Sie sind auf Seite 1von 19

V E P I

CODE

: 0132211BBMD2400

TITLE

: SCOPE OF WORK

SHEET

1 OF

C A

19

PROJECT

: PDVSA 013, VEPICA 002204

NAME

INGENIERA BSICA DEL PROYECTO "UNIDAD


: DE HIDROTRATAMIENTO DE NAFTA EN EL
CENTRO REFINADOR DE PARAGUAN (CRP)"

CLIENT

: PDVSA

LOCATION

: PARAGUAN EDO FALCN.

08/10/02

ISSUE.

DATE

LEADER OF (PDVSA):
DOUGLAS ESPINOZA

FINAL ISSUE

L. CENEDESE
DESCRIPTION

ENGINEERING LEADER (PDVSA):


FRANCIA ARISMENDI

PREPARED

R. LEAL
REVIEWED

R. LEAL
APPROVED

DEFINITION LEADER (PDVSA):


DOUGLAS MARTNEZ

FORM 0132100ABG40004 Issue. 0 03/07/02

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 2 OF 19

INDEX
DESCRIPTION

PAGE

DESCRIPTION OF WORK - GENERAL

1.1

SPECIFICATIONS

SCOPE OF SUPPLY

2.1

COMPRESSOR SKID

2.2

CONTROL SYSTEM

2.3

SPARE PARTS

2.4

SPECIAL TOOLS

2.5

BATTERY LIMITS

2.6

TECHNICAL INFORMATION

2.7

TRANSPORTATION

2.8

REQUIRED DOCUMENTATION

2.9

MISCELLANEOUS

RECYCLE GAS CENTRIFUGAL Compressor package integration

10

RECYCLE GAS CENTRIFUGAL Compressor package installation,


commissioning and startup supervision

11

TECHNICAL TRAINING

11

FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 3 OF 19
SCOPE OF WORK
1.

DESCRIPTION OF WORK - GENERAL


Except as otherwise expressly herein, CONTRACTOR shall supply all labor,
supervision, tools, equipment, installed and consumable materials, services,
testing devices and warehousing and each and every item of expense necessary
for design, fabrication, inspection, painting, testing, evaluation, quality assurance,
transportation and delivery of One (01) Recycle Gas Centrifugal Compressor
Package comprised of: compressor skid, control system, special tools, technical
information and all necessary appurtenances and auxiliary equipment; in
accordance with the technical specifications listed below under 1.1. As well as, all
the personnel required for the supervision of the installation, commissioning and
startup of the Recycle Gas Centrifugal Compressor Package, including the
technical training for the operating and maintenance staff.
1.1 SPECIFICATIONS
If two (02) or more of the preceding documents have conflicting requirements,
CONTRACTOR shall bring this to PURCHACERS attention for PURCHASERS
decision.

Data Sheet Recycle Gas Centrifugal Compressor C-1550. Rev 3. Date


Oct/2002.

Data Sheet Special Purpose Steam Turbine ST-1650. Rev 1. Date


23/10/2002.

N2351-DB-100-1M-15

PDVSA SN-252

VEPICA N 0132100ABM85501, Special-Purpose Steam Turbines Rev 2

VEPICA N 0132100ABE88909, Technical Specifications Electric Motors

Centrifugal Compressors Specification. Rev 1


Equipment Noise Control

200HP and Below. Rev 2. Date 16/08/2002

PDVSA K-300

PDVSA Instrumentation Introduction


FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 4 OF 19

PDVSA K-335

Package Unit Instrumentation

API-RP 540

Electrical Installations in Petroleum Processing Plants

API-RP-551

Process Measurement Instrumentation

ISA S 50.1

Compatibility of Analog Signals for Electronic Industrial

Process Instruments
2.

SCOPE OF SUPPLY
The

equipment,

material,

information

and

services

to

be

supplied

by

CONTRACTOR is comprised by the following:


2.1 COMPRESSOR SKID

Compressor.

Steam Turbine.

Speed increasing gear box (if utilized).

Common Baseplate for compressor, speed increasing gear (if utilized)


and steam turbine.

Flexible dry type coupling between steam turbine and speed increasing
gear box.

Flexible dry type coupling between speed increasing gear box and
compressor.

Seal Gas System (The location of this skid is open to CONTRACTORS


election).

Lube Oil System (The location of this skid is open to CONTRACTORS


election).

All lube oil piping within Compressor Skid.

All lube oil piping between Compressor Skid and Lube Oil System,
regardless of location of Lube Oil System.
FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 5 OF 19

All seal gas piping within Compressor Skid.

All seal gas piping between Compressor Skid and Seal Gas System,
regardless of location of Seal Gas System.

One (01) set of foundation bolts, plates and leveling screws for
compressor skid.

One (01) set of foundation bolts, plates and leveling screws for Lube Oil
System Skid (if not on Compressor Skid Baseplate).

One (01) set of foundation bolts, plates and leveling screws for Seal Gas
System Skid (if not on Compressor Skid Baseplate).

Instrumentation

2.1.1 INSTRUMENTATION
All instrumentation required for the proper and safe operation and diagnostic of the
Recycle Gas Centrifugal Compressor Package, also including the following:
Compressor and auxiliary system local boards.
All compressor and speed increasing gear box temperature sensing devices.
All compressor and speed increasing gear box vibration sensing devices.
All steam turbine temperature sensing devices.
All steam turbine vibration sensing devices
All pressure transmitters comprised within compressor skid, seal gas system, lube
oil system.
All temperature transmitters.
All flow transmitters and controllers.
All pressure controllers.
All valve position and status indicators.
All valve position and status transmitters.
FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 6 OF 19
All level sensing devices, indicators, transmitters and controllers.
Keyphasor.
Speed sensing devices.
Speed transmitters.
All junction boxes.

All materials and installation of the wiring system(s) within the Compressor Skid and
Control System.
All motor starters for the equipment in the Compressor Skid and Control System.
2.2 CONTROL SYSTEM
System enclousure.
Triple Modular Redundant Control System.
I/O modules.
Anti Surge Controller.
Vibration and Temperature Monitoring System.
Human Machine Interface Devices.
2.3 SPARE PARTS
One (01) set of recommended startup spare parts quote as an option.
Compressor bundle (Rotor, impellers and diaphragms) quote as an option.
One (01) Speed increasing gear high and low speed pinion set - quote as
an option.
One (01) set of couplings quote as an option.
One (01) set of seals (Compressor) quote as an option.
One (01) set of seals (Steam Turbine) quote as an option.
One (01) set of bearings (Compressor and Steam Turbine) quote as an option.
FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 7 OF 19
2.4 SPECIAL TOOLS

All special tools and fixtures required to disassemble, assemble, or maintain the
compressor, gear box, couplings, steam turbine, and the control system.
All lifting devices required for the field installation of the compressor skid, lube oil
system, seal gas system and control system. Purchaser will only furnish the crane.
2.5 BATTERY LIMITS
In broad terms, the Recycle Gas Centrifugal Compressor Package is to be supplied
such that all piping and electrical connections to PURCHASERS facilities are located
at the physical edge of the Compressor Skid and the Control System, and do not
require the connection, intervention or installation of any individual component, with
the exception of the leveling and alignment of the steam turbine and compressor,
including the installation of the couplings and guards, and the connection of the Lube
Oil System and Seal Gas System to the Compressor Skid (if and only if the Lube Oil
System and/or Seal Gas System are not mounted on the Compressor Skid
Baseplate). All the electrical connections between the control system and the
compressor skid will be done by a third party. All electrical connections between field
mounted instruments and control system will be done by a third party. All electrical
connections between the control system and PURCHASERS Distributed Control
System (DCS) will be done by a third party. All electrical connections between the
Compressor Skid and the PURCHASERS electrical system will be done by a third
party. All electrical connections between the Control System and the PURCHASERS
electrical system will be done by a third party.
In this document the word piping includes all pipes, bolts, studs, flanges, gaskets,
joints, elbows, tees, reductions, fittings, spectacle blinds and supports, required to
direct the fluid from the source to the sink. CONTRACTOR shall supply all piping
fully welded. No welds will be done by PURCHASER or third party.
2.6 TECHNICAL INFORMATION
The CONTRACTOR shall furnish, as a minimum, the following technical information:
FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 8 OF 19
a)

Mechanical data books. The mechanical data books shall contain to the fullest
extent the specifications, mechanical data sheets, instrument data sheets,
equipment lists, instrument lists, signals list, valve data sheets, valve list,
QA/QC

reports,

purchase

specifications,

as

well

as,

drawings,

and

manufacturer's literature. The books shall be in durable binders capable of


withstanding hard usage, of polyvinyl material with rounded outside corners,
riveted to piano type hinges, and have a locking (no ring type binders) to
accommodate A4 or US letter sized sheets with standard 3-hole punching. The
lettering on the covers shall clearly and prominently display PURCHASERS
logo, facility name, unit designation, and in a less prominent position, the
CONTRACTOR'S name. The time and distribution of the mechanical data books
shall be as specified in Attachment A.
b)

Lateral and torsional analysis.

c)

Operating manuals.

d)

Maintenance manuals.

e)

Test protocols and data.

Test bed or system instrumentation data sheets,

calibration certificates, and data gathering system and component specifications


are considered an integral part of the Test data.
f)

Engineering drawings for the electrical system installation, including but not
limited to:
Descriptive bulletins
Bill of materials of all electrical devices
One-Line Diagram(s)
Schematic/Elementary Wiring Diagrams
Interconnection Wiring Diagrams
Conduit/Wiring Installation Plans and Details
FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 9 OF 19

Vendor drawings and data for all subvendor-purchased electrical equipment


shall be provided.
All documentation, except for equipment catalogs not available in Spanish, shall
be in Spanish.

Two sets of the documentation shall be made available in

English. PURCHASER will not furnish a set of documents for CONTRACTORS


use during the installation, commissioning and start-up phase of the Recycle
Gas Centrifugal Compressor Package.
2.7 TRANSPORTATION
The CONTRACTOR shall be responsible for the transportation of all materials,
and equipment from place of manufacture to the Plant Site. DDU INCO Terms
2000.
2.8 REQUIRED DOCUMENTATION
In addition to the mechanical data books, the CONTRACTOR shall include
within its scope of work the following documentation:
Job coordination specification
Project quality plan
Design criteria
2.9 MISCELLANEOUS
Additionally the CONTRACTOR shall be responsible for executing or furnishing
the following items:
Compressor and speed increasing gear mechanical run tests.
Steam turbine mechanical run test.
Compressor performance test.
Dry Gas Seals performance test.
On site performance test.
Shop testing of the electrical wiring system.
FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 10 OF 19
Fabrication schedules
Procurement schedules
Testing schedules

Monthly progress report, including the engineering, fabrication, procurement,


testing and delivery schedules.
3.

RECYCLE GAS CENTRIFUGAL Compressor package integration.


CONTRACTOR shall be responsible for producing all the documents, specifications
and drawings necessary in order to assure that no mechanical, electrical,
instrumentation or control systems interference occurs; that is, all components of the
Recycle Gas Centrifugal Compressor package must fit together without incurring on
site modifications.
CONTRACTOR shall be responsible for supervising that all components of each skid
or shelter comprising the Recycle Gas Centrifugal Compressor package and its
auxiliaries are assembled at manufacturers shop in strict accordance with
CONTRACTOR'S specifications. This requirement is strictly applicable to equipment
furnished in the same skid or panel. On site installation, commissioning and start-up
of the Recycle Gas Centrifugal Compressor package will be executed by a third party
at PURCHASERS location in strict accordance to CONTRACTORS specifications.
CONTRACTOR shall be responsible for producing all the documents, specifications
and drawings necessary in order to assure that no mechanical, electrical,
instrumentation or control system interference occurs between the Recycle Gas
Centrifugal Compressor Package and its associated process units, process
instrumentation, process valves, and the Distributed Control System; that is, all
components of Recycle Gas Centrifugal Compressor package and its associated
process units, process instrumentation, process valves, and main control system,
function properly without incurring on site modifications.

FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 11 OF 19
4.

RECYCLE GAS CENTRIFUGAL Compressor package installation,


commissioning and startup supervision.
CONTRACTOR

shall

be

responsible

for

supervising

that

the

installation,

commissioning and startup of the Recycle Gas Centrifugal Compressor Package


including all the auxiliaries systems, is carried out in strict accordance with
CONTRACTORS specifications. In order to do this, CONTRACTOR, shall assist
third party in programming the installation, commissioning and startup activities of the
Recycle Gas Centrifugal Compressor Package including its auxiliaries, coordinate
and give instructions to field and technical personnel furnished by third party; as well
as, furnish all specialized personnel (Centrifugal Compressor field engineer, Steam
Turbine field engineer, Control System field engineer, and instrumentation field
engineer).

CONTRACTOR shall quote a lump sum daily rate that includes all

transportation, lodging, living expenses, medical and insurance costs, associated


with CONTRACTORS specialized personnel.
5.

TECHNICAL TRAINING
CONTRACTOR shall prepare a technical program for compressor skid components
and control system operating and maintenance personnel. Program shall be based
upon the assumption that the personnel possesses sufficient knowledge and
experience in operation and maintenance of centrifugal compressors, steam turbines
and control system.
The CONTRACTOR shall furnish all instructors, materials, documents and drawings,
conference rooms, including the furnishings, slide and transparency projectors, black
boards or its equivalent, refreshments, and all other writing materials required for this
task.
The technical training program shall include the following:
Operation

Operation and control philosophy.

Operation principles of centrifugal compressors


FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002

SHEET 12 OF 19

Operation principles of steam turbines.

Operation principles of steam turbine governors.

Head Vs. Flow curves.

Balance pistons.

Pressure equalization in centrifugal compressors.

Thermodynamic behavior of natural gas.

Surge control of centrifugal compressors.

Operation principles of dry-gas sealing systems.

Control of dry gas sealing systems.

Startup of centrifugal compressors.

Startup of steam turbines.

Shutdown of centrifugal compressors

Depressurization of centrifugal compressors

V E P I

Maintenance

Leveling of centrifugal compressors

Alignment of centrifugal compressors

Alignment of gear boxes

Leveling of gear boxes

Leveling of steam turbines.

Alignment of steam turbines.

Deflections of shafts during operation

Installation/removal of couplings
FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002

SHEET 13 OF 19

Installation/removal of bearings and seals

Installation/removal of covers

Troubleshooting and typical vibration spectra

V E P I

FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002

SHEET 14 OF 19

V E P I

ATTACHMENT A

FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 15 OF 19

PFDs
1. ISAL

TM

PROCESS

UNIT.

SEPARATOR

SECTION.

N 2351-DB-100-2P-02

P&IDs
1. ISAL TM PROCESS UNIT. REACTION SECTION. RECYCLE
GAS COMPRESSOR. PIPING & INSTRUMENT DIAGRAM. N
0132211BBP20813

AREA PLOT PLAN


1. PLANO DE IMPLANTACION DE EQUIPOS. AMUAY ON
SITE/UNIDAD HNAY (PROCESO ISAL). N 0132211BBM30101.

FORM 0132100ABG40005 Issue. 0 03/07/02

C A

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 16 OF 19

C A

MECHANICAL DATA BOOKS


VENDOR DRAWINGS AND DOCUMENTS (1/4)
Proposal

For Approval

As Built

N of
Prints

After
P. O.

N of
Prints

N of
Prints

Electronic
File

3W

2R+3X

GENERAL
1

Vendors Drawing and Document List (Purchasers Form)

Reference List

3X

Vendors Product Catalog

3X

Quality Assurance Manual (As per ISO 9000/9001)

3X

Sub-vendor list

3X

4W

2R+3X

Deviation and Clarification List

3X

Note 3

2R+3X

Construction and Commisioning Spare Part List

3X

4M

2R+3X

1X

Recommended Operational Spare Part List

3X

4M

2R+3X

1X

Special Tool List with sketches

3X

4M

2R+3X

1X

4M

2R+3X

1X

1E

11 Utility Consumption summary

3X

2M

2R+3X

1X

1E

12 Noise Date Sheet

3X

3M

2R+3X

1X

1E

13 Q. C. Plan (Inspection and Test List)

3X

6W

2R+3X

1X

1E

14 Detailed Test and Inspection Procedure

3M

2R+3X

1X

1E

15 Painting and Insulation Procedure

4M

2R+3X

1X

1E

16 Rust Prevention Procedure for Shipping

4M

2R+3X

1X

17 Rust Prevention Procedure for Site Storage

4M

2R+3X

1X

18 Engineering and Manufacturing Schedule

4W

2R+3X

1X

monthly

2R+3X

1X

3X

Before
Ship

2R+3X

1X

21 Packing, Knock Down and Transportation Procedure

4M

2R+3X

1X

1E

22 Installation Manual

5M

2R+3X

1X

1E

23 Operation and Maintenance Manual

Before
Ship

2R+3X

1X

1E

24 Manufacturing Date Records

Note 5

2R+3X

1X

25 Certificates for Materials, Elect. Devices and Instruments

Note 6

2R+3X

1X

10 Lubricant schedule

19 Monthly Engineering and manufacturing status Report


20 Packing List with Shipping Weight /Dimension Information

Notes:
1.- W: Weeks, M: Months, R: Reproduceable Copy, X: Xerox, E: Electronic Format on CD-Rom.
2.- First submission shall be made within X-weeks or X-months after a purchase commitment as specified.
3.- Submission of revised deviation/Clarification List (to include only the items agreed to by Purchaser) after contract award.
4.- As-build documents shall be submitted before shipment.
5.- This document shall be submitted within 2 weeks after a final inspection.
6.- As a part of Manufacturing Data Records.

FORM 0132100ABG40005 Issue. 0 03/07/02

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 17 OF 19

C A

VENDOR DRAWINGS AND DOCUMENTS (2/4)


Proposal

For Approval

As Built

N of
Prints

After
P. O.

N of
Prints

N of
Prints

Electronic
File

6W

1R+3C

1R+3C

1E

CENTRIFUGAL COMPRESSOR (API-617)


1

Date Sheet

3X

Expected Performance Curve

3X

6W

1R+3C

1R+3C

1E

Before
Ship

1R+3C

1R+3C

1E

As-built Performance Curve

Cross Sectional Drawing with B.O.M.

3M

1R+3C

1R+3C

1E

Rotor Assembly Drawing with B.O.M.

4M

1R+3C

1R+3C

1E

Coupling Assembly Drawing with B.O.M.

3M

1R+3C

1R+3C

1E

Thrust Bearing Assembly Drawing with B.O.M.

4M

1R+3C

1R+3C

1E

Journal Bearing Assembly Drawing with B.O.M.

4M

1R+3C

1R+3C

1E

Seal Assembly Drawing with B.O.M.

3M

1R+3C

1R+3C

1E

10 Rotor Lateral Vibration Analysis

3M

1R+3C

1R+3C

1E

11 Rotor Torsional Vibration Analysis

3M

1R+3C

1R+3C

1E

12 Purchasers Connection List

2M

1R+3C

1R+3C

1E

13 P&ID Diagram for Lube Oil System

3X

2M

1R+3C

1R+3C

1E

14 P&ID Diagram for Dry Gas Seal System

3X

2M

1R+3C

1R+3C

1E

15 P&ID Diagram for Machine Condition Monitoring System

7
8
9

3X

2M

1R+3C

1R+3C

1E

16 P&ID Diagram for Process Gas Flow

2M

1R+3C

1R+3C

1E

17 General Arrangement Drawing for Complete Package

6W

1R+3C

1R+3C

1E

18 Auxiliary Piping Drawing with B.O.M.

3M

1R+3C

1R+3C

1E

19 Compressor Outline Drawing with list of connections

3M

1R+3C

1R+3C

1E

20 Lube Oil Console Outline Drawing with list of connections

3M

1R+3C

1R+3C

1E

21 Lube Oil Rundown Tank Outline Drawing

3M

1R+3C

1R+3C

1E

22 Piping Specification and Line List

3M

1R+3C

1R+3C

1E

23 Interconnecting Piping Plan Drawing

2M

1R+3C

1R+3C

1E

24 Interconnecting Piping Isometric Drawing with B.O.M

3M

1R+3C

1R+3C

1E

25 Foundation Design Information including Loading Data

2M

1R+3C

1R+3C

1E

26 Allowable Nozzle Forces and Moments

2M

1R+3C

1R+3C

1E

27 Lube Oil System Component Drawing and Data

4M

1R+3C

1R+3C

1E

28 Seal Buffer Gas System Component Drawing and Data

4M

1R+3C

1R+3C

1E

29 Motor Data Sheet

2M

1R+3C

1R+3C

1E

3X

2M

1R+3C

1R+3C

1E

31 Instrument Data Sheets

3M

1R+3C

1R+3C

1E

32 Instrument Drawings

4M

1R+3C

1R+3C

1E

33 Function and Logic Diagram

3M

1R+3C

1R+3C

1E

34 Control Panel Sequence Drawing

4M

1R+3C

1R+3C

1E

35 Control Panel Drawing

4M

1R+3C

1R+3C

1E

36 Pneumatic Hook-up Drawing

4M

1R+3C

1R+3C

1E

30 Motor Outline Drawing with terminal Box Details

FORM 0132100ABG40005 Issue. 0 03/07/02

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 18 OF 19

C A

VENDOR DRAWINGS AND DOCUMENTS (3/4)


Proposal

For Approval

As Built

N of
Prints

After
P. O.

N of
Prints

N of
Prints

Electronic
File

37 Electrical Hook-up Drawing

4M

1R+3C

1R+3C

1E

38 List of Electrical/Instrument Connectons

4M

1R+3C

1R+3C

1E

39 Field Instruments/Junction Boxes Layout Drawing

4M

1R+3C

1R+3C

1E

40 Junction Box Wiring Diagram

5M

1R+3C

1R+3C

1E

41 WPS and PQR with Welding Map

2M

1R+3C

1R+3C

1E

42 Code Vessel Drawings

2M

1R+3C

1R+3C

1E

43 Pressure Vessel Drawings

3M

1R+3C

1R+3C

1E

CENTRIFUGAL COMPRESSOR (API-617) (Continuation)

3M

1R+3C

1R+3C

1E

45 Gear Unit Data Sheet

3X

3M

1R+3C

1R+3C

1E

46 Gear Outline Drawing

2M

1R+3C

1X

1E

47 Gear Cross Sectional Drawing

1R+3C

1X

1E

48 Oil System API-614 Data Sheet

3X

6W

1R+3C

1X

1E

44 Heat Exchanger Drawings

FORM 0132100ABG40005 Issue. 0 03/07/02

CODE: 0132211BBMD2400
SCOPE OF WORK

ISSUE:

DATE: 08/10/2002
V E P I

SHEET 19 OF 19

C A

VENDOR DRAWINGS AND DOCUMENTS (4/4)


Proposal

For Approval

N of
Prints

After
P. O.

N of
Prints

As Built
N of
Prints

Electronic
File

SPECIAL PURPOSE STEAM TURBINE


1

Data sheet

3C

6M

1R+3C 1R+3C

1E

Expected Performance curve

3C

6M

1R+3C 1R+3C

1E

Cross Sectional Drawing with B.O.M.

3M

1R+3C 1R+3C

1E

Rotor Assembly Drawing with B.O.M.

4M

1R+3C 1R+3C

1E

Coupling Assembly Drawing with B.O.M.

3M

1R+3C 1R+3C

1E

Thrust Bearing Assembly Drawing with B.O.M.

4M

1R+3C 1R+3C

1E

Journal Bearing Assembly Drawing with B.O.M.

4M

1R+3C 1R+3C

1E

Seal Assembly Drawing with B.O.M

3M

1R+3C 1R+3C

1E

Rotor Lateral Vibration Analysis

3M

1R+3C 1R+3C

1E

10 Rotor Torsional Vibration Analysis

3M

1R+3C 1R+3C

1E

11 Goodman Diagram

3M

1R+3C 1R+3C

1E

12 Cambell Diagram

3M

1R+3C 1R+3C

1E

13 Purchasers Connection List

2M

1R+3C 1R+3C

1E

14 P&ID Diagram for Speed Governor and Control Oil System

3C

2M

1R+3C 1R+3C

1E

15 P&ID Diagram for Machine Condition Monitoring System

3C

2M

1R+3C 1R+3C

1E

16 P&ID Diagram for Steam Flow

3C

2M

1R+3C 1R+3C

1E

17 Steam Turbine Outline Drawing with List of Connections

3M

1R+3C 1R+3C

1E

18 Piping Specification and line List

3M

1R+3C 1R+3C

1E

19 Interconnecting Piping Plan Drawing

2M

1R+3C 1R+3C

1E

20 Interconnecting Piping Isometric Drawing with B.O.M.

3M

1R+3C 1R+3C

1E

21 Foundation Design Information Including Loading Data

2M

1R+3C 1R+3C

1E

22 Allowable Nozzle Forces and Moments

2M

1R+3C 1R+3C

1E

23 Control Oil System Component Drawing and Data

4M

1R+3C 1R+3C

1E

24 Steam Turbine Gland steam System Component Drawing and Data

4M

1R+3C 1R+3C

1E

25 Instrument Data Sheets

3M

1R+3C 1R+3C

1E

26 Instrument Drawings

4M

1R+3C 1R+3C

1E

27 Function and logic Diagram

3M

1R+3C 1R+3C

1E

28 Control Panel Sequence Drawing

4M

1R+3C 1R+3C

1E

29 Control Panel Drawing

4M

1R+3C 1R+3C

1E

30 Pneumatic Hook-up Drawing

4M

1R+3C 1R+3C

1E

31 Electrical Hook-up Drawing

4M

1R+3C 1R+3C

1E

32 List of Electrical / Intrument Connections

4M

1R+3C 1R+3C

1E

33 Fiel Instruments / Junction Boxes Layout Drawing

4M

1R+3C 1R+3C

1E

34 Junction Box Wiring Diagram

5M

1R+3C 1R+3C

1E

35 WPS and PQR with Welding Map


36 Code Vessel Mechanical Calculations

2M

1R+3C 1R+3C

1E

2M

1R+3C

1R+3C

1E

37 Pressure Vessel Drawings

3M

1R+3C

1R+3C

1E

38 Heat Exchanger Drawing

3M

1R+3C

1R+3C

1E

FORM 0132100ABG40005 Issue. 0 03/07/02