ID
Activity
Description
Location
LOCN
QTY
Orig PROJ
Dur
RESP
Early
Start
Early
Finish
14-151337
VISCOMI
01JUL15
29AUG15
14-151335
VISCOMI
01JUL15
29AUG15
15-157743
HUDICK
15JUN15
08AUG15
15-2059-00
HUDICK
26MAY15
03JUL15
14-138164
THAYER
11MAY15
31JUL15
14-146234
15-2000-18
HUDICK
J.COMBS
26MAY15
26MAY15
31JUL15
07AUG15
HUDICK
20JUL15
08AUG15
15-2067-00
SHANTZ
01JUN15
08AUG15
14-2000-33
DERROW
26MAY15
15AUG15
15-2065-00
15-2055-00
THAYER
THAYER
11MAY15
11MAY15
06AUG15
18JUL15
Speed Bunps
15-2043-00
15-2069-00
14-149303
THAYER
DERROW
VISCOMI
26MAY15
01JUN15
15JUN15
10JUL15
01AUG15
26JUN15
15-2037-0
15-2047-00
J.COMBS
DERROW
12MAY15
12MAY15
18JUL15
11JUL15
Replace Ceiling
SHANTZ
27JUL15
01AUG15
refinish floor
DERROW
12MAY15
22AUG15
Weeks
722 S.MAIN
EN1368 Demo of 722 S. Main - Project on Hold
738 S.MAIN
EN1288 Demo of 738 S. Main -Project on Hold
A-2 Building
EN1498 Cadaver lab renovations -
Bio Science
EN1528 Specimen room -in design -for summer 2015
Alumnae Hall
EN1298 Replace roof & Soffett
Anthony-Seeger Hall
EN1318 Upgrade Fire Alarms
EN1338 Renovations
Renovations
Burruss Hall
EN1248 Fire Alarm Panel change out
Carrier Library
EN1268 Starbucks refresh Awaiting drawings
CARRIER DR
EN090
CHAMPION
EN310
EN320
Structural Issues-
Chandler Hall
EN998 Re-grout all brick joints (Shops)
EN1918 Lakeside express renovations
EN1008 Replace carpet in 8 rooms
Chappelear Hall
EN1728 Replace Ceiling
EN1788 room 100 build wall in all wings
Convocation Center
EN237
refinish floor
Dingledine Hall
EN1818 room 100 build wall in all wings
Start Date
Finish Date
Data Date
Run Date
05JAN15
05JAN15
22JUN15 13:15
15-2047-00
Early Bar
Float Bar
Progress Bar
Critical Activity
PLAN
Sheet 1 of 4
Date
Revision
Checked
Approved
Activity
ID
Activity
Description
Location
LOCN
QTY
Orig PROJ
Dur
RESP
Early
Start
Early
Finish
09-2003-00
14-2002-00
THAYER
VISCOMI
16DEC13
01JAN14
06SEP14
29DEC14
15-2060-00
15-2018-00
DERROW
THAYER
11MAY15
15JUN15
22JUN15
11JUL15
15-2000-13
HUDICK
11MAY15
08AUG15
15-156039
THAYER
11MAY15
18JUL15
14-128603
14-137529
THAYER
HUDICK
11MAY15
11MAY15
01AUG15
31JUL15
Covered walkway
DERROW
11MAY15
05JUN15
SHANTZ
SHANTZ
11MAY15
11MAY15
18JUL15
29MAY15
SHANTZ
SHANTZ
11MAY15
12MAY15
11JUL15
18JUL15
13-2008-04
SHORT
06MAY13
01JUL15
15-2047-00
DERROW
12MAY15
18JUL15
15-2046-00
12MAY15
12MAY15
12MAY15
11JUL15
31JUL15
01AUG15
15-2046-00
VISCOMI
JENKINS
VISCOMI
15-2037-00
J.COMBS
12MAY15
18JUL15
Replace ceiling
15-2036-00
J.COMBS
12MAY15
11JUL15
14-146200
THAYER
18MAY15
10JUL15
14-143592
J.COMBS
03NOV14
13JUN15
Renovations to Lakeview
14-146204
THAYER
BAKER
26MAY15
22JUN15
30JUN15
26JUN15
Repair roof
Weeks
E&G
EN198
EN238
Eagle Hall
EN728
EN688
Replace Roof
FARM
EN1678 Renovations to JMU Farm
Festival
EN220
Forbes Center
EN200
EN230
Covered walkway
Paint booth
Paint booth
Frederikson Hall
EN1798 room 100 build wall in all wings
Godwin Hall
EN1638 Repair Pool
EN1698 repairs to Volleyball court
15-258-00
Repair Pool
GR ROW
EN1118 Water intrusion project
EN1108 Floor Tile Lake A,
Hanson Hall
EN1808 room 100 build wall in all wings
Hillside Hall
EN1418 Replace floor Tile
EN1478 Total Paint
EN1488 Replace boiler & Coils
Total Paint
Replace boiler & Coils
Huffman Hall
EN1738 Replace ceiling
Ikenberry Hall
EN1748 Install Hand Dryers
Johnston Hall
EN1648 Repair water intrusion into basement
LAKEVIEW
EN1658 Renovations to Lakeview
Memorial Hall
EN1168 Repair roof
EN1178 Cover stages at amphtheater
Sheet 2 of 4
Activity
ID
Activity
Description
Location
LOCN
QTY
Orig PROJ
Dur
RESP
Early
Start
Early
Finish
15-158786
SHANTZ
25JUN15
03JUL15
1272
THAYER
26MAY15
30JUN15
Replace roof
NANCY C
17NOV14
15AUG15
15-2008-06
15-2061-00
THAYER
VISCOMI
11MAY15
11MAY15
15AUG15
13JUN15
15-2062-00
SHANTZ
26MAY15
30JUN15
15-2019-00
11MAY15
11MAY15
12MAY15
01JUN15
25JUL15
25JUL15
31JUL15
17JUL15
14-2049-00
HUDICK
HART
J.COMBS
THAYER
replace windows-
15-2068-00
HUDICK
26MAY15
02AUG15
Auntie Annes
14-153283
HUDICK
04MAY15
01OCT15
Renovations to Farm
12-2081-00
15-161324
14-137164
15-2026-00
G.WAY
SHANTZ
SHANTZ
J.COMBS
05MAY14
11MAY15
11MAY15
11MAY15
16JUL16
05JUN15
05JUN15
20JUN15
14-2047-00
15-2049-00
DERROW
HUDICK
11MAY15
11MAY15
01AUG15
18JUL15
renovate 4 HD appts
216-17949
R.MILLER
16DEC13
04AUG15
TELECOM
11MAY15
05JUN15
Network Install
15-2001-02
J.COMBS
15JAN15
15AUG15
15-2035-00
15-2047-00
VISCOMI
DERROW
11MAY15
12MAY15
03JUL15
24JUL15
Replace ceiling
14-144880
15-158866
15-2036-00
VISCOMI
J.COMBS
J.COMBS
07MAR15
11MAY15
12MAY15
14MAR15
08AUG15
18JUL15
Weeks
Music Building
EN698
Replace roof
NORTH CAMP
EN898
Rockingham Hall
EN1878 Rockingham parking lot
EN1888 Rockingham demo
Rose Library
EN1958 room 2300 renovate
Spotswood Hall
EN1708
EN1948
EN1778
EN1688
Taylor Hall
EN908
Auntie Annes
University Farm
EN1668 Renovations to Farm
Village Halls
EN1458 Village Quad rooms
EN1468 renovate 4 HD appts
Walnut Lane
EN1378 New Student Housing
Wampler Hall
EN1408 Network Install
Warren Hall
EN1238 Post office/bank Renovations
Weaver Hall
EN1438 Replace ceiling
EN1828 room 100 build wall in all wings
White Hall
EN1428 C302/C303 Bathroom ceiling
EN1928 Network Install
EN1758 Install Hand Dryers
Sheet 3 of 4
Network Install
Install Hand Dryers
Activity
ID
Activity
Description
Location
LOCN
QTY
Orig PROJ
Dur
RESP
Early
Start
Early
Finish
BAKER
08JUL15
09JUL15
Weeks
Wine-Price Hall
EN1388 Install carpet in basement
Sheet 4 of 4