Sie sind auf Seite 1von 26

PPM FOR THE MONTH OF AUGUST-2015

EQUIPMENT

location

AHU

SC-5 (G)

AHU

Sl No

DONE DATE

DUE DATE

WORK DONE BY

8/14/2015

Rahees,noufal,
lukman

SC-5 (F)

8/16/2015

lukman,asifali

AHU

AHU1 (ROOF)

8/28/2015

lukman,asifali

CSU

SC 1 (G)

8/21/2015

noufal,Rahees

CSU

SC-3(G)

8/21/2015

noufal,Rahees

CSU

SC-7(G)

8/21/2015

noufal,Rahees

CSU

SC-7(T)

8/22/2015

noufal,Rahees

CSU

SC-9 (G)

8/23/2015

noufal,Rahees

CSU

SC-2 (G)

8/23/2015

Noufal,Rahees

PRIMARY PUMP 1

CHILLERPLANT

8/28/2015

Asifali,Lukman

CONDENSOR PUMP 1

CHILLERPLANT

8/30/2015

Asifali,Lukman

SECONDARY PUMP 1

CHILLERPLANT

8/22/2015

Asifali,Lukman

9
10
11
12

COOLING TOWER MAKE UP PUMP


CHILLERPLANT
1
8/24/2015
TERRACE

13

COOLING TOWER #1 SUMP

14
15

COOLING TOWER #2 SUMP


SPLIT AC

8/24/2015

AsifaliNoufal,
jyothish

8/25/2015
8/30/2015

Rahees, lukman,
jyothish
Asifali,Noufal

TERRACE
UPS ROOM

Asifali

F AUGUST-2015
REMARKS

Abnormal sound, vibration and


water overflow

SUPERVISOR

TECH MANAGER

PM FOR THE MONTH OF AUGUST


Sl
No

ITEM

52

TFA(SC-1)

53

TFA(SC-3)

54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

TFA(SC-5)
TFA(SC-7)
TFA(SC-1)
TFA(SC-3)
TFA(SC-5)
TFA(SC-7)
TFA(SC-1)
TFA(SC-3)
TFA(SC-5)
TFA(SC-7)
TFA(SC-1)
TFA(SC-3)
TFA(SC-7)
TFA(1)
TFA(2)
BASEMENT 3
A BLOCK
A BLOCK
B BLOCK
B BLOCK
C BLOCK
D BLOCK

DONE DATE DUE DATE

GROUND
FLOOR

FIRST FLOOR

SECOND
FLOOR

THIRD FLOOR
ROOF TOP
EXHAUST
FANS
FRESH AIR
FANS

JET AIR
CIRCULATION
FANS

WORK DONE
BY

REMARKS

ST
SUPERVISOR

TECH
MANAGER

PPM FOR THE MONTH OF OCTOBER -2015


Sl No

EQUIPMENT

location
AHU3 (ROOF)

AHU

AHU

AHU4 (ROOF)

CSU

SC 1 (S)

CSU

SC 2 (S)

CSU

SC-3(S)

CSU

SC-7(S)

CSU

SC-1(T)

CSU
COOLING TOWER FAN
MOTOR-2

SC10 (S)

ROOF TOP

10

PRIMARY PUMP 3

CHILLERPLANT

11

CONDENSOR PUMP 3

CHILLERPLANT

12

SECONDARY PUMP 3

CHILLERPLANT

13

COOLING TOWER MAKE


UP PUMP 3

CHILLERPLANT

14

COOLING TOWER MAKE


UP PUMP 4

CHILLERPLANT

13

COOLING TOWER #1
SUMP

TERRACE

14

COOLING TOWER #2
SUMP

TERRACE

15

SPLIT AC

3F ,D-BLOCK

DONE DATE

DUE DATE

WORK DONE BY

REMARKS

2015
SUPERVISOR

TECH MANAGER

PPM FOR THE MONTH OF SEPTEMBER -2015


EQUIPMENT

location

AHU

SC-5 (S)

AHU

CSU

CSU

SC 2 (F)

CSU

SC-3(F)

CSU

SC-7(F)

CSU

SC-3(T)

CSU

SC10 (G)

Sl No

AHU2 (ROOF)
SC 1 (F)

ROOF TOP
8

COOLING TOWER FAN MOTOR

PRIMARY PUMP 2

10

CONDENSOR PUMP 2

11

SECONDARY PUMP 2

CHILLERPLANT
CHILLERPLANT
CHILLERPLANT

12

COOLING TOWER MAKE UP


PUMP 12

CHILLERPLANT

13

COOLING TOWER #1 SUMP

TERRACE

14

COOLING TOWER #2 SUMP

TERRACE

15

SPLIT AC #1

16

SPLIT AC #2

GARBAGE ROOM

DONE DATE

DUE DATE

WORK DONE BY

REMARKS

015
SUPERVISOR

TECH MANAGER

HiLITE Mall-HVAC Incomplete Works-31 May 2015


(50 days post Mall opening)
Sl.
No.

Location

Issue

Terrace

All exhaust and ventilation fan ducting need to be completed by fixing cowl
and make the unit safe from water entering during rain

Terrace

All exhaust and ventilation fan ,TFA isolator need to be covered with proper
water proof enclosure

Terrace

Cooling tower area floor levelling work not yet completed and water is
accumulating in floor and so drain is actually only a dummy

Electrical
rooms

All floor electrical rooms, exhaust ducting work need to be lined and
completed and to give electrical connection

Terrace

Staircase #9,& #10 pressurisation unit ducting work need to be


completed and unit motor connection be given and the unit should be
linked with fire alarm system

Terrace

10

All AHUs in terrace floor need to fix bird mesh for the louvers and VCD to
control the fresh air
TFA supply
need
be provided inand
each
shop, tapping work not yet
Terrace
units still
nottocommissioned
operational
Terrace and completed and VCD is not fixed and air balancing need to do be done.
floor
Please note the full exercise of providing TFA & the ducting is a waste if
fresh court
air is not
from
the,exhaust,
ducting to
the store/air
Mall.
Food
stallsupplied
area both
sides
ventilation
should be
3rd floor
balanced
by providing
VCDsbe
forbalanced
each shopfor proper exhausting of air and
All toilet exhaust
air should
Terrace and avoid foul smell accumulating in rest room as TFA is not commissioned no
floors
cool air circulation in ladies area feeding room .

11

Terrace

Cooling tower water piping should be balanced need to provide balancing


valve so that both the cooling tower can be operate together for the
smooth running of chillers

12

Terrace

Cooling tower water level need to maintain automatically by providing


water level controller for the same

13

Terrace

Main chill water line BTU meter should be commissioned

14

Chiller plant Need to provide de-coupler line in chill water system for the smooth
room
operation of system

15

Chiller plant Bypass line in the secondary pumps should be removed to reduce the
room
cooling issue

16

Chiller plant
room
Repairing of primary pump #3 alignment issue need to be rectified.

7
8
9

17

Chiller plant Need to commission the secondary VFD panel by providing DP switch and
room
to work as per the load in auto

18

Terrace

Terrace area chilled water line cladding work not yet completed and need
to provide support for chilled water line

19

Plant room

Plant room flooring need to provide proper slope for easy drain of
condensate water and floor cleaning water

20

Need to provide ladder from plant room passage to cooling tower floor for
Terrace area easy operation and safety

21

Common
area

22

Plant room &


floor wise
Complete balancing of chill water circulation in entire chill water system

23

Mall inside

Commissioning and handing over of all CSUs ,AHUs and TFA with proper
check list

24

Plant room and cooling tower area debris and building scaffoldings and
Terrace area pipes need to be cleared to provide shutter to make it restricted entry

25

Terrace

Cooling tower area need to provide proper illumination especially in night

26

Public area

Most of the CSU units trap doors are in dangerous condition need to
change the shutter (with light material)

27

Cooling
tower

Need to take urgent action to arrest water loss from cooling tower.

28

Terrace

Need to provide float valve on urgent basis for the HVAC make-up tank

29

Plant room

Need to provide water tap point connection in plant room for maintenance
purpose

30

Plant room

Need to provide electrical socket connection inside the plant room for
maintenance purposes

31

3rd floor

Need to complete ducting work for the game zone and make it water proof

32

Need to provide drain connection for AHU room in terrace area ,even
Terrace area though provided for unit

33

Need to provide float valve on urgent basis for the fire overhead make up
Terrace area tank

34

Mall inside

Need to provide BTU meter for all anchor shops & KFC

35

Plant room

Need to provide water treatment system for chill water and cooling
tower

36

Plant room

Need to provide BTU meter in chill water return line for getting the exact
reading

37

Need to provide covering for fire tank and HVAC tank with proper holding.
Terrace area Temporarily covered with plank

38

3rd floor

Entire common area air balancing need to be done for uniform cooling
inside the mall

Need to do necessary action for the noise issue in d-block area in 3rd floor.
Cream stone noise to be reduced.

39

Fitment of dual meters for HVAC system. The tenants & CAM needs to be
billed based on the expenditure & without meters we cannot justify the
Chiller plant expenditure.

40

AHU Rooms All AHU rooms to be airtight

41

Projects

Detailed check list/ pre commissioning / commissioning report to be


shared.

42

Two way
valves

The two way valves close only 60%, which reduces the efficiency of the
system, effects water balancing & increase cost; correct specification two
way valves to be placed

43

Lighting

Proper lighting to be provided in all AHU rooms to ensure good


maintenance

Status
Ducting work has been
completed. But not
provided the bird mesh for
safety.
Pending
Floor levelled. Completed.
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending

Fixed level controller by


us .

BTU meter commissioned


but display not fixed
properly .BTU meter need
to insulate to avoid
sweating .pending
Pending

Pending

Pending

Pending

Pending
Pending

Pending

Pending
Pending

Pending
Pending

Pending
Work under progress

Pending
Pending
Pending
Pending

pending
Pending. Rain water is
entering the room
Pending
Life style fixed but not
totally commissioned
Pending

Pending
Pending
Pending

Pending
Cant lock the rooms as the
lever not operating. fire
dampers not linked with
fire alarm system
pending

Pending
Pending. Also drain line is
not provide in AHU rooms
for servicing

PPM FOR Electrical List.


ITEM

32
33
34
35
36
37
38
39
40
41

HVAC-Panel
MCCB-125A-ABB
MCCB-63A-ABB
MPCB-25A-ABB
MPCB-10A-ABB
40 KVA UPS
16 KVA UPS
Battery-12v-42ah
Battery-12v-65ah
ELCB+MCB-40A

Sub-Station

Diesel Generator - 1
Diesel Generator - 2
Diesel Generator - 3
ACB-6300A-1no.
ACB-4000A-4nos
ACB-2000A-1no.
Indication lamps
DEIF Control Display
Emergency Button
Selector switch (Manual/Auto)
ACB-3200A-1
Earth fault relay
Over current relay
Frequency meter
Temperature relay
Dual source meter (V/A)
ACB-1200A
ACB-1000A
ACB-1600A
MCCB-800A
MCCB-400A
Cooling Fan
Voltmeter
MCCB-630A
ACB-2500A
ACB-1250A
UPS-5kva
Battery-12v
MCB
Tube light & Fixing
Ex-haust Fan

DONE
DATE

oor

Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

DUE DATE

65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87

MCCB-1000A-ABB
MCCB-630A-ABB
MCCB-200A-ABB
MCCB-400A-ABB
MCCB-150A-ABB
MCCB-125A-ABB
MCCB-100A-ABB
MCCB-63A-ABB
MCCB-32A-ABB
MCB-40A-ABB
MPCB-32A-ABB
MPCB-25A-ABB
MPCB-16A-ABB
MPCB-10A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light

Ground Floor

ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
HVAC-Panel
MCCB-100A-ABB
MCCB-63A-ABB
MPCB-25A-ABB
MPCB-16A-ABB
MPCB-10A-ABB
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing

1st foor

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133

ACB-1000A-ABB
MCCB-630A-ABB
MCCB-400A-ABB
MCCB-320A-ABB
MCCB-200A-ABB
MCCB-125A-ABB
MCCB-100A-ABB
MCCB-80A-ABB
MCB-40A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
ACB-1000A-ABB
MCCB-800A-ABB
MCCB-400A-ABB
MCCB-200A-ABB
MCCB-125A-ABB
MCCB-63A-ABB

1st fo

Tube light & Fixing


ACB-1000A-ABB
MCCB-800A-ABB
MCCB-400A-ABB
MCCB-200A-ABB
MCCB-125A-ABB
MCCB-63A-ABB
MCB-40A-ABB
MPCB-25A-ABB
MPCB-16A-ABB
MPCB-10A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing

2nd foor

88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108

2
MPCB-25A-ABB
MPCB-16A-ABB
MPCB-10A-ABB
MCB-40A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing

148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179

ACB-1000A-ABB
MCCB-630A-ABB
MCCB-200A-ABB
MCCB-150A-ABB
MCCB-125A-ABB
MCCB-100A-ABB
MCCB-63A-ABB
MCCB-40A-ABB
MPCB-25A-ABB
MPCB-10A-ABB
MCB-40A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
ACB-1000A-ABB
MCCB-630A-ABB
MCCB-250A-ABB
MCCB-200A-ABB
MCCB-100A-ABB
MCCB-80A-ABB
MCCB-40A-ABB
MCB-40A-ABB
Dual source energy meters
ELCB+MCB-40A
ELCB+MCB-63A

3rd foor

134
135
136
137
138
139
140
141
142
143
144
145
146
147

MCB-25A
MCB-20A
MCB-10A
One way Switch-5A
Socket-15A
15w LED Light
Tube light & Fixing
MCB-40A-ABB
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A
MCB-10A
15w LED Light

194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225

ACB-1250A
MCCB-T6S-800A-ABB
MCCB-T5N-400A-ABB
MCCB-T4N-320A-ABB
MCCB-T4N-250A-ABB
Voltmeter
Dual source meter (V/A)
ACB-1000A-ABB
MCCB-T5N-630A-ABB
MCCB-T4N-160A-ABB
MCCB-T4N-100A-ABB
MCCB-T4N-125A-ABB
Tube light & Fixing
MCCB-T4N-80A-ABB
MCCB-T4N-200A-ABB
MCB-40A-L&T
MCB-32A-L&T
MCB-20A-L&T
Dual source energy meters
Dual source energy meters
MCCB-1000A-ABB
MCCB-800A-ABB
MCCB-200A-ABB
MCCB-400A-ABB
MCCB-250A-ABB
MCCB-150A-ABB
MCCB-630A-ABB
MCB-40A-L&T
ELCB+MCB-40A
ELCB+MCB-63A
MCB-25A
MCB-20A

-1basement

180
181
182
183
184
185
186
187
188
189
190
191
192
193

MCB-10A
One way Switch-5A
Socket-15A
Tube light & Fixing

230 ACB-2500A-ABB
231 ACB-1200A-ABB
232 VFD-22kw
233 MCCB-400A-SIEMENS
234 MCCB-40A-SIEMENS
235 MCCB-800A-ABB
236 MCCB-250A-ABB
237 MCCB-320A-ABB
238 MCCB-40A-ABB
239 MCCB-32A-ABB
240 MCCB-25A-ABB
241 MPCB-100A-ABB
242 MPCB-75A-ABB
243 MPCB-32A-ABB
244 MPCB-50A-ABB
245 MCCB-250A-ABB
246 MCCB-80A-ABB
247 MCCB-40A-ABB
248 MCCB-32A-ABB
249 MCCB-25A-ABB
250 Isolator-160A-L&T
251 Centrifugal chiller 650 TR , 2 Nos
252 Primary pump KW 18.5, 3 Nos
253 Secondary pump KW 30, 3 Nos
254 Condensor pump KW 45 , 3Nos
255 Make up pump for chiller, 2 Nos
256 Make up pump for cooling tower, 2 Nos
257 cooling tower fan motor,2 Nos
258 Exhaust fan, 2Nos
259 Fresh air fan,2 Nos
260 Exhaust fan
261 Fresh air fan

4th foor

226
227
228
229

st.
WORK
TECH
REMARKS
DONE BY
MANAGER

Das könnte Ihnen auch gefallen