MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
ThisdocumentisaControlledDocument.Anychangetothisdocumentmustbereviewedandapproved
priortouseandissue.AnydocumentnotapprovedinthismannerwillbeUncontrolled.
19/02/2014 R.Asgarov
N.Dadashev
Forapproval
Rev.
Rev.Date
Checked
ReasonforIssue
Prepared
QC124,Rev.:1,05/11/2012
Approved
Page1of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
Table of Contents
1.
2.
3.
4.
5.
Scope.....................................................................................................................................................4
1.1.
Purpose.........................................................................................................................................4
1.2.
DefinitionofScope........................................................................................................................4
1.3.
ScopeDetails.................................................................................................................................4
1.4.
Location.........................................................................................................................................4
1.5.
WONos.........................................................................................................................................4
1.6.
Discipline.......................................................................................................................................4
Documentation.....................................................................................................................................5
2.1.
ReferenceDocuments...................................................................................................................5
2.2.
Definitions&Abbreviations..........................................................................................................5
2.3.
GoC................................................................................................................................................6
HSE,SecurityandSocialAspects...........................................................................................................7
3.1.
Induction.......................................................................................................................................7
3.2.
PersonalProtectiveEquipment.....................................................................................................7
3.3.
OperationPlantandEquipment...................................................................................................7
3.4.
RiskAssessment............................................................................................................................8
3.5.
ToolBoxTalks................................................................................................................................8
3.6.
PermittoWork..............................................................................................................................8
3.7.
EnvironmentalImpact...................................................................................................................8
3.8.
NoiseandVibrationEmissions......................................................................................................8
3.9.
EnvironmentalImpactAssessment...............................................................................................8
3.10.
EnvironmentalAwarenessandTraining...................................................................................9
3.11.
WasteManagement..................................................................................................................9
Requirements......................................................................................................................................10
4.1.
Personnel.....................................................................................................................................10
4.2.
Equipment,Tools&Materials.....................................................................................................10
4.3.
ImpactonOperationalProcesses...............................................................................................10
4.4.
Isolations.....................................................................................................................................10
4.5.
Responsibilities............................................................................................................................10
Execution.............................................................................................................................................11
5.1.
SummaryofWorkActivities........................................................................................................11
5.2.
WorkActivities............................................................................................................................11
QC124,Rev.:1,05/11/2012
Page2of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
5.3.
Reinstatement.............................................................................................................................12
QC124,Rev.:1,05/11/2012
Page3of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
1. Scope
Thissectiondefinesdetailsofthescopeofworkthatsubjectmethodstatementwaspreparedfor.
1.1.
Purpose
ThepurposeofthismethodstatementistodefinethespecifictaskstobeperformedrelatingtoMinor
PaintingWorksatPS05.Itisalsodescribesthequality,safety,health,environmental,socialandsecurity
requirements.
1.2.
Definition of Scope
WOswereraisedforCorrosionCleaningontheOilyWaterSeparatorPumpCasing&FoundationandPig
LauncherKickerByPassLine2"GlobeValveatPS05.
1.3.
Scope Details
Worksshallinclude,butnotbelimitedto:
Cleaning&PaintingWorks
1.4.
Location
PS05
1.5.
WO Nos.
3315095&3519714
1.6.
Discipline
Mechanical
QC124,Rev.:1,05/11/2012
Page4of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
2. Documentation
Thissectiondefinesallreferencedocumentation,definitions&abbreviations.
2.1.
Reference Documents
DocumentNumber:
AZSPUHSSEDOC004043
AZSPUHSSEDOC001975
Interseal670HSAluminiumPartA
Interseal670HSPartB
Intergard475HSMIOLightGreyPartA
Intergard475HSPartB
Interthane990OffWhitePartA
Interthane990LightGreyPartA
Interthane990PartB
CleanerGTA822
ThinnerGTA007
ThinnerGTA220
ThinnerGTA713
Intergard475HS
Interseal670HS
Interthane990
N/A
N/A
MQSQPI011
N/A
N/A
GP0660
IPPCCAT114
IPPCCAT115
2.2.
DocumentDescription:
AzerbaijanExportPipelinesWasteManagementProcedure
ProcedureforSiteVisitNotification
MSDS
MSDS
MSDS
MSDS
MSDS
MSDS
MSDS
MSDS
MSDS
MSDS
MSDS
TDS
TDS
TDS
CalibrationCertificateforElcometer319DewPointMeter
CalibrationCertificateforDFTGauge
MQSITP
CertificationofApplicator
CertificationofInspector
GroupPractice forPaintingofMetalSurfaces
ManufacturerMethodStatement
ManufacturerQualityControlPlan
Definition/Abbreviation:
ASAP
COMPANY
CONTRACTOR
GoC
HSE
MS
N/A
Nos.
PPE
PTW
QTY
TBT
WO
QC124,Rev.:1,05/11/2012
Description:
Assoonaspossible
ClientofMQSLLC
MQSLLC
GuidanceonCertificationDocumentation
Health,SafetyandEnvironmental
MethodStatement
Notapplicable
Numbers
PersonalProtectiveEquipment
PermittoWork
Quantity
ToolBoxTalks
WorkOrderinBPMAXIMOSystem
Page5of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
2.3.
GoC
FollowingGoCdocumentationshallbefilledbyexecutorofsubjectMethodStatement:
N/A
QC124,Rev.:1,05/11/2012
Page6of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
3.1.
Induction
Prior to start work all personnel must attend the specified HSE induction course, conducted by the
COMPANYAreaAuthority.Allemployeesalsoshallsignthesheetsofacknowledgementwithcorporate
HealthandSafetyPolicy.Inductionlogbookshallbeproperlyimplementedandmaintained.Personnel
whohavenotpassedtheProjectInductionCourseshallundertakenowork.
3.2.
AllpersonnelinvolvedinworkactivitiesshallcomplywiththeprojectPPEstandards.TheminimumPPE
requirementsonsiteduringworkactivitiesshallbe:
SafetyBootswithmetaltoeprotectors
SafetyHardHat
AppropriateEyeProtection
Coveralls
Gloves
HearingProtection(whereapplicable)
Additional PPE identified by the risk assessment shall also be implemented. Personnel shall take
reasonable care about personal protective equipment issued by contractor. PPE logbook shall be
implemented and maintained to ensure all respective personnel is issued with standard PPE set and
defectiveordamagedPPEisreplacedwithappropriateone.AnyviolationofPPEstandards,misuseof
corporateissuePPEorequipmentwillbethesubjectfordisciplinaryaction.HandmadeorpersonalPPE
willnotbeacceptablebyCONTRACTOR.
3.3.
Thecrewsupervisorshallinspectallequipmentfordamageand/ordeficienciespriortothestartofwork
ondailybasisandappropriatesurveillanceshallbeimplementedandmaintainedonequipmenttocheck
ifithassustainedfromanydamageduringthecourseofexploitation.
Defectiveitems,thataffectthesafeoperationofthepieceofequipment,shallbeimmediatelyremoved
fromserviceuntilrepairedorreplaced.OtherdeficienciesshallberectifiedonASAPbasis.
CrewsupervisorsshallcompletedailyaPlant&EquipmentChecklistfortheitemofplanttheyoperate
and shall report all deficiencies to the site supervisors who are in charge of rectification from any
deficiencies.TheTechnicaldepartmentshalldocumentanyrectificationworkperformed.Allpersonnel
shall exercise care when performing their duties with the contrast movement of vehicle plant and
personnel within the work area. The Crew supervisors and workmen shall take special care when
workingandmovingnearorunderoverheadservicesandburiedexistingservices.
QC124,Rev.:1,05/11/2012
Page7of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
3.4.
Risk Assessment
Suitable and sufficient risk assessment shall be implemented by CONTRACTOR, which shall cover
activitiesofcontractorspersonnel as wellasvisitors,clientspersonnel.Refertothespecifictaskrisk
assessmentfordetailsoftheassociatedhazardsandmitigationmeasurestobeimplemented.
Prior to the commencement of works the risk assessment shall be reviewed by HSE Department and
Operations(AreaAuthority)inconjunctionwithConstructiondepartmenttoensurethatalltherisksare
addressed and the required control measures are in place, and followed during operations. Lessons
learnedpracticemustbeimplemented.
3.5.
Prior to the commencement of works the Crew supervisor, with support from the HSE Officer, shall
conduct a prestart toolbox talk with all of the crew present. The crew supervisor shall explain the
method of works focusing on the hazards, risks and the mitigation measures that shall be taken as
detailedintheRiskAssessment.AllTBTsshallbedocumentedandfiledaccordingly.Registrationshall
takeplaceinworkplaceinstructionandtraininglogbook.ThecustodianofallTBTdocumentationshall
bethecrewsupervisor.
3.6.
Permit to Work
APTWshallbeobtainedinaccordancewiththerequirementsofPermittoworkProceduredescribedin
corporate occupational health and safety manual, prior to performing the following operations or
activities.Thesiteandcrewsupervisorshallexplainthemethodsinvolved,focusingonthehazardsand
risks involved the activity, and the mitigation measures that shall applied as detailed in the Risk
Assessmentincluding.
3.7.
Environmental Impact
Prior to commencing work all personnel shall have been inducted by the CONTRACTORS HSE
DepartmentinaccordancewiththerequirementsoftheProject.Personnelwhohavenotattendedthe
ProjectInductionCoursesshallundertakenowork.
TheHSEDepartmentshallensurethatalltherisksareaddressedandthecontrolmeasuresareinplace.
3.8.
Allequipmentshallbemaintainedinefficientstatetominimizenoiseandvibrationemissions.Potential
sourceofnoiseshallbeidentifiedandcontrolmeasuresimplementedasfarasitreasonablypracticable.
Regularnoiseemissionsmonitoringshallbecarriedoutbytrainedpersonnel.
IncasenoisemonitoringiscarriedoutbyCOPMANYpersonnelonregularbasisandCONTRACTORnot
likelytoexceedregularsitenoiseemissions,thensubjectsectionisnotapplicable.
3.9.
Significant environmental impacts resulted from scope of work performed by CONTRACTOR shall
adequately addressed with consistent control and monitoring measures implemented. Where
necessary, an Environmental impact assessment shall be carried out by competent environmental
engineer.
QC124,Rev.:1,05/11/2012
Page8of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
3.10.
Prior to commencement of any work general environmental awareness programs will be run by
COMPANYforCONTRACTORpersonnel.CONTRACTORwillensurethatits personnel actinaccordance
withinstructionandtrainingprovidedbyCOMPANY.
3.11.
Waste Management
FollowupAzerbaijanExportPipelinesWasteManagementProcedure(AZSPUHSSEDOC004043).
QC124,Rev.:1,05/11/2012
Page9of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
4. Requirements
This section describes personnel, tools, equipment etc. requirements. It also describes impacts on
operationalprocess,requiredisolationsandresponsibilitiesofclient.
4.1.
Personnel
Trade
SiteSupervisor/PerformingAuthority
Painter
CoatingInspector
4.2.
QTY
1
1
1
Duration
8 days
8days
8days
Thefollowingtoolsandequipmentarerequiredtoperformtheworkscopeasminimum:
Description
PickupVehicle
FittersHandToolsSet
Elcometer319Standard
Elcometer124
4.3.
QTY
1
1
1
1
Duration
8days
8days
8 days
8days
N/A.
4.4.
Isolations
AnyIsolationrequiredduetocleaning&coating.
4.5.
Responsibilities
On default COMPANY is responsible for provision of anything that CONTRACTOR not providing as per
thismethodstatement.Thisistoinclude,butnotlimitedtothefollowing:
Scaffoldsupport
COMPANYInspectortofollowITP
ProvideBlisterBlaster(andairsupplyaswell)
Removalofanyinsulationbeforeworkstarts(ifapplicable)
Accesstoworklocation
Scaffolding
Anyisolationsrequired
Liftingauthority
Sign and approve Work Acceptance Certificate(s), Mobilization Sheet(s) and Weekly Charge
Sheet.
MQSisresponsibletoexecutethescopeasperthismethodstatement.
QC124,Rev.:1,05/11/2012
Page10of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
5. Execution
Thissectiondefinesworkactivitiesimplementation.
5.1.
Cleaning
Coating
5.2.
Work Activities
Allworkactivitiesarebasedon10hoursworkingday.
Traveltimerequiredfor:
Mobilization1day
Demobilization1day
Task
No.
5.2.1
5.2.2
5.2.3
5.2.4
5.2.5
5.2.6
5.2.7
5.2.8
5.2.9
5.2.10
5.2.11
5.2.12
5.2.13
5.2.14
5.2.15
Task
Duration
TaskSteps
OnarrivalatsitecontactthesiterepresentativeBPandidentityallMQSpersonnel
involvedinworkactivities
Thesupervisorwillrequestapermittowork
EnsureallpersonnelinvolvedinworkactivitiestakepartinBPriskassessmentprior
toworkcommencing
Carryouttoolbox,ensurethatpersonnelareclearlyunderstandSOWandtheirown
responsibilities
Checkallequipmentisinplacepriortoworkcommencement
Transfer all equipment and materials to work location taking care not to obstruct
anyemergencyescaperoutes,orcauseanyobstructionordisruptiontooperations
Erectsignsandbarriersatworklocation
Cleanallrequiredareasfromanydebrisandcontaminationtoachievelevelof
cleannessrequiredbyproductdatasheet.
Checkambientconditionsandrepeatevery4hours(minimumapplicationtemp.5
deg.C),shelflifeofproductsselectedbasedonGP0660system.Ifacceptable,
proceedtonextsection.
CarryoutsurfacepreparationtoSt3usingbristleblaster.
Spotrepairareasandnoncoatedareasneedstobemaskedoff.Carryoutstripe
primingwithInterseal670HSusingbrush.
ApplyInterseal670HSasaprimerusingbrushesandrollerstoachieve125microns
DFT(typically100125micronscanbeachieved).*durationidentifiedisbestcase
scenarioandcanvarydependingonachievedDFTandtemperatureduringdryingof
products.
CarryoutchecksofDFTasperSSPCPA2aftereachcoat.
Overcoatasperproductdatasheet,cleansurfaceandcarryoutstripecoatingwith
Intergard475HSusingbrushesandrollers.
ApplyfirstlayerofIntergard475HS,asanintermediatecoatusingbrushesand
rollerstoachieve125micronsDFT(typically5075micronscanbeachieved).*
durationidentifiedisbestcasescenarioandcanvarydependingonachievedDFT
andtemperatureduringdryingofproducts.
QC124,Rev.:1,05/11/2012
2ndday
2ndday
3rdday
3rdday
3rdday
3rdday
3rdday
3rdday
3rdday
3rdday
3rdday
3rdday*
4thday
4thday
4th5th
days*
Page11of12
JobNumber:
MethodStatement
50860WREP058
DocumentNumber:
Client:BP
QC124127
Overcoatasperproductdatasheet,cleansurfaceandcarry outstripecoatingwith
Interthane990offwhiteandlightgreyusingbrushesandrollers.
ApplyfirstlayerofInterthane 990lightgreyonOilyWaterSepatorPumpcasing&
Foundation,andoffwhiteonPigLauncherKickerByPassLine2"GlobeValveusing
5.2.17 brushesandrollerstoachieve50micronsDFT(typically3050micronscanbe
achieved).*durationidentifiedisbestcasescenarioandcanvarydependingon
achievedDFTandtemperatureduringdryingofproducts.
Ifanyrepairsrequired,carrythemoutasperGP0660(betweenapplicationsof
5.2.18
eachcoat).
Onceallworkhasbeensatisfactorilycompletedworkpackcompletioncertificate
5.2.19
willbeofferedforsigningoff.
5.2.16
6thday
6thday*
7thday
7thday
SummaryofWorkActivatesdurationinclusiveofmobilizationanddemobilization8days
5.3.
Reinstatement
Ensureworkareaisleftcleanandtidyandalderbiesremovedfromsiteanddisposedofinthecorrect
location.
Removeallplantandequipmentfromsiteandcloseoutpermittowork.
Uponcompletionensureallrelevantdocumentationandtimesheetsaresignedandapprovedbyclient.
QC124,Rev.:1,05/11/2012
Page12of12