Beruflich Dokumente
Kultur Dokumente
Basic Data
Bill of Material
Define Modification Parameters
Define BOM Usages
Define Material Types For BOM Header
Define Item Categories used for Item Data
Define allowed Material Types for BOM Items
Define Order of priority for alternative BOM usages
Work center
Define WorkCenter Category
Define Field Selection for Work Center
Define Task List Usage for Workcenters
Define Parameters for Standard Value Key
Define Standard Value Key
Define Person Responsible for work Centers
- INTERNAL -
Routing
Define Number Ranges for Routings
Define Field Selection
Define Material Type Assignments
Select Automatically (Routing Selection)
Define Task List Usage
Configure Planner Group
Configure Control Keys
Define Reduction Strategy
Define Relevancy to Costing
Define (Standard) Trigger Point Usage
Define Automatic Selection of Routings
- INTERNAL -
Production Planning
Demand Management
Define number ranges for planned independent requirements
Configuring Requirement Types and Requiremtent Classes
Define Strategy
Define Strategy Group
Define version numbers
Maintain consumption mode and period of adjustment
CRP
Plant Parameters
- INTERNAL -
- INTERNAL -
Master Data
- INTERNAL -
Availability Check
Define Checking Group
Define Checking Rule
Define Scope of Check
Define Checking Control
Checking Rule for Back order Processing
Scheduling
Specify Scheduling Type
Define Scheduling Parameters for Planned Orders
Define Scheduling Parameters for Production Orders
Configuration of MRP
1.
2.
MRP type
3.
4.
Procurement Type(MM)
5.
(MM)
- INTERNAL -
6.
(MM)
7.
8.
- INTERNAL -
3Define Planner GroupIMG > Production Planning for Process Industries > Master Data > Master Recipe > Define Capacity Planner
- INTERNAL -
IMG > Production Planning for Process Industries > Process Management > Tools > Define copy setting between
plants
11) Define Floats (Scheduled Margin Key)IMG > Material Management > Consumption based Planning > Planning > Define Floats (Scheduled Margin Key)
12Define Splitting of Forecast requirements for MRPIMG > Material Management > Consumption based Planning > Evaluation > Forecast > Define Splittng of forecast
requirements of MRP
- INTERNAL -
- INTERNAL -
- INTERNAL -
IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define
Checking rule for back order processing
- INTERNAL -
IMG > Production Planning for Process Industries > Process Order > Integration > Define Valuation of goods received
Further you need to do Manual Configuration in PP after Transport Request transfer in Production Server:
- INTERNAL -
- INTERNAL -
Planned Orders
Reservations / Dependent Requirements
Purchase Requisitions
MRP Lists
Simulative Dependent Requirements
- INTERNAL -
Confirmations in CO80
Reservations in CO83
Operations in CO81
Capacity Requirements in CO84
- INTERNAL -