Preparation
1) Under Training Project, create Ice Fatigue subdirectory
2) Under Ice Fatigue, Create Foundation SE, Modes and Fatigue subdirectories.
3) Copy SACINP.STA model file, SEAINP.STA and PSIINP.DAT soil data from \Spectral
Earthquake\Static SE directory to Foundation SE directory.
Creating foundation superelement under Foundation SE directory,
1) Modifying Seastate file SEAINP.STA
Delete EQKS from LCSEL and load combinations.
Rename load case GRVX to X000: delete ACCEL line and modifying INCWGT to include
only ANOD and WKWY for possible wave loads. Add 000 direction wave at 2.5m wave
height @ 7.5 sec wave period, stream function wave theory will be used in 18 steps for
maximum base shear.
Rename load case GRVY to Y090: delete ACCEL line and modifying INCWGT to include
only ANOD and WKWY for possible wave loads. Add 090 direction wave at 2.5m wave
height @ 7.5 sec wave period, stream function wave theory will be used in 18 steps for
maximum base shear.
In load combinations using X000 to replace GRVX and Y090 to replace GRVY.
Portion of modified Seastate input shall looks like following,
------------------------------------------------------------------------------------------------------------LDOPT
NF+Z
1.025
7.85 -79.50
79.50
LCSEL
SUPX SUPY
LOAD
LOADCNDEAD
INCWGT ANODWKWY
DEAD
DEAD
-Z
M
LOADCNMASS
INCWGT MASS
ACCEL
1.0
LOADCNX000
INCWGT ANODWKWY
WAVE
WAVE
STRE
2.5
7.50
0.00
LOADCNY090
INCWGT ANODWKWY
WAVE
WAVE
STRE
2.5
7.50
90.00
LCOMB
LCOMB SUPX DEAD
1.0MASS
1.0X000
1.0
LCOMB SUPY DEAD
1.0MASS
1.0Y090
1.0
MN
NPNP
N CEN1
20.0
18MS
20.0
18MS
Ice Fatigue - 1
END
-------------------------------------------------------------------------------------------------------------
2) Creating run file to generate foundation superelement using SUPX and SUPY.
In Analyis Options > Foundation part, select Create foundation superelement and
input SUPX and SUPY to 1st X and 1st Y load cases respectively, Max load and
deflections will be used for pile head load/deflection option.
No Element Check and Postvue database needed for this analysis.
Run analysis.
Mode extraction under Modes directory,
Ice Load Group Modification line GRPMD will be used to delete ice loading from pile
groups PL3, PL4 and PL5.
An integration Control TIME line added to enable Start time = 0.0 Secs and End time =
60.00 secs, output time interval = 0.02 secs, minimum integration time step = 1.0E-8 and
finally the integration control tolerance factor =1.0.
Fatigue options defined here for ice fatigue analysis.
Design life = 20.0 with Life safety factor = 2.0
All plates and non-tubular elements may be skipped;
API X curve with thickness correction selected as S-N curve;
Kuang and Wordsworth KAW will be used for SCF calculation;
Max and Min SCF will be prescribed
For fatigue option 2 line, check Member Summ. Rep. (Life Order) and SCF Validity
Range Check.
Using joint selection line to define only joints 201L, 203L, 205L, 207L, 301L, 303L, 305L,
307L, 401L, 403L, 405L and 407L will be included for fatigue damage evaluations.
Using SCF limits line SCFLM to define max. SCF = 6.0 and min. SCF = 2.0.
The ice floe characteristics listed below will be added in 000, 045 and 090 directions for ice
fatigue analysis using ICE lines. Elastic Modulus = 0.4 MN/cm2, Weight Density = 0.9 t/m3,
Stiffness parameter = 0.0315, All velocity step size = 0.05 m/sec, All durations of ice
movement = 0.2 hrs.
Ice Floe
No.
T
(cm)
Crushing
Strength
(KN/cm2)
Breaking
Length
Ratio
Top of Ice
Elevation (m)
Velocity
(m/sec)
No. of
Velocity
Steps
10.0
0.24
2.50
0.01
0.25
15.0
0.22
3.00
0.02
0.20
20.0
0.20
3.50
0.03
0.15
25.0
0.19
4.00
0.03
0.15
30.0
0.17
4.50
0.04
0.15
35.0
0.17
5.00
0.04
0.15
40.0
0.15
5.50
0.05
0.15
Ice Fatigue - 3
Dynamic response input for ice fatigue shall looks like following,
------------------------------------------------------------------------------------------------------------DROPT VIBR 50EC+Z-79.50
SDAMP
2.0
LOAD
FVIB ICE
SDO
LN PLSPLMIFDMMSPPT
GRPMD
PL3 0.001PL4 0.001PL5 0.001
TIME
0.00
60.00
0.02
1.0E-8
FTOPT
20.0
2.0 SMAXX SKMXMNSK
FTOPT2
PTVC
JSLC 201L203L205L207L301L303L305L307L401L403L405L407L
SCFLM 6.0 2.0
ICE
10.0
0.4 0.24
2.5 0.01 0.00 0.25 0.9
ICE
15.0
0.4 0.22
3.0 0.02 0.00 0.20 0.9
ICE
20.0
0.4 0.20
3.5 0.03 0.00 0.15 0.9
ICE
25.0
0.4 0.19
4.0 0.03 0.00 0.15 0.9
ICE
30.0
0.4 0.17
4.5 0.04 0.00 0.15 0.9
ICE
35.0
0.4 0.17
5.0 0.04 0.00 0.15 0.9
ICE
40.0
0.4 0.15
5.5 0.05 0.00 0.15 0.9
ICE
10.0
0.4 0.24
2.5 0.01 45.00 0.25 0.9
ICE
15.0
0.4 0.22
3.0 0.02 45.00 0.20 0.9
ICE
20.0
0.4 0.20
3.5 0.03 45.00 0.15 0.9
ICE
25.0
0.4 0.19
4.0 0.03 45.00 0.15 0.9
ICE
30.0
0.4 0.17
4.5 0.04 45.00 0.15 0.9
ICE
35.0
0.4 0.17
5.0 0.04 45.00 0.15 0.9
ICE
40.0
0.4 0.15
5.5 0.05 45.00 0.15 0.9
ICE
10.0
0.4 0.24
2.5 0.01 90.00 0.25 0.9
ICE
15.0
0.4 0.22
3.0 0.02 90.00 0.20 0.9
ICE
20.0
0.4 0.20
3.5 0.03 90.00 0.15 0.9
ICE
25.0
0.4 0.19
4.0 0.03 90.00 0.15 0.9
ICE
30.0
0.4 0.17
4.5 0.04 90.00 0.15 0.9
ICE
35.0
0.4 0.17
5.0 0.04 90.00 0.15 0.9
ICE
40.0
0.4 0.15
5.5 0.05 90.00 0.15 0.9
END
1.0
KAW
2
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.0315
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
4
3
2
2
2
2
2
4
3
2
2
2
2
2
4
3
2
2
2
2
2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
Ice Fatigue - 4
Portion of ice fatigue analysis report for joint 401L and 403L:
----------------------------------------------------------------------------------------------------------------------------------*
JOINT
ORIGINAL
OD
WT
(CM)
(CM)
M E M B E R
JNT MEM
TYP TYP
F A T I G U E
(DAMAGE ORDER)
CHORD
LEN.
(M )
TUB
40.75
1.500 K
BRC
12.06
TUB
107.00
3.500 K
CHD
12.06
TUB
40.75
1.500 K
BRC
12.06
TUB
107.00
3.500 K
CHD
12.06
TUB
32.38
1.250 K
BRC
12.06
TUB
107.00
3.500 K
CHD
12.06
TUB
32.38
1.250 K
BRC
12.06
TUB
107.00
3.500 K
CHD
12.06
TUB
32.38
1.250 T
BRC
12.06
TUB
107.00
3.500 T
CHD
12.06
R E P O R T
30.67
20.72
30.67
0.00
FATIGUE RESULTS
DAMAGE LOC SVC LIFE
2.93
2.93
2.29
2.00
.1998861
100.0570
2.00
2.00
2.00
2.00
.0466238
428.9658
2.85
2.85
2.22
2.00
.0274330
729.0496
2.00
2.00
2.00
2.00
.76470-2
2615.419
5.20
5.20
3.00
3.41
.4913432
40.70475
2.86
2.86
2.00
2.54
.0627053
318.9522
5.28
5.28
2.99
3.37
.5663338
35.31486
2.91
2.91
2.00
2.52
.0751937
265.9797
3.16
4.37
2.19
2.66
.0568737
351.6562
3.44
5.35
2.00
2.63
.0487902
TL
409.9180
REQUIRED
OD
WT
(CM)
(CM)
TUB
40.75
1.500 K
BRC
12.12
TUB
107.00
3.500 K
CHD
12.12
TUB
32.38
1.250 Y
BRC
12.12
30.96
0.00
2.84
2.84
2.22
2.00
.0282604
707.7051
2.00
2.00
2.00
2.00
.78352-2
2552.580
3.17
4.35
2.19
2.65
.1002534
BL
199.4944
Ice Fatigue - 5