Sie sind auf Seite 1von 1

14678 Federal Register / Vol. 71, No.

56 / Thursday, March 23, 2006 / Notices

Statement. The supplement would supplement to the environmental Dated: March 16, 2006.
clarify and add more detail to the impact statement will be prepared for Anne F. Archie,
cumulative effects analysis regarding comment. The comment period on the Forest Supervisor, Chequamegon-Nicolet
certain Regional Forester Sensitive draft statement will be 45 days from the National Forest.
Species that may be affected by the date the Environmental Protection [FR Doc. 06–2796 Filed 3–22–06; 8:45am]
actions considered in the original Agency publishes the notice of BILLING CODE 3410–11–M
Environmental Impact Statement. availability in the Federal Register. The
DATES: Comments concerning the scope Forest Service believes, at this early
of the analysis must be received by May stage, it is important to give reviewers DEPARTMENT OF AGRICULTURE
15, 2006 in order to be fully considered notice of several court rulings related to
in preparing this supplemental Forest Service
public participation in the
statement. The draft supplemental environmental review process. Sierra County, CA, Resource Advisory
environmental impact statement is
First, reviewers of draft Committee
expected July, 2006 and the final
supplemental environmental impact environmental impact statements must
AGENCY: Forest Service, USDA.
statement is expected September, 2006. structure their participation in the
environmental review of the proposal so ACTION: Notice of Meeting.
ADDRESSES: Send written comments to
Anne F. Archie, Forest Supervisor, that it is meaningful and alerts an SUMMARY: The Sierra County Resource
Chequamegon-Nicolet National Forest, agency to the reviewer’s position and Advisory Committee (RAC) will meet on
1170 4th Avenue S, Park Galls, WI contentions. Vermont Yankee Nuclear April 5, 2006, in Downieville,
54552. Power Corp. v. NRDC, 435 U.S. 519, 553 California. The purpose of the meeting
(1978). Also, environmental objections is to discuss issues relating to
FOR FURTHER INFORMATION CONTACT:
Brian Quinn, Forest Environmental that could be raised at the draft implementing the Secure Rural Schools
Coordinator, (see address above). supplemental environmental impact and Community Self-Determination Act
statement stage but that are not raised of 2000 (Payments to States) and the
SUPPLEMENTARY INFORMATION:
Purpose and Need for Action: The until after completion of the final expenditure of Title II funds benefiting
purpose of the Cayuga Project is to move supplemental environmental impact National Forest System lands on the
the structure and cover of the existing statement may be waived or dismissed Humboldt-Toiyabe, Plumas and Tahoe
forest closer to desired conditions by the courts. City of Angoon v. Hodel, National Forests in Sierra County.
described in the 2004 Nicolet National 803 F.2d 1016, 1022 (9th Cir. 1986) and DATES: The meeting will be held
Forest Plan. A concurrent purpose is to Wisconsin Heritages, Inc. v. Harris, 490 Wednesday, April 5, 2006 at 10 a.m.
eliminate unneeded roads and manage F. Supp. 1334, 1338 (E.D. Wis. 1980). ADDRESSES: The meeting will be held at
needed roads in a more efficient and Because of these court rulings, it is very the Community Hall, Downieville, CA.
effective way. important that those interested in this FOR FURTHER INFORMATION CONTACT: Ann
Proposed Action: The major actions proposed action participate by the close Westling, Committee Coordinator,
would use commercial timber harvest, of the 45-day comment period so that USDA, Tahoe National Forest, 631
non-commercial vegetation substantive comments and objections Coyote St, Nevada City, CA, 95959,
management, road closure and road are made available to the Forest Service (530) 478–6205, e-mail:
decommissioning to achieve the at a time when it can meaningfully awestling@fs.fed.us.
purpose and need. consider them and respond to them in
Responsible Official: Anne F. Archie, the final environmental impact SUPPLEMENTARY INFORMATION: Agenda
Forest Supervisor, Chequamegon- statement. To assist the Forest Service items to be covered include: (1)
Nicolet National Forest, is the Welcome and announcements; (2)
in identifying and considering issues
responsible official. Status of previously approved projects;
and concerns on the proposed action,
Nature of Decision To Be Made: The and (3) Review of and decisions on new
decision will be limited to determining comments on the draft environmental
projects proposals for current year. The
whether to revise, amend or reassert; the impact statement should be as specific meeting was previously scheduled for
original Cayuga Record of Decision as possible. It is also helpful if February 28, but due to winter weather
(May 7, 2003). comments refer to specific pages or was cancelled. It is open to the public
Scoping Process: A scoping package chapters of the draft statement. and the public will have an opportunity
will be mailed to all parties who Comments may also address the to comment at the meeting. This
previously were mailed the original adequacy of the draft environmental meeting will be rescheduled if weather
draft environmental impact statement, impact statement or the merits of the conditions warrant.
and to those who request a copy. alternatives formulated and discussed in
Dated: March 17, 2006.
Comment Requested: This notice of the statement. Reviewers may wish to
Steven T. Eubanks,
intent initiates the scoping process refer to the Council on Environmental
which guides the development of the Quality Regulations for implementing Forest Supervisor.
supplemental environmental impact the procedural provisions of the [FR Doc. 06–2795 Filed 3–22–06; 8:45am]
statement. Specifically, the supplement National Environmental Policy Act at 40 BILLING CODE 3410–11–M
will fully consider cumulative effects of CFR 1503.3 in addressing these points.
timber harvest to goshawk, red-
Comments received, including the DEPARTMENT OF AGRICULTURE
shouldered hawk, American marten,
names and address of those who
spruce grouse and black-backed
wwhite on PROD1PC61 with NOTICES

comment, will be considered part of the Rural Utilities Service


woodpecker that occur in the Cayuga
public record on this proposal and will
project area. Information Collection Activity;
Early Notice of Importance of Public be available for public inspection.
Comment Request
Participation in Subsequent Authority: 40 CFR 151.7 and 1508.22;
Environmental Review: A draft Forest Service Handbook 1909.15, Section 20 AGENCY: Rural Utilities Service, USDA.

VerDate Aug<31>2005 16:54 Mar 22, 2006 Jkt 208001 PO 00000 Frm 00002 Fmt 4703 Sfmt 4703 E:\FR\FM\23MRN1.SGM 23MRN1

Das könnte Ihnen auch gefallen