7028 Federal Register / Vol. 71, No.

28 / Friday, February 10, 2006 / Notices

listed as a contact for an intervenor in Order No. 652, its indirect affiliation should submit an original and 14 copies
must create and validate an with the San Juan Mesa Wind Project, of the protest or intervention to the
eRegistration account using the LLC and Storm Lake’s recent indirect Federal Energy Regulatory Commission,
eRegistration link. Select the eFiling affiliation with the East Ridge Projects. 888 First Street, NE., Washington, DC
link to log on and submit the Comment Date: 5 p.m. eastern time on 20426.
intervention or protests. February 16, 2006. This filing is accessible on-line at
Persons unable to file electronically 2. California Independent System http://www.ferc.gov, using the
should submit an original and 14 copies Operator Corporation; Pacific Gas and ‘‘eLibrary’’ link and is available for
of the intervention or protest to the Electric Company review in the Commission’s Public
Federal Energy Regulatory Commission, Reference Room in Washington, DC.
888 First St. NE., Washington, DC [Docket Nos. ER04–115–006; EL04–47–006; There is an ‘‘eSubscription’’ link on the
20426. ER04–242–005; EL04–50–004] Web site that enables subscribers to
The filings in the above proceedings Take notice that on January 27, 2006, receive e-mail notification when a
are accessible in the Commission’s the California Independent System document is added to a subscribed
eLibrary system by clicking on the Operator, pursuant to Commission’s docket(s). For assistance with any FERC
appropriate link in the above list. They Order issued on February 2, 2005, is Online service, please e-mail
are also available for review in the filing its refund report. FERCOnlineSupport@ferc.gov, or call
Commission’s Public Reference Room in Comment Date: 5 p.m. eastern time on (866) 208–3676 (toll free). For TTY, call
Washington, DC. There is an February 17, 2006. (202) 502–8659.
eSubscription link on the Web site that 3. American Electric Power Service Magalie R. Salas,
enables subscribers to receive e-mail Corporation
notification when a document is added Secretary.
[Docket No. ER06–533–000] [FR Doc. E6–1850 Filed 2–9–06; 8:45 am]
to a subscribed dockets(s). For
assistance with any FERC Online Take notice that on January 24, 2006, BILLING CODE 6717–01–P
service, please e-mail American Electric Power Service
FERCOnlineSupport@ferc.gov or call Corporation, as agent for Kentucky
(866) 208–3676 (toll free). For TTY, call Power Company (KPCo) tendered for DEPARTMENT OF ENERGY
(202) 502–8659. filing an interconnection and local
delivery service agreement between Federal Energy Regulatory
Magalie R. Salas, KPCo and the city of Olive Hill, Commission
Secretary. Kentucky.
[FR Doc. E6–1849 Filed 2–9–06; 8:45 am] Comment Date: 5 p.m. eastern time on [Docket No. PF06–12–000]
BILLING CODE 6717–01–P February 14, 2006.
Equitrans, LP; Notice of Intent To
New England Power Company Prepare an Environmental Assessment
DEPARTMENT OF ENERGY [Docket No. ER06–555–000] for the Proposed Big Sandy Pipeline
Take notice that on January 27, 2006, Project, Request for Comments on
Federal Energy Regulatory New England Power Company (NEP) Environmental Issues and Notice of
Commission tendered for filing a Fourth Revised Site Visit
[Docket Nos. ER98–4643–004, et al.] Service Agreement No. 6 between NEP
February 3, 2006.
and its affiliate, Granite State Electric
Company. The staff of the Federal Energy
Storm Lake Power Partners I, LLC, et
Comment Date: 5 p.m. eastern time on Regulatory Commission (FERC or
al.; Electric Rate and Corporate Filings
February 17, 2006. Commission) will prepare an
February 3, 2006. environmental assessment (EA) that will
The following filings have been made Standard Paragraph discuss the environmental impacts of
with the Commission. The filings are Any person desiring to intervene or to Equitrans, LP’s (Equitrans) planned Big
listed in ascending order within each protest this filing must file in Sandy Pipeline Project located in Floyd,
docket classification. accordance with Rules 211 and 214 of Johnson, Lawrence, and Carter County,
the Commission’s Rules of Practice and Kentucky.
1. Storm Lake Power Partners I, LLC; Procedure (18 CFR 385.211, 385.214). This notice announces the opening of
DeGreeffpa, LLC; Bendwind, LLC; Protests will be considered by the the scoping process we will use to
Sierra Wind, LLC; Groen Wind, LLC; Commission in determining the gather input from the public and
Larswind, LLC; TAIR Windfarm, LLC; appropriate action to be taken, but will interested agencies on the project. Your
Hillcrest Wind, LLC not serve to make protestants parties to input will help the Commission staff
[Docket Nos. ER98–4643–004; ER06–215– the proceeding. Any person wishing to determine which issues need to be
001; ER06–220–001; ER06–221–001; ER06– become a party must file a notice of evaluated in the EA. Please note that the
222–001; ER06–223–001; ER06–224–001; intervention or motion to intervene, as scoping period will close on March 24,
ER06–225–001] appropriate. Such notices, motions, or 2006.
Take notice that on January 26, 2006, protests must be filed on or before the This notice is being sent to affected
DeGreeffpa, LLC; Bendwind LLC; Sierra comment date. On or before the landowners; federal, state, and local
Wind, LLC; Groen Wind, LLC; comment date, it is not necessary to government representatives and
Larswind, LLC; TAIR Windfarm, LLC; serve motions to intervene or protests agencies; environmental and public
rmajette on PROD1PC67 with NOTICES1

Hillcrest Wind, LLC and Storm Lake on persons other than the Applicant. interest groups; Native American tribes;
Power Partners I, LLC (collectively, The Commission encourages other interested parties in this
Edison Entities), each of which is an electronic submission of protests and proceeding; and local libraries and
indirect subsidiary of Edison interventions in lieu of paper using the newspapers. We encourage government
International, tendered for filing in ‘‘eFiling’’ link at http://www.ferc.gov. representatives to notify their
compliance with reporting requirements Persons unable to file electronically constituents of this planned project and

VerDate Aug<31>2005 15:10 Feb 09, 2006 Jkt 208001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\10FEN1.SGM 10FEN1
Federal Register / Vol. 71, No. 28 / Friday, February 10, 2006 / Notices 7029

encourage them to comment on their Land Requirements Certificate of Public Convenience and
areas of concern. Construction of the project facilities Necessity. NEPA also requires us to
If you are a landowner receiving this would disturb about 912 acres of land. discover and address concerns the
notice, you may be contacted by a Following construction, about 550 acres public may have about proposals. This
pipeline company representative about of the total would be retained for the process is referred to as ‘‘scoping.’’ The
the acquisition of an easement to main goal of the scoping process is to
operation of the pipeline and the
construct, operate, and maintain the focus the analysis in the EA on the
aboveground facilities (compressor and
proposed facilities. The pipeline important environmental issues. By this
meter stations). Equitrans currently
company would seek to negotiate a Notice of Intent, we are requesting
proposes to use a nominal 100-foot-wide
mutually acceptable agreement. public comments on the scope of the
right-of-way (ROW) to construct its
However, if the project is approved by issues that should be addressed in the
pipeline, with occasional increases in
the Commission, that approval conveys EA. We will consider all comments
width for additional workspace at
with it the right of eminent domain. received during scoping in the
waterbody, wetland, road, and railroad
Therefore, if easement negotiations fail preparation of the EA.
crossings. Temporary extra workspaces Our independent analysis and
to produce an agreement, the pipeline may also be required in areas with site-
company could initiate condemnation evaluation of the issues will be included
specific constraints, such as side-slope in the EA. The EA will also include
proceedings in accordance with state construction. Other temporary land
law. possible alternatives to the proposed
requirements would include areas project or portions of the project, and
A fact sheet prepared by the FERC needed for pipe storage and equipment
entitled ‘‘An Interstate Natural Gas we will make recommendations on how
yards. For operation of the pipeline to lessen or avoid impacts on the
Facility on My Land? What Do I Need facilities, Equitrans proposes a 50-foot-
to Know?’’ is available for viewing on various resource areas of concern.
wide permanent ROW. Depending on the comments received
the FERC Internet Web site (http://
www.ferc.gov). This fact sheet addresses Currently Identified Environmental during the scoping process, the EA may
a number of typically asked questions, Issues be published and mailed to federal,
including the use of eminent domain state, and local agencies; elected
We have already identified several officials; environmental and public
and how to participate in the FERC’s issues that we think deserve attention
proceedings. interest groups; other interested parties;
based on a preliminary review of the affected landowners; Native American
Summary of the Proposed Project proposed facilities and information tribes; libraries, and newspapers; and
provided by Equitrans. This list of the Commission’s official service list for
The project would consist of issues may be changed based on your
construction of about 60 miles of 20- this proceeding. A 49-day comment
comments and our analysis: period will be allotted for review of the
inch-diameter pipeline. The pipeline • The effect of blasting on
would originate at the discharge of the EA. We will consider all comments
groundwater; submitted on the EA in any Commission
existing Kentucky Hydrocarbon plant in • Difficult ROW restoration in areas
Langley, Kentucky and terminate at Order that is issued for the project.
of side slope construction; and We are currently involved in
Tennessee Gas Pipeline Company’s • Impact on visual resources due to
Broad Run Lateral in Carter County, discussions with other jurisdictional
vegetation clearing to create a new agencies to identify their issues and
Kentucky. Equitrans would also ROW.
construct one new 5,000 horsepower concerns. These agencies include the
compressor station on the south end of The EA Process U.S. Army Corps of Engineers, U.S. Fish
and Wildlife Service, Kentucky
the line. One pig launcher, one pig The FERC will be the lead federal Department of Environmental
receiver, eight mainline valves, and one agency for the preparation of the EA. Protection—Division of Water,
new metering and regulating station The document will satisfy the Kentucky Department of Fish and
would also be constructed along the requirements of the National Wildlife, Kentucky Department of
pipeline. Location maps depicting Environmental Policy Act (NEPA). The Natural Resources, Kentucky State
Equitrans’ proposed facilities are Big Sandy Pipeline Project is in the Nature Preserve Commission, Kentucky
provided in Appendix 1.1 preliminary design state. Heritage Council, and the Eastern Band
Equitrans indicates that these For this project, the FERC staff has of Cherokee Indians. By this notice, we
facilities are needed to provide much initiated its National Environmental are asking these and other federal, state,
needed relief for the summer capacity Policy Act (NEPA) review prior to and local agencies with jurisdiction
constraints that are currently restricting receiving the application. The purpose and/or special expertise with respect to
gas production in the eastern Kentucky of the Commission’s Pre-Filing Process environmental issues to formally
basin. is to involve interested stakeholders cooperate with us in the preparation of
Equitrans anticipates filing an early in project planning and to identify the EA. Agencies that would like to
application with the FERC in June 2006. and resolve issues before an application request cooperating status should follow
If approved, Equitrans would seek is filed with the FERC. A docket number the instructions for filing comments
approval to begin construction by (PF06–12–000) has been established to provided below.
September 2006, with a proposed in- place information filed by Equitrans,
service date of April 1, 2007. and related documents issued by the Public Participation
1 The appendices referenced in this notice are not
Commission, into the public record. You can make a difference by
being printed in the Federal Register. Copies are
Once a formal application is filed with providing us with your specific
rmajette on PROD1PC67 with NOTICES1

available on the Commission’s website (excluding the FERC, a new docket number will be comments or concerns about the
maps) at the ‘‘eLibrary’’ link or from the established. proposals. Your comments should focus
Commission’s Public Reference Room or call (202) NEPA requires the Commission to on the potential environmental effects,
502–8371. For instructions on connecting to
eLibrary refer to the end of this notice. Copies of
take into account the environmental reasonable alternatives and measures to
the appendices were sent to all those receiving this impacts that could result from an action avoid or lessen environmental impact.
notice in the mail. whenever it considers the issuance of a The more specific your comments, the

VerDate Aug<31>2005 15:10 Feb 09, 2006 Jkt 208001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\10FEN1.SGM 10FEN1
7030 Federal Register / Vol. 71, No. 28 / Friday, February 10, 2006 / Notices

more useful they will be. Please For additional information, please documents. To register for this service,
carefully follow these instructions to contact the Commission’s Office of go to http://www.ferc.gov/
ensure that your comments are received External Affairs at 1–866–208–FERC esubscribenow.htm.
in time and properly recorded: (3372). Public meetings or site visits will be
• Send an original and two copies of posted on the Commission’s calendar
Equitrans Sponsored Open Houses
your letter to: Magalie R. Salas, located at http://www.ferc.gov/
Secretary, Federal Energy Regulatory You may have also been notified by EventCalendar/EventsList.aspx along
Commission, 888 First St., NE., Room Equitrans that it plans on holding two with other related information.
1A, Washington, DC 20426; public open houses designed to provide You can also contact David J.
• Label one copy of the comments for opportunities to explain the project to Spigelmyer, Equitrans Representative,
the attention of Gas Branch 1, DG2E; stakeholders. OEP staff will be attending by phone at (412) 553–5739 or by e-mail
• Reference Docket No. PF06–12–000 these events and will be available to at dspigelmyer@eqt.com with your
on the original and both copies; and answer questions about the NEPA specific concerns or comments
• Mail your comments so that they process. FERC staff may utilize these regarding this project.
will be received in Washington, DC on open houses to determine the amount of
or before March 24, 2006. stakeholder interest in the project to Magalie R. Salas,
Please note that the Commission identify if a FERC sponsored public Secretary.
encourages electronic filing of scoping meeting would be necessary in [FR Doc. E6–1856 Filed 2–9–06; 8:45 am]
comments. See 18 Code of Federal the project area at a later date. The BILLING CODE 6717–01–P
Regulations 385.2001(a)(1)(iii) and the location and dates for Equitrans’ open
instructions on the Commission’s houses are as follows:
Internet Web site at http://www.ferc.gov February 22, 2006 at 6:30 p.m. (EST); DEPARTMENT OF ENERGY
under the ‘‘eFiling’’ link and the link to Paintsville Ramada Inn, 624 James
the User’s Guide. Prepare your Trimble Blvd., Paintsville, Federal Energy Regulatory
submission in the same manner as you Kentucky. Commission
would if filing on paper and save it to February 23, 2006 at 6:30 p.m. (EST);
a file on your hard drive. Before you can Louisa Community Center, 101 [Docket No. PF06–10–000]
file comments you will need to create an West Pike St., Louisa, Kentucky.
account by clicking on ‘‘Login to File’’ Cameron LNG L.L.C.; Notice of Intent
and then ‘‘New User Account.’’ You will Environmental Mailing List to Prepare an Environmental
be asked to select the type of filing you The determination of whether to Assessment for the Proposed Terminal
are making. This filing is considered a distribute the EA for public comment Expansion Project and Request for
‘‘Comment on Filing.’’ will be based on the response to this Comments on Environmental Issues
When Equitrans submits its notice. If you are interested in receiving
it, please return the Information Request February 3, 2006.
application for authorization to
construct and operate the Big Sandy (Appendix 2). The staff of the Federal Energy
Pipeline Project, the Commission will Regulatory Commission (FERC or
Availability of Additional Information Commission) will prepare an
publish a Notice of Application in the
Federal Register and will establish a Additional information about the environmental assessment (EA) that will
deadline for interested persons to project is available from the discuss the environmental impacts of
intervene in the proceeding. Because the Commission’s Office of External Affairs Cameron LNG L.L.C.’s (Cameron)
Commission’s Pre-Filing Process occurs at 1–866–208 FERC (3372) or on the proposed Terminal Expansion Project
before an application to begin a FERC Internet Web site (http:// involving construction and operation of
proceeding is officially filed, petitions www.ferc.gov). Using the ‘‘eLibrary’’ facilities in Cameron Parish, Louisiana.
to intervene during this process are link, select ‘‘General Search’’ from the This EA will be used by the
premature and will not be accepted by eLibrary menu, enter the selected date Commission in its decision-making
the Commission. range and ‘‘Docket Number’’ (i.e., PF06– process to determine whether to
12–000), and follow the instructions. authorize the project.
Site Visit Searches may also be done using the This notice announces the opening of
On February 22 and 23, 2006, the OEP phrase ‘‘Big Sandy Pipeline’’ in the the scoping process that the
staff will conduct a pre-certification site ‘‘Text Search’’ field. For assistance with Commission will use to gather
visit of the planned Big Sandy Pipeline access to eLibrary, the helpline can be environmental input from the public
Project. reached at 1–866–208–3676, TTY (202) and interested agencies on the Terminal
We will view the proposed route and 502–8659, or at Expansion Project. Your input will help
variations that are being considered for FERCOnlineSupport@ferc.gov. The determine which issues need to be
the planned pipeline. Staff will view the eLibrary link on the FERC Internet Web evaluated in the EA. Please note that the
area by helicopter on February 22, 2006, site also provides access to the texts of scoping period will close on March 6,
and by automobile and on foot on formal documents issued by the 2006. Details on how to submit
February 23, 2006. Representatives of Commission, such as orders, notices, comments are provided in the Public
Equitrans will be accompanying the and rule makings. Participation section of this notice.
OEP staff. In addition, the FERC now offers a This notice is being sent to affected
All interested parties may attend the free service called eSubscription that landowners; federal, state, and local
site visit on February 23, 2006. Those allows you to keep track of all formal government agencies; elected officials;
rmajette on PROD1PC67 with NOTICES1

planning to attend must provide their issuances and submittals in specific environmental and public interest
own transportation. If you are interested dockets. This can reduce the amount of groups; Native American tribes; other
in attending the site visit, please meet time you spend researching proceedings interested parties; and local libraries
us at 8 a.m. in the parking lot of the by automatically providing you with and newspapers. State and local
Paintsville Ramada Inn, 624 James notification of these filings, document government representatives are asked to
Trimble Blvd, Paintsville, Kentucky. summaries, and direct links to the notify their constituents of this planned