Engineers
Vijayashankar, Suriyaprakash
Fitters
Indrajeet,Dharmendar, Srikanth, Pandey, Manojkumar & Raham
Manpower Details:
Gets
Harimukunda Reddy
Date
1-Feb-15
Time
Defect
Type of
Total
Sino
Area
Equipment
No
Job
Hrs
Start End
1
WTP
PM
8:30
10:30
2.0
BLR
PM
10:30
12:00
1.5
ESP
PM
13:00
14:30
1.5
MINS
PM
15:00
17:00
2.0
Total
Hrs
Equipment
Mins
Defect
Sino
No
1-Feb-15
Time
Type of
Area
Job
Start End
WTP
PM
9:00
10:30
1.5
MINS
PM
15:00
17:00
2.0
BLR
PM
10:30
12:00
1.5
STG
PM
13:00
14:30
1.5
ESP
CRM
8:30
12:00
3.5
ESP -1
ESP
CRM
13:00
17:00
4.0
ESP - 2
CHP
CRM
10:00
17:00
6.0
ASH
GEN
8:30
12:00
3.5
1.
2.
NO OF CONSUMABLES USED:
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
B/D-BREAK
DOWN, PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
PM
Day Compliance
Defect/ Observation
PM
PM
PM
Permit
No
3671
3670
3672
PM
PM job carried out for Scavenging Air Blower, Equipment throwely cleaned,
Impeller free rotation was checked, All fasteners bolt tightness was checked.
Take trial run found normal.
3673
Alignment work
3680
3681
2
6
1
Man Power
Man
Power
Total
Hrs
4.0
3.0
3.0
4.0
Engineer /
Technician
Man
Power
Total
Hrs
Spares Consumed
3.0
Cotton waste
4.0
Cotton waste
3.0
Cotton waste
3.0
Cotton waste
Status
COMPLETED
COMPLETED
COMPLETED
COMPLETED
Patel, Dharmendar &
GET
10.5
Cotton waste
12.0
Cotton waste
Indarjeet,
18.0
Rahaman,
Manojkumar & Helper
10.5
OD-MODIFICATION,FI - FOR
DLING PLANT, LHS - LIME
COMPLETED
UNDERPROGRESS
COMPLETED
UNDERPROGRESS
WTP
PM
8:30
10:30
2.0
MGF Blower
WTP
PM
10:30
12:00
1.5
SMBS Agitator
BLR
PM
13:00
15:00
2.0
ESP
CRM
8:30
17:00
7.5
ESP
Total
Hrs
Equipment
Mins
Defect
Sino
No
2-Feb-15
Time
Type of
Area
Job
Start End
ESP
CRM
8:30
12:00
3.5
ESP
WTP
PM
13:00
15:30
2.5
MGF Blower
WTP
PM
11:00
12:00
1.0
SMBS Agitator
ASH
GEN
8:30
16:00
6.5
BLR
PM
8:30
11:00
2.5
STG
CRM
16:00
17:00
1.0
ESP
CRM
13:00
17:00
4.0
ESP
1.
2.
NO OF CONSUMABLES USED: Cottonwaste
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
7 No's
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
Day Compliance
Defect/ Observation
Permit
No
Alignment work
3687
PM
PM job carried out for MGF Blower, Equipment throwely cleaned, Oil level
was check normal, " V" - Belt tightness was check normal, All fastener
tightness was checked. Take trial run found normal.
3688
PM
3691
Follow up job carried out for ASH handling system ground floor
shed erection work under progress.
3693
PM
3694
Reported job carried out for PRDS attemperator line pine hole leak near by HP
Heater top side. So pinhole position tied with rubber tube then take charging
line rubber not withstand again leak.
3699
3701
Alignment work
Target Date of Co
2
6
3
2
Total Person
13
Man Power
Man
Power
Total
Hrs
4.0
3.0
4.0
15.0
Engineer /
Technician
Man
Power
Total
Hrs
Spares Consumed
10.5
Cotonwaste
Srikanth &
Pothankumar Reddy
5.0
Cotonwaste
Status
COMPLETED
COMPLETED
Srikanth & Pandey
2.0
Cotonwaste
COMPLETED
Rahaman,
Manojkumar,
Kamalesh &
satendrakumar
5.0
Rahaman &
Manojkumar
2.0
26.0
UNDERPROGRESS
Cotonwaste
COMPLETED
UNDERPROGRESS
Dharmendar, Patel &
Ramesh Reddy
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
12.0
COMPLETED
BLR
PM
8:30
12:00
3.5
LRSB - 1
ESP
PM
13:00
15:00
2.0
STG
PM
13:00
16:00
3.0
EOT Crane
Total
Hrs
Equipment
Mins
Defect
Sino
No
3-Feb-15
Time
Type of
Area
Job
Start End
BLR
PM
8:30
12:00
3.5
LRSB - 1
ESP
PM
14:00
15:00
1.0
ESP
ESP
PM
14:00
16:00
2.0
EOT Crane
CHP
CRM
9:00
12:00
3.5
RBC & BC - 3
ASH
GEN
8:30
17:00
7.5
STG
PM
10:00
11:30
1.5
JOP (DC)
ACC
CRM
10:00
11:30
1.5
CEP - 2
STG
CRM
13:00
15:00
2.0
ESP
CRM
15:00
17:00
2.0
ESP
10
ESP
CRM
16:00
17:00
1.0
ESP
11
STG
CRM
16:00
16:30
0.5
CEP - 1
1.
2.
NO OF CONSUMABLES USED: Cottonwaste
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
11 No's
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
Day Compliance
Defect/ Observation
PM
Emitting Rapping
Motor - 2
PM
Belt sway adjust
Ground Floor Shed
Erection
PM
Input oil seal leak
Permit
No
PM job carried out for LRSB-1, Equipment throwely cleaned, Gear box oil
level checked, Worm weel rack grease applied, Gear box support roller grease
was applied, All fasterner bolt tightness checked. Take trial run found normal.
3709
PM job carried out for ESP Emitting Rapping motor - 2, Equipent throwely
cleaned, Gearbox oil level check found normal, All fastener tightness was
checked. Take tria found normal.
3707
PM job carried out for EOT Crane, Equipemnt throwely cleaned, All gearbox
oil level check found normal, All fastener tightness was checked. Take trial
found normal.
3708
Reported job carried out for RBC & BC - 2 belt sway. So sway was adjust.
3709
Follow up job carried out for ASH handling system ground floor
shed erection work under progress.
PM job carried out for JOP (DC), Equipment throwely cleaned,
All fastener tightness was checked.
Reported job carried out for CEP - 2, Gear box Input oil seal
leak found oil level high. So oil was drained. Take trial run
found normal.
Follow up job carried out for PRDS line pin hole leak. So leak position clamp
was fixed. Take charging the line again leak. ( Shutdown Required)
Emitting Rapping
Motor - 1 & 3
Collecting Rapping
Motor - 2
Reported job carried out for ESP Emitting rapping motor - 1 & 3, Online
alignment work was completed.
Reported job carried out for ESP Collecting Rapping motor - 2, Gearbox fixing
work under progress.
3715
3719
3721
3723
3727
3728
3729
Target Date of Co
2
7
3
3
Total Person
15
Man Power
Man
Power
Total
Hrs
7.0
4.0
6.0
Engineer /
Technician
Man
Power
Total
Hrs
Spares Consumed
Cotton waste
Status
COMPLETED
Dharmendar & Helper
2.0
Cotton waste
COMPLETED
Srikanth & Pandey
4.0
7.0
COMPLETED
22.5
UNDERPROGRESS
COMPLETED
Indrajeet &
Pothankumar Reddy
Rahaman &
Manojkumar
COMPLETED
3.0
UNDERPROGRESS
0.5
Dharmendar &
Harikunda Reedy
Satendrakumar,
Kamalesh & Helper
Patel & Ramesh
Reddy
Cotton waste
COMPLETED
COMPLETED
UNDERPROGRESS
COMPLETED
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
COM
Date
Defect
Sino
No
GEN
8:30
17:00
4-Feb-15
Time
Type of
Area
Job
Start End
7.5
Total
Hrs
Equipment
COM
GEN
8:30
17:00
7.5
Plant
BLR
CRM
14:00
17:00
3.0
PA Fan - 2
1.
2.
NO OF CONSUMABLES USED: Cottonwaste
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
2 No's
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
House Keeping
Total Manpower
Day Compliance
Defect/ Observation
House Keeping
General work carried out for Plant inside & Out side House keeping work was
completed.
NDE Bearing vibration Reported job carried out for PA Fan - 2, NDE Bearing vibraion high. So
Bearing clearance - 0.05MM. Take trial run found normal.
high
Permit
No
3748
Target Date of Co
2
6
3
3
Man Power
Man
Power
Total
Hrs
Total Manpower
14
105.0
Engineer /
Technician
Man
Power
Total
Hrs
Total Manpower
14
105
Indrajeet,
Srikanth &
Helper
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
Total Person
14
Spares Consumed
Status
COMPLETED
COMPLETED
BLR
PM
8:30
11:30
2.5
LRSB -2
ESP
CRM
8:30
15:30
7.0
ESP - 2
TG
PM
13:30
14:30
1.0
OVF - 1
TG
PM
14:30 16:00
ESP
CRM
8:30
3:00
5-Feb-15
Time
Type of
Area
Job
Start End
1.5
6.5
GSC - 1
ESP - 2
Total
Hrs
Equipment
4
4
Mins
Defect
Sino
No
BLR
PM
8:30
11:30
2.5
LRSB -2
TG
PM
13:00
14:30
1.0
OVF - 1
TG
PM
14:30
16:00
1.5
GSC - 1
ESP
CRM
8:30
15:30
7.0
ESP - 2
TG
CRM
16:00
17:00
1.0
LP Dosing Agitator
BLR
CRM
9:30
12:30
3.0
Stripper cooler
BLR
CRM
17:00
17:30
0.5
1.
2.
NO OF CONSUMABLES USED: Cotton waste
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
7 No's
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
NEW GEAR SET FITTING
Day Compliance
Defect/ Observation
PM
PM job carried out for LRSB-2, Equipment throwely cleaned, Gear box oil
level checked, Worm weel rack grease applied, Gear box support roller grease
was applied, All fasterner bolt tightness checked. Take trial run found normal.
Hand
permit
PM
PM job carried out for Oil vapour extraction fan-1 , Equipment throwely
cleaned, Impeller free rotation was checked, All fastener bolt tightness was
checked. Take trial run found normal.
Hand
permit
PM
PM job carried out for Gland seal blower-1, Equipment throwely cleaned,
Impeller free rotation was checked, All fastener bolt tightness was checked.
Take trial run found normal.
Hand
permit
Collecting Rapping Follow up job carried out for ESP - 2, Collecting rapping new Gear motor was
Gear motor fixing work fix & Alignment work was completed. Take trial run found normal.
Hand
permit
Reported job carried out for LP Dosing agitator, Shaft fell down
Hand
inside the tank . So shaft was fixed. Trial taken run found
permit
normal.
Reported job carried out for Stripper cooler Bed material
Hand
Line dummy removed bunker conveying line dummy was replaced to bed material
permit
silo.
Screw feeder jam
Reported job carried out for bed material screw feeder jam was Hand
releasing
released.
permit
Shaft fixing
Target Date of Co
2
6
3
3
Total Person
14
Man Power
Man
Power
Total
Hrs
2.5
7.0
1.0
2
2
1.5
Engineer /
Technician
Man
Power
Total
Hrs
Spares Consumed
Cotton waste
Status
COMPLETED
Pandey & Helper
Cotton waste
COMPLETED
Pandey & Helper
Cotton waste
COMPLETED
indrajeet & rajvanjin
14
indrajeet &
Dharmndran
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
COMPLETED
COMPLETED
COMPLETED
COMPLETED
BLR
CRM
8:30
11:00
2.5
Stripper cooler
BLR
CRM
13:00
14:00
1.0
WTP
CRM
14:30 17:00
ESP
CRM
8:30
3:00
Date
6-Feb-15
Time
Defect
Type of
Sino
Area
No
Job
Start End
1.5
6.5
RO Chemical pump
ESP - 2
Total
Hrs
Equipment
3
4
BLR
CRM
0.35417 0.45833
2.5
Stripper cooler
BLR
CRM
0.54167 0.58333
WTP
CRM
0.60417 0.70833
1.5
RO Chemical pump
COM
GEN
0.35417 0.70833
COM
GEN
0.35417 0.70833
1.
2.
NO OF CONSUMABLES
3.
USED:
NO OF SPARES USED:
Cotton waste
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
5 NO'S
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
Stripper cooler Bed Material silo dummy replace to Bed Material Bunker
CRM
CRM
NEW GEAR SET FITTING
Day Compliance
Defect/ Observation
Reported job carried out for Lime stone RAV - 1 & 2, Transmission chain was
fixed.
1352
Reported job carried out for RO chemical cleaning pump discharge line flange
gasket leak , So gasket to replaced work . Trial taken normal.
1353
shifted at store
Reported job carried out for open yard , All pipes and angles , Shifted at plant
inside work shop.
Hand
Permit
Arrangement
Reported job carried out for plant inside store , All pipes and arrangement in
pipe racks.
Hand
Permit
Target Date of Co
2
7
3
3
Total Person
15
Man Power
Man
Power
Total
Hrs
2.5
2.5
2
2
1.5
Man
Power
Total
Hrs
Spares Consumed
2.5
Engineer /
Technician
Srikanth &
Pandey
Status
COMPLETED
Srikanth &
Pandey
Srikanth &
Pandey
1.5
Rajvanjni Satendrakumar,
kamalesh &
Hepler
COMPLETED
Rubber gasket
COMPLETED
COMPLETED
Patel,
Indrajeet
Manjokumar & Rehman
COMPLETED
MOD-MODIFICATION,FI - FOR
DLING PLANT, LHS - LIME
Engineers
Vijayashankar, Suriyaprakash
Fitters
Indrajeet, Patel, Dharmendar, Srikanth, Pandey, Manojkumar &
Manpower Details:
Riggers
Rajvanjni, Satendrakumar, Kamalesh
Gets
Pothankumar Reddy, Ramesh Reddy, Harikunda Reddy
Date
7-Feb-15
Time
Defect
Type of
Total
S.No
Area
Equipment
No
Job
Hrs
Start End
1
WTP
PM
8:30
11:00
1.5
MB feed pump -1
WTP
PM
11:00
12:00
1.0
DE - gasser blower -1
WTP
PM
13:30
15:30
2.0
4
4
BLR
PM
9:00 12:00
ESP
CRM
8:30
3:00
7-Feb-15
Time
Type of
Area
Job
Start End
3.0
6.5
LDO pump - 2
ESP - 2
Total
Hrs
Equipment
Date
Defect
S.No
No
1
WTP
PM
8:30
11:00
1.5
MB Feed Pump -1
WTP
PM
11:00
12:00
1.0
DE - Gasfier Blower
WTP
PM
13:30
15:30
2.0
BLR
PM
9:00
12:00
3.0
LDO pump - 2
WTP
CRM
10:00
16:00
4.0
New Dm tank
CHP
LUB
10:00
12:00
2.0
ESP
CRM
13:00
17:00
4.0
ESP - 3
1.
2.
NO OF CONSUMABLES USED: Cotton waste & EP2 Grease - 2 Kg
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
07 No's
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
PM
NEW GEAR SET FITTING
Day Compliance
Defect/ Observation
Permit
No
PM
PM job carried out for MB feed Pump-1, Equipment throwely cleaned, All
fastener tightness checked. Take trial found normal.
1357
PM
1354
PM
1360
PM
PM job carried out for LDO Pump - 2, Equipment throwely cleaned, All
fastener tightness was checked. Take trial run found normal.
1359
Reported job carried out for New DM tank, S.S line welding
joint leak arrested
1356
Bearing Lubrication
Reported job carried out for Vibrating screen & Crusher, DE &
NDE side bearing lubrication was applied.
1355
Reported job carried out for ESP -3 Field collecting system gear
inter change, Take trial run found abnormal sound, so inspect
the gear box found input gear was damaged.
1361
Target Date of Co
2
7
3
3
Total Person
15
Man Power
Man
Power
Total
Hrs
3.0
2.0
4.0
2
2
6.0
Man
Power
Total
Hrs
Spares Consumed
Srikanth &
Pandey
Cotton waste
Srikanth &
Pandey
Cotton waste
Srikanth &
Helper
Cotton waste
Cotton waste
Rahman &
Manojkumar
Dharmendar &
pandey
Cotton waste
Engineer /
Technician
Status
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
UNDERPROGRESS
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
TG
PM
8:30
12:00
2.5
ACC - 3
TG
PM
13:00
15:00
2.0
ACC - 2
WTP
PM
9:00
10:00
1.0
MB - REGENRATION PUMP
4
4
WTP
PM
10:30 11:30
ESP
CRM
8:30
3:00
8-Feb-15
Time
Type of
Area
Job
Start End
1.0
6.5
MB - BLOWER
ESP - 2
Total
Hrs
Equipment
Date
Defect
S.no
No
1
TG
PM
8:30
12:00
2.5
ACC -3
TG
PM
13:00
15:00
2.0
ACC - 2
WTP
PM
9:00
10:00
1.0
MB - REGENRATION PUMP
WTP
PM
10;30
11:30
1.0
MB -BLOWER
BLR
CRM
9:00
12:00
3.0
HP Dosing pump - 1
COM
CRM
9:00
16:00
7.0
Pipe Fabrication
1.
2.
NO OF CONSUMABLES USED: Cotton waste
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
6 No's
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
PM
Man Power
PM
PM
PM
NEW GEAR SET FITTING
Day Compliance
Defect/ Observation
Permit
No
PM
PM job carried out for ACC fan-3, Equipment throwely cleaned, Fan blade
angle was checked - 10 , Oil level check in normal, All fastener tightness was
checked. Take trial run found normal.
1363
PM
PM job carried out for ACC fan-2, Equipment throwely cleaned, Fan blade
angle was checked - 10 , Oil level check in normal, All fastener tightness was
checked. Take trial run found normal.
1367
PM
1364
PM
PM job carried out for MB Blower, Equipment throwely cleaned, Oil level was
check normal, V-belt condition was check in normal, All fastener tightness
was checked. Take trial run found normal.
1365
Reported job carried out for HP DOSING Pump -1, Gland leak,
So gland packing was replaced. Trial take run found normal.
1362
Reported job carried out for Pipe Line fabrication in labor room
1366
Gland leak
Target Date of Co
2
7
1
Total Person
10
Man Power
Man
Power
Total
Hrs
5.0
4.0
2.0
2
2
2.0
Engineer /
Technician
Man
Power
Total
Hrs
Spares Consumed
Indrajeet &
Dharmendar
Cotton waste
Status
COMPLETED
Srikanth & Indrajeet
Cotton waste
COMPLETED
Srikanth &
Helper
Cotton waste
COMPLETED
Srikanth &
Helper
Cotton waste
COMPLETED
Patel &
Pandey
Rahman &
Helpers
21
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
Teflon
COMPLETED
Underprogrees
BLR
PM
8:30
12:00
2.5
LRSB - 3
BOP
PM
8:30
12:00
2.5
WTP
PM
13:30
15:30
2.0
RO -Feed pump - 1
4
4
WTP
PM
15:30 17:00
ESP
CRM
8:30
3:00
9-Feb-15
Time
Type of
Area
Job
Start End
1.5
6.5
PH - Corrosion agitator
ESP - 2
Total
Hrs
Equipment
Date
Defect
S.No
No
BLR
PM
8:30
12:00
2.5
LRSB - 3
BOP
PM
8:30
12:00
2.5
WTP
PM
13:30
15:30
2.0
RO Feed pump - 1
WTP
PM
15:30
17:00
1.5
PH - Corrosion Agitator
TG
CRM
13:00
15:00
2.0
BLR
CRM
10:00
18:00
9.0
ESP
CRM
9:00
17:00
8.0
1.
2.
NO OF CONSUMABLES USED: Cotton waste
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN( PTW NOS): 07 No's
Emitting discharge
system - 6
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
PM
PM
PM
PM
NEW GEAR SET FITTING
Day Compliance
Defect/ Observation
Man Power
Permit
No
PM
PM job carried out for LRSB-3, Equipment throwely cleaned, Gear box oil
level checked, Worm weel rack & Gear box support roller lubrication was
applied, All fasterner bolt tightness checked. Take trial run found normal.
1368
PM
PM job carried out for Service air compressor-1, Equipment throwely cleaned,
Oil level found in normal, Suction air filterwas cleaned. All fastener tightness
checked. Take trial run found normal.
1369
PM
PM job carried out for RO Feed Pump-1, Equipment throwely cleaned, All
fastener bolt tightness checked. Take trial found normal.
1371
PM
1370
Handills fixing
1375
Reported job carried out for Small DCF (706), Inlet chute got
jam. And hammering the hopper. But jam not released.
1372
Alignment work
1373
Target Date of Co
2
7
3
2
Total Person
14
Man Power
Man
Power
Total
Hrs
5.0
5.0
4.0
2
2
3.0
Engineer /
Technician
Man
Power
Total
Hrs
Spares Consumed
Status
COMPLETED
Dharmendra &
Rajvanjni
Cotton waste
COMPLETED
Dharmendra &
Rajvanjni
Cotton waste
Dharmendra &
Rajvanjni
Cotton waste
COMPLETED
COMPLETED
Rehman &
Manojkumar
Rehman,
Manojkumar,
Dharmendra,
kamalesh & Rajvanji
45
Patel &
Helpers
COMPLETED
UNDERPROGRESS
2
16
UNDERPROGRESS
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
BLR
PM
8:30
12:00
3.5
WTP
PM
8:30
10:30
2.0
DM Transfer pump -1
3
4
WTP
PM
15:00 16:00
ESP
CRM
8:30
3:00
10-Feb-15
Time
Type of
Area
Job
Start End
1.0
6.5
Total
Hrs
Equipment
Date
Defect
S.No
No
BLR
PM
8:30
12:00
3.5
ESP
CRM
9:00
12:00
3.0
ESP - 6
CHP
CRM
13:00
15:00
WTP
PM
13:00
15:00
2.0
DM Transfer pump -1
WTP
PM
15:00
16:00
1.0
CRM
15:00
17:00
CHP
Caustic Unloading
Pump -1
WTP
GEN
16:00
17:00
1.0
New DM TANK
CHP
CRM
16:00
17:30
1.5
CHP
GEN
10:00
17:00
8.0
10
ESP
CRM
13:00
17:00
4.0
ESP -3
1.
2.
NO OF CONSUMABLES USED: Cotton waste
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
10 NO'S
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
NEW GEAR SET FITTING
Day Compliance
Defect/ Observation
Permit
No
PM
1376
Follow up job carried out for ESP -6 field, Emitting Rapping gear motor realignment work was completed. Take trial run found normal.
1377
RE - Alignment
Inspection work
PM
PM
1378
1379
1380
1381
1382
1383
1384
1385
Target Date of Co
1
7
3
3
Total Person
14
Man Power
Man
Power
Total
Hrs
7.0
4.0
2
2
2.0
Engineer /
Technician
Man
Power
Total
Hrs
Spares Consumed
Dharmandar &
Satendrakumar
Cotton waste
Status
COMPLETED
Patel,
Indrajeet &
Helper
Srikanth &
Pandey
Cotton waste
Srikanth &
Pandey
Cotton waste
COMPLETED
COMPLETED
COMPLETED
16
COMPLETED
12
Dharmandar
Dharmandar
pandey &
Helper
srikanth &
Helper
Rehman &
Manojkumar
Patel,
Indrajeet &
Helper
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
COMPLETED
COMPLETED
COMPLETED
COMPLETED
UNDERPROGRESS
BOP
PM
8:30
11:30
2.0
INC -1
BLR
PM
11:30
14:00
2.5
SRSB - 1
WTP
PM
14:00
15:00
1.0
HCL U / N PUMP -1
4
4
WTP
PM
ESP
CRM
11-Feb-15
Type of
Area
Job
15:00
8:30
16:00
3:00
1.0
6.5
N -PIT UMP -2
ESP - 2
Total
Hrs
Equipment
Date
S.no
Defect No
Time
Start
End
BOP
PM
8:30
11:30
BLR
PM
11:30
14:00
2.5
SRSB - 1
WTP
PM
14:00
15:00
1.0
WTP
PM
15:00
16:00
1.0
N -PIT UMP -2
ESP
CRM
8:30
17:00
7.5
ESP - 3
CHP
GEN
9:00
10:00
1.0
BUNKER TOP
WTP
GEN
16:00
17:00
1.0
NEW DM TANK
WTP
GEN
13:00
17:00
4.0
NEW DM TANK
com
GEN
9:00
11:00
2.0
STORE
10
BLR
GEN
10:00
12:00
2.0
DCF -706
1.
2.
NO OF CONSUMABLES USED: cotton waste
3.
NO OF SPARES USED:
NO OF BREAKDOWNS:
Instrument Air
Compressor -1
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
10 No's
B/D-BREAK
DOWN,
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECT
ABRIVATIONS INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLAN
STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
PM
NEW GEAR SET FITTING
Day Compliance
Defect/ Observation
Permit
No
PM
1389
PM
PM job carried out for SRSB- 1 , Equipment throwely cleaned, Gear box oil
level checked, Worm weel rack grease applied, Gear box support roller grease
was applied, All fastrner bolt tightness checked. Take trial run found normal.
1386
PM
PM job carried out for HCL Unloading pump - 1, Equipment throwely cleaned,
Oil level check in normal, All fastener bolt tightness was checked.
1394
PM
PM job carried out for N-pit pump - 1, Suction filter was cleaned, All valve
lubrication was applied, All fastener tightiness checked. Take trial run found
normal.
1395
1390
Manual door
Follow up job carried out for RAC Bottom chute manual door leak inspection
work done.
1388
Manual door
Follow up job carried out for DM Tank, Manual door leak was arrested.
1396
CAM Replaced
General work carried out for New DM tank discharge line connect to DM
SS Pipe connecting work transfer pump suction line work was completed. Take charging line found
normal.
General work job carried out for store back side grounting plate fabricated &
Grouting plate
fixed.
Reported job carried out for DCF manual door fabrication job work under
Manual door
progress.
1391
1392
1393
Target Date of Co
1
6
3
3
Man Power
Man
Power
Total
Hrs
2.0
2.5
1.0
2
2
1.0
Engineer / Technician
Srikanth &
pandey
Total Person
13
Man
Power
Total Hrs
Spares Consumed
Cotton waste
Status
COMPLETED
Srikanth &
pandey
Cotton waste
COMPLETED
Srikanth &
pandey
Cotton waste
Srikanth &
Hepler
Cotton waste
Patel &
Helper
15
COMPLETED
Rahman &
Helper
COMPLETED
Pandey &
Helper
COMPLETED
COMPLETED
UNDERPROGRESS
Rahman &
Rajvanji
Indrajeet & Manojkumar
Rahman &
Rajvanji
COMPLETED
COMPLETED
COMPLETED
OD-MODIFICATION,FI - FOR
LING PLANT, LHS - LIME
TG
PM
8:30 12:00 3.5
ESP
CRM
8:30
3:00
6.5
Date
12-Feb-15
Time
Defect
Type
Total
S.No
Area
No
of Job Start End
Hrs
ACC Fan - 5
ESP - 2
Equipment
TG
PM
8:30
12:00
3.5
ACC Fan - 5
ESP
CRM
8:30
17:00
8.0
ESP - 5
BLR
CRM
9:00
11:00
2.0
DCF 706
WTP
GEN
8:30
12:00
3.5
General
WTP
GEN
10:00 16:00
6.0
INTIAL FILLING
BLR
CRM
13:00 19:00
6.0
1.
2.
NO OF CONSUMABLES
3.
USED:
NO OF SPARES USED:
Cotton waste
NO OF BREAKDOWNS:
NO OF DEFECTS
IDENTIFIED:
NO OF DEFECTS
ATTENDED:
PERMITS TAKEN( PTW
06 NO'SPM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIV
B/D-BREAK DOWN,
NOS):
ABRIVATION
FOR INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING P
S
LIME STONE HANDLING, OH - OVERHAULING, SD - SHUTDOWN
Date
Equipment
Job Description
Day Planning
Job Description
PM
NEW GEAR SET FITTING
Day Compliance
Defect/ Observation
PM
Reported job carried out for ESP -5, Rapping mechanism cam replacing work
was completed.
Follow up job carried out for DCF Suction chute inspection door fabrication
Manual door
work
Follow up job carried out for Coal sampling tray fabrication work was
Coal sample tray fab.
completed.
Reported job carried out for Initial filling pump suction, side new DM tank line
S.S PIPE LINE
connecting work was completed.
PM
Man Power
1398
1399
1400
1401
1402
Target Date of Co
2
7
3
3
Total Person
15
Man Power
Man
Power
Total
Hrs
2
2
3.5
Engineer /
Technician
Man
Power
Total
Hrs
Spares Consumed
Pandey &
Dharmendar
Cotton waste
Status
COMPLETED
Patel &
Indrajeet
16
COMPLETED
UNDERPROGRESS
Manojkumar &
Kamalesh
COMPLETED
36
COMPLETED
Pandey, Dharmendar,
Kamalesh &
Satendrakumar
24
UNDERPROGRESS
BLR
PM
8:30
12:00
3.5
SRSB - 2
WTP
PM
8:30
10:30
2.0
BLR
CRM
8:30
17:00
7.5
DCF - 706
Total
Hrs
Equipment
Date
13-Feb-15
Type of
Area
Job
Time
Start
End
BLR
CRM
8:30
17:00
7.5
DCF - 706
BLR
PM
8:30
12:00
3.5
SRSB - 2
WTP
PM
8:30
10:30
2.0
STG
CRM
11:00
12:00
1.0
PRDS
COM
GEN
14:00
17:00
3.0
Punch machine
BLR
CRM
14:00
18:30
4.5
WTP
GEN
14:00
15:00
1.0
CHP
GEN
15:00
17:00
2.0
Sino
Defect No
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(B/D-BREAK
PTW NOS):DOWN,8 No's
PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAIN
ABRIVATIONS - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WATER TREATMENT
SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
rimukunda Reddy
Day Planning
Job Description
Man Power
PM
PM
Coal feeding chain assembling work
Indrajeet &
Day Compliance
Defect/ Observation
Permit
No
Follow up job carried out for DCF - 706, Coal feeding chain damage plates
was welded, Bend plates was corrected and then chain was fixed, Take trial run
found normal and all inspection door was closed.
1403
PM
PM job carried out for SRSB - 2, Equipment throwely cleaned, Gear box oil
level checked, Worm weel rack grease applied, Gear box support roller grease
was applied, All fastener bolt tightness checked. Take trial run found normal.
1404
PM
PM job carried out for ACT Make-up Pump - 1, Equipment throwely cleaned,
Oil level checked found normal, All fastener bolt tightness checked. Take trial
found normal.
1405
Reported job carried out for PRDS Drain line leak near drain header. So tools
piece was welded. Take changing line found normal.
1406
General work carried out for Punch machine frame fixing work was completed.
1407
Reported job carried out for Wall Seal blower - 2, Free hand rotate found
slightly jam, so both side oil cover was removed inspect found normal and
then box upped, Oil top-upped. Take trial run found normal.
1408
Follow up job carried out for New DM tank SS line connect to initial filling
pump suction side, take service pin hole leak. So metal built up work was
completed.
1409
Reported job carried out Lime stone conveying line SOV fixing work was
finished.
1410
Pothan
Reddy
1
7
3
3
Total Person
14
Man Power
Man
Power
Total Hrs
7.0
4.0
37.5
Engineer / Technician
Man
Power
Total Hrs
Spares Consumed
Dharmendar, Patel,
Manojkumar, Rajvanjni &
Harimukunda Reddy
37.5
Cottonwaste
Indrajeet &
Pothankumar
Reddy
Status
COMPLETED
Srikanth &
Ramesh
Reddy
Cottonwaste
COMPLETED
Indrajeet & Pothankumar
Reddy
Cotton waste
COMPLETED
Rahaman, Satendrakumar,
Kamalesh
13.5
COMPLETED
COMPLETED
Cotton waste &
Oil - 3 Ltrs
320
COMPLETED
Rahaman, Satendrakumar,
Kamalesh
Rahaman, Satendrakumar,
Kamalesh
COMPLETED
COMPLETED
Date
STG
PM
8:30
11:00
2.5
ACC Fan - 6
BLR
PM
8:30
11:00
2.5
SRSB - 3
WTP
PM
13:00
15:00
2.0
ACT Fan - 1
Total
Hrs
Equipment
14-Feb-15
Type of
Area
Job
Time
Start
End
STG
PM
8:30
11:00
2.5
ACC Fan - 6
BLR
PM
8:30
11:00
2.5
SRSB - 3
WTP
PM
8:30
10:30
2.0
STG
GEN
8:30
10:00
1.5
EOT Crane
CHP
CRM
8:30
11:30
3.0
RBC
WTP
PM
10:30
11:30
1.0
RO CI Pump
WTP
PM
11:30
15:00
2.5
Barine Agitator
STG
GEN
13:00
17:00
4.0
ESP
CRM
11:30
17:00
4.5
ESP
10
BOP
CRM
13:00
15:00
2.0
S.No Defect No
11
WTP
CRM
14:00
14:30
0.5
SMBS
12
WTP
PM
14:30
16:30
2.0
ACT Fan - 1
13
STG
CRM
14:00
14:30
0.5
Ejector
14
BLR
GEN
14:00
17:00
3.0
DCF'S
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(B/D-BREAK
PTW NOS):DOWN,14PM-PREVENTIVE
No's
MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAIN
ABRIVATIONS BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WATER TREATM
OVERHAULING, SD - SHUTDOWN
PENDING JOB L
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
Day Compliance
Defect/ Observation
Permit
No
PM
PM job carried out for ACC fan-6, Equipment throwely cleaned, Fan blade
angle in 10 , Oil level check found normal, Oil filter was cleaned, All fastner
bolt tightness was checked. Take trial run found normal.
1411
PM
PM job carried out for SRSB - 3, Equipment throwely cleaned, Gear box oil
level checked, Worm weel rack grease applied, Gear box support roller grease
was applied, All fastrner bolt tightness checked. Take trial run found normal.
1412
PM
PM job carried out for Softner Feed Pump-1, Equipment throwely cleaned, All
fastner bolt tightness checked. Take trial found normal.
1413
General work carried out for EOT Crane remote stand was fixed & Wet and
Dry bulb was fixed.
1414
Reported job carried out for RBC, Scatt rubber frame side coal spillage found
pin hole. So patch welding work was completed.
1415
PM
PM job carried out for RO CI Pump, Equipment throwely cleaned, All fastener
bolt tightness was checked. Take trial run found normal.
1416
PM
PM job carried out for Braine Agitator, Equipment throwely cleaned, Coupling
sprider got damage spare nill. So SMBS agitator coupling sprider was replaced,
All fastener bolt tightness was checked. Take trial run found normal.
1417
Follow up job carried out for Vaccum loop line fabrication work under
progress.
1418
Modification work
4th field Emitting cam shaft Reported job carried out for ESP 4th field Emitting mechanism new cam was
replacing work
replaced. Take trial run found normal.
1419
Reported job carried out for Inst & Service Air Receiver Tank, Auto drain line
fitting leak. So both tank leak was arrested.
1420
PM
Outlet line
Inlet chute inspection
PM Job carried out for ACT Fan - 1, Equipment throwely cleaned, Blade angle
- 10, Gear box oil top up, All fastener bolt tightness was
checked. Take trial run found normal.
Reported job carried out for Ejector CEP Outlet line 1/2 '' valve slightly
passing. So dummy was fixed.
Follow up job carried out for Small DCF'S Inlet chute inspection door
fabrication work under progress.
1421
1422
1423
1425
1
6
3
3
Total Person
13
Man Power
Man
Power
Total Hrs
7.5
5.0
4.0
Engineer / Technician
Man
Power
Total Hrs
Spares Consumed
7.5
Cottonwaste
Status
COMPLETED
Pandey &
Ramesh
Reddy
Cottonwaste
COMPLETED
Srikanth & Helper
Cottonwaste
4.5
Cottonwaste
Cottonwaste
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
Manojkumar, Kamelash &
Helper
12
Dharmendar &
Harimukunda Reddy
Pandey &
Ramesh
Reddy
UNDERPROGRESS
Cam
1No
COMPLETED
COMPLETED
COMPLETED
Cottonwaste &
320 Oil - 3 Ltrs
COMPLETED
Indrajeet & Pothanreddy
Rajvanjni &
Satendrakumar
1/2 "
Dummy - 1 No
COMPLETED
UNDERPROGRESS
CHP
PM
8:30
9:30
1.0
BC - 1
CHP
PM
8:30
10:00
1.5
BC - 1 ( RPG Gate)
CHP
PM
10:00
12:00
2.0
CHP
PM
9:30
12:00
2.5
BC - 2
CHP
PM
13:00
16:00
3.0
RBC - 1
Total
Hrs
Equipment
Date
15-Feb-15
Type of
Area
Job
Time
Start
End
CHP
PM
8:30
9:30
BC - 1
CHP
PM
8:30
10:00
1.5
BC - 1 ( RPG Gate)
CHP
PM
10:00
12:00
2.0
CHP
CRM
8:30
17:00
7.5
Lime Stone
CHP
PM
9:30
12:00
2.5
BC - 2
CHP
PM
13:00
16:00
3.0
RBC - 1
DM
CRM
13:00
15:00
2.0
DM
GEN
15:00
17:00
2.0
S.No Defect No
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
DE - Blower
( Crusher House)
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(B/D-BREAK
PTW NOS):DOWN, PM-PREVENTIVE
8 No's
MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAIN
ABRIVATIONS - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WATER TREATMENT
SHUTDOWN
PENDING JOB
Sino
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
PM
PM
Day Compliance
Defect/ Observation
Permit
No
PM
PM job carried out for BC -1, Equipment throwely cleaned, All pulley
lubrication applied, Gear box oil level - 50 %, Return idler & caring idler
checked found normal. All fastener tightness was checked.
1426
PM
PM job carried out for BC - 1 ( RPG Gate), Equipment throwely cleaned, Gear
box oil level - 50 %, All fastener tightness was checked.
1427
PM
1428
Air receiver tank top side General work carried out for Air receiver tank top side got missed. So new
dummy fixing work
dummy was fixed.
1429
PM
PM job carried out for BC -2, Equipment throwely cleaned, All pulley
lubrication applied, Gear box oil level - 50 %, Return idler & caring idler
checked found normal. All fastener tightness was checked.
1430
PM
PM job carried out for RBC -1, Equipment throwely cleaned, All pulley
lubrication applied, Gear box oil level - 50 %, Return idler & caring idler
checked found normal. All fastener tightness was checked.
1431
Gland Leak
Reported job carried out for Softener Feed Pump - 2, Gland leak. So new gland
rope was replaced. Take trial run found normal
1424
General work carried out for Caustic Dilutation Tank front side tank got crack.
So M- Seal was applied.
1424
1
7
1
Man Power
Man
Power
Total Hrs
2.0
3.0
4.0
5.0
6.0
Engineer / Technician
Man
Power
Total Hrs
Total Person
9
Spares Consumed
Cotton waste &
Grease - 0.5 Kg
Status
EP2
COMPLETED
Indrajeet & Dharmendar
Cotton waste
COMPLETED
COMPLETED
Rahman, Patel & Helper
22.5
COMPLETED
Cotton waste &
Grease - 1 Kg
EP2
COMPLETED
Srikanth & Pandey
EP2
COMPLETED
Indrajeet & Dharmendar
COMPLETED
COMPLETED
CHP
PM
8:30
12:00
3.5
Crusher
CHP
PM
8:30
12:00
3.5
DE-1 RAV
CHP
PM
8:30
12:00
3.5
BC - 3
BLR
GEN
8:30
17:00
7.5
RSC - 1 & 2
Total
Hrs
Equipment
Defect/ Observation
Date
Defect
S.No
No
Discharge H
16-Feb-15
Type of
Area
Job
Time
Start
End
CHP
PM
8:30
12:00
3.5
Crusher
PM
CHP
PM
8:30
12:00
3.5
DE - 1 RAV
PM
CHP
PM
8:30
12:00
3.5
BC - 3
PM
BLR
GEN
8:30
17:00
7.5
RSC - 1 & 2
Inspection door
WTP
GEN
8:30
10:00
1.5
ACT -2
Trip
WTP
CRM
11:00
12:00
1.0
SMBS
WTP
CRM
13:00
17:00
4.0
Caustic
WTP
PM
13:30
16:30
3.0
Guard pond
PM
WTP
CRM
13:30
15:30
2.0
RO Feed Pump - 1
Gland Leak
10
WTP
CRM
15:30
17:00
1.5
Gland Leak
11
BLR
GEN
13:30
17:00
3.5
DCF
Inspection door
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
11 No's
B/D-BREAK
DOWN, PM-PREVENTIVE
MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAINTE
ABRIVATION
INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WA
S
OH - OVERHAULING, SD - SHUTDOWN
Date
Equipment
Job Description
Day Planning
Job Description
PM
PM
Man Power
Dharmendar, Rajvanjni &
RameshReddy
Dharmendar, Rajvanjni &
RameshReddy
PM
Day Compliance
Permit
No
Engineer / Technician
1432
1433
PM job carried out for BC -3, Equipment throwely cleaned, All pulley
lubrication was applied, Gear box oil level - 50%, Return idler & caring idler
checked found normal. Take trial run found normal.
1434
Reported job carried out for RSC - 1 & 2, Discharge hoper inspection door was
fixed.
1435
Reported job carried out for ACT fan -2 , Oil level check in normal, Free
rotation was check found normal.
1436
Reported job carried out for SMBS Dilutation tank was removed.
1437
Reported job carried out for Caustic Dilutation tank front side got cracked. So
interchanged the SMBS Dilutation tank.
1438
PM job carried out for Guard Pond Pump - 2, Equipment throwely cleaned,
Suction strainer was cleaned, All fastener tightness was checked. Take trial run
found normal.
1439
Dharmendar,& Ramesh
Reddy
Reported job carried out for RO feed pump - 1, Gland leak. So new rope was
replaced. Take trial run found normal.
1440
1441
1442
Reported job carried out for Raw Water Pump -1, Gland leak, So new was
replaced. Take trial run found normal.
Follow up job carried out for DCF Inlet chute inspection door fabrication work
was completed.
1
5
3
2
Man
Power
Total
Hrs
10.5
10.5
10.5
22.5
Man
Power
Total
Hrs
10.5
Total Person
11
Spares Consumed
Status
EP2
COMPLETED
3
10.5
Cotton waste
COMPLETED
3
10.5
EP2
COMPLETED
3
22.5
COMPLETED
COMPLETED
COMPLETED
COMPLETED
Cotton waste
COMPLETED
2
Non
Non
COMPLETED
COMPLETED
COMPLETED
Completion
CHP
PM
8:30
12:00
3.5
BC - 4
CHP
PM
8:30
12:00
3.5
ASH
CRM
8:30
17:00
7.5
Telescopic Chute
Total
Hrs
Equipment
Defect/ Observation
Date
Defect
S.No
No
17-Feb-15
Type of
Area
Job
Time
Start
End
CHP
PM
9:00
13:00
PM
CHP
PM
13:00
15:00
PM
CHP
PM
9:00
12:00
BC - 4
PM
CHP
CRM
9:00
15:00
5.0
ASH
CRM
10:00
18:00
7.0
Telescopic Chute
Servicing Work
WTP
CRM
16:30
17:30
1.0
Caustic
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
6 No's
B/D-BREAK
DOWN, PM-PREVENTIVE
MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAINTE
ABRIVATION
INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WA
S
OH - OVERHAULING, SD - SHUTDOWN
Date
Equipment
Job Description
& Rahaman
Day Planning
Job Description
PM
Man Power
Srikanth, Pandey &
Reddy
Ramesh
PM
Servicing Work
Day Compliance
Permit
No
Engineer / Technician
PM job carried out for Filp flop screen top door 3 No's was fixed.
1443
Rhaman, Manojkumar,
Harimukunda Reddy &
Helper
PM job carried out for Filp flop screen, Equipment throwely cleaned, All
bearing lubrication was applied, V- Belt was replaced, All fastener tightness
was checked. Take trial run found normal.
1443
PM job carried out for BC -4, Equipment throwely cleaned, All pulley
lubrication was applied, Gear box oil level - 50%, Return idler & caring idler
checked found normal. Take trial run found normal.
1444
Reported job carried out for Lime stone conveying line air leak.
So gasket was fixed and take trial found normal.
1445
Indrajeet &
Reddy
Reported job carried out for Telescopic cute, Damage rope was
replaced & New Turnbuckle was fixed. Take trial run found
normal.
1446
Patel, Dharmendar,
Rajvanjini, Satendrakumar
& Kamalesh
Reported job carried out for Caustic tank fitting leak. So leak was arrested.
1447
Pothan
Completion
1
7
3
3
Man
Power
Total
Hrs
10.5
10.5
37.5
Man
Power
Total
Hrs
16
Total Person
14
Spares Consumed
Status
COMPLETED
3
EP2
COMPLETED
3
COMPLETED
2
10
35
COMPLETED
COMPLETED
2
COMPLETED
BLR
PM
8:30
10:00
1.5
DE - 2 Blower
BLR
PM
10:00
12:00
2.0
DE - 2 RAV
ASH
GEN
8:30
17:00
7.5
Total
Hrs
Equipment
Defect/ Observation
Date
Defect
S.No
No
"O"
18-Feb-15
Type of
Area
Job
Time
Start
End
BLR
PM
8:30
10:00
1.5
RSC - 1
PM JOB
BLR
PM
10:00
12:00
2.0
RSC - 2
PM JOB
BLR
PM
8:30
10:00
1.5
DE - 2 Blower
PM JOB
BLR
PM
10:00
12:00
DE - 2 RAV
PM JOB
ASH
GEN
8:30
17:00
7.5
BLR
GEN
13:00
15:00
PA Fan - 1
BLR
CRM
15:00
17:00
SRSB - 1
MINS
CRM
15:00
17:00
2.0
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
8 No's
B/D-BREAK
DOWN, PM-PREVENTIVE
MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAINTE
ABRIVATION
INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WA
S
OH - OVERHAULING, SD - SHUTDOWN
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
Day Compliance
Detailed Description of Job
Permit
No
Engineer / Technician
PM job carried out for RSC -1,Equipment thorwely cleaned, Gear box oil
check found in normal, DE & NDE bearing grease was applied, All fastener
tightness checked. Take trial run found normal.
1448
Srikanth &
Pandey
PM job carried out for RSC - 2, Equipment thorwely cleaned, Gear box oil
check found in normal, DE & NDE bearing grease was applied, All fastener
tightness checked. Take trial run found normal.
1449
Srikanth &
Pandey
PM job carried out for Bunker - DE- Blower system, Equipment thorwely
cleaned, V-Belt tension check found normal, DE & NDE Bearing grease
applied , All fastener bolts tightness checked.Take trial run found normal
1450
Patel &
Manojkumar
PM job carried out DE - RAV, Equipment throwely cleaned, Gear box oil level
was checked, Transmission chain lubrication was applied, RAV free rotation
was checked. Take trial run found normal.
1651
Patel &
Manojkumar
Follow up job carried out for Bed & Ash silo " O " Meter shed fabrication work
under progress.
1652
General work carried out for PA Fan - 1, NDE side Platform approach
fabrication work under progress.
1654
Patel &
Reported job carried out for SRSB - 1, Gland leak. So rope was replaced. Take
trial run found normal.
1655
Srikanth &
Reported job carried out for Farm pond pump - 1, 2, Priming pump also, Flow
not yet. So foot valve was cleaned. Take trial run again flow not yet.
Rahaman, Rajvanjni,
Satendrakumar &
Kamalesh
Patel &
Manojkumar
Pandey
Manojkumar
6
3
1
Man
Power
Total
Hrs
3.0
4.0
30.0
Man
Power
Total
Hrs
Total Person
10
Spares Consumed
Cotton waste &
Grease - 1 Kg
Status
EP2
COMPLETED
2
EP2
COMPLETED
2
COMPLETED
2
Cotton waste
COMPLETED
4
30
UNDERPROGRESS
2
UNDERPROGRESS
Cotton waste &
20
(MM Metallic Rope)
COMPLETED
UNDERPROGRESS
Completion
CHP
PM
8:30
10:00
1.5
LS Crusher - 1
CHP
PM
10:00
11:00
1.0
LS Crusher - 2
CHP
PM
11:00
12:00
1.0
LS Crusher - 2 ( Hoist)
ASH
GEN
8:30
17:00
7.5
MINS
CRM
8:30
12:00
3.5
Total
Hrs
Equipment
Defect/ Observation
Date
Defect
S.No
No
"O"
19-Feb-15
Type of
Area
Job
Time
Start
End
CHP
PM
11:30
12:30
1.0
BC -5 ( RPG Gate)
PM
CHP
PM
8:30
9:30
1.0
LS Crusher - 1
PM
CHP
PM
9:30
10:30
1.0
LS Crusher - 2
PM
CHP
PM
10:30
11:30
1.0
LS Crusher - 2 ( Hoist)
PM
ASH
GEN
8:30
17:00
7.5
MINS
CRM
8:30
12:00
3.5
BLR
SAF
13:00
17:00
4.0
PA Fan - 1
BLR
CRM
14:00
17:00
3.0
SRSB - 3
Gland Leak
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
Cotton waste
12MM - Metallic rope
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
8 No's
B/D-BREAK
DOWN, PM-PREVENTIVE
MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAINTE
ABRIVATION
INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WA
S
OH - OVERHAULING, SD - SHUTDOWN
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
PM
PM
Day Compliance
Permit
No
Engineer / Technician
1656
1657
1658
1659
Follow up job carried out for Bed & Ash silo " O " Meter shed fabrication work
under progress.
1660
Rahman, Rajvanji,
Satehdrakumar &
Kamalseh
Follow up job carried out for Farm pond pump - 1, 2, Foot valve was cleaned.
Take trial run found normal.
Follow up job work carried out for PA Fan - 1, NDE side Platform approach
fabrication work was completed.
Reported job carried out for SRSB - 3, Gear box gland leak, so rope was
replaced. Take trial run found normal.
1661
1662
1663
Manojkumar &
Patel
Manojkumar &
Patel
6
3
2
Total Person
11
Man
Power
Total
Hrs
3.0
2.0
2.0
30.0
7.0
Man
Power
Total
Hrs
Spares Consumed
Cotton waste
Cotton waste
Cotton waste
Cotton waste
37.5
Status
COMPLETED
COMPLETED
COMPLETED
COMPLETED
UNDERPROGRESS
COMPLETED
COMPLETED
COMPLETED
Completion
CHP
CRM
8:30
12:00
3.5
Coal Crusher
BLR
PM
8:30
11:00
2.5
ACC fan 1
ASH
GEN
8:30
17:00
7.5
CHP
PM
13:00
15:00
2.0
Total
Hrs
Equipment
Defect/ Observation
Date
Defect
S.No
No
Hammer
"O"
20-Feb-15
Type of
Area
Job
Time
Start
End
STG
PM
8:30
11:00
2.5
ACC fan 1
PM
CHP
CRM
8:30
12:00
4.5
Coal Crusher
ASH
GEN
8:30
17:00
7.5
BLR
CRM
8:30
11:30
3.0
CHP
CRM
9:30
11:30
2.0
Limestone crusher 2
Bearing inspection
CHP
PM
13:00
15:00
2.0
PM
BLR
CRM
14:00
17:00
3.0
SRSB - 2
Gland Leak
ESP
SAF
15:30
17:00
1.5
ID Fan - 1 & 2
ESP
CRM
15:00
15:30
0.5
ESP -6
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
9 No's
B/D-BREAK
DOWN, PM-PREVENTIVE
MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAINTE
ABRIVATION
INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WA
S
OH - OVERHAULING, SD - SHUTDOWN
Date
Equipment
Job Description
Day Planning
Job Description
Man Power
PM
Srikanth,Pandey
PM
Manoj& Dharmendar
Day Compliance
Detailed Description of Job
Permit
No
Engineer / Technician
PM job carried out for ACC fan-6, Equipment throwely cleaned, Fan blade
angle in 10 , Oil level check found normal, Oil filter was cleaned, All fastener
bolt tightness was checked. Take trial run found normal.
1665
Reported job carried out at coal crusher, Impact hammers position changing
work planed from tomorrow
1666
Manojkumar,
Dharmendar& Helper
Follow up job carried out for Bed & Ash silo " O " Meter shed fabrication work
under progress.
1667
Arjunprasad, Rajvanjni,
Satendrakumar, Kamalesh,
Reported job carried out for Stripper cooler ( RHS) Bed material bunker
dummy replaced to bed material silo. Take trial run no leak & RAV gland leak
was arrested.
1668
1669
Indrajeet
PM job carried out for Coal Crusher ( Hoist), Equipment throwely cleaned,
Gear box oil top-up, All fastener bolt tightness was checked. Not in service.
1671
Manojkumar,
Dharmendar& Helper
Reported job carried out for SRSB - 2, Gear box gland leak, so rope was
replaced. Take trial run found normal
Safety punch point carried out for ID Fan - 1 & 2, NDE side
approach fabrication work under progress.
Reported job carried out for Esp -6, Doom seal pressure not built up. So Doom
seal position was adjusted. No pressure was - 6 KG/CM2
1672
1673
6
3
2
Total Person
11
Man
Power
Total
Hrs
10.5
2.5
6.3
30.0
4.0
Man
Power
Total
Hrs
Spares Consumed
Cotton waste
Status
COMPLETED
4
18
Cotton waste
UNDERPROGRESS
4
30
COMPLETED
2
COMPLETED
1
COMPLETED
3
0.5
320
COMPLETED
COMPLETED
UNDERPROGRESS
COMPLETED
Completion
STG
Date
Defect
S.No
No
PM
8:30
12:00
3.5
ACC Fan - 4
Total
Hrs
Equipment
Defect/ Observation
21-Feb-15
Type of
Area
Job
Time
Start
End
ESP
GEN
8:30
17:00
7.5
ID Fan - 1 & 2
ASH
GEN
8:30
17:00
7.5
ASH Silo
MINS
CRM
8:30
17:00
7.5
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
B/D-BREAK
DOWN, PM-PREVENTIVE MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAINTE
ABRIVATION
INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WA
S
OH - OVERHAULING, SD - SHUTDOWN
Date
Equipment
Job Description
& Rahman
Day Planning
Job Description
Man Power
PM
Day Compliance
Detailed Description of Job
Permit
No
Engineer / Technician
Follow up job carried out for ID Fan - 1 & 2, NDE side platform approach
fabrication work was completed.
1675
Rehman,
&
Helper - 1
Helper -2
Follow up job carried out for Ash Silo " O - Meter" floor shed fabrication work
under progress.
1676
Rajvanjni, Satendrakumar,
Kamalesh & Arjunprasad
Reported job carried out for Farm pond pump -1 & 2, Flow not yet, so foot
valve was cleaned & Priming. Take trial run found normal.
1677
Dharmendar &
Patel
Completion
7
4
1
Man
Power
Total
Hrs
7.0
Man
Power
Total
Hrs
22.5
Total Person
12
Spares Consumed
Status
COMPLETED
4
30
UNDERPROGRESS
2
15
COMPLETED
WTP
PM
8:30
12:00
3.5
ACT Fan - 2
WTP
PM
8:30
10:00
1.5
Portable Pump - 2
WTP
PM
13:00
15:00
2.0
RO Feed Pump - 2
Total
Hrs
Equipment
Defect/ Observation
Date
Defect
S.No
No
22-Feb-15
Type of
Area
Job
Time
Start
End
WTP
PM
8:30
10:30
2.0
ACT Fan - 2
PM
WTP
PM
10:30
12:00
1.5
Portable Pump - 2
PM
WTP
CRM
8:30
10:30
2.0
DM Transfer pump -2
WTP
PM
10:30
12:00
1.5
RO Feed Pump - 2
PM
ASH
PM
14:00
16:00
2.0
PM
CHP
GEN
8:30
12:00
3.5
CHP
WTP
CRM
14:00
17:00
3.0
DM Transfer pump -2
1.
2.
3.
NO OF CONSUMABLES USED:
NO OF SPARES USED:
NO OF BREAKDOWNS:
Cotton waste
NO OF DEFECTS IDENTIFIED:
NO OF DEFECTS ATTENDED:
PERMITS TAKEN(
PTW NOS):
7 No's
B/D-BREAK
DOWN, PM-PREVENTIVE
MAINTENANCE, PI-PM INSPECTION, CM-CORRECTIVE MAINTE
ABRIVATION
INFORMATION, BLR - BOILER & AUX, TG - TURBINE & AUX, CHP - COAL HANDLING PLANT, WTP - WA
S
OH - OVERHAULING, SD - SHUTDOWN
Sino
Date
Equipment
Job Description
& Rahman
Day Planning
Job Description
Man Power
PM
PM
PM
Day Compliance
Detailed Description of Job
Permit
No
PM Job carried out for ACT Fan - 2, Equipment throwely cleaned, Blade angle
- 10, Gear box oil level normal, All fastener bolt tightness was
checked. Take trial run found normal.
1680
Dharmendar &
PM job carried out for Portable pump - 2, Equipment throwely cleaned, All
fasterner tightness was checked. Take trial run found normal.
1681
Indrajeet &
Srikanth
Reported job carried out for DM Transfer pump -2, Motor over load trip, so
decoupled the pump found slightly jam, Pump air vent released, Axial ply was
checked, now free. Take trial run again over load trip.
1682
Indrajeet &
Srikanth
PM job carried out for Portable pump - 2, Equipment throwely cleaned, Gland
leak so follower tightened, All fasterner tightness was checked. Take trial run
found normal.
1683
Dharmendar &
Patel
PM job carried out for BED Ash silo RAV, Equipment throwely cleaned, Rotar
free rotation was checked, Transmission chain lubrication was applied. Take
trial run found normal.
1684
Dharmendar &
Patel
General job carried out for CHP area Lighting frame fixing work was under
progress ( Total frame - 10 No's)
1685
Reported job carried out for DM Transfer pump - 2, Pump not free rotate, so
pump dismandling found inside carbon was broken. So material not available
work under progress.
1686
Indrajeet &
Engineer / Technician
Patel
Srikanth
1
7
1
Total Person
9
Man
Power
Total
Hrs
7.0
3.0
4.0
Man
Power
Total
Hrs
Spares Consumed
Cotton waste
Status
COMPLETED
2
Cotton waste
COMPLETED
COMPLETED
2
Cotton waste
COMPLETED
2
Cotton waste
COMPLETED
3
10.5
UNDERPROGRESS
UNDERPROGRESS
Completion
Engineers
Fitters
Riggers
Gets
Vijayashankar, Suriyaprakash
Indrajeet,Dharmendar, Patel, Pandey, Manojkumar & Rahaman
Rajvanjni, Satendrakumar, Kamalesh & Arjun Prasad
Pothan kumar reddy ,Ramesh reddy
23-02-15
Type of
Area
Job
Time
Start
End
STG
SD
8:30
STG
SD
STG
Total
Hrs
Equipment
15:00
5.3
Ejector
15:00
17:00
2.0
HP Heater
SD
15:00
16:00
1.0
Ejector
STG
SD
19:00
20:00
1.0
PRDS
STG
SD
17:00
18:30
1.5
Ejector
STG
SD
8:30
10:00
1.5
Ejector
BLR
SD
8:30
16:00
6.5
Atttemparator - 1 & 2
STG
SD
10:00
11:00
1.0
Dearator
STG
SD
8:30
12:00
3.5
CEP 1
10
STG
SD
13:00
17:00
4.0
CEP 2
11
STG
SD
8:30
12:00
3.5
CDP 1
12
STG
SD
13:00
15:00
2.0
CDP 2
13
STG
SD
11:00
14:00
2.0
Dearator
14
STG
SD
13:00
16:00
3.0
ESP
15
STG
SD
14:00
16:00
2.0
PRDS
16
STG
SD
16:00
17:00
1.0
Dearator
17
STG
SD
17:00
18:00
1.0
Turbine
18
BLR
SD
16:00
19:00
3.0
PA fan -2
Sino
Defect No
SHUTDOWN WORKS
Defect/ Observation
Stand by 2, 3 & 4 gasket leak Shutdown job carried out for Ejector stand by 2 , 3 & 4 gasket was replaced .
Channel vent flange leak
Shutdown job carried out for HP Heater channel vent flange leak. So spiral
gasket was replaced
Inter cooled condenser valve Shutdown job carried out for ejector inter cooled condenser drain valve
leak
nipple leak. So nipple leak arrest by applying Teflon tape
Permit
No
1687
1688
1689
Shutdown job carried out for PRDS De-superheater line. So welding work
under process.
1690
Shutdown job carried out for Main Ejector drain valve passing. So secondary
valve has been welded.
1691
Shutdown job carried out for Ejector PRDS attemptator drain line.
1692
Shutdown job carried out for Attemparator MOV - 1 & 2 gland leak. So new
gland rope was replaced.
1694
Shutdown job carried out for Dearator Tapping & Dereator Pressure gauge Pin
hole leak. So metal built up work was completed.
1696
Suction stainer
Shutdown job carried out for CEP -1 suction strainer was cleaned.
1697
Suction strainer
Shutdown job carried out for CEP -2 suction strainer was cleaned.
1698
Suction strainer
Shutdown job carried out for CDP -1 suction strainer was cleaned.
1699
Suction strainer
Shutdown job carried out for CDP -2 suction strainer was cleaned.
1700
Shut down job carried out for Pegging steam to Dereator BY-Pass line valve
has been welded.
1552
Pegging to Dereator
Pent house & Centre manual Shutdown job carried out for ESP Pent house & Centre Manual door was
door opening
opened.
1553
Shutdown job carried out for PRDS to Ejector By-pass line valve has been
welded.
1554
Shut down job carried out for Feed water sample line pin hole leak. So metal
built up work was completed.
1555
Shutdown job carried out for Turbine Start up vent drain line provision work
was completed.
1556
Shutdown job carried out for PA fan 2 Damper MOV servicing work was
under progress.
1557
PRDS to Ejector
Damper servicing
2
6
1
Engineer / Technician
Man
Power
Total Hrs
15.9
4.0
Dharmendar &
Rajbansingh
2.0
3.0
3.0
Patel &
Arjun
prasad
Ramesh
Spares Consumed
Metalic Gasket
54
Status
Grade -
COMPLETED
COMPLETED
COMPLETED
UNDERPROGRESS
1/2" # 800
Globe
Valve - 1 No
0.0
COMPLETED
COMPLETED
13.0
3.0
7.0
COMPLETED
8.0
COMPLETED
7.0
COMPLETED
4.0
COMPLETED
6.0
9.0
6.0
3.0
3.0
6.0
Reddy
Patel &
Arjun
prasad
Patel &
Arjun
prasad
Pandy &
Ramesh
Reddy
Metallic rope - 8 MM
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
UNDERPROGRESS
Engineers
Fitters
Riggers
Gets
Vijayashankar
Indrajeet,Dharmendar, Patel, Pandey, Manojkumar & Rahaman
Rajvanjni, Satender kumar, Kamalesh & Arjun Prasad
Pothan kumar Reddy, Ramesh reddy
24-02-15
Type of
Area
Job
Time
Start
End
BLR
SD
14:00
BLR
SD
STG
Total
Hrs
Equipment
19:00
5.0
PA fan-2
8:30
12:00
3.5
PA fan
SD
8:30
12:00
3.5
Dearator
STG
SD
8:30
14:00
4.5
Pegging line
STG
SD
8:30
14:00
4.5
PRDS
STG
SD
14:00
15:00
1.0
Wood spray
BLR
SD
17:00
23:00
6.0
Boiler
STG
SD
13:00
15:00
2.0
Dearator
STG
SD
14:00
15:00
1.0
HP Heater
10
STG
SD
15:00
19:00
4.0
11
BLR
SD
15:00
17:30
2.5
PA Fan - 1
12
BLR
SD
17:30
20:00
2.5
PA Fan - 2
13
BLR
SD
15:00
17:30
2.5
SA Fan - 1
14
BLR
SD
17:30
20:00
2.5
SA Fan - 2
slno
Main steam
Attemptator - 1
&2
SHUTDOWN WORKS
Defect/ Observation
Shutdown job carried out for PA fan - 2 Damper MOV servicing work is
under process.
Shutdown job carried out for PA Fan Air By-pass duct crack has been
Discharge duct crack welding
welded.
Top side vent orifice flange Shutdown job carried out for Dearator top both side air vent orifice flange
leak
leak. So new gasket were replaced.
Damper MOV servicing job
Permit
No
1560
1561
1562
Shutdown job carried out for pegging line NRV gasket is damaged. So gasket
was replaced.
1563
Shutdown job carried out for PRDS attemptator line pin hole leak (Near HP
Heater top side). So line was replaced.
1564
Nozzle cleaning
Shutdown job carried out for wood spray nozzle cleaning work under
progress.
1566
Suffolding work
Shutdown job carried out for Furnace inside suffolding work underprogress.
1569
Top vacuum breaker flange Shutdown job carried out for dearator top vacuum breaker flange arrest has
leak
been completed.
1570
Inlet & outlet heater drain line Shutdown job carried out for Feed water Inlet & outlet drain line direction
direction changing
was changed.
1571
Shutdown job carried out for Main steam Attemperator - 1 & 2 Inlet line
isolation valve was fixed.
1572
PM
PM job carried out for PA Fan - 1, Equipment throwely cleaned, DE & NDE
side bearing clearance - 0.05MM, Coupling grease was applied, All fasterner
tightness was checked
1573
PM
PM job carried out for PA Fan - 2, Equipment throwely cleaned, DE & NDE
side bearing clearance - 0.05MM, Coupling grease was applied, Casing
manual door leak was rectified, All fasterner tightness was checked
1573
PM
PM job carried out for SA Fan - 1, Equipment throwely cleaned, DE & NDE
side bearing clearance - 0.05MM, Coupling grease was applied, All fasterner
tightness was checked
1574
PM
PM job carried out for SA Fan - 2, Equipment throwely cleaned, DE & NDE
side bearing clearance - 0.05MM, Coupling grease was applied, All fasterner
tightness was checked
1574
1
6
4
2
Total Person
13
Engineer / Technician
Man
Power
Total Hrs
Spares Consumed
Status
Pandey &
Ramesh
reddy
10.0
Cottonwaste
UNDERPROCESS
7.0
Manojkumar &
Indrajeet &
Pandey &
Patel
Helper
Ramesh reddy
7.0
9.0
9.0
Dharmendar
1.0
Rajvanjni, Satendrakumar,
Kamalesh &
Arjun
Prasad
24.0
Indrajeet &
Helper
4.0
Rehman &
Helper
2.0
12.0
Patel &
5.0
Manojkumar
COMPLETED
54 Grade
Metalic
Gasket
154 Grade
Metalic Gasket
COMPLETED
COMPLETED
COMPLETED
UNDERPROCESS
UNDERPROCESS
COMPLETED
COMPLETED
1 1/2" # 1500
Globe
valve - 2No's
Cottonwaste &
Grease
COMPLETED
EP2
COMPLETED
Patel &
Manojkumar
5.0
Cottonwaste &
Grease
EP2
COMPLETED
Indrajeet & pothan
reddy
5.0
Cottonwaste &
Grease
EP2
COMPLETED
Indrajeet & pothan
reddy
5.0
Cottonwaste &
Grease
EP2
COMPLETED
Engineers
Fitters
Riggers
Gets
Vijayashankar
Indrajeet,Dharmendar, Patel, Pandey,Srikanth, Manojkumar & Rahaman
Rajvanjni, Satendarkumar, Kamalesh & Arjun Prasad
Pothan kumar reddy, Ramesh reddy
SHUTDOWN WORKS
25-02-15
Type of
Area
Job
Time
Start
End
STG
SD
13:00
STG
SD
BLR
Total
Hrs
Equipment
Defect/ Observation
15:30
2.5
Wood spray
Nozzle leak
8:30
12:00
3.5
EOP
PM
SD
8:30
12:00
3.5
SWAS panel
BLR
SD
15:30
19:00
3.5
Main steam
BLR
SD
16:00
19:00
3.0
BLR
SD
9:00
12:00
3.0
DCF
BLR
SD
10:00
12:00
2.0
PM
STG
SD
10:30
18:00
6.5
BFP-2
Alignment checking
Sino
WTP
SD
13:00
18:00
5.0
DM transfer pump-2
Servicing work
10
BLR
SD
13:00
15:00
2.0
PA Fan
11
STG
SD
13:00
14:00
1.0
MOP
PM
12
STG
SD
14:00
15:00
1.0
AOP
PM
13
STG
SD
15:00
16:00
1.0
JOP (AC)
PM
man
1
7
4
2
Total Person
14
Spares Consumed
SHUTDOWN WORKS
Detailed Description of Job
Permit
No
Engineer / Technician
Man
Power
Total Hrs
Shutdown job carried out for wood spray nozzle line nipple leak. So leak was
arrested.
1575
7.5
PM carried out for EOP, Equipment throwely cleaned, Discharge flange leak
was arrested, Suction filter was cleaned, All fastener tightness was checked
1577
7.0
1578
10.5
Shutdown job carried out for Main steam drain line trap not working. So new
trap was replaced.
1579
10.5
Shutdown job carried out for Main steam flow nozzle DP valve gland leak .
So new gland rope was replaced.
1580
Srikanth &
Pandey
6.0
Shutdown job carried out for DCF zero limit switch fabrication is
underprogress.
1581
6.0
PM job carried out for Wall seal blower - 1. Equipment throwely cleaned,
Gear box oil changed, V- Belt condition check found normal, All fasterner
tightness was checked.
1583
4.0
13.0
Reported job carried out for BFP - 2 Present condition cold Alignment
reading.
Alignment Reading:
Radial
R : 0.02, B : 0.34, L : 0.34
Axial -1
R : 0.01, B : 0.08, L : 0.05
Axial - 2
R : 0.01, B : -0.02, L : 0.02
1586
Pandey &
Patel &
Srikanth
Arjun
prasad
Cotton waste
Cotton waste,
Servo
System
320 Oil - 4
Ltrs
Follow up job carried out for DM Transfer pump - 2, Pump Over load trip. So
pump dismandling found carbon push was broken but spare not avaliable.
1587
10.0
Shutdown job carried out for PA Fan Casingdoor leak was arrested.
1588
4.0
PM job carried out for MOP, Equipment throwely cleaned, All fastener
tightness was checked.
1593
Srikanth &
Pandey
2.0
Cotton waste
PM job carried out for AOP, Equipment throwely cleaned, All fastener
tightness was checked.
1594
Srikanth &
Pandey
2.0
Cotton waste
PM job carried out for JOP (AC), Equipment throwely cleaned, All fastener
tightness was checked.
1595
Srikanth &
Pandey
2.0
Cotton waste
Status
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
UNDERPROGRESS
COMPLETED
UNDERPROGRESS
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
Manpower
Details
DATE
Sino
1
STG
SD
8:30
12:00
3.5
JB (ACC)
BLR
SD
8:30
14:00
4.5
DCF - 707
ESP
SD
8:30
12:00
3.5
ID fan -1
BLR
SD
8:30
12:00
3.5
DCF - 706
STG
SD
9:00
12:00
3.0
Ejector
STG
SD
13:00
18:00
5.0
Mines
SD
13:00
18:00
5.0
WTP
SD
9:00
12:00
3.0
RO HP Pump - 2
ESP
SD
13:00
18:00
5.0
ID fan -2
10
BLR
SD
14:00
18:00
4.0
DCF - 705
SHUTDOWN WORKS
Defect/ Observation
Fabrication
Permit
No
Shutdown job carried out for Junction box frame fabrication & Fixed.
1598
PM
PM job carried out for Drag Chain Feeder - 707, Equipment throwely
cleaning, Drive chain inspection found normal, Gear box oil level check for
50%, All fasene tightness was checked. Take trial found normal.
151
PM
PM job carried out for ID Fan - 2, Equipment throwely cleaned, DE & NDE
side bearing clearance - 0.05MM, Coupling grease was applied, All fastener
tightness was checked.
152
Shutdown job carried out for DCF - 706, Suction chute inspection door was
fixed.
153
Shutdown job carried out for Ejecor all fastners tightness checked.
155
Shutdown job carried out for Main steam drain line trap not working. So new
trap was replaced.
157
161
Shutdown job carried out for RO HP pump -2 discharge vavle gasket was
replaced.
163
PM
PM job carried out for ID Fan - 2, Equipment throwely cleaned, DE & NDE
side bearing clearance - 0.05MM, Coupling grease was applied, All fastener
tightness was checked.
164
PM
PM job carried out for Drag Chain Feeder (705), Equipment throwely
cleaning, Drive chain inspection found normal, Gear box oil level check for
50%, All fastener tightness was checked. Take trial found normal.
165
Engineer / Technician
Rehman &
Helper
2
7
4
1
Total Person
14
Man
Power
Total Hrs
Spares Consumed
7.0
9.0
Status
COMPLETED
Cottonwaste &
Grease
EP2
COMPLETED
Patel & Satendarkumar
7.0
Cottonwaste &
Grease
EP2
COMPLETED
Rehman, Manojkumar &
Kamalesh
10.5
COMPLETED
2
6.0
COMPLETED
Rehman,
&
Kamalesh
Helper
15.0
Manojkumar,
Patel
&
Kamalesh
10.0
Pandey,
Ramesh
Reddy & Helper
6.0
Pandey,
Ramesh
Reddy & Helper
COMPLETED
COMPLETED
COMPLETED
10.0
Cottonwaste &
Grease
EP2
COMPLETED
Indrajeeth,
&
Rajvanjni
Helper
12.0
Cottonwaste &
Grease
EP2
COMPLETED
Engineers
Fitters
Riggers
Gets
Vijayashankar
Indrajeet, Dharmendar, Patel, Pandey, Srikanth, Manojkumar & Rahaman
Rajvanjni, Satendrakumar, Kamalesh & Arjun Prasad
Pothan kumar reddy, Ramesh reddy
SHUTDOWN WORKS
27-02-15
Type of
Area
Job
Time
Start
End
BLR
SD
8:30
Mines
SD
STG
Total
Hrs
Equipment
Defect/ Observation
12:00
3.5
DCF - 706
PM
9:00
12:00
3.0
SD
9:00
11:00
2.0
BFP -1
STG
SD
13:00
20:00
7.0
BFP -2
Alignment checking
Mines
SD
13:00
18:00
5.0
BLR
SD
13:00
17:00
4.0
Burner
Below leak
Sino
Total Person
14
Man
Power
Total Hrs
Spares Consumed
10.5
Cotton waste
man
SHUTDOWN WORKS
Detailed Description of Job
Permit
No
Engineer / Technician
PM job carried out for Small drag chain Feeder (706), Equipment throwely
cleaning, Drive chain inspection found normal, Gear box oil level check for
50%, All fastener tightness was checked. Take trial found normal.
1600
Indrajeeth,
Rajvanshi &
shutdown job carried out for Farm pond pump - 1 Flow not yet found foot
valve goes deep in sludge. So floating arrengement is completed.
156
Dharmendar,
Patel
&
Arjun prasad
9.0
Shutdown job carried out for BFP - 1 Discharge MOV gland leak, So gland
follower tighten. Now leak was arrest.
162
Pandey &
Ramesh
Reddy
4.0
168
Indrajeeth,
Srikanth,
Kamalesh &
Helper
28.0
Shutdown job carried out for Farm pond pump discharge line coupling leak
found inside thread damage. So removed the coupling & tool piece has been
welded.. Take trial run no leak.
169
15.0
Shutdown job carried out for Furnace oil burner expansion below leak. So
rubber was pasted.
170
8.0
Follow up job carried out for BFP - 2 Alignment work was completed. Take
trial run found normal.
Alignment Readings:
Radial
R : 0.02, B : 0.00,
L : - 0.01
Axial -1
R : 0.02, B : 0.06, L : 0.04
Axial - 2
R : 0.01, B : 0.00, L : - 0.02
Pandey &
Helper
Ramesh
Reddy
Metallic rope - 10 MM
Status
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
Engineers
Fitters
Riggers
Gets
Vijayashankar
Indrajeet, Dharmendar, Patel, Pandey,Srikanth, Manojkumar & Rahaman
Rajvanjni, Satenderkumar, Kamalesh & Arjun Prasad
Pothan kumar reddy ,Ramesh reddy
28-02-15
Type of
Area
Job
Time
Start
End
STG
CRM
8:30
STG
CRM
BLR
Total
Hrs
Equipment
12:00
3.5
BFP - 2
9:00
12:00
3.0
LP Dosing agitator
CRM
9:00
15:00
5.0
BLR
GEN
9:00
14:00
4.0
PA Fan - 2
BLR
CRM
13:00
16:00
3.0
DCF-706
STG
SD
18:00
20:00
2.0
Turbine
STG
SD
18:00
20:00
2.0
Turbine
Sino
SHUTDOWN WORKS
Defect/ Observation
Alignment checking
Permit
No
172
Reported job carried out for LP dosing agitator shaft fell down to dosing tank,
So shaft was fixed. Take tria run found normal.
173
Frequently Jam
Reported job carried out for Bed material RAV removed & Tool piece
fabricated and then fixed.
174
Actuator servicing
1475
Reported job carried out for DCF -706 Suction chute Plate gate jam internal
gear dust accumilation found. So cleaning work was completed.
176
Shutdown job carried out for Turbine pedastal suffolding work was
completed.
177
Shaft fixing
Jam release
Suffolding work
ESV upsteam chest chamber Shutdown job carried out for Turbine ESV upsteam chest chamber gasket
leak
leak. So work underprogress.
178
Engineer / Technician
Indrajeeth,
&
Rajvanjni
Helper
2
7
4
1
Total Person
14
Man
Power
Total Hrs
Spares Consumed
10.5
Status
EP 2
COMPLETED
Srikanth & Kamalesh
6.00
Rehman,
Manojkumar &
Satendarkumar
15.00
Pandey &
Ramesh reddy
COMPLETED
COMPLETED
12.00
Cotton waste
COMPLETED
Srikanth,
Pandey
& Kamalesh
9.00
14
28.00
14
28.00
COMPLETED
COMPLETED
UNDERPROGRESS