Sie sind auf Seite 1von 2

Federal Register / Vol. 71, No.

67 / Friday, April 7, 2006 / Notices 17929

to establish clearance for an evaluation 1. Abstract expanding research on effective STEM


of the Teacher Professional Continuum The National Science Foundation teaching and teacher learning,
(TPC) to assess how well the TPC (NSF) requests a three-year clearance for developing professional resources of
program is meeting its intended goals. research, evaluation and data collection STEM teachers and those who educate
In accordance with the requirement of (e.g. surveys and interviews) from them, and strengthening the STEM
Section 3506(c)(2)(A) of the Paperwork stakeholders in the Teacher Professional education infrastructure? (4) What has
Reduction Act of 1995, we are providing Continuum (TPC) Program. TPC facilitated the accomplishment or
opportunity for public comment on this stakeholders typically are limited to progress towards outcomes?
action. After obtaining and considering faculty and administrators from A series of surveys and interviews
public comment, NSF will prepare the universities and not-for-profit will be employed to answer these
submission requesting OMB clearance institutions (e.g., museums, non-degree questions, along with the visits. Data
of this collection for no longer than 3 granting educational or research sources will include a review of
years. institutions), K–12 educators, and literature and resources, a review of
Comments: Comments are invited on: former NSF employees and grantee portfolios (including proposals,
(a) Whether the proposed collection of intergovernmental personnel act (IPA) products and annual reports), surveys of
information is necessary for the proper appointees. This data collection will be TPC Principal Investigators (PIs),
performance of the functions of the the first time the NSF has evaluated the interviews with PIs and other grant staff,
agency, including whether the TPC Program. and extend grant documentation.
information shall have practical utility; K–12 Science, Technology, NSF will use the TPC program
(b) the accuracy of the Agency’s Engineering, and Mathematics (STEM) evaluation data and analyses to respond
estimate of the burden of the proposed teachers and pre-service teacher to requests from Committees of Visitors
collection of information; (c) ways to candidates have inadequate content (COV), Congress and the Office of
enhance the quality, utility, and clarity knowledge and experience high rates of Management and Budget, particularly as
of the information on respondents, teacher turnover that threaten student related to the Government Performance
including through the use of automated learning and the STEM teacher and Results Act (GPRA) and the
collection techniques or other forms of workforce. The current STEM Program Effectiveness Rating Tool
information technology; and (d) ways to knowledge base and infrastructure is ill (PART). NSF will also use the program
minimize the burden of the collection of equipped to respond to this crisis. In evaluation to improve communication
information on respondents, including response, the TPC Program is designed with TPC stakeholders and to share the
through the use of automated collection to expand research on effective STEM broader impacts of the TPC program
techniques or other forms of information teaching and teacher learning; develop with the general public.
technology. professional resources for STEM Respondents: Individuals or
teachers and those who educate them; households, business or other for profit,
DATES: Written comments should be and not-for-profit institutions.
received by June 6, 2006 to be assured and strengthen the infrastructure that
supports the STEM profession. Estimated Number of Respondents:
of consideration. Comments received 143.
after that date would be considered to Recognizing that teacher professional
development is comprised of a sequence Burden on the Public: 1100 hours.
the extent practicable.
of experiences that spans teachers’ Dated: April 3, 2006.
ADDRESSES: Written comments professional careers, the TPC program Suzanne H. Plimpton,
regarding the information collection and awards grants to researchers addressing Reports Clearance Officer, National Science
requests for copies of the proposed pre-service training, new teacher Foundation.
information collection request should be induction, and in-service professional [FR Doc. 06–3334 Filed 4–6–06; 8:45 am]
addressed to Suzanne Plimpton, Reports development. For specific details and BILLING CODE 7555–01–M
Clearance Officer, National Science the most updated information regarding
Foundation, 4201 Wilson Blvd., Rm. TPC program operations, please visit the
295, Arlington, VA 22230, or by e-mail NSF Web site at: http://www.nsf.gov/
to splimpto@nsf.gov. NATIONAL TRANSPORTATION
funding/pgm_summ.jsp?pims_id=12785
SAFETY BOARD
FOR FURTHER INFORMATION CONTACT: =ESIE&from=home.
Suzanne Plimpton at (703) 292–7556 or Abt Associates Inc. has been awarded Information Collection Request;
send e-mail to splimpto@nsf.gov. a three-year contract to assess how well Submission for OMB Review;
Individuals who use a the TPC program is meeting its intended Comment Request
telecommunications device for the deaf goals and to examine the program’s
(TDD) may call the Federal Information contribution to the knowledge base for The National Transportation Safety
Relay Service (FIRS) at 1–800–877–8339 each stage of the teacher professional Board intends to submit the following
between 8 a.m. and 8 p.m., Eastern time, continuum. This theory-based (see below) public information
Monday through Friday. evaluation will construct a conceptual collection request (ICR) to the Office of
model outlining how the TPC Program Management and Budget (OMB) for
SUPPLEMENTARY INFORMATION: Request
is intended to work, and then use a review and clearance under the
for Clearance for Program Evaluation of
mixed-methods approach to assess paperwork reduction Act of 1995 (Pub.
the National Science Foundation’s
observed program implementation and L. 104–13, 44 U.S.C. Chapter 35). OMB
(NSF) Teacher Professional Continuum
outcomes against the desired model. approval is being requested
(TPC).
The study will answer the questions: (1) concurrently with this submission. A
Title of Collection: Evaluation of the How does the TPC program work? (2) copy of this individual ICR, with
wwhite on PROD1PC61 with NOTICES

National Science Foundation’s Teacher How are TPC resources allocated and applicable supporting documentation,
Professional Continuum (TPC) Program. what is the relationship between may be obtained by calling the National
OMB Control No.: 3145–NEW. allocated resources and project results? Transportation Safety Board Records
Expiration Date of Approval: Not (3) To what extent is the TPC program Management Officer, Ms. Melba Moye,
applicable. meeting its stated outcomes of at (202) 314–6551.

VerDate Aug<31>2005 19:13 Apr 06, 2006 Jkt 208001 PO 00000 Frm 00125 Fmt 4703 Sfmt 4703 E:\FR\FM\07APN1.SGM 07APN1
17930 Federal Register / Vol. 71, No. 67 / Friday, April 7, 2006 / Notices

Written comments and questions to, a collection of information unless it For the Nuclear Regulatory Commission.
about the ICR should be sent within 30 displays a currently valid OMB control Brenda Jo. Shelton,
days of publication of this notice to number. NRC Clearance Officer, Office of Information
Alex Hunt, OMB Desk Officer, FAX 1. Type of submission, new, revision, Services.
number (202) 395–6974, or or extension: Extension. [FR Doc. 06–3363 Filed 4–6–06; 8:45 am]
ahunt@omb.eop.gov. 2. The title of the information BILLING CODE 7590–01–P
Agency: National Transportation collection: Billing Instructions for NRC
Safety Board. Cost Type Contracts.
Title: Pilot/Operator Aircraft 3. The form number if applicable: N/ NUCLEAR REGULATORY
Accident/Incident Report. A. COMMISSION
OMB Number: 3147–0001. 4. How often the collection is
Frequency: On Occasion. required: Monthly and on occasion. Agency Information Collection
Affected Public: Individuals, 5. Who will be required or asked to Activities: Submission for the Office of
Businesses (for and not for profit), report: NRC Contractors. Management and Budget (OMB)
Governments (State, Local, and Tribal). 6. An estimate of the number of Review; Comment Request
Number of Respondents: 2100. annual responses: 2,140. AGENCY: U.S. Nuclear Regulatory
Estimated time per respondent: 60 7. The estimated number of annual Commission (NRC).
minutes. respondents: 55.
ACTION: Notice of the OMB review of
Total Burden Hours: 2100. 8. An estimate of the total number of
Description: The National hours needed annually to complete the information collection and solicitation
Transportation Safety Board is required requirement or request: 1,070 hours (754 of public comment.
to investigate aviation accidents and hours billing and 316 hours, License Fee SUMMARY: The NRC recently has
certain incidents as stated in the 49 Recovery Cost). submitted to OMB for review the
Code of Federal Regulations Part 830. 9. An indication of whether Section following proposal for the collection of
Entities having a reportable accident/ 3507(d), Pub. L. 104–13 applies: N/A. information under the provisions of the
incident are required to report the 10. Abstract: In administering its Paperwork Reduction Act of 1995 (44
details pertaining to the event to the contracts, the NRC Division of Contracts U.S.C. Chapter 35). The NRC hereby
Safety Board. To ensure pertinent data provides billing instructions for its informs potential respondents that an
is collected, the Board uses a standard contractors to follow in preparing agency may not conduct or sponsor, and
form for reporting the accident/incident. invoices. These instructions stipulate that person is not required to respond
The National Transportation Safety the level of detail in which supporting to, a collection of information unless it
Board is seeking clearance to use the data must be submitted for NRC review. displays a currently valid OMB control
Pilot/Operator Aircraft Accident/ The review of this information ensures number.
Incident Report to help determine the that all payments made by NRC for valid 1. Type of submission, new, revision,
facts, conditions, and circumstances of and reasonable costs are in accordance or extension: Revision.
aviation accidents/incidents in order to with the contract terms and conditions. 2. The title of the information
facilitate strategies and maintain A copy of the final supporting collection: NRC Form 7, ‘‘Application
statistics on aviation safety. statement may be viewed free of charge for NRC Export/Import License,
Dated: March 31, 2006. at the NRC Public Document Room, One Amendment, or Renewal,’’ formerly,
Candi Bing,
White Flint North, 11555 Rockville ‘‘Application for License to Export
Pike, Room O–1 F21, Rockville, MD Nuclear Equipment and Material.’’
Acting Federal Register Liaison Officer.
20852. OMB clearance requests are 3. The form number if application:
[FR Doc. 06–3345 Filed 4–6–06; 8:45 am] available at the NRC worldwide Web NRC Form 7.
BILLING CODE 7533–01–M site: http://www.nrc.gov/public-involve/ 4. How often is the collection
doc-comment/omb/index.html. The required: On occasion; for each separate
document will be available on the NRC export, import, amendment, or renewal
NUCLEAR REGULATORY home page site for 60 days after the license application, and for exports of
COMMISSION signature date of this notice. incidental radioactive material using
Comments and questions should be existing general licenses.
Agency Information Collection directed to the OMB reviewer listed
Activities: Submission for the Office of 5. Who is required or asked to report:
below by May 8, 2006. Comments Any person in the U.S. who wishes to
Management and Budget (OMB) received after this date will be
Review; Comment Request export or import (a) Nuclear material
considered if it is practical to do so, but and equipment subject to the
AGENCY: U. S. Nuclear Regulatory assurance of consideration cannot be requirements of a specific license; (b)
Commission (NRC). given to comments received after this amend a license; (c) renew a license,
date. and (d) for notification of incidental
ACTION: Notice of the OMB review of
John A. Asalone, Office of Information radioactive material exports that are
information collection and solicitation
and Regulatory Affairs (3150–0109), contaminants of shipments of more than
of public comment.
NEOB–10202, Office of Management 100 kilograms of non-waste material
SUMMARY: The NRC has recently and Budget, Washington, DC 20503. using existing NRC general licenses.
submitted to OMB for review the Comments can also be e-mailed to 6. An estimate of the number of
following proposal for the collection of John_A._Asalone@omb.eop.gov or responses: 319.
information under the provisions of the submitted by telephone at (202) 395– 7. The number of annual respondents:
wwhite on PROD1PC61 with NOTICES

Paperwork Reduction Act of 1995 (44 4650. 319.


U.S.C. Chapter 35). The NRC hereby The NRC Clearance Officer is Brenda 8. The number of hours needed
informs potential respondents that an Jo. Shelton, 301–415–7233. annually to complete the requirement or
agency may not conduct or sponsor, and Dated at Rockville, Maryland, this 29th day request: 788 hours (2.4 hours per
that a person is not required to respond of March, 2006. response).

VerDate Aug<31>2005 19:13 Apr 06, 2006 Jkt 208001 PO 00000 Frm 00126 Fmt 4703 Sfmt 4703 E:\FR\FM\07APN1.SGM 07APN1

Das könnte Ihnen auch gefallen