EQUIPMENT
location
AHU
SC-5 (G)
AHU
Sl No
DONE DATE
DUE DATE
WORK DONE BY
8/14/2015
Rahees,noufal,
lukman
SC-5 (F)
8/16/2015
lukman,asifali
AHU
AHU1 (ROOF)
8/28/2015
lukman,asifali
CSU
SC 1 (G)
8/21/2015
noufal,Rahees
CSU
SC-3(G)
8/21/2015
noufal,Rahees
CSU
SC-7(G)
8/21/2015
noufal,Rahees
CSU
SC-7(T)
8/22/2015
noufal,Rahees
CSU
SC-9 (G)
8/23/2015
noufal,Rahees
CSU
SC-2 (G)
8/23/2015
Noufal,Rahees
PRIMARY PUMP 1
CHILLERPLANT
8/28/2015
Asifali,Lukman
CONDENSOR PUMP 1
CHILLERPLANT
8/30/2015
Asifali,Lukman
SECONDARY PUMP 1
CHILLERPLANT
8/22/2015
Asifali,Lukman
9
10
11
12
13
14
15
8/24/2015
AsifaliNoufal,
jyothish
8/25/2015
8/30/2015
Rahees, lukman,
jyothish
Asifali,Noufal
TERRACE
UPS ROOM
Asifali
F AUGUST-2015
REMARKS
SUPERVISOR
TECH MANAGER
ITEM
52
TFA(SC-1)
53
TFA(SC-3)
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
TFA(SC-5)
TFA(SC-7)
TFA(SC-1)
TFA(SC-3)
TFA(SC-5)
TFA(SC-7)
TFA(SC-1)
TFA(SC-3)
TFA(SC-5)
TFA(SC-7)
TFA(SC-1)
TFA(SC-3)
TFA(SC-7)
TFA(1)
TFA(2)
BASEMENT 3
A BLOCK
A BLOCK
B BLOCK
B BLOCK
C BLOCK
D BLOCK
GROUND
FLOOR
FIRST FLOOR
SECOND
FLOOR
THIRD FLOOR
ROOF TOP
EXHAUST
FANS
FRESH AIR
FANS
JET AIR
CIRCULATION
FANS
WORK DONE
BY
REMARKS
ST
SUPERVISOR
TECH
MANAGER
EQUIPMENT
location
AHU3 (ROOF)
AHU
AHU
AHU4 (ROOF)
CSU
SC 1 (S)
CSU
SC 2 (S)
CSU
SC-3(S)
CSU
SC-7(S)
CSU
SC-1(T)
CSU
COOLING TOWER FAN
MOTOR-2
SC10 (S)
ROOF TOP
10
PRIMARY PUMP 3
CHILLERPLANT
11
CONDENSOR PUMP 3
CHILLERPLANT
12
SECONDARY PUMP 3
CHILLERPLANT
13
CHILLERPLANT
14
CHILLERPLANT
13
COOLING TOWER #1
SUMP
TERRACE
14
COOLING TOWER #2
SUMP
TERRACE
15
SPLIT AC
3F ,D-BLOCK
DONE DATE
DUE DATE
WORK DONE BY
REMARKS
2015
SUPERVISOR
TECH MANAGER
location
AHU
SC-5 (S)
AHU
CSU
CSU
SC 2 (F)
CSU
SC-3(F)
CSU
SC-7(F)
CSU
SC-3(T)
CSU
SC10 (G)
Sl No
AHU2 (ROOF)
SC 1 (F)
ROOF TOP
8
PRIMARY PUMP 2
10
CONDENSOR PUMP 2
11
SECONDARY PUMP 2
CHILLERPLANT
CHILLERPLANT
CHILLERPLANT
12
CHILLERPLANT
13
TERRACE
14
TERRACE
15
SPLIT AC #1
16
SPLIT AC #2
GARBAGE ROOM
DONE DATE
DUE DATE
WORK DONE BY
REMARKS
015
SUPERVISOR
TECH MANAGER
Location
Issue
Terrace
All exhaust and ventilation fan ducting need to be completed by fixing cowl
and make the unit safe from water entering during rain
Terrace
All exhaust and ventilation fan ,TFA isolator need to be covered with proper
water proof enclosure
Terrace
Cooling tower area floor levelling work not yet completed and water is
accumulating in floor and so drain is actually only a dummy
Electrical
rooms
All floor electrical rooms, exhaust ducting work need to be lined and
completed and to give electrical connection
Terrace
Terrace
10
All AHUs in terrace floor need to fix bird mesh for the louvers and VCD to
control the fresh air
TFA supply
need
be provided inand
each
shop, tapping work not yet
Terrace
units still
nottocommissioned
operational
Terrace and completed and VCD is not fixed and air balancing need to do be done.
floor
Please note the full exercise of providing TFA & the ducting is a waste if
fresh court
air is not
from
the,exhaust,
ducting to
the store/air
Mall.
Food
stallsupplied
area both
sides
ventilation
should be
3rd floor
balanced
by providing
VCDsbe
forbalanced
each shopfor proper exhausting of air and
All toilet exhaust
air should
Terrace and avoid foul smell accumulating in rest room as TFA is not commissioned no
floors
cool air circulation in ladies area feeding room .
11
Terrace
12
Terrace
13
Terrace
14
Chiller plant Need to provide de-coupler line in chill water system for the smooth
room
operation of system
15
Chiller plant Bypass line in the secondary pumps should be removed to reduce the
room
cooling issue
16
Chiller plant
room
Repairing of primary pump #3 alignment issue need to be rectified.
7
8
9
17
Chiller plant Need to commission the secondary VFD panel by providing DP switch and
room
to work as per the load in auto
18
Terrace
Terrace area chilled water line cladding work not yet completed and need
to provide support for chilled water line
19
Plant room
Plant room flooring need to provide proper slope for easy drain of
condensate water and floor cleaning water
20
Need to provide ladder from plant room passage to cooling tower floor for
Terrace area easy operation and safety
21
Common
area
22
23
Mall inside
Commissioning and handing over of all CSUs ,AHUs and TFA with proper
check list
24
Plant room and cooling tower area debris and building scaffoldings and
Terrace area pipes need to be cleared to provide shutter to make it restricted entry
25
Terrace
26
Public area
Most of the CSU units trap doors are in dangerous condition need to
change the shutter (with light material)
27
Cooling
tower
Need to take urgent action to arrest water loss from cooling tower.
28
Terrace
Need to provide float valve on urgent basis for the HVAC make-up tank
29
Plant room
Need to provide water tap point connection in plant room for maintenance
purpose
30
Plant room
Need to provide electrical socket connection inside the plant room for
maintenance purposes
31
3rd floor
Need to complete ducting work for the game zone and make it water proof
32
Need to provide drain connection for AHU room in terrace area ,even
Terrace area though provided for unit
33
Need to provide float valve on urgent basis for the fire overhead make up
Terrace area tank
34
Mall inside
Need to provide BTU meter for all anchor shops & KFC
35
Plant room
Need to provide water treatment system for chill water and cooling
tower
36
Plant room
Need to provide BTU meter in chill water return line for getting the exact
reading
37
Need to provide covering for fire tank and HVAC tank with proper holding.
Terrace area Temporarily covered with plank
38
3rd floor
Entire common area air balancing need to be done for uniform cooling
inside the mall
Need to do necessary action for the noise issue in d-block area in 3rd floor.
Cream stone noise to be reduced.
39
Fitment of dual meters for HVAC system. The tenants & CAM needs to be
billed based on the expenditure & without meters we cannot justify the
Chiller plant expenditure.
40
41
Projects
42
Two way
valves
The two way valves close only 60%, which reduces the efficiency of the
system, effects water balancing & increase cost; correct specification two
way valves to be placed
43
Lighting
Status
Ducting work has been
completed. But not
provided the bird mesh for
safety.
Pending
Floor levelled. Completed.
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Work under progress
Pending
Pending
Pending
Pending
pending
Pending. Rain water is
entering the room
Pending
Life style fixed but not
totally commissioned
Pending
Pending
Pending
Pending
Pending
Cant lock the rooms as the
lever not operating. fire
dampers not linked with
fire alarm system
pending
Pending
Pending. Also drain line is
not provide in AHU rooms
for servicing
32
33
34
35
36
37
38
39
40
41
HVAC-Panel
MCCB-125A-ABB
MCCB-63A-ABB
MPCB-25A-ABB
MPCB-10A-ABB
40 KVA UPS
16 KVA UPS
Battery-12v-42ah
Battery-12v-65ah
ELCB+MCB-40A
Sub-Station
Diesel Generator - 1
Diesel Generator - 2
Diesel Generator - 3
ACB-6300A-1no.
ACB-4000A-4nos
ACB-2000A-1no.
Indication lamps
DEIF Control Display
Emergency Button
Selector switch (Manual/Auto)
ACB-3200A-1
Earth fault relay
Over current relay
Frequency meter
Temperature relay
Dual source meter (V/A)
ACB-1200A
ACB-1000A
ACB-1600A
MCCB-800A
MCCB-400A
Cooling Fan
Voltmeter
MCCB-630A
ACB-2500A
ACB-1250A
UPS-5kva
Battery-12v
MCB
Tube light & Fixing
Ex-haust Fan
DONE
DATE
oor
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
DUE DATE
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
MCCB-1000A-ABB
MCCB-630A-ABB
MCCB-200A-ABB
MCCB-400A-ABB
MCCB-150A-ABB
MCCB-125A-ABB
MCCB-100A-ABB
MCCB-63A-ABB
MCCB-32A-ABB
MCB-40A-ABB
MPCB-32A-ABB
MPCB-25A-ABB
MPCB-16A-ABB
MPCB-10A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Ground Floor
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
HVAC-Panel
MCCB-100A-ABB
MCCB-63A-ABB
MPCB-25A-ABB
MPCB-16A-ABB
MPCB-10A-ABB
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
1st foor
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
ACB-1000A-ABB
MCCB-630A-ABB
MCCB-400A-ABB
MCCB-320A-ABB
MCCB-200A-ABB
MCCB-125A-ABB
MCCB-100A-ABB
MCCB-80A-ABB
MCB-40A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
ACB-1000A-ABB
MCCB-800A-ABB
MCCB-400A-ABB
MCCB-200A-ABB
MCCB-125A-ABB
MCCB-63A-ABB
1st fo
2nd foor
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
2
MPCB-25A-ABB
MPCB-16A-ABB
MPCB-10A-ABB
MCB-40A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
ACB-1000A-ABB
MCCB-630A-ABB
MCCB-200A-ABB
MCCB-150A-ABB
MCCB-125A-ABB
MCCB-100A-ABB
MCCB-63A-ABB
MCCB-40A-ABB
MPCB-25A-ABB
MPCB-10A-ABB
MCB-40A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
ACB-1000A-ABB
MCCB-630A-ABB
MCCB-250A-ABB
MCCB-200A-ABB
MCCB-100A-ABB
MCCB-80A-ABB
MCCB-40A-ABB
MCB-40A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
3rd foor
134
135
136
137
138
139
140
141
142
143
144
145
146
147
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
MCB-40A-ABB
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
15w LED Light
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
ACB-1250A
MCCB-T6S-800A-ABB
MCCB-T5N-400A-ABB
MCCB-T4N-320A-ABB
MCCB-T4N-250A-ABB
Voltmeter
Dual source meter (V/A)
ACB-1000A-ABB
MCCB-T5N-630A-ABB
MCCB-T4N-160A-ABB
MCCB-T4N-100A-ABB
MCCB-T4N-125A-ABB
Tube light & Fixing
MCCB-T4N-80A-ABB
MCCB-T4N-200A-ABB
MCB-40A-L&T
MCB-32A-L&T
MCB-20A-L&T
Dual source energy meters
Dual source energy meters
MCCB-1000A-ABB
MCCB-800A-ABB
MCCB-200A-ABB
MCCB-400A-ABB
MCCB-250A-ABB
MCCB-150A-ABB
MCCB-630A-ABB
MCB-40A-L&T
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
-1basement
180
181
182
183
184
185
186
187
188
189
190
191
192
193
MCB-10A
One way Switch-5A
Socket-15A
Tube light & Fixing
230 ACB-2500A-ABB
231 ACB-1200A-ABB
232 VFD-22kw
233 MCCB-400A-SIEMENS
234 MCCB-40A-SIEMENS
235 MCCB-800A-ABB
236 MCCB-250A-ABB
237 MCCB-320A-ABB
238 MCCB-40A-ABB
239 MCCB-32A-ABB
240 MCCB-25A-ABB
241 MPCB-100A-ABB
242 MPCB-75A-ABB
243 MPCB-32A-ABB
244 MPCB-50A-ABB
245 MCCB-250A-ABB
246 MCCB-80A-ABB
247 MCCB-40A-ABB
248 MCCB-32A-ABB
249 MCCB-25A-ABB
250 Isolator-160A-L&T
251 Centrifugal chiller 650 TR , 2 Nos
252 Primary pump KW 18.5, 3 Nos
253 Secondary pump KW 30, 3 Nos
254 Condensor pump KW 45 , 3Nos
255 Make up pump for chiller, 2 Nos
256 Make up pump for cooling tower, 2 Nos
257 cooling tower fan motor,2 Nos
258 Exhaust fan, 2Nos
259 Fresh air fan,2 Nos
260 Exhaust fan
261 Fresh air fan
4th foor
226
227
228
229
st.
WORK
TECH
REMARKS
DONE BY
MANAGER