7744 Federal Register / Vol. 71, No.

30 / Tuesday, February 14, 2006 / Notices

DELAWARE RIVER BASIN to supply the applicant’s public water Mill Creek Watershed in Buckingham
COMMISSION supply distribution system from existing Township, Bucks County, Pennsylvania,
Wells Nos. 1, 3, 4, 5 and 6 in the in the Southeastern Pennsylvania
Notice of Commission Meeting and Hamburg Formation. The project is Ground Water Protected Area.
Public Hearing located in the Schuylkill River 8. Rosenberger’s Dairies, Inc. D–95–1–
Watershed in Shoemakersville Borough 2. An application for the renewal of a
Notice is hereby given that the ground water withdrawal project to
and Perry Township, Berks County,
Delaware River Basin Commission will continue withdrawal of 3.4 mg/30 days
Pennsylvania.
hold an informal conference followed 4. BP Oil Company D–91–32 (G)–2. An to supply the applicant’s dairy
by a public hearing on Wednesday, application for the renewal of a ground processing facility from existing Wells
March 1, 2006. The hearing will be part water decontamination project to Nos. R–1, R–3 and R–4 in the Brunswick
of the Commission’s regular business withdraw up to 1 million gallons per Formation. The project is located in the
meeting. Both the conference session day for treatment and discharge to the West Branch Neshaminy Creek
and business meeting are open to the Delaware River through an existing Watershed in Hatfield Township,
public and will be held at the outfall in DRBC Water Quality Zone 4. Montgomery County, Pennsylvania and
Commission’s office building, located at The project is located at the former BP is located in the Southeastern
25 State Police Drive in West Trenton, Oil Company Refinery located off of Pennsylvania Ground Water Protected
New Jersey. Mantua Avenue in Paulsboro Borough, Area.
The conference among the Gloucester County, New Jersey. Up to 30 9. Clement Pappas & Co., Inc. D–95–
commissioners and staff will begin at mg/30 days of ground water is 37–2. An application for renewal of a
10:15 a.m. Topics of discussion will withdrawn from existing Wells Nos. R– ground water withdrawal project to
include a presentation on the State of 4A, R–5A, R–6A, R–8, R–9 and R–10 continue to supply up to 73.4 mg/30
Delaware Water Supply; an update on and from new Wells Nos. R–11 and R– days of water to the applicant’s food
the State of the Basin Report currently 12, all located in New Jersey Critical processing facility from existing Well
under development; a presentation on Area 2 of the Potomac-Raritan-Magothy No. 6B in the Kirkwood-Cohansey
the Oyster Revitalization Initiative in Formation. Formation. The project is located in the
the Delaware Bay; a status report on the 5. E.I. du Pont de Nemours and Cohansey River Watershed in Upper
Development of a Long-Term Flow Company D–93–19–2. An application for Deerfield Township, Cumberland
Regime for the New York City renewal of a surface and ground water County, New Jersey.
Reservoirs; a discussion about a forum withdrawal project to continue 10. Sybron Chemicals, Inc. D–85–5–3.
to advance coordination among federal withdrawal of 1,126 mg/30 days to An application for the renewal of a
agencies that partner with the DRBC; supply the applicant’s industrial facility ground water withdrawal project to
and an update on activities relating to from existing Wells Nos. INT–10B, R– decrease withdrawal from 77 mg/30
PCBs in the Delaware River. 5A, INT–103A, INT–102A, Q13–R01C, days to 34 mg/30 days to supply the
The subjects of the public hearing to Q13–R01D, WS–1, M–259, M–257, CP– applicant’s industrial facility from
be held during the 1:30 p.m. business 2, CP–4, WS–2, R–7, DW–8R, CL–1, CL– existing Wells Nos. 4, 5 and EQ106 in
meeting include the dockets listed 2, CL–3, and CP–7 and Salem Canal the Middle Raritan and Mt. Laurel/
below: Surface Water Intake No. III. The project Wenonah Aquifers. The project is
1. DSM Nutritional Products, Inc. D– is located in the Glacial/PRM Aquifer located in the West Branch Rancocas
85–14–3. An application for renewal of and the Salem Canal Watershed in Watershed in Pemberton Township,
a ground water and surface water Carneys Point, Mannington and Burlington County, New Jersey.
withdrawal project to continue to Pennsville Townships, Salem County, 11. Willingboro Municipal Utilities
supply up to 120 mg/30 days of water New Jersey. Authority D–87–42 CP–3. An
for industrial process, potable and 6. Township of Lower Municipal application for the renewal of a ground
sanitary uses and ground water Utilities Authority D–94–21 CP–2. An water withdrawal project and for an
remediation purposes to the applicant’s application to discontinue the increase in withdrawal from 300 mg/30
manufacturing facility from six existing withdrawal of water and close Wells days to 310 mg/30 days to supply the
wells in the Pleistocene Alluvial Nos. AP–2 and 3 in the applicant’s applicant’s public water supply
Formation and one existing surface public water supply system, which have distribution system from existing Wells
water intake located on the main stem become unreliable sources of supply, Nos. 1, 6, 9, 10, and 11 and new
of the Delaware River. The project is and to withdraw water from replacement Well No. 5A. Replacement
located in the Delaware River replacement Wells Nos. 6 and 7. The Well No. 5A is located in the Potomac-
Watershed in White Township, Warren total withdrawal from replacement Raritan-Magothy Formation. The project
County, New Jersey. Wells Nos. 6 and 7 and existing Wells is located in the Rancocas Creek
2. J.G. Townsend, Jr. & Co. D–89–48– Nos. 1, 2 and 4 remains limited to 93 Watershed in Willingboro Township,
3. An application for the renewal of a mg/30 days. Well No. 7 is located in the Burlington County, New Jersey.
ground water withdrawal project to Atlantic Basin. The project is located in 12. PPL Martins Creek, LLC D–87–56–
continue withdrawal of 15 million the Cohansey Formation in the 2. An application to update the existing
gallons per thirty days to supply the Delaware River Watershed in Lower docket to reflect operational and
applicant’s vegetable processing facility Township, Cape May County, New structural modifications to Ash Basin
from existing Wells Nos. 1 and 5 in the Jersey. No. 4 as a result of an ash slurry spill
Columbia Formation. The project is 7. Meter Services Company D–94–49 which occurred from Ash Basin No. 4
located in the Savannah Ditch CP–2. An application for renewal of a due to a wooden stop-log failure.
Watershed in the Town of Georgetown, ground water withdrawal project to Approximately 100 million gallons of
rmajette on PROD1PC67 with NOTICES

Sussex County, Delaware. continue to supply up to 3.6 mg/30 days ash slurry was released from Ash Basin
3. Borough of Shoemakersville D–90– of water to the applicant’s public water No. 4 from August 23–30, 2005. In
7 CP–3. An application for the renewal supply distribution system from existing addition, this project includes
of a ground water withdrawal project to Wells Nos. 1 and 2 in the Brunswick emergency remediation activities that
continue withdrawal of 7.5 mg/30 days Formation. The project is located in the PPL conducted in response to the ash

VerDate Aug<31>2005 14:46 Feb 13, 2006 Jkt 208001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\14FEN1.SGM 14FEN1
Federal Register / Vol. 71, No. 30 / Tuesday, February 14, 2006 / Notices 7745

slurry spill. Emergency approval was water withdrawal project and increase Pennsauken Township, Camden
granted by letter dated October 12, 2005 in the applicant’s withdrawal from County, New Jersey.
for this project. The project discharges 26.42 mg/30 days to 30 mg/30 days to 21. Town of Bethel D–2005–19 CP–1.
to the Delaware River in DRBC Water supply the Six Flags Great Adventure An application to construct a
Quality Zone 1D, which is designated Hurricane Harbor water amusement groundwater/leachate seep collection
Special Protection Waters. The facility park from existing Wells Nos. 7, 10 and and treatment system to serve the Town
is located in Lower Mount Bethel ASR–12 in the Upper Potomac-Raritan- of Bethel Landfill, an inactive and
Township, Northampton County, Magothy Formation. The project is officially closed domestic waste landfill
Pennsylvania. located in the Crosswicks Creek located on a 10-acre parcel of municipal
13. E.I. du Pont de Nemours and Watershed in Jackson Township, Ocean property off Old White Lake Turnpike,
Company D–88–85–2. An application to County, New Jersey. about 0.25 miles east of its intersection
update and renew an existing industrial 17. Sunny Dell Foods, Inc. D–2000– with State Route 55 in the Town of
waste treatment plant (IWTP) discharge 23–2. An application to increase the Bethel, Sullivan County, New York.
docket, which includes clarifying the discharge from the applicant’s industrial Following aeration and sedimentation,
Area Served and granting preliminary waste treatment plant (IWTP) from 0.05 up to 0.035 mgd of wastewater will be
approval for the installation of a new mgd to 0.072 mgd; modify effluent applied to a subsurface absorption bed
outfall extension and diffuser. The limits associated with the Christina for final processing and disposal. In
IWTP discharges to Zone 5 of the River total maximum daily loads for addition to proposed Discharge
Delaware River. DuPont Chambers CBOD5, ammonia, phosphorus and total Monitoring Reports, the existing
Works is a large multi-product chemical nitrogen; and modify an existing contact groundwater monitoring well network
manufacturing plant. The facility has an cooling water system discharge of 0.09 will be used to assure that the proposed
IWTP that is classified by EPA as a mgd. Both the IWTP effluent and treatment system does not impair
Centralized Waste Treatment system. contact cooling water are discharged to groundwater quality. The project is
The facility is located in Pennsville and the West Branch Red Clay Creek. The located in the Mongaup River
Carneys Point, Salem County, New facility is located in Kennett Township, Watershed upstream from Swinging
Jersey. The application does not request Chester County, Pennsylvania. Bridge Reservoir and in the drainage
the Commission’s approval to accept VX 18. Swedesboro, Inc. (t/a Beckett Golf area of DRBC Special Protection Waters.
hydrolysate for treatment and discharge Club) D–87–77–1. An application for a Although the Town of Bethel Landfill is
at the DuPont Chambers Works IWTP. surface water withdrawal project to capped with impervious materials, it is
14. Hamburg Municipal Authority D–
supply up to 4.0 mg/30 days of water for an unlined facility with residual
92–73 CP–2. An application to expand
supplemental irrigation of the leachate seepage that currently flows
a 1.0 mgd wastewater treatment plant
applicant’s golf course from existing overland to the West Branch Mongaup
(WWTP) to treat 1.5 mgd, while
Intakes Nos. 1 and 2. The surface water River without any prior treatment.
continuing to provide advanced
treatment via activated sludge and intakes are located on two on-site 22. Chadds Ford Township D–2005–
chemical addition processes. The ponds. The project is located in the 22 CP–1. An application to construct a
WWTP will continue to serve the Oldmans Creek Watershed in Woolwich 0.15 mgd WWTP to serve existing
Borough of Hamburg, and portions of Township, Gloucester County, New residents in a portion of Chadds Ford
Tilden and Windsor townships, all in Jersey. A Notice of Application Township, Delaware County,
Berks County, Pennsylvania. The Received (NAR) for this project was Pennsylvania and future residents of the
proposed expansion will enable the previously published on November 5, proposed subdivision at Camp Sunset
docket holder to serve the Borough of 1987 under docket number D–87–77. Hill (Turner’s Mill), also in Chadds Ford
Port Clinton in Schuylkill County, The current NAR reflects project Township. The WWTP is proposed to
Pennsylvania as well. The WWTP is revisions made since the 1987 provide advanced treatment via
located in Hamburg Borough, just east of application. extended aeration and tertiary filtration
State Route 61 on the east bank of the 19. Mercer County Correction Center prior to ultraviolet light disinfection and
Schuylkill River, to which the plant will D–2002–50 CP. An application for discharge to Harvey Run, a tributary of
continue to discharge. At the WWTP approval of a ground water withdrawal Brandywine Creek in the Christina River
outfall, the Schuylkill River is project to supply up to 4.333 mg/30 Watershed. Its proposed location is the
conditionally designated as ‘‘Modified days of water to the applicant’s intersection of U.S. Route 1 (Baltimore
Recreational’’ in the DRBC correctional facility from existing Wells Pike) and Ring Road, across from the
Comprehensive Plan. Nos. 1, 3 and 4 and new Well No. 5, all Brandywine Battlefield State Park. The
15. Purex Industries, Inc. D–93–34 in the Passaic Formation. The project is Pantos WWTP that currently serves
(G)–2. An application for the renewal of located in the Delaware River Chadds Ford Village and the Painter’s
a ground water withdrawal project to Watershed in the northwest corner of Crossing Condominiums is proposed to
decrease withdrawal from 11.23 million Hopewell Township, Mercer County, be converted to a pumping station,
gallons per thirty days (mg/30 days) to New Jersey. which will route up to 35,000 gallons
7.78 mg/30 days to supply the 20. Holman Enterprises—RMP per day of flow to the new WWTP.
applicant’s ground water remediation Facility D–2004–25 1. An application for 23. Motiva Enterprises, LLC D–2005–
project from existing Wells RW–2, RW– approval of a ground water withdrawal 23–1. An application for approval of a
7, RW–9, RW–10, and RW–13 and new project to pump up to 7.45 million ground water withdrawal project to
Wells MP–7, MP–19 and MP–30 in the gallons per 30 days (mg/30 days) of supply up to 6.7 mg/30 days of water to
Kirkwood-Cohansey Aquifer. The water to be treated by the applicant’s the applicant’s ground water
project is located in the Maurice River ground water remediation project from remediation project from new Wells
rmajette on PROD1PC67 with NOTICES

Watershed in the City of Millville, Wells Nos. MW–7D, MW–19D, MW– Nos. 1 through 9 in the Kirkwood-
Cumberland County, New Jersey. 23D, R–77D, R–78D, R–79D, R–80D and Cohansey Formation. The project is
16. Jackson Township Municipal R–81D in the Potomac-Raritan-Magothy located in the Maurice River Watershed
Utilities Authority D–94–18 CP–2. An Formation. The project is located in the in Franklin Township, Gloucester
application for the renewal of a ground Pennsauken Creek Watershed in County, New Jersey.

VerDate Aug<31>2005 14:46 Feb 13, 2006 Jkt 208001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\14FEN1.SGM 14FEN1
7746 Federal Register / Vol. 71, No. 30 / Tuesday, February 14, 2006 / Notices

24. Congoleum Corporation D–2005– by the addition of a new primary to the dockets and other items may be
25–1. An application to discharge an clarification process and a new aeration examined at the Commission’s offices.
average of 168,000 gallons per day of system. Seasonally, the WWTP Please contact William Muszynski at
non-contact cooling water from the discharges approximately 30,000 gallons 609–883–9500, extension 221, with any
applicant’s tile floor manufacturing per day to an unnamed tributary of docket-related questions.
facility. The discharge is to a Hamilton Equinunk Creek, a tributary to the West Individuals in need of an
Township municipal storm sewer, Branch Delaware River. The facility is accommodation as provided for in the
which discharges to Pond Run, a located in Buckingham Township, Americans with Disabilities Act who
tributary to the Assunpink Creek. The Wayne County, Pennsylvania. wish to attend the informational
facility is located in Hamilton 29. U.S. Army Corps of Engineers, meeting, conference session or hearings
Township, Mercer County, New Jersey. Philadelphia District D–2005–32 CP–1. should contact the commission
25. Tidewater Utilities, Inc. D–2005– An application to modify the Prompton secretary directly at 609–883–9500 ext.
26 CP–1. An application for approval of Dam to safely pass the Probable 203 or through the Telecommunications
a ground water withdrawal project to Maximum Flood (PMF) of 111,000 cubic Relay Services (TRS) at 711, to discuss
supply up to 1.427, 1.22 and 1.22 mg/ feet per second (cfs), based upon revised how the Commission may accommodate
30 days of water to the applicant’s North estimates of flow regimes for the 60- your needs.
Dover District public water supply square mile drainage area. The original Dated: February 7, 2006.
distribution system from new Wells PMF flow of 81,500 cfs was calculated
Pamela M. Bush,
Nos. SF–01, SF–02 and KWE–02, in the year 1949, prior to advancements
Commission Secretary.
respectively. The wells are all located in in mathematical modeling. Primarily a
the Federalsburg and Cheswold flood control facility, Prompton Dam is [FR Doc. E6–1999 Filed 2–13–06; 8:45 am]
aquifers. The total withdrawal from all located in Prompton Borough, Wayne BILLING CODE 6360–01–P

wells will be limited to 3.85 mg/30 County, Pennsylvania. The lake that it
days. The project is located in the forms on the West Branch Lackawaxen
Leipsic River Watershed in Kent River extends into Clinton Township, DEPARTMENT OF EDUCATION
County, Delaware. also in Wayne County. The project
26. Tidewater Utilities, Inc. D–2005– involves the widening of the spillway Notice of Proposed Information
27 CP–1. An application for approval of from 50 to 85 feet, constructing a fuse- Collection Requests
a ground water withdrawal project to plug in the spillway, upgrading the AGENCY: Department of Education.
supply up to 0.13, 3.51 and 0.065 mg/ outlet works rip-rap, and constructing SUMMARY: The IC Clearance Official,
30 days of water to the applicant’s Wild an embankment with material that will Regulatory Information Management
Quail District public water supply be excavated from the spillway. The Services, Office of the Chief Information
distribution system from new Wells project is located in the drainage area of Officer, invites comments on the
Nos. WQ–01, WQ–02 and WQ–04, DRBC Special Protection Waters and the proposed information collection
respectively. Wells Nos. WQ–01 and Upper Delaware Scenic and requests as required by the Paperwork
WQ–04 are located in the Frederica Recreational River. Reduction Act of 1995.
Formation and Well No. WQ–02 is In addition to the public hearing on
DATES: Interested persons are invited to
located in the Piney Point Aquifer. The the dockets listed above, the
total withdrawal from all wells will be Commission’s 1:30 p.m. business submit comments on or before April 17,
limited to 3.51 mg/30 days. The project meeting will include a public hearing 2006.
is located in the St. Jones River on a resolution to approve the SUPPLEMENTARY INFORMATION: Section
Watershed in Kent County, Delaware. Commission’s FY 2006–2007 budget 3506 of the Paperwork Reduction Act of
27. Penns Grove Sewerage Authority and work plan. The Commission also 1995 (44 U.S.C. Chapter 35) requires
D–2005–29 CP–1. An application to will consider a resolution amending the that the Office of Management and
upgrade, but not expand, a 0.75 million Basin Regulations—Water Supply Budget (OMB) provide interested
gallon per day wastewater treatment Charges regarding certificates of Federal agencies and the public an early
plant (WWTP), which serves Penns entitlement; a resolution establishing opportunity to comment on information
Grove Borough, Salem County, New the PMP Peer Review Advisory collection requests. OMB may amend or
Jersey. The WWTP upgrade will provide Committee; and a resolution authorizing waive the requirement for public
two new final clarifiers with the Executive Director to extend the consultation to the extent that public
appurtenances. The existing final Commission’s contract with the participation in the approval process
clarifiers require costly chemical Northeast-Midwest Institute on a would defeat the purpose of the
additives to meet NJPDES permit limits, month-to-month basis through information collection, violate State or
particularly during surge flow December 31, 2006. Federal law, or substantially interfere
conditions. The two new final clarifiers The meeting will also include: with any agency’s ability to perform its
should reduce or eliminate the need to adoption of the Minutes of the statutory obligations. The IC Clearance
add costly chemicals to meet permit December 7, 2005 business meeting; Official, Regulatory Information
limits. Penns Grove Sewerage Authority announcements; a report on basin Management Services, Office of the
requested and was granted emergency hydrologic conditions; a report by the Chief Information Officer, publishes that
approval by the DRBC on January 12, executive director; a report by the notice containing proposed information
2006 to implement the WWTP Commission’s general counsel; and an collection requests prior to submission
improvements expeditiously, in order to opportunity for public dialogue. Draft of these requests to OMB. Each
meet a construction grant deadline. The dockets and the resolutions scheduled proposed information collection,
WWTP will continue to discharge to the for public hearing on March 1, 2006 will grouped by office, contains the
rmajette on PROD1PC67 with NOTICES

Delaware River in DRBC Water Quality be posted on the Commission’s Web following: (1) Type of review requested,
Zone 5 through the existing outfall. site, http://www.drbc.net, where they e.g. new, revision, extension, existing or
28. Camp Ramah in the Poconos D– can be accessed through the Notice of reinstatement; (2) Title; (3) Summary of
2005–30–1. An application to upgrade Commission Meeting and Public the collection; (4) Description of the
an existing seasonally operated WWTP Hearing. Additional documents relating need for, and proposed use of, the