Sie sind auf Seite 1von 2

Federal Register / Vol. 71, No.

87 / Friday, May 5, 2006 / Notices 26493

facilities that affect the safety and an appropriate date range. For The DEA is available for review and
security of port areas and navigable assistance, please contact FERC Online reproduction at the Commission’s
waterways under Executive Order Support at Public Reference Room, located at 888
10173; the Magnuson Act (50 U.S.C. FERCOnlineSupport@ferc.gov or toll First Street, NE., Room 2A, Washington,
191); the Ports and Waterways Safety free at 1–866–208–3676, or for TTY, DC 20426. The DEA may also be viewed
Act of 1972, as amended (33 U.S.C. contact (202) 502–8659. The eLibrary on the Commission’s Web site at
1221, et seq.); and the Maritime link on the FERC Internet Web site also http://www.ferc.gov using the ‘‘elibrary’’
Transportation Security Act of 2002 (46 provides access to the texts of formal link. Enter the dock number (prefaced
U.S.C. 701). The Coast Guard also has documents issued by the Commission, by P–) and excluding the last three
authority for LNG facility plan review, such as orders, notices, and digits, in the docket number field to
approval and compliance verification as rulemakings. access the document. For assistance,
provided in title 33 CFR part 105, and In addition, the Commission now contact FERC Online Support at
siting as it pertains to the management offers a free service called eSubscription FERCOnlineSupport@ferc.gov or toll-
of vessel traffic in and around the LNG which allows you to keep track of all free at (866) 208–3676, or for TTY,
facility. As required by its regulations, formal issuances and submittals in contact (202) 502–8659.
the Coast Guard is responsible for specific dockets. This can reduce the Comments on the DEA should be filed
issuing a Letter of Recommendation amount of time you spend researching within 30 days of the date of this notice
(LOR) as to the suitability of the proceedings by automatically providing and should be addressed to Magalie
waterway for LNG marine traffic. you with notification of these filings, Roman Salas, Secretary, Federal Energy
The final EIS has been placed in the document summaries and direct links to Regulatory Commission, 888 First
public files of the FERC and is available the documents. Go to the eSubscription Street, NE., Washington, DC 20426.
for distribution and public inspection link on the FERC Internet Web site. Please reference ‘‘Catawba-Wateree
at: Federal Energy Regulatory Project, FERC Project No. 2232–485’’ on
Commission, Public Reference Room, Magalie R. Salas,
all comments. Comments may be filed
888 First Street, NE., Room 2A, Secretary.
electronically via the Internet in lieu of
Washington, DC 20426, (202) 208–1371. [FR Doc. E6–6844 Filed 5–4–06; 8:45 am] paper. See, 18 CFR 385.2001(a)(1)(iii)
Copies of the final EIS have been BILLING CODE 6717–01–P and the instructions on the
mailed to Federal, State, and local Commission’s Web site under the ‘‘e-
agencies; public interest groups; Filing’’ link.
individuals and affected landowners DEPARTMENT OF ENERGY
who requested a copy of the final EIS or Magalie R. Salas,
provided comments during scoping; Federal Energy Regulatory Secretary.
libraries; newspapers; and parties to this Commission [FR Doc. E6–6852 Filed 5–4–06; 8:45 am]
proceeding. A limited number of [Project No. 2232–485–NC] BILLING CODE 6717–01–P
documents and CD–ROMs are available
from the Public Reference Room Duke Power, a Division of Duke Energy
identified above. In addition, hard- Corporation; Notice of Availability of DEPARTMENT OF ENERGY
copies of the document are also Draft Environmental Assessment
available for reading at public libraries Federal Energy Regulatory
along the proposed project route. April 28, 2006. Commission
In accordance with the Council on In accordance with the National
[Docket No. CP05–83–000; Docket Nos.
Environmental Quality’s (CEQ) Environmental Policy Act of 1969 and
CP05–84–000; CP05–85–000; CP05–86–000]
regulations implementing NEPA, no the Federal Energy Regulatory
agency decision on a proposed action Commission’s (Commission) Port Arthur LNG, L.P.; Port Arthur
may be made until 30 days after the U.S. regulations, 18 CFR part 380 (Order No. Pipeline, L.P.; Notice of Availability of
Environmental Protection Agency 486, 52 FR 47897), the Office of Energy the Final Environmental Impact
publishes a notice of availability of a Projects has reviewed an application for Statement and Final General
final EIS. However, the CEQ regulations non-project use of project lands and Conformity Determination for the Port
provide an exception to this rule when waters at the Catawba-Wateree Project Arthur LNG Project
an agency decision is subject to a formal (FERC No. 2232), and has prepared a
internal appeal process which allows draft environmental assessment (DEA) April 28, 2006.
other agency review or the public to for the proposal. The proposed non- The staff of the Federal Energy
make their views known. In such cases, project use would be located on Lake Regulatory Commission (FERC or
the agency decision may be made at the James in McDowell County, North Commission) has prepared this final
same time the notice of the final EIS is Carolina. Environmental Impact Statement (EIS)
published, allowing both periods to run In the application, Duke Power for the construction and operation of the
concurrently. The Commission decision (licensee) requests Commission liquefied natural gas (LNG) import
for this proposed action is subject to a authorization to lease to Black Bear terminal and natural gas pipeline
30-day rehearing period. Development, Inc. 6.57 acres of project facilities (referred to as the Port Arthur
Additional information about the land for a commercial/non-residential LNG Project or Project) as proposed by
project is available from the marina. The marina would be located on Port Arthur LNG, L.P. and Port Arthur
Commission’s Office of External Affairs, Lake James at the Bear Cliff Community, Pipeline, L.P. (collectively Sempra) in
at 1–866–208–FERC or on the FERC a planned lakefront development the above-referenced dockets.
Internet Web site (http://www.ferc.gov) combining a private residential The final EIS was prepared to satisfy
cchase on PROD1PC60 with NOTICES

using the eLibrary link. Click on the development and a public day-use area. the requirements of the National
eLibrary link, click on ‘‘General Search’’ The DEA contains the Commission Environmental Policy Act (NEPA). The
and enter the docket number excluding staff’s analysis of the probable staff concludes that approval of the Port
the last three digits in the Docket environmental impacts of the proposed Arthur LNG Project, with appropriate
Number field. Be sure you have selected marina. mitigating measures as recommended,

VerDate Aug<31>2005 18:48 May 04, 2006 Jkt 208001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\05MYN1.SGM 05MYN1
26494 Federal Register / Vol. 71, No. 87 / Friday, May 5, 2006 / Notices

would have limited adverse 32,228 lb/hr, and one direct-contact authorize the proposed Project, it would
environmental impact. The final EIS recondenser; be subject to a 30-day rehearing period.
evaluates alternatives to the proposal, • LNG transfer system to transfer LNG Additional information about the
including system alternatives, from the recondenser to the send-out Project is available from the
alternative sites for the LNG import LNG vaporizers. The transfer system Commission’s Office of External Affairs,
terminal, and pipeline alternatives. The would consist of 16 pot-mounted LNG at 1–866–208–FERC or on the FERC
final EIS also contains our final General booster pumps (two being spares) each Internet Web site (http://www.ferc.gov)
Conformity Determination. sized for 1,964 gpm; using the eLibrary link. Click on the
The purpose of the Port Arthur LNG • LNG vaporization system consisting ‘‘eLibrary’’ link, click on ‘‘General
Project is to allow access to LNG of 12 shell-and-tube LNG vaporizers Search’’ and enter the docket number
supplies and thus provide a new, stable (two being spares) each sized for 0.305 excluding the last three digits in the
source of between 1.5 and 3.0 billion Bcf/d. The heat source to the vaporizers Docket Number field. Be sure you have
cubic feet per day of natural gas to would be heated water; selected an appropriate date range. For
supplement the diminishing supplies • Hot water heating system consisting assistance, please contact FERC Online
while utilizing, to the extent practicable, of 8 gas-fired hot water heaters each Support at:
the existing natural gas pipeline sized for 348 million British thermal FERCOnlineSupport@ferc.gov or toll
infrastructure within the Gulf of Mexico units per hour (MMBtu/hr) and 6 free at 1–866–208–3676, or for TTY at
region of the U.S.; and allow natural gas centrifugal hot water circulation pumps (202) 502–8659. The eLibrary link on
delivery to markets in the Midwestern (two being spares) each sized for 11,727 the FERC Internet Web site also
and Northeastern markets by use of gpm; provides access to the texts of formal
existing interstate natural gas pipeline • Emergency vent system; LNG spill documents issued by the Commission,
systems. Sempra’s proposed facilities containment system; fire water system; such as orders, notices, and
would be constructed in two phases and fuel gas, nitrogen, instrument/plant air rulemakings.
would ultimately provide an average of and service water utility systems; Magalie R. Salas,
3.0 billion cubic feet per day of natural various hazard detection, control, and
Secretary.
gas to the existing pipeline prevention systems; and cryogenic
infrastructure in Texas and Louisiana, [FR Doc. E6–6843 Filed 5–4–06; 8:45 am]
piping, electrical, and instrumentation
and to potential other end-users in the BILLING CODE 6717–01–P
systems;
Midwestern and Northeastern natural • Utilities, buildings and support
gas markets. facilities; facilities for pig launchers and
DEPARTMENT OF ENERGY
The final EIS addresses the potential receivers; and metering facilities; and
environmental effects of the • Approximately 73 miles of 36-inch- Federal Energy Regulatory
construction and operation of the diameter natural gas pipeline and Commission
following facilities in Jefferson and associated ancillary pipeline facilities.
Orange Counties, Texas, and Cameron, The final EIS has been placed in the [Project No. 2174–012–California]
Calcasieu, and Beauregard Parishes, public files of the FERC and is available
Southern California Edison; Notice of
Louisiana: for public inspection at: Federal Energy
Availability of Final Environmental
• A protected LNG unloading slip Regulatory Commission, Public
Assessment
with ship maneuvering area (turning Reference and Files Maintenance
basin); Branch, 888 First Street, NE., Room 2A, April 27, 2006.
• LNG ship unloading system Washington, DC 20426. (202) 502–8371. In accordance with the National
consisting of two berths each consisting A limited number of copies of the Environmental Policy Act of 1969, as
of four 16-inch unloading arms and one final EIS are available from the Public amended, and the Federal Energy
16-inch vapor return arm, mooring and Reference and Files Maintenance Regulatory Commission’s (Commission
breasting dolphins, gangway tower, Branch identified above. In addition, or FERC) regulations (18 CFR part 380),
firewater monitors, service utilities and copies of the final EIS have been mailed Commission staff has reviewed the
associated valves and piping. LNG to Federal, state, and local agencies; application for license for the Portal
transfer from the ship to the on-shore elected officials; public interest groups; Hydroelectric Project (FERC No. 2174–
storage system would be through two individuals and affected landowners 012) and has prepared a final
36-inch-diameter unloading lines, one who requested a copy of the final EIS; environmental assessment (EA). The
per berth. Each berth would be sized for and parties to these proceedings. project is located on Camp 61 Creek and
an unloading rate of 17,500 cubic meters In accordance with the Council on Rancheria Creek in Fresno County,
per hour (m3/hr); although, only one Environmental Quality’s (CEQ) California.
ship would be unloaded at a time regulations implementing the NEPA, no The final EA contains the staff’s
during Phase I; agency decision on a proposed action analysis of the potential environmental
• LNG storage system consisting of a may be made until 30 days after the U.S. effects of the project and concludes that
total of six full-containment LNG Environmental Protection Agency licensing the project, with appropriate
storage tanks each with a nominal publishes a notice of availability of the environmental protective measures,
capacity of 160,000 cubic meters (m3) final EIS. However, the CEQ regulations would not constitute a major federal
(1,006,000 barrels). Each tank would be provide an exception to this rule when action that would significantly affect the
equipped with three can-type, fully an agency decision is subject to a formal quality of the human environment.
submerged LNG in-tank pumps sized for internal appeal process that allows other Before the Commission makes a
2,976 gallons per minute (gpm) each; agencies or the public to make their licensing decision, it will take into
cchase on PROD1PC60 with NOTICES

• Boil-off gas (BOG) recovery system views known. In such cases, the agency account all concerns relevant to the
consisting of 4 reciprocating BOG decision may be made at the same time public interest. The final EA will be part
compressors each sized for 13,887 as the notice of the final EIS is of the record from which the
pounds per hour (lb/hr), four integrally published, allowing both periods to run Commission will make its decision.
geared return gas blowers, each sized for concurrently. Should the Commission Copies of the final EA are available for

VerDate Aug<31>2005 18:48 May 04, 2006 Jkt 208001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\05MYN1.SGM 05MYN1

Das könnte Ihnen auch gefallen