
150 mm
WBM Grade II
225 mm
Total
50 mm
BM
20 mm
225 mm
50 mm
BM
25 mm
Mastic Asphalt
610 mm
12 ANALYSIS OF RATES
12.1 Rate Analysis
Rates have been adopted for various items of work from the schedule of Rates for Road works,
culverts & Carriage PW(Roads)D Schedule 2008 -2009 Effective from 05.01.09
Malay Ghosh
Assistant Engineer
Superintending Engineer
Executive Engineer
P.W.(Roads) Directorate
P.W.(Roads) Directorate
P.W.(Roads) Directorate
Type
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
BOX CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
BRIDGE
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
HUME PIPE
PIPE CULVERT
PIPE CULVERT
HUME PIPE
HUME PIPE
BOX CULVERT
BOX CULVERT
HUME PIPE
HUME PIPE
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
PIPE CULVERT
BOX CULVERT
PIPE CULVERT
PIPE CULVERT
Necessary
Action
Functioning
Functioning
No Action, Temporary
Functioning
Maintenance
Functioning
only,Removal of
Functioning
unwanted vegetative
Functioning
growth
Functioning
Functioning
Clogged
Cleaning
Good
No Action
Functioning
Functioning
Functioning No Action, Temporary
Functioning Maintenance
Functioning only,Removal of
Functioning unwanted vegetative
Functioning growth
Good Condt. No Action
Clogged
Cleaning
Clogged
Cleaning
Clogged
Cleaning
Functioning
Functioning
Functioning
No Action, Temporary
Functioning
Maintenance
Functioning
only,Removal of
Functioning
unwanted vegetative
Functioning
growth
Functioning
Functioning
Functioning
Good Condt. No Action
Functioning No Action, Temporary
Functioning Maintenance
only,Removal
of
Clogged
Cleaning
Functioning No Action, Temporary
Functioning Maintenance
Functioning only,Removal of
Functioning unwanted vegetative
Functioning growth
Good Condt. No Action
Functioning No Action, Temporary
Functioning Maintenance
only,Removal of
9000
C L of Proposed Carriageway
1750
2750
2750
Earthen
Shoulder
2.5 %
1750
Earthen
Shoulder
3.5 %
3.5 %
2.5 %
1
600 (TYP)
Existing Embankment
75MM JHAMA
75MM BRICK-BATS
20MM Premix Carpet
225MM WMM
50MM BM
8000
C L of Proposed Carriageway
1250
2750
2750
1250
Subgrade
100 mm Jhama-metal
Calculation Of Quantity.
Length Of the Road =
18530.00 M
Width =
5.5 m
78.25 M
18451.75 M
WMM =
BM =
0.225 m
0.05 m
ITem No -1
Picking up of Existing Bituminous layer
1X
18451.8 X
5.50
101485.00 M
2
2
2030.00 M
2
103515.00 M
ITem No -2
Repairing Pot holes
( Assuming 6.5% of surface area are potholes and average loose net thickness is 100mm)
1X
18451.75 X
5.50 X
2
101485.00 M
2
2030.00 M
2
103515.00 M
Volume of potholes =
103515.00
6.50% X
0.1
673.000 M
ITem No -3
Hard shouldering
Width =
600 mm
Thickness =
150 mm
75 mm thick single-layer brick-bat used for shoudering
1660.6575 M
3
33.00 M
1693.6575 M
ITem No -4
75 mm thick single-layer Jhama-metal used for shoudering
2
22142.1 M
2
443.00 M
2
22585.1 M
ITem No -5
Wet Mix Macadam 150mm thick
In Jibanmondalhat Bazar
1X
18451.75 X
5.50 X
0.225
1X
145.00 X
3.80 X
0.15
3
22834.00 M
3
83.00 M
22917.00
3
458.00 M
3
23375.00 M
ITem No -6
Priming coat
In Jibanmondalhat Bazar
18530.00 X
5.50
2
101915.00 M
145.00 X
3.80
2
551.00 M
2
102466.00 M
2
2049.00 M
2
104515.00 M
ITem No -7
50mm th Bituminous Macadam
1X
In Jibanmondalhat Bazar
18530.00 X
5.50
101915.00 M
145.00 X
3.80
551.00 M
2
102466.00 M
2
2049.00 M
2
104515.00 M
ITem No -8
20mm thick premixed carpet
Area Of 50mm thick B.M.
2
104515.00 M
2
5302.00 M
2
99213.00 M
ITem No -9
25mm thick Mastic Asphalt
1X
945 X
5.50
5198.00 M
2
2
104.00 M
2
5302.00 M
2
99213.00 M
ITem No -11
Eucallyptuc Bullah Pilling
1425.00 M
ITem No -12
Placing of Cement Bag filled with Earth
Using 22 nos of bag per meter length along with bullah pilling
1425.00 X
22.00
31350.00
31350.00
73903.06
28466.44
3387.54
3
42049.08 M
Less :Built-up areas, homestead areas and markets ,side drain, earthen bundh, river,
ponds and water bodies, and other allied activities =
35 %
3
14717.18 M
27331.90 M
ITem No -13
Borrow Pit Earth Work =
40% of
27331.90 m3
3
10932.76 M
60% of
27331.90 m3
3
16399.14 M
ITem No -14
Carried Earth Work =
Un
laden
8
12.04.13
00.00
12.04.13
24.00
206
347
27
27
45
53
10
27
16
510
431
13.04.13
00.00
13.04.13
24.00
327
347
32
34
56
65
16
29
16
621
625
14.04.13
00.00
14.04.13
24.00
315
311
35
32
62
48
20
28
19
549
503
15.04.13
00.00
15.04.13
24.00
311
336
39
42
60
44
21
21
19
509
435
16.04.13
00.00
16.04.13
24.00
312
297
42
42
56
68
18
27
11
488
429
17.04.13
00.00
17.04.13
24.00
297
291
43
42
57
65
19
24
13
483
399
18.04.13
00.00
18.04.13
24.00
291
324
46
40
71
45
24
12
13
487
462
2059
2253
264
259
407
388
128
168
107
3647
3284
294.14
294
321.86
322
0.00
0
0.00
0
37.71
38
37.00
37
58.14
58
55.43
55
18.29
18
24.00
24
15.29
15
521.00
521
469.14
469
294
161
114
111
261
248
81
108
120
261
938
HOUR
TO DATE
HOUR
CARS,JEE
PS, VANS
Wt <3MT
Agri-Tractors with
trailers
Truck
Un laden
Laden
Un laden
Laden
Un laden
Laden
ANIMAL
DRAWN
VEHICLES
CYCLES
OTHER
(SPECIFY)
VAN
RICHSHAW
TWO
WHEELERS
Other motorised
commercial
vehicles
Laden
FROM
DATE
BUSES
10
11
12
1851
Total PCU =
(CPVD)
Un laden
55
58
0
38
0
37
Total =
96
(CVPD) at the time of Census(No. of vehicle weight > 3MT) =
92
133
Assistant Engineer
Executive Engineer
2696
A
A
P
r
n
=
=
=
=
Therefore,
No. of commercial vehicles per day at the end of "n" years during project
No. of commercial vehicles per day at last count
Annual growth rate
7.5 %
Nos. of years
2 yrs
A =
Ns =
365 x A x ((1+r)^t-1) x F x L / r
A =
r =
t =
F =
L =
Ns =
P x (1 + r ) ^ n
133 x (1 + 7.5/100)^2
153.6981
7.5 %
10 yrs
3.5
0.75
2083329
2.08E+06
Therefore , Ns =
CBR =
2 msa
3%
PAVEMENT DESIGN
Now Since, Designed CBR is
Designed msa is
3%
2
CBR(%)
Cumulative
Traffic
(msa)
2
3
Total
Pavement
Thickness
(mm)
610
Pavement Composition
Bituminous Coarse Granular Granular
Wearing Binder Base
Sub-base
Coarse
Coarse Coarse
Coarse
(mm)
(mm)
(mm)
(mm)
25
50
225
WMM
BM
Total =
335
20 mm wearing coat
IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)- MOIDAHJIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 KMP)
UNDER DIAMOND HARBOUR HIGHWAY DIVISION
IN THE DISTRICT OF SOUTH 24 PGS.
Cost in Rupees
3616557.00
2 Cost of Sub-Base
7668175.00
52669530.00
64445386.00
569108.00
Say
Say
3922392.00
653732.00
1307464.00
136629991.00
1366.29991
Malay Ghosh
Executive Engineer
Superintending Engineer
PW(Roads) Directorate
PW(Roads) Directorate
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
Description
Unit
Quantity
Sqm
82812
Cum
Cum
Rate
(Rs)
Amount
(Rs)
3.54
293154.00
362.300
2180.19
789883.00
1693.6575
1252.30
2120967.00
( V.p.264,It-16)
(V.P.191 It-1)
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
Description
Rate
(Rs)
Amount
(Rs)
Unit
Quantity
Sqm
22585.100
197.66
4464171.00
Cum
23375.02
2253.24
52669530.00
(V.P.259 It-7b))
( V.p.262,It-9)
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
Description
Rate
(Rs)
Amount
(Rs)
Unit
Quantity
Sqm
104515.32
36.87
3853480.00
Sqm
104515.32
364.31
38075976.00
( V.p.266,It-4,a)
Providing and applying bituminous Primer Coat for priming of
base course with Cationic bituminous emulsion of approved grade
and requisite quantity including preparation of the surface to be
primed, through cleaning and sweeping, uprooting weeds, grass
etc. dampening the surface beforehand spraying the primer using
sprayer mounted on distributor truck or with hand sprayer using
mechanical pump including cost and carriage of bitumen emulsion
and all other incidental costs of work.
(a) For surfaces with low porosity
(@ 7.5 kg / 10 m2).
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
Description
Rate
(Rs)
Amount
(Rs)
Unit
Quantity
Sqm
99213.870
148.30
14713417.00
Sqm
99213.870
50.12
4972599.00
( V.p.276,It-18b))
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
10
Rate
(Rs)
Amount
(Rs)
Description
Unit
Quantity
Sqm
5301.450
533.80
2829914.00
Cum
10932.760
57.56
629290.00
Cum
16399.140
182.16
2987267.00
11
12
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
Description
Unit
Quantity
Rate
(Rs)
13
1425.00
1952.25
2781956.00
Nos.
31350
9.67
303155.00
Each
64
953.44
61020.00
14
Amount
(Rs)
15
Supplying fitting and fixing R.C. guard post 1.37m long with
c.c.1:2:4 with graded stone chips of 13.2mm down casting , curing
complete including cost of providing 4nos.of 12mm dia. rod of
length 1.54m as main reinforcement and 6 nos. of round shaped
8mm dia rods used as binders; the placing of the first binder
should be at 75mm below the top finished surface and the other 5
nos of binders should be placed at 245mm c/c ; the guard post is
of octagonal section with inscribed circle of dia 24cm at the base
tappering to corresponding dimensions of 16cm at the top
including two coats of painting with best quality synthetic enamel
paint of approved make and grade to form 6 nos. horizontal
alternate bands in white/tanery yellow and black to 90 cm length
standing up above ground after mending good damages if any
during striking off shuttering, making hole in ground of 47cm
depth and 30cm minimum dia, fixing the guard posts in the
same holes and repacking the earth properly so as to keep the
guard posts standing properly erect in correct position true to line
and length including carriage of R. C. Guard Post with due care to
the site including loading into the truck and unloading at site
complete in all respect.
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
16
Description
Amount
(Rs)
Quantity
Each
74
402.99
29821.00
Each
2616.91
7851.00
Rate
(Rs)
Unit
17
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
18
Description
Unit
Quantity
Each
15
Rate
(Rs)
Amount
(Rs)
2074.54
31118.00
(V.p. 148 Item No 4) of Schedule of Rates of Public Works (Roads) Department , National Highway Wing
19
Each
20
3047.05
60941.00
Each
86
4154.69
357303.00
Each
4826.29
0.00
ESTIMATE OF IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)MOIDAH-JIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 0KMP)
Sl
No.
Description
Unit
Quantity
Rate
(Rs)
Amount
(Rs)
(V.p. 149 Item No 5) of Schedule of Rates of Public Works (Roads) Department , National Highway Wing
Direction and Place Identification Signs upto 0.9 sqm Size Board
20
Providing and ercting direction and place identification retroreflectorised sign as per IRC:67 made of high intensity grade
sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm
thick with area not exceeding 0.9 sqm supported on a mild steel
single angle iron post 75 X 75 X 6 mm firmly fixed to the ground
by means of properly designed foundation with M-15 grade cement
concrete 45 X 45 X 60 cm, 60 cm below ground level as per
approved drawing
(Reference to MORT&H's specification 801)
Each
10526.87
21054.00
132053867.00
130746403.00
Malay Ghosh
Superintending Engineer
State Highway Circle No. - I
PW (Roads) Directorate
IMPROVEMENT AND STRENGTHENING OF JOYNAGAR (BURORGHAT)- MOIDAHJIBONMONDALHAT-MAHISHMARIHAT ROAD (0.000 KMP TO 18.53 KMP)
UNDER DIAMOND HARBOUR HIGHWAY DIVISION
IN THE DISTRICT OF SOUTH 24 PGS.
S.No.
Description of Item
Unit
Amount
Coarse Sand
1 (Grading Zone - I as per IS:383-1970)
Stacked at Site
cum
820.00
Medium Sand
2 (Grading Zone - I as per IS:383-1970)
Stacked at Site
cum
650.00
cum
500.00
cum
350.00
Fine Sand
3 (Grading Zone - I as per IS:383-1970)
Stacked at Site
Silver Sand
4
Stacked at Site
# Ref. PWD (Roads)Directorates S/R 2008-09,
Annex -II Page 319
BRICK, BATS
1
nos/1000
8000.00
nos/1000
8000.00
cum
1650.00
cum
1150.00
48.00
Cost at Ballygunge
cum
cum
62.00
62.00
62.00
62.00
cum
1441.00
1604.00
1624.00
1644.00
cum
46.50
46.50
46.50
46.50
46.50
cum
473.00
473.00
473.00
473.00
473.00
cum
1425.50
1588.50
1608.50
1628.50
62.00
62.00
Stone Screening
1174.00
1195.00 1067.00
Type A
Stone Dust
5.6 mm
11.2 mm
13.2 mm
22.4 mm
26.5 mm
37.5 mm
Boulder
30/45 kg
Unit
Grade I (90-45)
Item
Grade II (63-45)
Size of Aggregates
Hand Broken Aggregates
Type B
Source of Material:
833.00
727.00
909.00
729.00
62.00
62.00
62.00
62.00
58.00
62.00
58.00
1709.00
1730.00
1602.00
1368.00
1258.00
1444.00
1260.00
46.50
46.50
46.50
46.50
46.50
43.50
46.50
43.50
473.00
473.00
473.00
473.00
473.00
473.00
473.00
473.00
1628.50 1679.50
1693.50
1714.50
1586.50
1352.50
1243.50
1428.50
1245.50
1644.00 1695.00
Carriage for
48.00 Km
Rate for Plant work
Carriage
Ballygunge to D. Barasaat
D. Barasaat to Moida
Moida to Site Middle
Say
38.00 Km
3.50 Km
6.27 Km
47.77 Km
48.00 Km
Carriage From
0.00
To
5.00
To
10.00
To
20.00
To
5.00
10.00
20.00
48.00
=
=
=
=
5.00
5.00
10.00
28.00
Km @Rs
Km @Rs
Km @Rs
Km @Rs
79.00
10.00
9.20
9.00
Rs.
Rs.
Rs.
Rs.
79.00
50.00
92.00
252.00
Rs.
473.00
(Format for anlysis of rates of bitumen / bituminous emulsion / CRMB supplied by Contractor)
Source of Material:
Haldia
Kolkata
170.00
52.00
Unit
Sl No.
Item
Source
(A)
(V.P.-316 It -4)
MT
Bitumen
Bitumen
Emulsion
(Bulk): VG(Packed):
30 (60/70)
MS Type
Bitumen
(Packed):
VG- 30
(10/20)
Haldia
Kolkata
Haldia
41423.00
41,903.00
37,400.00
43.50
43.50
330.70
897.50
4,190.30
3,740.00
1,000.00
1,000.00
45,467.50
41,081.00
(B)
(V.P.-302 It -3a)
MT
769.00
(C)
(D)
(E)
MT
4,142.30
MT
Rate at Site
MT
46,334.30
For rates Refer Table I - 2 at page 316 & Format - B at page 317 of Government of
West Bengal , Public Works (Roads) Directorate Schedule of Rates for Road &
Bridge Works 2008 - 2009 & 7th Corrigenda, Addenda & Errata of SOR of SOR of
P.W. (Roads) Directorate 2008-2009- April, 2012
FORMAT B:
FORMAT B:
Carriage
(Vide P-325 I- 4g)
Haldia to New Alipur
New Alipur D. Barasaat
D. Barasaat to Moida
Moida to Site Middle
Say
(Format for anlysis of rates of bitumen / bituminous emulsion / CRMB supplied by Contractor)
Carriage From
118.00
42.00
3.50
6.27
169.77
170.00
Km
Km
Km
Km
Km
Km
0.00
100.00
To
To
100.00
170.00
=
=
100.00
70.00
Km @Rs
Km @Rs
468.00
4.30
Rs.
Rs.
468.00
301.00
Rs.
769.00
Rs.
Rs.
Rs.
Rs.
Rs.
68.00
29.50
58.00
165.00
10.20
Rs.
330.70
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
68.00
29.50
58.00
165.00
255.00
322.00
Rs.
897.50
Carriage
Carriage From
Kolkata to D. Barasaat
D. Barasaat to Moida
Moida to Site Middle
Say
42.00 Km
3.50 Km
6.27 Km
51.77 Km
52.00 Km
Say
To
To
To
To
To
5.00
10.00
20.00
50.00
52.00
=
=
=
=
=
5.00
5.00
10.00
30.00
2.00
Km @Rs
Km @Rs
Km @Rs
Km @Rs
Km @Rs
68.00
5.90
5.80
5.50
5.10
Carriage
(Vide P-325 I- 4g)
Haldia to New Alipur
New Alipur D. Barasaat
D. Barasaat to Moida
Moida to Site Middle
0.00
5.00
10.00
20.00
50.00
Carriage From
118.00
42.00
3.50
6.27
169.77
Km
Km
Km
Km
Km
170.00 Km
0.00
5.00
10.00
20.00
50.00
100.00
To
To
To
To
To
To
5.00
10.00
20.00
50.00
100.00
170.00
=
=
=
=
=
=
5.00
5.00
10.00
30.00
50.00
70.00
Km @Rs
Km @Rs
Km @Rs
Km @Rs
Km @Rs
Km @Rs
68.00
5.90
5.80
5.50
5.10
4.60
RATE ANALYSIS
Sl
No.
Description
Unit
Quantity
Sqm
1.00
1.00
Cum
Rate
(Rs)
Amount
(Rs)
3.50
3.50
3.50
0.04
3.54
1.00
270.00
270.00
Cum
Cum
1.000
0.210
1624.00
1260.00
1624.00
264.60
2158.60
21.59
2180.19
Cum
1.000
173.70
173.70
Cum
Cum
0.900
0.048
1150.00
650.00
1035.00
31.20
1239.90
12.40
1252.30
( V.p.264,It-16)
(V.P.191 It-1)
RATE ANALYSIS
Sl
No.
Description
Rate
(Rs)
Amount
(Rs)
Unit
Quantity
Sqm
1.000
14.20
14.20
Cum
0.110
1650.00
181.50
195.70
1.96
197.66
Cum
1.00
273.90
273.90
Cum
Cum
Cum
Cum
0.396
0.264
0.356
0.304
1628.50
1714.50
1352.50
1243.50
644.89
452.63
481.49
378.02
2230.93
22.31
2253.24
(V.P.259 It-7b))
( V.p.262,It-9)
RATE ANALYSIS
Sl
No.
Description
Rate
(Rs)
Amount
(Rs)
Unit
Quantity
Sqm
1.00
2.40
2.40
kg
0.75
45.47
34.10
( V.p.266,It-4,a)
36.50
0.37
36.87
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)
Sqm
1.00
67.40
67.40
Cum
Cum
Cum
Cum
Kg
0.0177
0.0177
0.0248
0.0106
3.74
1693.50
1586.50
1352.50
1243.50
46.33
29.97
28.08
33.54
13.18
173.29
RATE ANALYSIS
Sl
No.
Description
Rate
(Rs)
Amount
(Rs)
Unit
Quantity
Sqm
1.00
1.60
Kg
0.30
45.47
Sqm
1.00
18.80
18.80
Cum
Cum
Kg
0.018
0.009
1.46
1714.50
1586.50
46.33
30.86
14.28
67.65
Sqm
1.00
1.60
1.60
Kg
0.30
45.47
13.64
Add: (V.P.265,It-3b)-ii)
Providing and applying tack coat using Cationic bituminous
emulsion of approved grade conforming to IS : 8887-1978,
over prepared surface including cleaning of surface with
mechanical broom, moistening the surface, applying tack
coat including cost and carriage of emulsion, hire charges
of machineries and labour, cost of fuel and lubricants all
complete as per specification and direction of the Engineerin-charge.
(b) Over black topped surface @ 3.0 kg per 10 m2 :
(ii) By mechanical means.
Add: Cost of Material per sqm
Cost of C.B. Emulsion for tack coat
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)
1.60
13.64
360.70
3.61
364.31
RATE ANALYSIS
Sl
No.
Description
Unit
Quantity
Rate
(Rs)
Amount
(Rs)
146.83
1.47
148.30
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)
( V.p.276,It-18b))
Sqm
Cum
Kg
1.00
0.006
0.680
9.90
9.90
1368.00
46.33
8.21
31.51
49.62
0.50
50.12
Sqm
1.00
181.80
181.80
Cum
Cum
Cum
Kg
Kg
Kg
Cum
0.0078
0.0078
0.0005
5.5000
0.0150
10.3000
0.0110
1352.50
1586.50
1714.50
41.08
46.33
6.32
1243.50
10.55
12.37
0.86
225.95
0.70
65.10
13.68
RATE ANALYSIS
Sl
No.
Description
Unit
Add: (V.P.265,It-3b)-ii)
Providing and applying tack coat using Cationic bituminous
emulsion of approved grade conforming to IS : 8887-1978,
over prepared surface including cleaning of surface with
mechanical broom, moistening the surface, applying tack
coat including cost and carriage of emulsion, hire charges
of machineries and labour, cost of fuel and lubricants all
complete as per specification and direction of the Engineerin-charge.
(b) Over black topped surface @ 3.0 kg per 10 m2 :
(ii) By manual means.
Sqm
Add: Cost of Material per sqm
Cost of S.R. Bitumen (applied hot)
Kg
A)Sub-Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per Sqm= A)+B)
Quantity
Rate
(Rs)
1.00
3.60
0.30
46.33
Amount
(Rs)
3.60
13.90
528.51
5.29
533.80
Cum
1.00
17.10
17.10
Cum
1.087
36.70
39.89
56.99
0.57
57.56
RATE ANALYSIS
Sl
No.
Description
(Payment shall be made in m3 on finished work on the
basis of pre-work and post-work level section
measurements.
(a) In ordinary soil.
Add: Land owned/ arranged by the Contractor
Add: (V.p.181,It-1a))
Earthwork in excavation from borrow pits (land
owned/arranged by the Department) and depositing in
layers of 250 mm. Including breaking clods and to fill up
back of abutments depressions and ruts with an initial lead
up to 50 m and initial lift up to 1.5 m making bunds at top
as directed dressing complete. (For petty emergent
works).
(a) In ordinary soil.
Rate
(Rs)
Amount
(Rs)
Unit
Quantity
Cum
Cum
1.00
1.087
17.10
20.00
17.10
21.74
Cum
1.087
36.70
39.89
Cum
1.25
61.00
76.25
Cum
1.25
20.30
25.38
180.36
1.80
182.16
RATE ANALYSIS
Sl
No.
Description
Taking Output = 50 m
Add: (V.p.229,It-37c))
Supplying Eucalyptus-bullah piles at work
including dressing and making one end pointed.
Unit
Quantity
Rate
(Rs)
Amount
(Rs)
454.50
124.00
56358.00
136.00
56.00
7616.00
272.70
46.00
12544.20
31.50
31.00
976.50
Sqm
277.00
7.90
2188.30
site,
RATE ANALYSIS
Sl
No.
Description
Add: (V.p.246,It-70))
Labour for fitting and fixing 10 cm. to 13 cm. diameter
sal-bullah as ties and runners including necessary nails,
bolts and nuts.
Runner = 75 m
Tie = 26.25 m
Total Length reqd. = 101.25 m
Supply of drum sheet
Rate
(Rs)
Amount
(Rs)
Unit
Quantity
101.25
10.50
1063.13
No.
Sqm
71.00
85.00
200.00
20.00
14200.00
1700.00
96646.13
1932.92
1932.92
19.33
1952.25
Nos.
100
385.00
385.00
Nos.
100
190.00
190.00
5.75
Cum
0.870
36.70
31.91
Cum
1.00
61.00
61.00
RATE ANALYSIS
Sl
No.
Description
(c) Sand, Cinder, Lime, Moorum and similar materials.
Rates to be evaluated considering only Loading and
Unloading i.e. 75% of Rs. 58.00
Rate per cum
B) Cost of earth per bag
C) Sub- Total = A) + B)
D) Add 1.00% as per "Workers' Welfare Cess Act, 1996)
Rate per number= C)+D)
Unit
Quantity
Cum
1.00
Rate
(Rs)
43.50
Cum
0.028
136.41
Each
1.000
944.00
Amount
(Rs)
43.50
136.41
3.82
9.57
0.10
9.67
944.00
944.00
9.44
953.44
RATE ANALYSIS
Sl
No.
Description
Unit
Quantity
Rate
(Rs)
Amount
(Rs)
1.000
399.00
399.00
399.00
3.99
402.99
1.000
2591.00
2591.00
2591.00
25.91
2616.91
Each
RATE ANALYSIS
Sl
No.
Description
Unit
Quantity
Rate
(Rs)
Each
1.000
2054.00
Amount
(Rs)
2054.00
2054.00
20.54
2074.54
(V.p. 148 Item No 4) of Schedule of Rates of Public Works (Roads) Department , National Highway Wing
1.000
2033.70
10
10
0.12
4669.39
2033.70
203.37
2237.07
223.71
2460.78
560.33
3021.11
25.94
1.000
2941.60
10
10
0.12
4669.39
3047.05
2941.60
294.16
3235.76
323.58
3559.34
560.33
4119.67
35.02
4154.69
RATE ANALYSIS
Sl
No.
Description
Unit
Each
19.3 (iii) 60 cm X 60 cm square
Add: Cost of Material per number as per chapter A Sl. No. 8.4
Add: Overhead Charges @ 10%
%
A) Sub- Total
Add: Contractor's Profit @ 10%
%
B) Sub- Total
Cost of 1:2:4 cement concrete (Refer Sub-analysis)
Cum
C) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996 on
cost of 1:2:4 cement concrete and Cost of 60 cm X 60 cm
square
Rate per number= A)+B)
Sub-Analysis:
Quantity
Rate
(Rs)
1.000
3492.10
10
10
0.12
4669.39
Amount
(Rs)
3492.10
349.21
3841.31
384.13
4225.44
560.33
4785.77
40.52
4826.29
Cum
3213.00
Cum
Cum
0.528
0.352
1693.50
1586.50
3213.00
894.17
558.45
3.77
4669.39
(V.p. 149 Item No 5) of Schedule of Rates of Public Works (Roads) Department , National Highway Wing
Direction and Place Identification Signs upto 0.9 sqm Size Board
Providing and ercting direction and place identification
retro-reflectorised sign as per IRC:67 made of high
intensity grade sheeting vide clause 801.3, fixed over
aluminium sheeting, 2 mm thick with area not exceeding
0.9 sqm supported on a mild steel single angle iron post
75 X 75 X 6 mm firmly fixed to the ground by means of
properly designed foundation with M-15 grade cement
concrete 45 X 45 X 60 cm, 60 cm below ground level as
per approved drawing
20 (iii) 60 cm X 60 cm square
Each
1.000
Add: Cost of Material per number as per chapter A Sl. No. 8.4
Add: Overhead Charges @ 10%
%
10
A) Sub- Total
Add: Contractor's Profit @ 10%
%
10
B) Sub- Total
Cost of 1:2:4 cement concrete (Refer Sub-analysis)
Cum
0.12
C) Sub- Total
B) Add 1.00% as per "Workers' Welfare Cess Act, 1996 on
cost of 1:2:4 cement concrete and Cost of 60 cm X 60 cm
square
Rate per number= A)+B)
8164.70
4669.39
8164.70
816.47
8981.17
898.12
9879.29
560.33
10439.62
87.25
10526.87