Cabinets installation:

BTS 3900A cabinet installation& fixation


Power cabinet installation& fixation (TP48200A)_1
Power cabinet installation& fixation of stacked cabinets_2
The equipment layout in BTS3900A cabinet
The equipment layout and cables inside BTS3900A cabinet
The equipment layout and cables inside TP48200A cabinet_1
The equipment layout and cables inside stacked cabinets_2
The MCB distribution for DCDU
Sensor installation
Cabinet labeling system

RF Installation:

Antennas and RRU installation


Antenna ports
Antenna Mechanical Tilt
Install AISG cable from ANT to 3G RRU
RRU power cable grounding
Antennas and RRU ports sealing
Feeders installation

Batteries installation

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 2

Cabinet Installation

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 3

BTS3900A cabinet installation& fixation

APM30

over the RFC cabinet,


should be fixed and tightened
by 4 bolts

RFC cabinet fixed on the


basement, four bolts
should be tightened well

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 4

Base is fixed using 4 bolts on


concrete foundation GF sites or
metal grillage for RF sites

Leave 80 cm from the base


frame to the end of the
concrete foundation is
desirable ( if available )

BTS cabinet base frame fixed


on the basement, four bolts
should be tightened well

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

BTS base frame must be


leveled

Page 5

Base frame is fixed and


leveled using 4 bolts on
concrete foundation

Power cabinet installation& fixation (TP48200A)_1


TP48 fixation bolts
and washers

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 6

Power cabinet installation& fixation of stacked cabinets_2

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 7

BTS and TP48 cabinets


should be leveled together
while doors are closed
Spacing between the 2
cabinets should be 5 cm

TP48 cabinet should be fixed


with 4 bolts

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 8

The equipment layout in BTS3900A cabinet

DCDU-12A
for MRFU
power

DCDU-12A for
BBU and Fan
BBU3910
DCDU-12B for 3G
and 4G RRU
In case more than 6
RRUs, add another
DCDU-12B here.

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

M
R
F
U
d

Page 9

The equipment layout and cables inside BTS3900A cabinet

RRU power cables and signal


cables should be routed from
the right entry port
DCDU power cables and fiber
cables and BTS ground cable to
be from the left entry port

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page

Page10
10

The equipment layout and cables inside TP48200A cabinet_1

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 11

The equipment layout and cables inside stacked cabinets_2


AC, Ground
and IF cable
to be installed
from the left
entry port
Make sure to
keep at least
5cm between
AC and IF

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Battery, RRU
dc cables and
alarm and
signal cables
to be installed
from the right
entry port

Page 12

The MCB distribution for DCDU

LLVD

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

BLVD

BAT

Page 13

Sensor installation

Temperaturehumidity index sensor

Lamp in TP

smoke
sensor

Water proof
sensor

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 14

Cabinet labeling system

Rectifier

AC power cables
connected in PDP should be
labeled, terminated and
fixed

Labels

for all power cables


inside the rectifier, all
cables should be terminated

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

All Signal, Power and Ground


cables inside the cabinet
should have label

Page 15

RF Installation

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 16

Antennas and RRU installation

- Stainless steel bolts, double


nuts
- Double nuts needed for
Antenna fixation
- Use the old antenna
grounding cable for the new
antenna after swap

- Stainless steel bolts, Spring


washer and nut.

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

If there is available space on


the Tower , the 2 RRU should
be of different types ( 3G & 4G
) for each sector .. 4G on the
left and 3G on the right

If there is no available space to


install 2 RRU for each sector ,
we can install 3 RRUs together
but they should be of the same
type 3G or 4G
Page 17

Antenna ports
4G1800M

AISG
Male

Left is 1800M, 4G

3G-2100M

900M

AISG
Female

Right is 2100M, 3G
Page

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 18

18

Antenna Mechanical Tilt


The HW Tri-band antenna length is 2.6 meters, should set mechanical tilt according to the marker of L=2.6

This small triangle using to


define mechanical down tilt

Record and call OMC to confirm the M-tilt value of all the sectors
HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 19

Install AISG cable from ANT to 3G RRU


AISG

cable will be installed from 3G RRU 3839 to antenna

AISG

cable input on the


antenna
AISG

cable input inside


the RRU

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page

Page20
20

RRU power cable grounding

From BTS When


RRU power cable
through into BTS
cabinet, must use 6
in 1 grounding clamp
for shield layer
grounding of RRU
power cable !

From RRU side The shielding


layer of RRU power cable need
to grounding using clip in RRU

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

6 in 1 grounding clamp, 1clamp


can fix 6pcs RRU power cable.

Page 21

Antennas and RRU ports sealing

Wrap

3 layers of
waterproof tape

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Wrap

3 layers of
insulation 3M tape

Top

and bottom
black ties

Page 22

Use out door labels for upper jumpers


( fixed with black cable ties)

Use out door labels for Fiber,


Power and ground cables

Use the Antenna port cover


for the unused ports.
Upper jumpers connectors
should be sealed as
mentioned before
Using joint bar connect each RRU

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 23

Feeders installation

Wrap 3

layers of
waterproof tape

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Wrap 3

layers of
insulation 3M tape

Top and

bottom
black tie wraps

Page 24

Cable tray Sharp


Edges should be
covered by
rubber

Subcontractor must make the


VSWR for all the RF system
before the swap and provide
Snap shots inside the As built
document

Outdoor Labels should be


installed before and after the
connectors
Earth Reading should be
taken before and after
the Swap , reading
should be less than 5
ohms

Feeders and fiber and power


cables arranged inside the cable
try in the mentioned order and
all cables should be flat over the
cable tray

Old cable should be shifted


Without affecting their service

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Feeder Grounding Kits to be


installed and connected to the
nearest grounding bar
Feeder Grounding Kits to be
isolated in the same way as the
antenna connecter

Page 25

After swap , the cable


tray covers must be Fixed
by Steal ties

Outdoor label system


Antenna
3G

Tx

Rx

RRU
Power

Fiber

BBU
Ground

Fiber

Sec1 ANT_0A

ANT_0B

MBTS PWR RRU 0 CPRI 0 MBTS PGND 0 CPRI 0

Sec2 ANT_1A

ANT_1B

MBTS PWR RRU 1 CPRI 1 MBTS PGND 1 CPRI 1

Sec3 ANT_2A

ANT_2B

MBTS PWR RRU 2 CPRI 2 MBTS PGND 2 CPRI 2

4G

Tx

Rx

Power

Fiber

Ground

Fiber

Sec1 ANT_3A

ANT_3B

MBTS PWR RRU 3 CPRI 3 MBTS PGND 3 CPRI 3

Sec2 ANT_4A

ANT_4B

MBTS PWR RRU 4 CPRI 4 MBTS PGND 4 CPRI 4

Sec3 ANT_5A

ANT_5B

MBTS PWR RRU 5 CPRI 5 MBTS PGND 5 CPRI 5

2G

Tx

Rx

Sec1 ANT_0C ANT_0D


Sec2 ANT_1C ANT_1D
Sec3 ANT_2C ANT_2D

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page 26

Batteries installation

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page

Page27
27

2
4
1

HUAWEI
CO., LTD.
HISILICONTECHNOLOGIES
SEMICONDUCTOR

Page

Page28
28

Thank you
www.huawei.com

Das könnte Ihnen auch gefallen