Sie sind auf Seite 1von 2

Federal Register / Vol. 71, No.

75 / Wednesday, April 19, 2006 / Notices 20085

Applicant. If an agency does not file license Article 405 for non-irrigation A copy of the application may be
comments within the time specified for season releases from Lake McConaughy obtained by agencies directly from the
filing comments, it will be presumed to for diversion at the Keystone Diversion Applicant. If an agency does not file
have no comments. One copy of an Dam. comments within the time specified for
agency’s comments must also be sent to l. Locations of the Application: A of filing comments, it will be presumed to
the Applicant’s representatives. the application is available for have no comments. One copy of an
q. Comments, protests, and inspection and reproduction at the agency’s comments must also be sent to
interventions may be filed electronically Commission’s Public Reference Room, the Applicant’s representatives.
via the Internet in lieu of paper. See, 18 located at 888 First Street, NE, Room q. Comments, protests and
CFR 385.2001(a)(1)(iii) and the 2A, Washington, DC 20426, or by calling interventions may be filed electronically
instructions on the Commission’s Web (202) 502–8371. This filing may also be via the Internet in lieu of paper. See, 18
site at http://www.ferc.gov under the ‘‘e- viewed on the Commission’s Web site at CFR 385.2001(a)(1)(iii) and the
Filing’’ link. http://www.ferc.gov using the instructions on the Commission’s Web
‘‘eLibrary’’ link. Enter the docket site at http://www.ferc.gov under the ‘‘e-
Magalie R. Salas, number excluding the last three digits in Filing’’ link.
Secretary. the docket number field to access the
[FR Doc. E6–5820 Filed 4–18–06; 8:45 am] document. You may also register online Magalie R. Salas,
BILLING CODE 6717–01–P at http://www.ferc.gov/docs-filing/ Secretary.
esubscription.asp to be notified via [FR Doc. E6–5821 Filed 4–18–06; 8:45 am]
email of new filings and issuances BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY related to this or other pending projects.
For assistance, call 1–866–208–3676 or
Federal Energy Regulatory e-mail FERCOnlineSupport@ferc.gov, DEPARTMENT OF ENERGY
Commission for TTY, call (202) 502–8659. A copy is
also available for inspection and Federal Energy Regulatory
Notice of Application for a Waiver of Commission
reproduction at the address in item (h)
Releases Under Article 405 of License
above.
for the 2005–2006 Water Year and m. Individuals desiring to be included Notice of Application for Non-Project
Soliciting Comments, Motions to on the Commission’s mailing list should Use of Project Lands and Waters and
Intervene, and Protests so indicate by writing to the Secretary Soliciting Comments, Motions to
of the Commission. Intervene, and Protests
April 12, 2006.
Take notice that the following n. Comments, Protests, or Motions to April 12, 2006.
hydroelectric application has been filed Intervene—Anyone may submit Take notice that the following
with the Commission and is available comments, a protest, or a motion to application has been filed with the
for public inspection: intervene in accordance with the Commission and is available for public
a. Type of Application: Request for a requirements of Rules of Practice and inspection:
waiver of non-irrigation releases under Procedure, 18 CFR 385.210, .211, .214. a. Application Type: Non-Project Use
Article 405 of the license for the water In determining the appropriate action to Of Project Lands And Waters.
year 2005–2006. take, the Commission will consider all b. Project No: 2165–024.
b. Project No: P–1417–178. protests or other comments filed, but c. Date Filed: April 5, 2006.
c. Date Filed: April 5, 2006. only those who file a motion to d. Applicant: Alabama Power
d. Applicant: Central Nebraska Public intervene in accordance with the Company.
Power & Irrigation District. Commission’s Rules may become a e. Name of Project: The Warrior River
e. Name of Project: Kingsley Dam party to the proceeding. Any comments, Project, which includes the Smith Dam
Project. protests, or motions to intervene must development.
f. Location: The project is located on be received on or before the specified f. Location: The proposed action will
the North Platte and Platte Rivers in comment date for the particular take place at the Smith Dam
Garden, Keith, Lincoln, Dawson, and application. development at the Mallard Point
Gosper Counties in south-central o. Filing and Service of Responsive Marina on the south side of Simpson
Nebraska. Documents—Any filings must bear in Creek, which is located in Cullman
g. Pursuant to: Federal Power Act, 16 all capital letters the title County, Alabama approximately 18
U.S.C. 791a–825r. ‘‘COMMENTS’’, stream miles above the Smith Dam.
h. Applicant Contact: Mr. Mike Drain, ‘‘RECOMMENDATIONS FOR TERMS g. Filed Pursuant to: Federal Power
Natural Resources Supervisor, Central AND CONDITIONS’’, ‘‘PROTEST’’, OR Act, 16 U.S.C. 791(a) 825(r) and sections
Nebraska Public Power and Irrigation ‘‘MOTION TO INTERVENE’’, as 799 and 801.
District, 415 Lincoln Street, P.O. Box applicable, and the Project Number of h. Applicant Contact: Mr. Keith E.
740, Holdrege, NE 68949; (308) 995– the particular application to which the Bryant, Sr. Engineer; Alabama Power
8601. filing refers. All documents (original Company Hydro Services; 600 18th
i FERC Contact: Any questions on this and eight copies) should be filed with: Street North, Birmingham, AL 35203;
notice should be addressed to Mr. Magalie R. Salas, Secretary, Federal (205) 257–1403.
Vedula Sarma at (202) 502–6190, or e- Energy Regulatory Commission, 888 i. FERC Contact: Any questions on
mail address: vedula.sarma@ferc.gov. First Street, NE., Washington DC 20426. this notice should be addressed to
j. Deadline for filing comments and or A copy of any motion to intervene must Lesley Kordella at (202) 502–6406, or by
motions: April 27, 2006. also be served upon each representative e-mail: Lesley.Kordella@ferc.gov.
cchase on PROD1PC60 with NOTICES

k. Description of Request: Because of of the Applicant specified in the j. Deadline for filing comments and or
prolonged and severe drought, Nebraska particular application. motions: May 1, 2006.
Public Power and Irrigation District p. Agency Comments—Federal, state, All documents (original and eight
requests a waiver, for the water year and local agencies are invited to file copies) should be filed with: Ms.
2005–2006, of a requirement under comments on the described application. Magalie R. Salas, Secretary, Federal

VerDate Aug<31>2005 17:09 Apr 18, 2006 Jkt 208001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\19APN1.SGM 19APN1
20086 Federal Register / Vol. 71, No. 75 / Wednesday, April 19, 2006 / Notices

Energy Regulatory Commission, 888 ‘‘COMMENTS’’, Regulatory Commission, 888 First


First Street, NE., Washington DC 20426. ‘‘RECOMMENDATIONS FOR TERMS Street, NE, Washington, DC 20426.
Please include the project number (P– AND CONDITIONS’’, ‘‘PROTEST’’, OR Comments, protests, and interventions
2165–024) on any comments or motions ‘‘MOTION TO INTERVENE’’, as may be filed electronically via the
filed. Comments, protests, and applicable, and the Project Number of Internet in lieu of paper. See, 18 CFR
interventions may be filed electronically the particular application to which the 385.2001(a)(1)(iii) and the instructions
via the internet in lieu of paper. See, 18 filing refers. A copy of any motion to on the Commission’s website under the
CFR 385.2001(a)(1)(iii) and the intervene must also be served upon each ‘‘e-Filing’’ link. Please reference
instructions on the Commission’s Web representative of the Applicant ‘‘Wallace Dam Project, FERC Project No.
site under the ‘‘e-Filing’’ link. The specified in the particular application. 2413–077’’ on any comments or motions
Commission strongly encourages e- p. Agency Comments—Federal, state, filed.
filings. and local agencies are invited to file k. GP requests Commission approval
k. Description of Request: The comments on the described to permit Rochester and Associates, Inc.
licensee has requested Commission applications. A copy of the applications to construct three docks (two 10-slip
approval to replace three damaged boat may be obtained by agencies directly boat docks and one 4-slip fuel dock)
docks at the existing Mallard Point from the Applicant. If an agency does totaling 24 slips. GP is also proposing to
Marina with two refurbished floating not file comments within the time construct a storage facility for 500 boats
boat dock structures, and increase the specified for filing comments, it will be on adjoining non-project lands, and an
number of fuel pumping locations on a presumed to have no comments. One associated concrete boat drop-off
fuel dock from one to four. The total copy of an agency’s comments must also platform on project waters. The licensee
number of docks would be reduced from be sent to the Applicant’s states any required dredging would be
four to three, and the total number of representatives. permitted by GP, consistent with
slips would be reduced from 92 to 66. current permitting limitations. The
The footprint of the existing marina Magalie R. Salas, facilities would be available for the
would be reduced from 30,368 square Secretary. private use of residents of Vintage
feet to 22,830 square feet. In addition, a [FR Doc. E6–5822 Filed 4–18–06; 8:45 am] Communities development.
small store would be located on the fuel BILLING CODE 6717–01–P l. Locations of the Application: This
dock to provide service to boaters. There filing is available for review at the
would be no dredging during Commission in the Public Reference
construction and the boat dock structure DEPARTMENT OF ENERGY Room or may be viewed on the
would be constructed on land and Commission’s Web site at http://
floated into place. Federal Energy Regulatory www.ferc.gov using the ‘‘e-library’’ link.
l. Location of the Application: This Commission Enter the docket number excluding the
filing is available for review at the last three digits in the docket number
Commission or may be viewed on the Notice of Application for Non-Project field to access the document. For
Commission’s Web site at http:// Use of Project Lands and Soliciting assistance, please contact FERC Online
www.ferc.gov, using the ‘‘eLibrary’’ link. Comments, Motions to Intervene, and Support at
Enter the docket number excluding the Protests FERCOnlineSupport@ferc.gov or toll-
last three digits in the docket number April 12, 2006. free at (866) 208–3676, or for TTY,
field to access the document. For Take notice that the following contact (202) 502–8659. A copy is also
assistance, contact FERC Online hydroelectric application has been filed available for inspection and
Support at with the Commission and is available reproduction at the address in item (h)
FERCOnlineSupport@ferc.gov or toll- for public inspection: above.
free at (866) 208–3676, or for TTY, a. Application Type: Non-project use m. Individuals desiring to be included
contact (202) 502–8659. of project lands and waters. on the Commission’s mailing list should
m. Individuals desiring to be included b. Project No.: 2413–077. so indicate by writing to the Secretary
on the Commission’s mailing list should c. Date Filed: March 17, 2006. of the Commission.
so indicate by writing to the Secretary d. Applicant: Georgia Power Company n. Comments, Protests, or Motions to
of the Commission. (GP). Intervene—Anyone may submit
n. Comments, Protests, or Motions to e. Name of Project: Wallace Dam comments, a protest, or a motion to
Intervene—Anyone may submit Project. intervene in accordance with the
comments, a protest, or a motion to f. Location: The project is located on requirements of Rules of Practice and
intervene in accordance with the the Oconee River in Green County, Procedure, 18 CFR 385.210, .211, .214.
requirements of Rules of Practice and Georgia. The project does not occupy In determining the appropriate action to
Procedure, 18 CFR 385.210, .211, .214. any Federal or tribal lands. take, the Commission will consider all
In determining the appropriate action to g. Filed Pursuant to: Federal Power protests or other comments filed, but
take, the Commission will consider all Act 16 U.S.C. 791(a)–825(r). only those who file a motion to
protests or other comments filed, but h. Applicant Contact: Lee Glenn, Lake intervene in accordance with the
only those who file a motion to Resources Manager, Georgia Power Commission’s Rules may become a
intervene in accordance with the Company, 125 Wallace Dam Road NE, party to the proceeding. Any comments,
Commission’s Rules may become a Eatonton, GA 31024. Phone: (706) 485– protests, or motions to intervene must
party to the proceeding. Any comments, 8704. be received on or before the specified
protests, or motions to intervene must i. FERC Contact: Gina Krump, comment date for the particular
be received on or before the specified gina.krump@ferc.gov, 202–502–6704. application.
cchase on PROD1PC60 with NOTICES

comment date for the particular j. Deadline for filing comments and or o. Filing and Service of Responsive
application. motions: May 12, 2006. Documents—Any filings must bear in
o. Filing and Service of Responsive All documents (original and eight all capital letters the title
Documents—Any filings must bear in copies) should be filed with Ms. Magalie ‘‘COMMENTS’’,
all capital letters the title R. Salas, Secretary, Federal Energy ‘‘RECOMMENDATIONS FOR TERMS

VerDate Aug<31>2005 17:09 Apr 18, 2006 Jkt 208001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\19APN1.SGM 19APN1

Das könnte Ihnen auch gefallen