OBRAS CIVILES CIMENTACIN 2 TKS 10 MBb, MURO PERIMETRAL, CANALETA, BASE DE 2 GENERADORES
Item
1.00
1.01
1.02
2.00
2.01
2.01.01
2.01.02.a
2.01.03
2.01.04
2.01.05
2.01.06
2.01.07
2.01.08
2.02
2.02.01
2.02.02
2.03
2.03.01
Descripcin
Preliminares
Exmen mdico
SCTR (2 meses contrato)
Transporte
Movilizacin materiales, equipos y personal
Fierro
Cemento
Madera
Piedra 1/2"
Afirmado
Arena
Material de relleno
Excavadora, Mezcladora, motobombas, herram
Movilizacin y desmovilizacin personal
Movilizacin y desmovilizacin personal
Desmovilizacin materiales y equipos
Almacn para materiales y equipos
Almacn, area techada con lona 20x10m
Unidad
Cantidad
P. Unitario ($)
Parcial
Observaciones
u
u
33.00
66.00
337.50
297.00
11,137.50
19,602.00
Tn
Tn
Tn
m3
m3
m3
m3
Tn
35.95
91.62
8.00
195.56
200.96
146.89
120.58
18.00
1,080.00
1,080.00
1,080.00
27.00
27.00
27.00
27.00
1,080.00
glb
Tn
31.00
20.00
270.00
1,080.00
8,370.00
21,600.00
glb
1.00
20,433.60
Plano PE-LA-15401-300-12-002-OC
213,760.26
20,433.60 6 Ay
3.00
3.01
3.02
Gabinete y Control
Toma de muestras, Anlisis, control e informe
Clculo estructural cimentaciones y muro
u
glb
3.00
1.00
0.00
0.00
3.03
glb
1.00
20,250.00
4.00
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
Cimentacin de tks
Excavacin con excavadora
Solado fc=125 Kg/cm2 (e=0.05m)
Fierro
Encofrado
Concreto fc 210 kg/cm2
Afirmado compactado
Relleno compactado
Relleno con arena limpia (e=0.10m)
Eliminacin material excedente
m3
m2
Kg
m2
m3
m3
m3
m2
m3
102.74
128.43
23,452.80
120.58
60.24
200.96
120.58
304.91
128.43
58.36
39.14
7.70
70.35
515.82
101.49
90.09
12.35
89.76
5,996.13 1 Opexc+1Ay+1Exc
5,026.25 2 Opalb+1 Opmezc+8Ay+1Mezc+1Vib+4Bug
180,469.30 6 Opf+6Ay
8,482.34 4Carp+2Ay
31,074.80 2 O alb+1 O mezc+8Ay+1Mezc+1Vib+4Bug
20,396.03 1 Opexc+2 Opcomp+1Ay+1Exc+2Comp
10,862.15 1 Opexc+2 Opcomp+1Ay+1Exc+2Comp
3,766.36 1 Opexc+2 Opcomp+1Ay+1Exc+2Comp
11,527.94 1 Op exc+1Ay+1Exc. Esponjamiemto 25%
5.00
5.01
5.02
5.03
5.04
5.05
5.06
5.07
5.08
5.09
5.10
m3
m2
Kg
m2
m3
m3
m3
m2
ml
m3
172.80
192.00
12,500.78
768.00
83.55
72.60
130.67
325.56
240.00
216.00
58.36
39.14
7.70
70.35
515.82
101.49
90.09
12.35
16.20
89.76
10,084.69 1 Opexc+1Ay+1Exc
7,514.21 2 Opalb+1Op mezc+8Ay+1Mezc+1Vib+4Bug
96,193.46 6 Opf+6Ay
54,027.65 4Carp+4Ay
43,096.11 2 Opalb+1 Opmezc+8Ay+1Mezc+1Vib+4Bug
7,368.07 1 Opexc+2 Opcomp+1Ay+1Exc+2Comp
11,771.85 1 Opexc+2 Opcomp+1Ay+1Exc+2Comp
4,021.42 1 Opexc+2 Opcomp+1Ay+1Exc+2Comp
3,888.00 1 Ay
19,388.48 1 Opexc+1Ay+1Exc. Esponjamiemto 25%
6.00
6.01
6.02
6.04
6.03
6.05
6.06
6.07
Canal perimetral
Excavacin con excavadora
Solado fc=125 Kg/cm2 (e=0.05m)
Fierro
Encofrado
Concreto fc 180 kg/cm2
Eliminacin material excedente
Tapa de rejilla, grating 1 1/4"
m3
m2
Kg
m2
m3
m3
ml
76.80
128.00
12,012.00
192.00
31.19
96.00
240.00
58.36
39.14
7.70
65.00
455.90
89.76
337.50
7.00
7.01
7.02
7.03
Obras de arte
Arquetas (cajas de paso), f 1/2", 0.9x1.6x0.50m
Cmara de drenaje, f 1/2", 0.9x8.8x1.2m
Disipadores de concreto
u
u
u
11.00
3.00
3.00
4,320.00
21,600.00
0.00
7.00
7.01
7.03
7.02
7.04
7.05
m3
Kg
m2
m3
m3
2.40
41.00
2.80
2.40
2.40
58.36
7.70
65.00
515.82
89.76
8.00
Caseta de Seguridad
8.01
m2
9.00
118.25
0.00
0.00 Ing estructural
Topgrafo, prismeros (3), ayudantes (4). Estacin total, nivel
20,250.00 topogrfico.