Name of Project

Project Description

Air Quality Monitoring for three


Power Plants in Jamshoro,
Guddu and Muzzafargarh for 24
hrs/site

Monitoring of air pollutants such as CO, NOx, SOx, O3 and


Suspended Particulate Matter (SPM) were performed for three
power plants in Jamshoro, Guddu and Muzzafargarh at seven
different locations for 24 hours/site during June-July, 2012

M/s Haggler Baily


Pakistan/ Asian
Development Bank
(ADB)

Criteria gaseous air pollutants such as CO, NOx, Sox and


Air Quality Monitoring at Suspended Particulate Matter (SPM) were monitored on two
different sites on two traffic traffic corridors of Karachi one Safoora Goath to M.A Jinnah
corridors of Karachi, 24 hrs/site road and second New Karachi to Tower at 05 locations on each
corridors

M/s Environmental
Management
Consultant (EMC),
Karachi

On request of Karachi Port Trust (KPT) authorities, monitoring of


environmental baseline conditions were carried out prior
reconstruction of planned berths 15-17A and Ship Repair Berths
Ambient Air Quality Monitoring, (SRBs) on East Wharves at KPT. Air pollutants such as CO,
M/s Karachi Port Trust
Noise Level and Vibrational NOx, SOx, O3, Suspended Particulate Matter (SPM),
(KPT), Karachi.
Monitoring at KPT for 24 hrs
Meteorological parameters (temp, humidity, pressure, wind
speed & direction) were measured along with Noise Level and
Vibration level were recorded at berth-16 for 24 hours during
March, 2012

EPA criteria gaseous air pollutants such as CO, NOx, Sox and
Ambient Air Quality Monitoring Suspended Particulate Matter (SPM) were monitored during 6 to
in Interior Sindh near Badin for 11 March, 2012 at 05 different locations around Kausar Gas
24 hrs/site
Facility and environmental monitoring report was submitted to
client

Client

M/s Environmental
Management
Consultant (EMC),
Karachi

In connection to project for the up gradation of Karachi Ambient Air Quality Monitoring Hyderabad super highway to Motor Way (M-9), environmental
for EIA Study of Karachi- condition for different gaseous pollutants such as CO, NOx, Sox
Hyderabad
Motorway
(M-9 and Suspended Particulate Matter (SPM) were monitored
during May, 2012 at 04 different locations on Super Highway
Prom) for 24 hrs/site
and environmental monitoring data were submitted to client

M/s Environmental
Management
Consultant (EMC),
Karachi

EPA criteria gaseous air pollutants such as CO, NOx, Sox and
Air Quality Monitoring at Tapal Suspended Particulate Matter (SPM) were monitored during
& Gul Ahmed Power Plants for May-Jun, 2012 at Gul Ahmed and Tapal power plants and
environmental monitoring data were submitted to client as
8 hrs/site
required by EPA for environmental audit.

M/s Research &


Development
Consultants (R&DC),
Karachi

Monthly monitoring of air pollutants such as CO, NOx, SOx, O3


M/s Environmental
Air Quality Monitoring at Naya and Suspended Particulate Matter (SPM) are carring out for
Management
Nazimabad
Naya Nazimabad residential project at two different locations for
Consultants (EMC)
01 hour/site for six month project

Monthly monitoring of air pollutants such as CO, NOx, SOx, O3 M/s Environmental
Air Quality Monitoring at Port
and Suspended Particulate Matter (SPM) are carring out at Port Management
Qasim Area
Qasim area for one year project
Consultants (EMC)

22.. W
WA
ATTE
ER
R ((D
DR
RIIN
NK
KIIN
NG
G&
&W
WA
AS
STTE
EW
WA
ATTE
ER
R))// S
SO
OIILL Q
QU
UA
ALLIITTY
Y TTE
ES
STTIIN
NG
G
1

Analysis of Total Organic Analysis of Total Organic Carbon (TOC) was preformed for 56
M/s SGS, Pakistan
Carbon (TOC) in Water Sample different well water samples

Keenjhar Lake Water & Soil

In April, 2012 some news article published in newspapers after


the death of fish, snails, cows and different species of animals
living in a section of water body, some experts claiming that
SUPARCO own
Keenjhar lake water is contaminating by HAROOLO Drain which
research study
carries rain water to Keenjhar Lake.
After this incident a detailed study was carried out by ES Dte,
SUPARCO to determine lake situation in the month of May 2012

Water analysis for Anions,


Trace Metals

Sediment analysis for Platinum


Group Elements (PGE)

Effluent Water analysis for


NEQS parameter

Keenjhar Lake Water Samples


analysis

Drinking & Waste Water


analysis for Dadex Factory in
Karachi and Hyderabad

Effluent water analysis for PRL

Total Organic Carbon (TOC) in


Soil

Analysis of Anion (Chloride, Fluoride, Sulphate, Nitrate) and


M/s Hub Power
Trace & Toxic metals (about 20 metals) were preformed for
Station, Pakistan
boiler feed or running water samples of HUBCO power plant
Analysis of sediment samples were preformed for Platinum
M/s Geography
Group Element (PGE) (Platinum, Platinum, Indium, Osmium,
department, University
Rhodium, Ruthenium) on the request of Geography department,
of Karachi
University of Karachi for their research project
M/s Environmental
Effluent water sample of Port Qasim Authority (PQA) area was
Management
analyzed for about 32 National Environmental Quality Standards
Consultants (EMC),
(NEQS) parameter
Karachi
Keenjhar Lake water samples were analyzed to estimate the
M/s ID Water
level of toxic metals (lead, chromium, cadmium, arsenic,
Technologist, Karachi
mercury) in lake water
Some priority parameters were analyzed for drinking and waste
water samples collected from Dadex factory in Karachi and M/s Dadex factory
Hyderabad as required by EPA for environmental audit
Some priority parameters were analyzed for effluent water
M/s Pakistan Refinery
samples collected from Pakistan Refinery Limited (PRL),Karachi
Limited (PRL)
as required by EPA for environmental audit
Total Organic Carbon (TOC) was determined in soil samples for
M/s SGS, Pakistan
M/s SGS, Pakistan

33.. S
STTA
AC
CK
K// V
VE
EH
HIIC
CU
ULLA
AR
RE
EM
MIIS
SS
SIIO
ON
NM
MO
ON
NIITTO
OR
RIIN
NG
G
1

Stack Emission Testing of 03


Power Plants in Jamshoro,
Guddu and Muzzafargarh

Stack Emission testing for PRL

Stack Emission Testing at Tapal


& Gul Ahmed Power Plants for 8
hrs/site

M/s Haggler Baily


Flue gas emission test were performed for three power plants
Pakistan/ Asian
in Jamshoro, Guddu and Muzzafargarh at different locations
Development Bank
during June-July, 2012
(ADB)
Stack emission was tested at Pakistan Refinery Limited M/s Pakistan Refinery
(PRL),Karachi as required by EPA for environmental audit
Limited (PRL)
M/s Research &
Stack emissions were tested at Tapal (Hub) and Gul Ahmed
Development
(Karachi) power plants as required by EPA for environmental
Consultants (R & DC),
audit
Karachi

4
5

Stack Emission Testing at TNB


Liberty Power Plant, Dharki
Stack Emission Testing at
Pakistan Refinery Limited (PRL),
Karachi
Stack Emission Testing for
Dadex factory in Karachi and
Hyderabad
Stack Emission Testing at
Pakistan Refinery Limited (PRL),
Karachi

Stack emissions were tested at TNB Liberty power plant, M/s TNB Liberty power
Dharki as required by EPA for environmental audit
plant, Dharki
Stack emission was tested at Pakistan Refinery Limited M/s Pakistan Refinery
(PRL),Karachi as required by EPA for environmental audit
Limited (PRL)
Stack emissions were tested at Dadex factories in Karachi and
M/s Dadex factory
Hyderabad as required by EPA for environmental audit
Stack emission was tested at Pakistan Refinery Limited M/s Pakistan Refinery
(PRL),Karachi as required by EPA for environmental audit
Limited (PRL)

Das könnte Ihnen auch gefallen