top of the pipe surface at the deepest point of the river bed. The measurement of river
crossing will be the length between the centre of the top bends of both sides of the river.
ITEM NO. 7.0 CANAL / KHAL/POND CROSSING :
The item includes canal/pond/water course crossing at different locations along the pipe line
route (Extra over item 03, 04, 08) by open cut method with necessary excavation as per
design depth (minimum cover= 6' from the top of the pipe surface) by adopting any
means including dewatering by pump (if necessary), providing 3.0" thick RCC (1:2:4)
coating as per standard drawing TGSTD 029. RCC coating must have best
workmanship, smooth finishing with no air-entrapment with proper curing, erection of
dam on the both side of the pipe crossing. Placing of pipe in proper position,
maintaining proper slopes, permanent restoration of banks stream to its original
position etc, complete in all respect as per drawing design and the direction of the
Engineerin-charge. The item also includes supply of all materials i.e shal-bullah,
drum-sheet bamboo etc. arrangement/hiring of all machineries/equipments etc. Only
the concrete coated portion will be consider for measurement of canal/khal/pond
crossing.
ITEM NO. 8.0 RCC COATING :
The item includes application of continuous reinforced cement concerte (1:2:4) coating of
thickness 3.0" with mesh wire net and re-inforcement over the wrapped pipe as per
standard drawing No. TGSTD 029 and in accordance with drawing/design and
direction of Engineer-in-charge. The item includes supply/arrangement of all
materials/machineries required for providing the RCC coat.
ITEM NO. 9.0 MAJOR ROAD CROSSING:
Major road crossing by thrust/augur/jack boring method (extra over item no. 03 and 04) with
installation of casing pipe at different locations as per designed depth (minimum cover 6'
from the top of the casing pipe to the road surface). The item also includes placing of pipe in
proper position, welding /installation of vent pipes with two coats of red oxide painting with
supply of paint, fitting and fixing of insulating spacer, end casing seals, providing permanent
indication boards at crossing etc, complete in all respect as per specification, drawing/design
and direction of Engineer in charge. All necessary equipment in this connection shall have to
be arranged by the Contractor at his own cost. The crossing shall have to be carried out by the
Contractor without minimum disruption to the traffic movement. The reinstatement of work
site following the construction of road crossing shall be made in accordance with the
requirements of the Road Authority. Immediately following the installation of the line pipe in
the casing pipe, the Contractor shall carry out the tests to establish whether an electric contact
exists between the line pipe and the casing to ensure that there is no electric contact exists.
ITEM NO. 10.0 FABRICATION & INSTALLATION OF SCRAPER STATION/
VALVE STATIONS :
The item includes complete mechanical fabrication & installation, civil construction etc. of
Scraper station(launching), Valve station & Scraper station(receiving) at 3(three)
different locations namely Monohordi, Munsefer Char & Narsingdi. The Scraper
station at Monohordi & Norsingdi also consists of necessary scraper launching/
receiving facilities. Detailed works involvement are as follow:
a) Above the ground pipeline construction
i) Welding
The item includes butt-welding of pipe/casing pipe, pipes to fittings, fittings
to fittings, pipe to valves as per specification, including beveling, cutting,
fabrication, end wall thickness reducing, re-beveling as required for any
reason etc. complete in all respect as per drawing/design and direction of
Engineer-in-charge. The cost of consumable materials like electrode,
grinding disc, power brush, jute, cotton, rope etc. is within the scope of the
item. The item also includes arrangement/hiring of all equipment/machinery
required for the welding work.
d) Radiography
Welded joints will be subjected to radiography & the test will be carried out at the
contractor expense. The radiography test may be done either by X-ray using
crawler mounted X-ray machine or by using gamma radiography source. The
method of radiography shall be carried out as per the requirement of the relevant
section of API 1104 standard. Rollpac industrial X-ray film shall be used for
radiography. Processed film along with test report shall have to be handed over to
the employer for necessary interpretation and final acceptance. Acceptance criteria
for the examination of weld will be API 1104 standard. Defective weld shall be cut
or rejected and re-tested. Radiography contractor must posses valid certificate from
Bangladesh Atomic Energy Commission. Relevant documents and list of
manpower shall be submitted along with tender document. This item covers all
& Monohordi valve & scraper station. The Contactor shall fabricate the remaining
temporary Pig launcher/ Receiver ( to be installed at Munsefer Char for testing
purpouse only) For which materials will be provided by the Company. The company
will supply requisite no. of "PIGs".
ITEM NO.12.0 CONSTRUCTION/RE-LOCATION OF MARKER POST:
The item includes re-location of marker post, previously fabricated and installed by the
company along the Acquisition strip boundary. The item also includes required no. of
marker post which will be newly constructed, fabricated & installed along the total
acquisition strip boundary (30 ft). This item also includes taking out of existing marker
post by excavation of earth, hauling & carrying all marker posts (existing & newly
constructed) to the new position and installation thereof by digging earth,fixing
property, backfilling etc. as per drawing/design and the direction of Engineer-in-charge
(ref. Tech.Spec.No.TR.CON-0120.0).The constractor shall take proper precautionary
measures to avoid any damage of the marker post during hauling, carrying, installation/
re-installation process. If there any damage the contractor will have to replace the
marker post.
AE (Design)
DM (Design)
Manager (Design)
DGM (PDD)