RESPONSETOREQUESTFORINFORMATION
DEPARTMENT:AustinTransportation
REQUESTNO.:285
REQUESTEDBY:Kitchen
DATEREQUESTED:09/01/15
DATEPOSTED:9/02/15
REQUEST:Pleaseprovidetheamountoffundingneededfortrafficsafetyimprovementsat
Austinsfivemostdangerousintersectionsintermsofbodilyinjury,listedseparatelyinorderof
magnitude(budgetconcept1.26).
RESPONSE:
TheAustinTransportationDepartment(ATD)hasreviewedthetopsixtylocationsandcategorized
theselocationsbasedonthehighestpriority,collisionproneintersectionsandidentifiedwhere
particulartrendsexistthatcanbeaddressedwithengineeringcountermeasures.
Basedonthereviewofthesafetyaspectsoftheselocations,ATDhasidentifiedengineering
improvementsthatwouldaddresssafetyissuesatthetopfivelocations(seeattachedbackup
materialfromConceptItem#1.26forcostbreakoutforeachspecificproposedimprovement):
1. W.SlaughterLane/ManchacaRoad(District5):$1,500,000
Crashesprimarilyhappenatdrivewaysnorthandsouthoftheintersection.Intheabsence
ofraisedmedians,driverscanmakeunsafeleftturnstoandfromthesedriveways.The
projectwouldaddaraisedmedianalongManchacatorestrictdrivewayaccessandimprove
safety.Dualleftturnlaneswouldbeaddedattheintersectiononbothstreetstoreduce
delays.
2. LamarBlvd/RundbergLane(District4):$525,000
Crashesprimarilyhappenatdrivewaysnorthandsouthoftheintersection.Intheabsence
ofraisedmedians,driverscanmakeunsafeleftturnstoandfromthesedriveways.The
projectwouldaddaraisedmedianalongLamartorestrictdrivewayaccessandimprove
safety.
3. LamarBlvd/ParmerLane(District7):$525,000
Mostcrashesarenorthboundandsouthboundrearendsinthechannelizedrightturnlanes.
Theprojectwouldmodifytherightturnlanestoforcedriverstoyield,decreasevehicle
speeds,reducerearends,andimprovesafetyforpedestrianscrossingthelanes.
4. US183ServiceRoad/CameronRoad(District1and4):$900,000
CrashesoccuralongCameronatbothfrontageroadsofUS183.Theprojectwouldadd
anothersouthboundthroughlaneatthenorthfrontageroadtoextendsouthofUS183.It
wouldalsomodifythesouthboundrightturnlanetodecreasevehiclespeedsandimprove
safetyforpedestrianscrossingthelane.
5. IH35ServiceRoadSouthbound/MartinLutherKing(District1):$375,000
Manycrashesoccuronthesouthboundfrontageroadasvehiclescrosslanesapproaching
MartinLutherKing.Theprojectwouldchangeoneofthesouthboundrightonlylanestoan
optionalthrough/rightlane.Itwouldalsomodifytheeastboundrightturnlanetodecrease
vehiclespeedsandimprovesafetyforpedestrianscrossingthelane.
TotalCost=$3,825,000.Thesecostsincludedesignandconstruction.
Background
ATDhasinitiatedanEngineeringSafetyImprovementProgramtoaddressexistingsafetyissuesat
thehighpriority,collisionpronelocationsinAustin.Inordertoidentifytheselocations,ATDhas
collectedcollisiondatafromtheAustinPoliceDepartment(APD)andanalyzeditbasedon
frequency,rate,andseveritylevel.ATDwillusethisanalysistobetterfocusonproblemareas.
NextSteps
Inordertoalleviatesafetyissues,engineering,enforcement,andeducationinitiativesarerequired.
Atsomelocations,collisionsarepredominantlyrandomandmostlyassociatedwithdriverserrors.
However,somelocationshaveparticularcollisionpatternsthatarepreventableandcanbetargeted
withengineeringcountermeasures.ATDisadoptingthisproceduretotargetthepreventable
collisionsandimproveoveralltrafficsafetyinAustin.
Afterapprovaloftheproposedsafetyimprovements,ATDplanstoconductcomprehensivebefore
andafterstudiestoassesstheireffectiveness.Basedontheresultsofthebeforeandafterstudies,
ATDwillcontinuetoapplytheeffectiveengineeringcountermeasuresontheremainingcollision
pronelocationstoimprovesafety.
Cost Estimate
$1,000,000
$250,000
$250,000
$1,500,000
$350,000
$87,500
$87,500
$525,000
$350,000
$87,500
$87,500
$525,000
$600,000
$150,000
$150,000
$900,000
TOTAL COST
$250,000
$62,500
$62,500
$375,000
$3,825,000