Scope of Work

The water supply project outputs will consist in a fully functioning water supply system, inclusive
of:
i) Water collection through Rainwater Harvesting (RWH) berkads, brackish water from the
borehole Reverse Osmosis (RO) system.
ii) Water distribution system from the elevated tank to the school compound distribution pipe
line network shall be installed house hold connections and meter.
iii) Roof water collection system and facilities including Gutters, down pipe, and all necessary
fitting directed to the Berkads and pumped to the elevated tank
iv) The planning and installation of groundwater protection and recharge measures using
surplus rainwater and improved management of wastewater;
v) Installation of Reverse Osmosis system where the brackish water would be treated and
disinfected.
vi) Supply, installation, Testing and commissioning of water tank with the capacity of
compressed/pressed steel tank (15 and 30) cubic meters.

Scope of work shall cover the following


Supplying, laying, jointing pipe, with specials such as tees, bend, door bend, coupling, Y with door,
unions, rubber ring, etc. cutting, earth work excavation, back filling, making good the walls, testing
the line, etc.
1. Reverse Osmosis
1.1. Reverse Osmosis system where the water would be treated and disinfected. The
water reverse osmosis system shall be capable of treating brackish raw water to produce
required output water in accordance with the conditions of service, required
performance, materials stated in Reverse osmosis specification.
2. Pipes
2.1. Piping for transmission of water between project elements, including piping for raw
water transmitted between the borehole and the reverse osmosis system, piping to
convey potable and brackish water from the elevated tank to the distribution system.
2.2. Excavating the trench and preparing the bed for laying the pipes, furnish all
necessary facilities for properly lowering and placing the section of the pipe in trench
without damage and shall properly install the pipe subsequently.
2.3. Supply, installation, testing and commissioning of double of HDPE pipe with
complete connection
2.4. Deflection of Pipeline: Minor deviation of direction in pipeline both vertically and
horizontally shall be achieved through deflections at the joints.
2.5. Joints with deflection shall be installed in accordance with the manufacturers
instruction.
3. Valves.
3.1. Valves are provided to regulate the flow, control of pressure and to cutoff the water
supply, two valves are provided at each node.
3.2. Supply, installation, testing and commissioning of Double Flanged Sluice Valves
4. Fittings.
4.1. Fittings shall be of the same make as that of pipes, injection molded

5. Storage tank. Storage of treated water and brackish water in a transmission system is
generally composed of two components. (Brackish water storage and treated water storage)
the Elevated tank will be located on the highest elevation land (4m high available along the
pipeline route, elevated tank siting is a function of the operational parameters of the water
delivery system and the topography of the pipe line routes.
The overall tank volume (50m3) will equal the operational plus allowances for freeboard
and
5.1. Float switch arrangement with two way float switch the systems pressure
switches should be set to allow pumping to approximate closely demand thereby
keeping reservoir levels within a preselected range. In the event that a reservoir reaches
the maximum level allowable, an altitude valve will close and isolate the reservoir from
the upstream supply to prevent overflow. When the reservoir levels falls to within the
normal operating range, the valve will re-open and again allow inflow from the
upstream pipe. The operation of the reservoir will control the volume of water pumped
from the source.
6. Pump
6.1. Pump discharge line will be equipped with a valve for pump control, a check valve to
prevent backflow in the event of a power failure or other pump shutdown
6.2. Metering. The outflow must be metered by installing flow meter; the meters should
be located at least 10m away from the pump.
B. Rain water harvest
6.3. The Scope of work covered includes all works & items necessary for the successful
implementation of rain water harvesting system. Construction and erection materials for
implementing the system. Construction later drain network along with all necessary
interconnection from these drains
6.4. Providing necessary labor, materials, scaffoldings, construction equipment, tools and
plants, appliances, necessary supervision by competent Supervisors and execution of all
incidental items not specified or indicated but implied or required to complete the work
under this scope in all respects and in strict accordance with the specifications, and
drawings including their revisions and amendments made from time to time.
6.5. Supply, erection and commissioning of pumps to be installed along with all required
piping, valves, fittings etc.,
6.6. The rain water from roof top through gutters and down pipe drain shall be directed
and stored in berckads where rain water shall be pumped to Raw Water elevated tank.
6.7. Supply and lying of DN 114, 141 PVC pipe line as shown in the drawing with
suitable fittings/accessories.
6.8. The PVC pipe shall be round and shall be supplied in straight lengths with socketed
ends. The internal and external surfaces of pipes shall be smooth, clean and free from
grooving and other defects. The end shall be cleanly cut and square with the axis of the
pipe
6.9. Laying of pipeline includes excavation, bedding and refilling of the pipeline route

6.10. Supplying, laying, jointing and testing PVC pipe, with specials such as tees, bend,
door bend, coupling, Y with door, unions, rubber ring, etc. cutting, earth work
excavation, back filling, making good the walls, testing the line, etc
Technical Specifications for main items of Water supply
1. Water Tank and Tank Tower, net capacity: (15, 30, 40) M3, suitable for storage of
potable water
Supply of elevated compressed/pressed steel tank stand with a height of 6 - 12 meters from the
ground depending on the topography of the area.
The height of the tank tower will depend on topographic surveys and designs but shall not be less 4
meters depending on the topography of the area.
The cold water storage tanks should be suitable for storage of brackish ground water qualities
prevailing in Lasanod, The tanks should therefore be rubber/butyl lined pressed steel tanks, for
bolted on-site assembly.
The plates of the tank shall be bolted hot pressed steel panels with sealant to ensure water tightness.
Panels shall be manufactured according to BS1564/1, steel according to BS4340/1449/1.
Structural steel work shall be according to BS5950/1. Plate thickness: not less than 4mm. Cover
thickness: not less than 3 mm.
The base shall be constructed from standard plates and supported by external flanges for ease of
erection, inspection and maintenance.
All materials and accessories for the storage tanks shall be new, in factory finished condition and
suitable for the climatic and other conditions prevailing in Lasanod. Special attention is drawn to
the basic character of the water;
The tanks shall be painted externally with one coat of primer and two coats of bright aluminum
paint. Internally two coats of non-toxic bituminous or non-toxic black epoxy paint, suitable for
storage of potable water shall be applied.
Bolts used in construction shall comply to BS4190. Divisions baffles and weirs shall be
constructed of the same materials positioned to coincide with plate joints in tank sides and base.
The structure of the tank should be manufactured to be unaffected by wind and earth tremors.
Ventilators shall be supplied to avoid pressure differentials when filling and emptying.
Tank foundation:
Supply and works shall include construction of the necessary tank foundations.
Tank tower:
The towers should be made of galvanized finished steel and should be corrosion protected. The tank
tower shall be supplied complete with ladder, top walkways and safety hand railing. Safety
measures should be installed to prevent unauthorized access to the tank. The tower shall be painted
with one coat of primer similar to zinc phosphate and one coat of silver aluminum.
Auxiliaries:
The tanks shall be provided with a weather-proof lockable and sealed roof cover of standard pitched
construction, external and internal (rope) ladder and cowl ventilator and cat & mouse type of water
level indicator, readable at up to 150 meters distance and with ball valve housings

Inlet: 2-inch galvanized steel pipe complete with bends, duck foot, thrust blocks, and any other
connectors and fittings that may be required, ground level connection to HDPE pipes 50 mm on an
appropriate spot at minimum 5 meters distance from the tank foundations.
Outlet: 2-inch galvanized steel pipe, complete with bends, duck foot, thrust blocks, check-valve
and any other connectors and fittings that may be required, connection to HDPE pipes 50 mm on an
appropriate spot at minimum 5 meters distance from the tank foundations.
HDPE Pipes
HDPE Pipes, OD 63 (DN 2)
Minimum specifications for pipes (to be used for main lines)
HDPE Water Pipes, OD 63 (DN 2), PN 10
Suitable for potable water distribution, safe for drinking water, odorless
Tough, flexible and superior resistance to stress and cracking
Convenient and easy installation
Delivered in coils (max. length per coil: 100 m)
Environment friendly
Outside dia: min. 50 mm / max. 50.5 mm
Wall thickness: min. 3.7 mm / max. 4.3 mm
Roundness: 3.0 mm
Visual appearance: smooth
Pipe standard: DIN 8074 / ISO 4427 / PS 3580 / DIN 16963
Colour: black with blue stripe
HDPE Pipes, OD 50 (DN 1 1/2)
Minimum specifications for pipes (to be used for main lines)
HDPE Water Pipes, OD 50 (DN 2), PN 10
Suitable for potable water distribution, safe for drinking water, odorless
Tough, flexible and superior resistance to stress and cracking
Convenient and easy installation
Delivered in coils (max. length per coil: 100 m)
Environment friendly
Wall thickness: min. 3 mm / max. 3.5 mm
Visual appearance: smooth
Pipe standard: DIN 8074 / ISO 4427 / PS 3580 / DIN 16963
Colour: black with blue stripe
Galvanized Steel Pipes
Hot dip galvanized, DN 2 , suitable to be connected to rising pipe of borehole.
Hot dip galvanized screwed and socketed, fitted with socket made of seamless steel or machined
from solid bar. Pipe ends shall have smooth finish and shall be free of burrs or sharp machining
chip. Internal surface of pipes shall not have any lump of zinc.
Sluice Valves
Sluice valves, DN 2, shall be suitable for HDPE pipes, DN 2, PN 10.
Sluice valves shall be supplied including all connectors
Water Meter
Dry type, water meters, DN 2, including all connectors, for metering the borehole and DN1 1/2
for the distribution shall be supplied.
Materials shall be selected to have adequate mechanical, chemical and electrochemical resistance
against abrasion and corrosion. Materials in contact with the water shall be non-toxic and shall not
affect the quality of the water

Water Distribution System


Water distribution system shall consist of following components:
Lying of distribution network with HDPE pipes, OD 63 (DN 2), OD 50 (DN 1 1/2),OD 40 (DN
1) and OD 30 (DN ), including all fittings with a network coverage of at least 400 m. Sluice
valves shall be installed at strategic points, such as at the inlet and outlet of the water tank, at each
junction, at the inlet of the kiosk (sluice valves to be placed in lockable manholes / including
construction of thrust blocks and / or support blocks if required)
Branches to water kiosks with HDPE pipes, OD 50 (DN 1), OD 30 (DN 3/4) including all
fittings and one sluice valve (placed in a lockable manhole). Approx. distance from main
line to water kiosk: up to 15 m.
Lying of galvanized steel pipe, DN 2 , including all fittings, from discharge port of
borehole to water meter, (water meter must be placed in a lockable metal box inside the
pump house).
From water meter the pipeline should continue with a HDPE pipe, DN 2and 1.
Installation of submersible pump (either suitable for solar and wind driven generator
including suitable solar panels or for solar energy & power supply by generator, including
suitable solar panels).

RWH material, PVC Rain gutters


material:
Length:
Product name
Sharp
Main color

Advantages

Quality guarantee
Available Size
Diameter for Rain Water
Gutter 5.2"
Diameter for Rain Water
Gutter 7 "
Rain Water Gutter length
Normal Environment
temperature

PVC
3M/4M/5M
5.2 " pvc gutter
square type
white,gray,brown and other color as requirement
1.ASA double-color extrusion, color never fade
2.High temperature resistance, anti-aging, anti-oxidant, acid-base
mold erosion resistance, oxidation resistance.
3.Easy to cut and install
4.Ethylene polymer material, leed-free, good UV performance
5.recyclable
10years quality guarantee
dual wall 5.2inch, single wall 7inch
Gutter:125*85mm*100mm, 3.2mm in thickness
Downspout:86*63mm, 1.9mm in thickness
Gutter:150*130*120mm, 1.7mm in thickness
Downspout:100*80mm, 1.9mm in thickness
4M/3M/5M or any length you want
-40-75

TAPPRO Brackish Water Reverse Osmosis Machines


Specifications
- 3000 gallons per day (gpd) (17.4 M3/day)
Model: 3000BW
The Base Unit Includes:
TFC Brackish Water RO Membrane
316SS High-Pressure Piping, Fittings, and Valves
Safety Pressure Relief Valve
5-Micron Sediment Prefilter
316SS Pump
Painted Steel or Powder-coated Aluminum Frame
Fiberglass Pressure Vessels
Automatic Feed Water Shut-off Valve