19882 Federal Register / Vol. 71, No.

74 / Tuesday, April 18, 2006 / Notices

DEPARTMENT OF ENERGY Reference Room in Washington, DC. Commission issues someone else a
There is an ‘‘eSubscription’’ link on the license for the project or otherwise
Federal Energy Regulatory Web site that enables subscribers to orders disposition of the project.
Commission receive e-mail notification when a If the project is subject to section 15
[Docket No. RP06–177–001 and 002] document is added to a subscribed of the FPA, notice is hereby given that
docket(s). For assistance with any FERC an annual license for Project No. 199 is
Iroquois Gas Transmission System, Online service, please e-mail issued to South Carolina Public Service
L.P.; Notice of Compliance Filing FERCOnlineSupport@ferc.gov, or call Authority for a period effective April 1,
(866) 208–3676 (toll free). For TTY, call 2006 through March 31, 2007, or until
April 11, 2006. (202) 502–8659. the issuance of a new license for the
Take notice that on April 3, 2006, project or other disposition under the
replacing the March 30, 2006, filing in Magalie R. Salas,
FPA, whichever comes first. If issuance
Docket No. RP06–177–001, Iroquois Gas Secretary. of a new license (or other disposition)
Transmission System, L.P. (Iroquois) [FR Doc. E6–5733 Filed 4–17–06; 8:45 am] does not take place on or before March
tendered for filing as part of its FERC BILLING CODE 6717–01–P 1, 2007, notice is hereby given that,
Gas Tariff, First Revised Volume No. 1, pursuant to 18 CFR 16.18(c), an annual
the following revised sheet to be license under section 15(a)(1) of the
effective five days after the date Iroquois DEPARTMENT OF ENERGY FPA is renewed automatically without
notifies the Commission that it intends further order or notice by the
to implement Hub Service: Federal Energy Regulatory
Commission, unless the Commission
Commission
Substitute Second Revised Sheet No. 60E orders otherwise.
Alternate Substitute Second Revised Sheet [Project No. 199] If the project is not subject to section
No. 60E 15 of the FPA, notice is hereby given
Original Sheet 60F South Carolina Public Service that South Carolina Public Service
Authority; Notice of Authorization for Authority of Berkeley, Calhoun,
Iroquois states that it has learned that Continued Project Operation
the revised tariff sheets (Substitute Clarendon, Orangeburg, and Sumter
Second Revised Sheet No. 60E and Alt. April 11, 2006. Counties, South Carolina, is authorized
Substitute Second Revised Sheet No. On November 20, 2000, South to continue operation of the Santee
60E) submitted in the March 30, 2006 Carolina Public Service Authority, Cooper Project No. 199 until such time
compliance filing inadvertently licensee for the Santee Cooper as the Commission acts on its
contained the subject language in Hydroelectric Project No. 199, filed an application for subsequent license.
subsection (b) to section 5 of its General application for a new or subsequent Magalie Salas,
Terms & Conditions rather than license pursuant to the Federal Power Secretary.
subsection (a) to section 5. Act (FPA) and the Commission’s [FR Doc. E6–5729 Filed 4–17–06; 8:45 am]
Iroquois states that copies of its filing regulations. Project No. 199 is located BILLING CODE 6717–01–P
were served on all jurisdictional on the Santee and Cooper Rivers, in
customers and interested state Berkeley, Calhoun, Clarendon,
regulatory agencies and all parties to the Orangeburg, and Sumter Counties, DEPARTMENT OF ENERGY
proceeding. South Carolina.
Any person desiring to protest this The license for Project No. 199 was Federal Energy Regulatory
filing must file in accordance with Rule issued for a period ending March 31, Commission
211 of the Commission’s Rules of 2006. Section 15(a)(1) of the FPA, 16
[Docket No. CP06–114–000]
Practice and Procedure (18 CFR U.S.C. 808(a)(1), requires the
385.211). Protests to this filing will be Commission, at the expiration of a Southern Natural Gas Company;
considered by the Commission in license term, to issue from year to year Notice of Application
determining the appropriate action to be an annual license to the then licensee
taken, but will not serve to make under the terms and conditions of the April 11, 2006.
protestants parties to the proceeding. prior license until a new license is Take notice that on April 3, 2006,
Such protests must be filed in issued, or the project is otherwise Southern Natural Gas Company
accordance with the provisions of disposed of as provided in section 15 or (Southern), P.O. Box 2563, Birmingham,
section 154.210 of the Commission’s any other applicable section of the FPA. Alabama 35202–2563, filed in Docket
regulations (18 CFR 154.210). Anyone If the project’s prior license waived the No. CP06–114–000 an application
filing a protest must serve a copy of that applicability of section 15 of the FPA, pursuant to section 7(b) of the Natural
document on all the parties to the then, based on section 9(b) of the Gas Act (NGA), as amended, for
proceeding. Administrative Procedure Act, 5 U.S.C. authorization to abandon in place
The Commission encourages 558(c), and as set forth at 18 CFR certain pipeline and appurtenant
electronic submission of protests in lieu 16.21(a), if the licensee of such project facilities in Douglas and Fulton County,
of paper using the ‘‘eFiling’’ link at has filed an application for a subsequent Georgia, all as more fully set forth in the
http://www.ferc.gov. Persons unable to license, the licensee may continue to application which is on file with the
file electronically should submit an operate the project in accordance with Commission and open to public
original and 14 copies of the protest to the terms and conditions of the license inspection. This filing may also be
the Federal Energy Regulatory after the minor or minor part license viewed on the Commission’s Web site at
hsrobinson on PROD1PC68 with NOTICES

Commission, 888 First Street, NE., expires, until the Commission acts on http://www.ferc.gov using the
Washington, DC 20426. its application. If the licensee of such a ‘‘eLibrary’’ link. Enter the docket
This filing is accessible on-line at project has not filed an application for number, excluding the last three digits,
http://www.ferc.gov, using the a subsequent license, then it may be in the docket number field to access the
‘‘eLibrary’’ link and is available for required, pursuant to 18 CFR 16.21(b), document. For assistance, call (202)
review in the Commission’s Public to continue project operations until the 502–8659 or TTY, (202) 208–3676.

VerDate Aug<31>2005 15:03 Apr 17, 2006 Jkt 208001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\18APN1.SGM 18APN1